$*d*@ Electric 0 Gas Company Den A. N Columt a 29218 Nuclear Operations SCE&G Febru ary 27, 1986
= - '
Dr. J. Nelson Grace Regional Administrator U.S. Nuclear Regulatory Commission Region II, Suite 2900 101 Marietta Street, N.W.
Atlanta, Georgia 30323
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 APPENDIX R REANALYSIS
Dear Dr. Grace:
We are enclosing a summary of our progress and efforts to address the findings from the June 3-7, 1985 Appendix R Audit as transmitted in your Report No.
50-395/85-26. The summary is presented in the fann of two tables, an audit Open Items Status table as enclosure #1 and an updated Schedule of Modification Implementation table (Rev. I to table 14 enclosed in September 4,1985 letter) as enclosure #2. These tables provide a cross reference for the audit report, our submittals to NRR, on-going modification work, due dates and the current sta tu s.
Please note that Rev. I to Table 14.0 from our Sept. 4',1985 letter to Harold R.
Denton contains a date slippage. The seventh line entry titled " Upgrade Chiller B Control Transfer Switch" had an original estimated completion date of 3/1/86.
This date is now estimated to be 3rd Refueling (2nd Qtr.1987).
The engineering work for this modification is near completion and all materials are on site but the complexity and the difficulty of installing the modification while online has caused us to extend completion of the modification. The delay in implementation has a negligible impact on risk to the public since the compensating actions of a functionally equivalent jumper procedure and a special roving fire watch will remain in effect until the modification is complete.
Any questions you may have concerning this information should be directed to Mr.
Hal Donnelly or Dr. James Barker at (803) 345-2201, ext. 4154, 1
rytr9yyrs,
.N man JHB/ DAN /mec Enclosure cc:
V. C. Summer C. L. Ligon (NSRC)
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
R. M. Campbell E. H. Crews, Jr.
K. E. Nodland E. C. Roberts R. A. Stough W. A. Williams, Jr.
G. O. Percival Group Managers R. L. Prevatte
- 0. S. Bradham J. B. Knotts, Jr.
D. R. Moore I&E Washington C. A. Price NPCF File 15.1360 pePSER 8%88$p F
v.,
t-Appendix R Fage 1 cf 2
~
OPUI ITE M STAftIS Encloeuro #1 to litter from 2-27-86 D. A. Neuman to J. N. Grace dated February 27, 1986
\\
Comment Item Due Date
Response
85-26-01 Sept. 4 Letter to H.R. Denton Method of Analysis & safe shutdom phllosophy Sectione 2,3,4,5,7,B,9,10 (Currently under NRC evaluation, no SCE&G action at this time.)
Seht. 4 Letter to H.R. Denton Local control and spurious operation 85-26-02 Sections 5,6,8 (Currently under NRC evaluation, no SCE&G action at this time.)
May 29 Letter to H.R. Denton Modification and Deviation Requests Sept.16 Letter to H.R. Denton PORY Modification Nov. 1 Letter to H.R. Denton T
hot cold MF-20784,20785,20786,20788, See Rev. I to Table 14.0 of Sept. 4 Letter 20789.20790.20791.20801.20896 (enclosure #2 to this letter) 6 85-26-03 let Qtr. 86 MF-31971 Wrap tray 3088, field installation almost complete (will meet date) a
(
85-26-04 let Qtr. 86 MF-31968 Protect NI-31, 32, work now in field (will meet date) 85-26-05 Supplemental Coordination (Study coglete, and ready for closure)
Study 85-26-06 Report Report on charging pump protection is under development. Estimated issue 07-01-86.
85-26-07 Sept. 4th Letter to H.R. Dentor Common enclosure. (Currently under NRC eval-Section 9 untion, no SCE&G action at this time.)
85-26-08 Sept. 4th Letter to H.R. Dentor Procedure changes and Information Notice 84-09 Section 11 (Currently under NRC evaluation, no SCEAC action at this tfUus.)
i FEP 1.0 Rev. 4 Estimated issue 4-1-86 i
FEP 1.1 Rev. O Estimated issue 4-1-86 4th Qtr. 86 NF 20579 Level indication for RWST i
-h 85-26-09 Sept. 4th Letter to H.R. Dentor Timeline Questions (Currently under) NRC eval-Section 12 untion, no SCE&G action at this time.)
l l
l l
i
. _ ~ _ -.
=
Appendix R Page 2 of 2 W DI 170 5 STATU5 Enclosure #1 to letter from 2-2746 D. A. Neuman te J. N. Grace dated February 27, 1986 i
Ites Due Date
Response
Comment 85-26-IC Sept. 4 Letter to H.R. Denton Cold shutdoom (Currently under NRC evaluation, I
Section 12 no SCE&G action at this time.)
Jed Qtr. 86 Issue FEP 2.X Series Weiting completion of engineering analyele, some preparation underway.
i j
85-26-1]
Verify Training on all FEP's Will be done after FEP 2.X series are 4
]
developed.
i 85-26-12 Sept. 4 to H.R. Denton, Sectinr Emergency lighting (Currently under NRC eval-13 uation,' no SCE&G action at this time).
i 1
2nd Qtr. 86 Mtr 20840 Install additional lighting units.
-on schedule.
f l
85-26-1]
Repair Fire Barrier Work le complete.
85-26-14 Repair raceway wrap Work le complete.
[
~I
.t 85-26-15 Fire barrier support study.
Report le complete.
85-26-Id Sept. 20 to H.R. Denton
".T Board Letter Dec. 30 to H.R. Denton Clarification Letter (Currently unoer NRC f
evaluation. no SCE&G action at this time.)
Fire watch log corrected and SCE&G actione couplete.
85-26-11 3
special report written.
Other 2nd Qtr. 86 Rewrite FPER On schedule.
l NRC 2nd Qtr. 86 Upgrade 023 drawings Required for FPER, on schedule.
NOTE: Enclosure #2 to this letter contains additional information related to modification status.
l
TABLE 14.0 Pcgo 1 of 2
,freo Rav. 1 Enclocuro #2 to Icttor D. A. N uccn to J. N. Greco-V.
C. SUMMER NUCLEAR STATION dated Februar y 27, 1986 SCHEDULE OF MODIFICATION I MP L E ME N T A T I ON ESTIMATES" NRC AUDIT MRF SCE&G t
SUMMARY
Of REPORT DESCRIPTION OUTAGE ENGR.
MATERIAL CONST.
C OMP E NS A T ORY ITEM f REQ.
COMPL.
DELIVERY C O MP L. DATE ACTION MRF f DATE DA TE 375/85-26-02 Add 2nd power disconnect for Yes 4/86 4/86 3rd Re fueling Interim Wire Cutting Procedure Para. 5.a(1)(a) air operated valves 20784 (2nd Qtr.'87) thru 5.a(1)(e) 395/85-26-02 Add Thyrite protectors to No C o mp l e t e Complete 4/86 Roving Fire Wa t e'>
Para. 5.a(1)(g) current transformers 20785 496/85-26-02 Add Fire Switches to 480V Yee 4/86 4/86 3rd Re fueling Interin Jumper Procedure Para. 5.a(1) switchgear 20786 (2nd Qtr.'87) l 375/85-26-02 Upgrade DC-8 Controls Yes Co mp le t e C o mp l e t e Co mp le t e Para. 5.a(1)(f) 20788 375/85-26-02 Add fire Switch to 7.2kV Yes 3/86 3/86 3rd Re fueling Interim Jumper Procedure Pera 5.a(1) switchgear 29789 (2nd Qtr.'87) 395/85-26-02 Upgrade Fire Switch for S.W.
Yes 7/86 11/86 3rd Re fueling Roving Fire Watch Pere 5.a(1)
Pp.
"B" and add Fire Switch (2nd Qtr. ' 87) for C.C. Pp.
"B" 20790 395/85-26-02 Upgrade Chiller B Conte.
Yes 4/86 Co mp le t e 3r d Re fuelin Interin Jumper Procedure Pora. 5.a(1)
Transfer Switch 20791 (2nd Qtr."87 395/85-26-02 Armor cables for solenoid Yes 10/19/86 10/19/86 3rd Refueling Interim Wire Cut ting Procedur e Pers. 5.a(1)(a) valves (see also 20784)
(2nd Qtr.'87) cnd 5.a(1)(e) 20800 M7H To be 395/85-26-02 Change RC Loop T /T Yes cumpleted 2/87 3rd Re fueling Operational Procedure h e Para 5.a(1)(h) instrumentation to one power as a (2nd Qtr.'87) train per loop 20801 resolution to RG 1.97 issues (9/86)
- Thoce are tentative and subject to change as detailed planning proceeds.
tA plant wide special roving fire watch remains in effect.
TABLE 14.0 (CONTINUED)
Pcgo 2 of 2 Rev. 1 Enclocuro #2 to lettor t g2C V.
C.
SUMMER NUCLEAR STATION D. A. N:uoen to J.
N. Grege SCHEDULE OF MODIFICATION IMPLEMENTATION dated Fcbru:r y 27, 1986 f
ESTIMATES
- NRC AUDIT HRF SCE&G t
SUMMARY
OF REPORT DESCRIPTION OUTAGE ENGR.
MATERIAL CONST.
COMPENSATORY ITEM #
REQ.
C O MP L.
DELIVERY C O MP L. DATE ACTION MRF #
DATE DATE 395/85-26-02 Renumber cables DGH21B and No Complete Co mp le t e Complete Perc. 5.a(1)(f)
DGM228 from tower cable spreading room 20788 395/85-26-12 Install additional self-con-No 4/86 Complete 2nd Qtr.'86 Existing Emergency Lighting tained emergency lighting Supplemented by Hand Held units 20840 Lighting 395/85-26-04 Protect conduite for NI-31/
No Co mp let e Complete let Qtr.'86 Rowing Fire Watch NI-32 or install transfer switch for NI-33 31968 395/85-26-08 Additional of direct reading No 9/86 9/86 4th Qtr.'86 Raving Fire Watch level gauge for RWST 20579 395/85-26-05 Revision of power circuit Yes Co mp le t e Complete Complete breaker overcurrent settings for coordination 20846 395/85-26-02 Add fire switches to 480V Yes 9/86 10/86 3rd Re fueling Interim Jumper Procedure MCC's, XFN-45A-AH, XFN-45B-(2nd Qtr.'87)
AH, XFN-46B-VL, XFN-80B-VL l
20896 395/85-26-03 Wrap Tray 3088 31971 No Conplete Co mp l e t e 1st Qtr.'86 Roving Fire Watch 395/85-26-16 Upgrade S W B Pp 45A barrier No 3/86 4/86 2nd Qtr.'86 Roving Fire Watch (supports) 20895 395/85-26-02 Change M.S.
PORV control logic No 9/86 N/A 4th Qtr.'86 Interim Wire Cut ting Procedur e to pre-1980 design (IPV-2000, 2010, 2020-MS)
Upgrade the FPER No 6/86 N/A 2nd Qtr.'86
- Thoce are tentative and subject to change as detailed planning proceeds.
tA plcnt wide special roving fire watch remains in effect.
i C