ML20149E813

From kanterella
Jump to navigation Jump to search
Informs That Rev in Requirements for Prompt Notification in 10CFR20 Needed
ML20149E813
Person / Time
Issue date: 07/27/1994
From: Congel F
Office of Nuclear Reactor Regulation
To: Thadani A
Office of Nuclear Reactor Regulation
Shared Package
ML20149C780 List:
References
FRN-61FR52388, RULE-PR-20, RULE-PR-32, RULE-PR-35, RULE-PR-36, RULE-PR-39 AF46-1-005, AF46-1-5, NUDOCS 9408080085
Download: ML20149E813 (1)


Text

c <

  1. Al 2 71994 MEMORANDUM FOR: Ashok C. Thadani, Associate Director . G f * // l for Inspection & Technic:.1 Assessment i

FROM: Frank J. Congel, Director Division of Radiation Safety g-and Safeguards j '

SUBJECT:

REQUEST FOR RULEMAKING - 10 CFR PART 20 NOTIFICATIONS -

In consultation with representatives of NMSS and AE00, we have determined that ANM a revision in the requirements for prompt notification in 10 CFR Part 20 is needed. The background for this de' termination is provided in the enclosed documents, as follows:

Enclosure 1 notes current inconsistencies and suggests that the requirements be changed so that licensees are required to provide the  :

prompt notifications only to the NRC Operations Center. )

Enclosure 2 provides AE00 agreement with the NRR suggestion.  ;

Enclosure 3 provides NMSS agreement with the NRR suggestion.

Please transmit this request for a rule change to RES.

i Original signed by Frank J. Con;ci I

Frank J. Congel, Director

/ Division of Radiation Safety and Safeguards

Enclosures:

As stated ,

Contact:

John Buchanan, NRR (301) 504-3184 Distribution:

Central Files PRP8 R/F PRPB S/F, PART 20 FCongel PMcKee REmch LJCunningham JWigginton TEssig JBuchanan RAnderson, TTC FCombs KBrockman DCool JJoyner, RI 0FC R d h :NRR RPhpSS:NRR RPB;4ftSS:NRR D:DRSS:NRR /q)

NAME N chan [ JWdnton ,LJCMkgham FJCongel ')Y /

DATE 07/2994 07/2894 07(l 94 07/7//94 0FFICIAL RECORD COPY 'lO k.

DISK \ DOCUMENT NAME: G:\THADANI.MMO

_