Text
/"p se%
'c UNITED STATES
{
- f ;^,
l' NUCLEAR REGUL ATORY COMMISSION YI w4mmcroN. o. c. 20sss e
'4,,,,,/
February 12, 1986 Docket No. 50-219 LICENSEES:
GPU Nuclear Corporaticn Jersey Central Power and Light Company FACILITY:
Oyster Creek Nuclear Generating Statfor,
SUBJECT:
DECEMBER 1985 PROGRESS REVIEW MEETING ON LICENSING ACTIONS On Wednesday, January 22, 1986, at NRR Headquarters in Bethesda, Maryland, a meeting was held with GPU Nuclear (the licensee) to discuss the status of station Iicensing actions. Attachment 1 is the list of the individuals that attended the meeting. Attachment 2 is a copy of the material presented by the Staff at this n,eeting. The following is a sumary of the significant items discussed acd the actions taken or proposed. is a marked up copy of the staff's Licensing Acticns Report (LAR) dated December 24, 1985 for Oyster Creek, The riarkup, to update the LAR, resulted frort the discussion on each item in this meeting. The status of each item is given in the column "SCT0ADTE" on the right-hand side of the LAR sheet. The status in that colutn is the folicwing: "01" means licensee, "02" means staff's reviewer, *03" means staf f's project manager, "04" means actico ccapleted and "05" means staff's project manager has licersing action in concurrence.
1.0 Oyster Creek Station Technical Specifications (T_S).
The staff stated that it is having the TS retyped. These retyped TS are now expected to be sent to the licensee by letter in March 1986.
The letter will request the licensee to review the TS and respond by letter confirming these TS are correct and should be reissued as typed.
2.0 Future Meetinas The licensee requested a meeting on the afterncon of February 12 or 13, 1986, on the integrated living schedule for Oyster Creek. Generic Letter 85-07 dated May 2, 1985, was issued by NRC on this subject. A meeting has been set up for the afternoori of February 12,1986, at hRR Headquarters, P-114, Phillips Building, 7920 Norfolk Avenue, Bethesda, Maryland.
3.0 Updated hRR Licensing Actions Peport (LAR) Dated 12/24/85
_ has the updated LAR for Oyster Creek. The updating was done during the discussion on each licensing action in this meeting.
The licensing actions are Ifsted by TAC number (left hand column of LAR).
8603030400 060212 PDR ADOCK 05000219 P
2-4.0 Future Licensee Technical Specification Change Requests (TSCR)
The licensee is planning to propose the following iSCR soon:
(a) Excess Flow Check Valves: The TS require the licensee to verify that these valves are open but do not provide criteria for determining this. The TSCR will propose criteria. This is needed before the restart from Cycle 11R outage.
(b) Diesel Generator Batteries: The TS require twelve 2-volt cell batteries and the licensee wants to install two 12-volt cell batteries. The licensee needs it as soon as the staff can review the TSCR because the licensee has found out that it cannot purchase replacement batteries that meet the TS.
(c) Diesel Generator Loading: The TS require loading the diesel generators during normal surveillance. The TSCR will request not loading the diesel generators in certain cases to provide additional assurance the diesels are available for an accident during certain conditions. The licensee will request review within 2 months of the TSCR submittal.
(d) Rod Worth Minimizer (RWM): The licensee is installing a new RWM in the Cycle 11R outage because of problems experienced with the present system. The TSCR will request a change to allow startup without a RWM and with appropriate administrative controls in case the new RWM is not operational before the restart from the outage. The licensee will need it before the restart from the Cycle 11R outage.
5.0 Request For Information The licensee stated on page 4 of its letter dated Septenber 24, 1985, that deletion of the TS requirement for a drywell-to-torus differential pressure has eliminated the need to open the large containment vent and purge valves following the vacuum breaker operability test. The staff requested the redaction in the amount of time that the licensee would be operating with the large containment purge and vent valves open because of the deletion of the above TS requirement.
6.0 Hydrogen Water Chemistry Test The licensee stated that tests on adding bydrogen to the reactor coolant water were run on Friday and Sunday, January 17 and 19,1986, respectively.
7.0 Minor Changes for the TS The licer:ee pointed out minor errors on TS page 3.5-7, containment is misspelled "contaiment" in reference (9), and TS page 4.5-10, the state-rent Amendment No. was listed twice on the bottom of the page and the one without any numbers should be deleted from the page.
1 l
FEB 121986 l
- 8.0 High Priority Licensing Actions Attachnent 3 is a list of the high priority licensing action:. These were taken fron the overall list of licensing actions in Attachment 2, r
9.0 Overall Status of Licensing Actions is the overall status of licensing actions.
10.0 Next Meeting The January 1986 Progress Review Meeting will be held at the Oyster Creek Station site in For ed River New Jersey, on February 20, 1986.
1
&WW b..
- r., Project Manager l
( BWR Project Di torate #1 Division of BWR Licensing Attactnents.
1.
List of Attendees 2.
Staff's Updated LAR 4
3.
High Priority Licensing Actions 4.
Overall Status of Lwensing Actions cc:
R. Bernero i
R. Houston i
J. Zvalinski
- 6. Laints 8.0. Liaw i
W. Hodget G. Hub?an i
M. Sririivasan i
- 0. Vassallo C. Grimes i
i DISTRIBUTION
- 7. Docket file --
i j
NRC~PDR Local POR BWD#1 Reading OC File OELD t
EJordan BGrimes i
JPartlow JDonohew CJamerson A S(10) g DBL:PD#1 i
J ohew:tm JZwolinski g /
86
& /g /86 i
. ~ -. -.-._.
j'
~.
- j. 4 j
8.0 high Priority Licensing Actfors i 15 a list cf the high priority licensing actions. These.
were tcken from the overall list of licensing actions in Attachment 2.
i 9.G Over.all Status of Licensing Actions
- is the overall status of licensing actions, i
10.0 Next Meeting
\\
The January 1955 Progress Pevfew Meeting will be held at the Oyster i
Creek Statioti site in Forked River, New Jersey, on February 20, 1986.
-l O
_l k D vig[vi ww U 1
ack N. Donchew, Jr., Pi ect Manager i
@W2 Froject Directorate #1 Ilivision of BWR Licensing Attachment, i
1.
List os Attendees
}
2.
ft.aff's Updated LAR j
3.
High Priority Licensing Act, ions 4.
Overall Status of Licensjng Actions cc:
R. Bernero j
R. Houston J. Iwolinski i
G. Laines l
B.D. Liaw W. Hodges 4
G. Hult,an M. Srinivasan D. Vassallo i
C. Grimes i
i f
i i
t t
i 4
4 I
4 i
cc:
G. F. Trowbridge, Esquire Resident Inspector i
Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W.
Post Office Box 445 Washington, D.C.
20036 Forked River, New Jersey 08731 J.B. Liberman, Esquire Comissioner Bishop, Liberman, Cook, 4:t al.
New Jersey Department of Energy 1155 Avenue of the Americas 101 Comerce Street hew York, New York 10036 Newark, New Jersey 07102 Eugene Fisher, Assistant Director i
Regional Administrator, Region I Division of Environmental Quality U.S. Nuclear Regulatory Comission Department of Environmental i
631 Park Avenue Protection i
King cf Prussir, Pennsylvania 19406 380 Scotch Road Trenton, New Jersey 08628 i
i BWR Licensing Manager P. B. Fiedler GPU Nuclear Vice President & Director
]
100 Interpace Parkway Oyster Creek Nuclear Generating i
Parsippany, New Jersey 07054 Station Post Office Box 388 l
Deputy Attorney General Forked River, New Jersey 08731 l
State of New Jersey Department of Law and Public Safety i
36 West State Street - CN 112 i
l Trenten New Jersey C8625 Mayor
{
Lacey Township 818 W$st Lacey Road Forked River, New Jersey 08731 i
j D. G. Holland Licensing Manager l
l Cyster Creek Nuclear Generating Station i
Post Office Box 388 Forked River, New Jersey 08731 l
i 1
I e
i i
t
?
)
t l
i
Attachtrent 1 MEETING January 22, 1986 Name Affiliation K. Tosch NJBRP*
J. Donohew NRC/NRR/ DBL M. Laggart GPUN#
J. Rogers GPUN J. Riesland Public
- State of New Jersey Bureau of Radiation Protection
- GPU Nuclear Corporation
O 9
0 O
ATTACHMENT 2 e
k
l e
R-1208673-REGULAT0RY INF0RMA N
TRACKINO 5Y5 TEM t.
NO.s 41
- BIVISION OF LICENSING RUN DATES 12/24/85 LICENSING ACTION 5 REPORT (HEAD 90AR TERS)
~
FACILITY: OYSTER CREEK 1 PLANT LOCATION: 9 MI 5 0F TOMS RIVER, NJ LICENSED P0HERs 1935 MNT PROJECT MANAGER: J. DONOMEN 4
DOCKET NUMBER: 850-80219 DESIGN POWER:
0650 MNE BRANCH CHIEF:
J. 2HOLINSKI e'
ARCH / ENGINEERS 54R NS$5 VENDORS GE LIC. ASSISTANTS C. JAMERSON IE INSPECTOR:
W. BATEMAN T
SC e-MULTI Y
P RAI 10 1
TAC PLANT INIT P
NOTICE R
REV
RESPONSE
NUMBER ACTION Mig g
EXPIRES 1 DEN REVIEMER RAI DATE DATE TER DATE DATE DATE COPW1ENTS If.
e munu ACTIVE ACTIONS nunu I
M08188 A-32 07/11/78 A 03/38/85 3 SHD1 DOM 0 HEN b
O ACTION ITEMS OYSTER CREEK - APPENDIX I TECH SPEC IMPLEMENTATION REVIEN OI 4
l w9gp99pggP*
31 BNPS MEINKE 06/26/85C ACTION ITEM: OYSTER CREEK - ptECHANICAL SNUBBERS IIf k U d Y
O M08439 3-22 88/38/78 A
- eme***9*
2 BHER SHAN
- -- L J 88/30/85
"-. REGION I, L BND1 DON 0 HEN
-- SHOLLY W REG 1 CAPHTON r
REG 1 MAVERKAMP ut2/28/36u
(
REG 1 GREGG REG 1 J0MN50N we2/28/86u r
j ACTION ITEMS OYSTER CREEK - MYDRAULIC SNUBBERS 1' i L
01 Me844e 3-17 08/30/78 A geswouwP 3 SHER SHAN
$4/30/85 N REGION I, p
BND1 DONOMEN SHOLLY e
REG 1 CAPHTON REG 1 HAVERKAfF W82/28/84u REG 1 GREGO REGI JOHNSON u S2/28/gu g
ACTION ITEM OYSTER CREEK - FULL TERM OPERATING LICENSE M11268 03/96/72 A 1 SND1 30 NOMEN 99/91/86T 83 PBSS MICHAELS 86/07/85X ACTION ITEM: SYSTER CREEK - INSERVICE TESTING (IST) 0, ggt
- M11278 84/08/76 L 1 50EI CHERNY 32 g
^
D MEN N
u
_ACTIcet ITEM: OYSTER CREEK - LONG TERM REVIEW CONTAINMENT PURGE AND VENT (B-243 Olh/hT ef
-M42613 3-24 11/29/78 L 1 PAPS SHAPAKER 89/24/85C 04/25/84C ^-
HION PRI F -
l s
C r.
"e
- m.ta o.. m u p m e m sW.s.=.
a....,
e R-1208673-R E O tl L A T 0 R Y INF0RMAT TRACKINO SY$ TEM P.
NO.s 42 DIVISION OF LICENSING LICENSING ACTIONS REPORT RUN DATE: 12/24/85 (HEADGUARIERS)
FACILITY OYSTER CREEK 1 r
T s
MULTI Y
NOTICE R
REV
RESPONSE
M12t1313 ACTION IlAIZ E
EXPIRES 1 CED3 EEVIENER RAI DATE DATE TER DATE DATE DATE COP 99ENTS 11 s usuu ACTIVE ACTIONS wung (CONTINUATION)
PBER HRIGHT r'
12/21/84X OR CYC IIR SHD1 DONONEN PADI FAIRTILE 04/25/84C Q f
ACTION 11EM: OYSTER CREEK - MASONRY HALL DESICW. ItESPONSE TO IE BULLETIN 80-11 M^ a ~.
8 M42914 3-59 85/08/88 L 2 SDRR Ch3ESHI 08/94/85C 11/22/85C s
CLE XI O BWD1 DOMCHIN UTAGE
('
ACTION ITEM: OYSTER CREEK - SAFE 1Y CONCERNS ASSOCIATED NITN PIPE BREAKS IN THE BNR SCRAM SYSTEM otM _
T or M43717 B-6 5 06/66/82 L 2 PBPE NERMIEL 81/08/82X ::
END OUT O -.84 SHDI DOM 0 HEN TOSS ECCLESTON ENERIC SE 05/10/85X SWPS CHANDRA5EKAR 11/02/84C ACTION ITEM: OYSTER CREEE 1 - PROCEDURES GENERATION P4CKAGE REVIEW (NUREO 0737 SUPP/t 3 M44124 F-OS L
1 SDD0 SHEPE N 07/30/86 10/31/85C 06/30/86 05/03/85X 03/3E/87T
-02 BNDt DONOHEN PSIA DELISO 02/28/87 ACTION ITEM:
k OYSTER CREEK - NURE0 e737 III. A.1.2, TECHs ICAL SUPPORT CENTER N
02 [
M45967 F-63 L
1 DND1 DONOMEN
/86T CONF. ORDE R 6/12/84 ACTION ITEM: OYSTER CREEK - NUREG-t?37 III.A.1.2, OPER4TIONAL SUPPORT CENTER O SO I~
M46038 F-64 L
1 BNDt DONot*EN
/86T CONF. ORDE 02 V R 6/12/84 L
_ ACTION ITEM: OYSTER CREEK - WURE0-873? III. A.1.2, IMER0ENCY OPERATIONS FACILITY OfM M*6110 F-63 L
1 DND1 DONOMEM m 86T CONF. ORDE 02 [
R 6/12/84 v
ACTION ITEM: OYSTER CREEE - NUREG-8737 III.A.2.2, METEOROLOGICAL DATA UPCRADE O
M44326 F-6 8
' L 1 BWDI PONOMEN PERS SPICKLER 867 02 PAD 3 NEIGHBOAS 0?/07/85X til
%d
^
Ill p
^
n R-12tS673-951 REOULATCRY INF0RMAiION TRACKINO 3YSTEM PAGE NO.s 43 e
DIVISION OF LICENSING LICLMSING ACTIONS REPORT RUN DATE: 12/24/85 (HFADQUARTERS)
F FACILITY: OYSTER CREEK 1 T
e MULTI Y
MOTICE R
REV
RESPONSE
!8211 G fLCllE Ill{
g EX* IRES 1 ERG REY 1GG RAI DATE
_ RAIL, IER DATE DATE n w ait N ACTIVE ACTIONS NENE ICONTIN'JATION)
DATE C0tW9EMTS 11 ACTICH ITEM CYSTER CREEK - RUREG-8757 III.D.3.4. CONTROL ROOM HA8!TABILITY
- - - -[ CYCLE 11/1 /
e3 1846466 F-78 L
1 EWOf 2 0 MEN 0/85C 50RI READ 02 V,
PARS DEMPSEf 04/05/85X 2 OUTAGE 11/30/85 PAPS GUAY 12/13/85X 3
SNPS CAMPE 07/30/85C ACTION ITEM: CYSTElt CREEK - HIND LOADS y M49392 1Cs01/82 L 1 HFMT PERSINKO 10/31/84C 07/05/85X IPSAR 4.3.
02 V e
/
BND1 DON 0 HEN 07/29/83 1-7 PRIA MCKENNA 87/31/85 PBSS MICHAELS 06/07/85X y
PBIA CHEN 12/30/85 g
ACTIDM ITEM CTSTER CREEK - TL*RNADO MISSILE FAMAGE M493T4 13/31/82 L ~
1 BWD1 DCNOMEN ST/05/85C 94/29/83 IPSAR 4.6.
P2 V g f
PBSS MICHAELS PARS MILSON 06/07/85X 1,2,4 SNPS HULMAN 04/ 05/85X 10/30/85 ACTIDM ITEM: OYSTER CREEK - TURSIME MISSILE N
M49595 10/81/82 L 1 SWO1 DONONEW 85/31/83
--- ^-
IPSAR 4.7 82 PBSS MICHAELS 06/07/85X s
ACTION ITEM: OYSTER CREEK - EMEW0ENCY CONDEMSER ISOLATIDM O
l M49397 18/01/82 L 1 BND1 DON 0 HEN M/A 93/31/83 86T IPSAR 4.10 02 V g
/
PSIA 30VLE PRIA MCKENNA 12/30/85 (2) 94/27/84X PESS MICHAELS 86/07/85X ACTION ITEM: OYSTER CREEK - SEISMIC DESIGN s
7%9398 10/01/82 L 1 BND1 DONOMEM 96/11/85C 01/31/84 84/30/86T C,A g { 02 //
PRIA CHENG PDSS MICHAELS 03/30/86 Y$h PRIA M'RENNA 06/07/85X IP5Mt 4.y O
O R-1208673.
REOULAT0RY INF0RMAT\\
N TRACKINO 5YSTEM P.,
NO.
44
- DIVISION OF LICENSIMO RUN DATE: 12/24/85 LICEN3ING ACTIONS REPORT (HEADQUARTERS)
~
FACILITY: OYSTER CREEK 1 T
SC MULTI Y
P RAI TO
~
TAC PLANT INIT P
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT AD NUMBER ACTION DAIE E
EXPIRES 1 QRfdl REVIEMER RAI DATE DATE TER DATE DATE DATE -
C0ff9ENTS 11 3
NNNN ACTIVE ACTIONS MNNN (CONTINU4 TION) r=
ACTION ITEM OYSTER CREEK - DESIGN CODES AND STANDARDS
_[
s M49399 10/01/82 L 1 HFMT PERSINKO 06/28/84C 06/07/85 07/05/85X IPSAR 4.12 82 Y r' HFMT CHALINA 06/22/84X BND1 DOH0 HEN 07/29/83 PRIA MCKENNA 04/27/84X g
PBSS MICHAELS 06/07/85X r-ACTION ITEMS OYSTER CREEK - LEAKAGE DETECTION O
s M49401 10/01/82 L 1 BND1 DON 0 HEN 08/23/85C 01/31/84 - " ^
IPSAR 4.16 PBIA MCKENNA 04/27/84X PBSS MICHAELS 06/07/85X N ACTION ITEM: OYSTER CREEK - HATER PURITY SPECIFICATION M49404 11/01/82 L 03/30/85 1 BA* DI DON 0 HEN 09/18/84C 11/21/85C *99P99P4PM* IPSAR 4.20 v
PBIA MCKENNA 04/27/84X PBSS MICHAELS 06/07/85X k\\M
~ e ACTION ITEMS OYSTER CREEK - NEUTRON MONITORING ISOLATION h
M49408 12/01/83 L 1 BND1 DON 0 HEN 02/28/83 eMustene66= IPSAR 4.27 01 ORBH SCHOLL 11/06/85X (1)
PBSS MICHAELS 06/07/85X PRIA GRIMES ACTION ITEM: OTSTER CREEK - BATTERY STATUS ALARMS b
h "3
7 M49410 12/01/83 L 1 BND1 DON 0 HEN 02/28/83 IPSAR 4.32 01 ORBH SCHOLL 12/06/85X PBIA GRIMES
'~
'21... h ACTION ITEM: OYSTER CREEK - PRIMARY COOLANT ACTIVITY M49412 12/01/83 L 03/30/85 1 BND1 DON 0 HEN 01/31/84 PSAR 4.36 St
~
PBSS MICHAELS s
06/07/85X ACTION ITEM: OYSTER CREEK - MAIN STEAM ISOLATION VALVE MAINT.
M49413 12/01/83 L 1 BMD1 DON 0 HEN 09/12/85C 01/31/84 PSAR 4.38 02 PBSS MICHAELS 86/07/85X
.yso/ur v
be
^
m
.)
R-1208673-001 REOULAT0RY INF0RMATION TRACKINO SY$ TEM PAGE NO.s 45 8
DIVISION OF LICENSING RUN DATE: 12/24/85 LICENSING ACTIONS REPORT (HEADQUARTERS) f%
FACILITYs DYSTER CREEK 1 T
SC eg MULTI Y
NOTICE R
R EV
RESPONSE
NUMBER ACTION RAIE E
EXPIRES 1 REQH REVIEHER RAI DATE DATE TER D&lE DATE,
DATE COMMENTS If og NNNN ACTIVE ACTIONS NNNN (CONTINUATION) 1 ACTION ITEMS OYSTER CREEK 1 - INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT (RG 1.97)
Eb fjb8 hllRW.1 COM p7
!) M51115 A-17 04/04/83 L BND1 DON 0 HEN
=mperf5P99""*
^'
7:_
01 PBIA SHEA SOSI JOYCE JIIlfl(h6 ING 04/01/86 ACTION ITEM OYSTER CREEK 1 - I.D.2. SAFETY PARAMETER DISPLAY SYSTEM
()
M51265 F-09 04/04/83 L PADI MILLER e-gesagemeemus N/A seegneenus BND1 DON 0 HEN
~y PAFO LAPINSKY N12/30/8SN BHRS McC0Y SOSI JOYCE 11/17/85 ACTION ITEMS OYSTER CREEK - REVIEN FINAL ENVIRONMENTAL STATEMENT (FES) FOR POL /FTL CONVERSION E>
M52336 03/21/83 L BND1 DON 0 HEN 86T RETS COMP. 83 SOEI HICKEY PAFO SAMHORTH NEEDED t
ACTION ITEMS OYSTER CREEK - SEP ACTION ITEMS - IPSAR SUPPLEMENT TIA M52482 T007 X
BNDI DONOMEN
/30/86T IPSAR TIA 03 PBSS MICHAELS 06/07/85X ACTION ITEM: OYSTER CREEK 1 - ITEM 2.1 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - RTS COMPONENTS M52863 3-77 11/01/83 L BND1 DON 0 HEN 04/05/85 10/23/85C 11/30/86T 02 PAEI LASHER 10/30/86
- ACTION ITEM OYSTER CREEK 1 - ITEMS 3.1.1 8 3.1.2 - POST MAINTENANCE TESTING PROCEDURES / VENDOR RECOMMENDATIONS RTS COMPONENTS 02y[
M52944 B-78 11/01/83 L BND1 DON 0 HEN REOS HAVERKAMP
?! T T T REGION I N02/28/86N RE01 SILK 0 09/30/85 REGI JOHNSON N02/28/86N REGI SCHUMACHER ACTION ITEM: OYSTER CREEK 1-ITEM 3.1.3 -POST-MAINT TESTING-CHANGES TO TECH SPECS-RTS COMPONENTS
,M53025 3-79 11/01/83 A BHD1 DON 0 HEN 04/05/85 10/23/85C 07/30/86T 02 PAEI LASHER 06/30/86 W
M.
f- *
. 'S R-1208673-0 REOULAT0RY INF0RMAT TRACKIN0 SYSTEM PA.
.0. 8 46 e
s DIVISION OF LICENSING LICENSING ACTIONS REPORT RUN DATE8 12/24/85 (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 es '
T-MULTI Y
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT AD 10 74 NUMBER ACTION R&lE E
EXPIRES 1 DEEH REVIEHER RAI DATE DATE TER DATE DATE DATE -
COMMENTS IE CMMM ACTIVE ACTIONS MMNN (CONTINUATION) 9 ACTION ITEM: OYSTER CREEK 1 - ITEM 1.2 - POST TRIP REVIEH-DATA AND INFORMATION CAPABILITY 11/01/84 L BHD1 DON 0 HEN
[
M53615 B-85 PAEI KRAMER 86T 027 r1 05/15/86 ACTION ITEM: OYSTER CREEK 1 - ITEM 2.2 - EQUIPMENT CLASSIFICATION AND VENDOR INTERFACE - ALL SR COMPONENTS M53698 B-86 11/01/84 L BND1 DON 0 HEN 04/05/85 10/23/85C 01/30/87T 02 75 PAEI LASHER 12/30/86
[
ACTION ITEM: OYSTER CREEK 1-ITEMS 3.2.1 8 3.2.2 - POST-MAINT TESTING PROCEDURES AND VENDOR RECOMMENDATIONS S q
M53781 B-87 11/01/84 L BNDI
- [ ELL SR COMPONENTS DON 0 HEN RE01 HAVERKAMP 02 REG 1 SILK 0 09/30/85 REOS JOHNSON RE01 SCHUMACHER ACTION ITEM
ACTION ITEM: OYSTER CREEK 1 - ITEMS 4.5.2 8 4.5.3 - REACTOR TRIP SYSTEM FUNCTIONAL TESTING - ALTERNATIVES 8 TEST INTERVALS [
M54008 B-93 11/01/84 L BNDI DON 0 HEN 04/05/85C 10/23/85C PAEI LASHER 06/30/86T 02,Y 03/31/86 gg ACTION ITEM: OYSTER CREEK 1 - ITEM 4.5.1 - REACTOR SYSTEM FUNCTIONAL TESTING - DIVERSE TRIP FEATURES h LIaf
/
M54091 B-92 11/01/84 L BNDI DON 0 HEN 08/09/85C E I 02 / tj RE01 HAVERKAMP RE01 SILKO N02/28/86N REGI JOHNSON 09/30/85 N02/28/86u RE01 SCHUMACHER
%r ACTION ITEM 8 OYSTER CREEK 1 - TECHNICAL SPECIFICATIONS COVERED BY GENERIC LETTERS 83-36, 83-37 FOR HUREG-0737;;. h 04h M54554 B-83 05/28/84 L 05/30/85 PADS PATEL e
01/15/85X BHD1 DON 0 HEN 11/22/85C h#
PBSS ERICKSON 04/04/85C
=
ORBH SCHOLL tur l
e Ill Od
^
n R-1208673-001 REOULAT0RY INF0RMATION TRACKINO SYSTEM PAGE R0.:
47 m
DIVIS10N OF LICENSING RUN DATE: 12/24/85 LICENSING ACTIONS REPORT (HEADQUARTERS) o FACILITY: OYSTER CREEK 1 T
SC n
MULTI Y
P RAI TO g
TAC PLANT INIT' P
MOTICE R
REV
RESPONSE
SE IMPUT LIC ACT AD NUMBER ACTION RAIZ g
EXPIRES 1 DRfdi REVIEMER RAI DATE DATE TER DATE DATE DATE fa!!MENTS IE ri MMMM ACTIVE ACTIONS MMMM (CONTINUATION) t ACTION ITEM: OYSTER CREEK 1 - I.D.1.2 DETAILED CONTROL ROOM DESION REVIEN
SUMMARY
REPORT - F-71
/
c5
) M56147 F-71 10/22/84 PSD6 NICOLARAS 04/05/85C 05/28/85 04/05/85X eessaogsopp 30/09/85 M HFIB RAMEY-SMITH 05/31/85C TO.
BND1 Df1N0 HEN BHEI RAMIREZ 06/07/85X ACTIDH ITEM 8 OYSTER CREEK - LICENSEE'S PROPOSED, CHANGES TO THE APPROVED ALTERNATE SAFE SHUTDOHN C5 M56740 01/22/85 BNDI DON 0 HEN 10/09/85C
_ :: ;,. HION PRIOR *)
PARS HILSON 04/05/85X ITY Y(
PAPS 00EL 07/11/85C j ACTION ITEMS OYSTER CREEK - RESPONSE TO IE BULLETIN 82 REACTOR COOLANT SYSTEM LEAKAGE M56754 10/22/84 11/15/85 BNDI DON 0 HEN 08/23/85C
]
ORPM CARUSD 07/12/85X -
^^r ACTION ITEM: OYSTER CREEK - EXEMPTIONS TO APPENDIX R - FIRE PROTECTION PROGRAM OF -
M56786 01/22/85 PBPE KUBICKI 10/09/85C 08/28/85C _
_..... HION PRIOR 49-BHD1 DOH0 HEN ITY ACTION ITEM: OYSTER CREEK - CHANGES FOR CLARIFICATION AND CONSISTENCY AMONG ACCIDENT MONITORING INSTRUMENT 0
M56918 02/11/85 05/30/85 BHD1 DON 0 HEN gg/09/85C -.-;
6 ACTION ITEM: OYSTEA CREEK - REMOTE MANUAL VALVES (VI-4)
/
M56951 10/01/82 BNDI DONOMEN 08/27/85C I SAR 4.22 82 /g q
PBIA MCKENNA
.2
" ACTION ITEM: OYSTER' CREEK 1 - MARK 1 DRY' ELL VACUUM BREAKERS, LICENSEE RESPONSE TO GENERIC LETTER 83-08 M
Y A
i M57161 D-20 03/20/85 BH31 DON 0 HEN 04/11/85 esenemmeSe T 1.
RAI -
81 dILA I
h
_MS,, ION ITEM: OYST,2,R CREE,K - EXTENSION TO 10,C.FR,50,.44(C)(3)(II)(3) - TMI ITEM,I,4,.E.4.1 eM580,5)O /
ACT E
I 58 24,8 BD 0NO.,
08 85C l
R-1208673-REOULAT0RY INF0RMAT TRACKINO
$YSTEM P.
40.:
48
~
DIVISION OF LICENSING RUN DATE: 12/24/85 LICENSING ACTIONS REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC i
3 MULTI Y
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT AD HUM 1f2 ACTION DAIE E
EXPIRf.1 1 DRQH REVIENER RAI DATE DATE TER DATE DATE DATE-COMMENTS IE g
NNNN ACTIVE ACTIONS NNNM (CONTINUATION)
I ACTION ITEMS OYSTER CREEK - EX ENSION TO CONF. ORDER DATED 3/14/33 - CONTROL ROOM HABITABILITY Y
s M57905 06/04/85 g
BND1 DON 0 HEN 03 ACTION ITEM: OYSTER CREEK - DISCREPANCY IN DRANINGS USED IN SEP REVIEN M.2 -
Y-Of s M58004 06/13/85 11HDI DON 0 HEN
"??" C ;;, 54,62
- _
- :- OUTSIDE DR --Se-r A
NA M
ACTION ITEM: OYSTER CREEK - OL 84 EXEMPTION REQUEST TO 50.44(C)(3)-RECOMBINER RULE M58018 07/13/84 BND1 DON 0 HEN 08/14/85C 2._D SEE M57758 02 1
BNPS KUDRICK N02/15/86N ACTION ITEMS OYSTER CREEK - NEN ANALYSIS OF MAXIMUM DRYMELL TEMPERATURE PRIOR TO LOCA U
/
M59052 07/02/85 BND1 DONOMEN 08/01/85C 11/22/85C edeettmee60==
[-
BNPS NOTAFRANCESC 08/14/85C
)
ACTION ITEM: OYSTER CREEK 1. 10 CFR 50.62 OPERATING REACTOR REVIENS M59122 A-20 06/28/84 BND1 DON 0 HEN 10/04/85C 86T ATHS GA RE 02 n
3 PBPE KENDALL SPONSE PARS KARSCH 11/01/85X PAEI MAUCK s ) =st ba-(
ACTION ITEM: OYSTER CREEK - POST ACCIDENT SAMPLING SYSTEM TECHNICAL SPECIFICATIONS Oh '
~
- e. g g M59281 06/14/85 09/28/85 BND1 DON 0 HEN M/90perP==
um0emm 6
s CTION ITEM: OYSTER CREEK - REVIEN OF DELAMINATION OF COATING FROM PIPING IN EMER0ENCY h
M59282 BNPS NITT BND1 DONONEN BNPS HULMAN 11/30/85 An_.
ACTION ITEM: 0YSTER CREEK - LIMITATION ON OVERTIME AS IDENTIFIED IN OL83-02 M59340 07/12/85 09/28/85 PAD 4 HOOD 08/02/85X 11/19/85 04 BND1 DONOMEN 11/19/85C e
v L
y lli
o s
.d a
R-1208673-001 REOULAT0RY ZNF0RMATION TRACKINO SYSTEM PAGE NO.s 49 r
DIVISION OF LICENSING RUN DATE8 12/24/85 LICENSING ACTIONS REPORT (HEADQUARTERS)
FACILITY: OYSTER CREEK 1 T
SC 3
MULTI Y
P RAI TO r-TAC PLANT INIT P
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT AD NUMBER ACTION RAIZ g
EXPIRES 1 DB9ff REVIEHER RAI DATE DATE TER DATE DATE DATE COMMENTS lE 3 mwww ACTIVE ACTIONS unum (CONTINUATION) p ACTION ITEMS OYSTER CREEK - EXEMPTION OF 10CFR50.41(C)(3)(III) - ISOLATION CONDENSER VENT T
g M59342 07/23/85 BNDI DOA0 HEN
^;J M&M48&same 01 g
g h
BHRS Sf0DGES 3 ACTION ITEM OYSTER CREEK - DEFERMENT OF NRC REQUIRED MODIFICATIONS FROM CYCLE IIR TO CYCLE 12R M59400 07/26/85 BND1 DONOMEN 11/20/85 mas S m. s m a
^^, -., ' g
-^ --
HIGH PRIOR Of BHER HESCOTT
-,.,or g g ITY SORI ELTAHILA g
g 11/29/85C
)
t.
ACTION ITEM OYSTER CREEK - EXPANDED SAFETY SYSTEM FACILITY STATUS OM]l[
M59663 03/11/85 BND1 DON 0 HEN
_ Osm1 M h j j
PAES BALLARD W -
meem49/86T 01 ACTION ITEM OYSTER CREEK - SCOPE CHANGE FOR RECIRCULATION LOOP INTERLOCK. II.K.5.19
[
/
M59758 09/19/85 BND1 DON 0 HEN enggyggag!pe meeseges4 9f*
01 / -
l BHRS H0DGES gg g
81 am au-ACTION ITEMS OYSTER CREEK - MAIN SECURITY BUILDING POST ACCIDENT SHIELDING II.B.2 l'
C.l""j=3 i
/
M59770 09/09/85 BHD1 DON 0 HEN
/7 RACgTws/g1
^^ --g g / % l~ A 02 /
l RE01 JOHNSON s
N lZ ;..
(
N,[
^^ h ACTION ITEM: OYSTER CREEK - DELETE DAILY CHANNEL CNECK FOR INSTRUMENTATION TO BE INSTALLED IN 10M OUTAGE M59814 09/30/85 11/25/85 BHD1 DON 0 HEN 11/30/85C w
maeme y e
ACTION ITEM OYSTER CREEK - CANCELLATION OF VENT AND PURGE VALVES REPLACEMENT Y
Ol U
.M59828 09/24/85 30RI ELTAHILA 12/06/85X " ' ' " '
ini MnM"
+fo/84T (( Mf
~
ACTION ITEM OYSTER CREEK - CANCELLATION OF UPORADE OF NITRO 0EN VENT AND PURGE SYSTEM M59829 09/24/85 A
12/06/85X N 02
{
SHPS HULMAN i
U me
^
3 R-1208673-06 REOULAT0RY I N F 0 R M A T I u-A TRACKINO SY$ TEM PAOL NO.s 50 9
t DIVISION OF LICENSING RUN DATE: 12/24/85 LICENSING ACTIONS REPORT (HEADQUARTERS)
FACILITYs OYSTER CREEK 1 i
T SC MULTI Y
P RAI TO
- )
TAC PLANT INIT P
NOTICE R
REV
RESPONSE
SE INPUT LIC ACT..
AD NUMBER ACTION RAIE E
EXPIRES 1 ARGB REVIEHER RAI DATE DATE TER DATE DATE
_ DAT L CDP 91ENT.3 II
~
s MMMM ACTIVE ACTIONS MMMM (CONTINUATION) 9
/
ACTION ITEM: OYSTER CREEK - CANCELLATION OF MODIFICATION TO INSTALL PRESSURE RELIEF IN PUROE AND VENT EXH S g M59830 09/24/85 BHD1 DON 0HEH
.aad44de6D 02 y 9 BHPS HULhAN 1
g ACTION ITEM OYSTER CREEK - REVISE OPERABILITY OF LOH-LON REACTOR HATER LEVEL INSTRUMENTATION FOR REACTOR VESSEL ISOLATION b
BHD1 DON 0 HEN M59935 10/11/85 gh BHRS HODGES gg-g N jHll SCHEDULED ACTIOqs n 3
OYSTERCREEK-CROSSREFERENCEINDEXINGSYSTEMFORIPSARSECTION4.26.2,INSTRtf.FORRTSTESTI O
,/
ACTION ITEMS 10/22/85 BHD1 DON 0 HEN
\\
y i M60151 3
ACTION ITEM: OYSTER CREEK - CANCEL MODIFICATION TO PROVIDE SUPPRESSION POOL THERMAL MIXINd la bY N
i M60152 10/31/85 BHD1 DON 0 HEN 5
ITEM OYS K - CANCEL MODIFIC NS VIDE SUPPRESSION POOL TE ATURE MONITORING g
f g
ACTION ITEMS OYSTER CREEK - JUSTIFICATION FOR NOT REVISING 50.72/73 TECHNICAL SPECIFICATIONS g
M60154 10/21/85 BND1 DON 0 HEN ACTION ITEMS OYSTER CREEK - COMPLY HITH LICENSED REACTOR OPERATORS STAFFING REGUIREMENTS IN 10CFR50.54(M)(2)
,/
M60155 11/01/85 BND1 DON 0 HEN g
gg y
O
" ACTION ITEM: OYSTER CREEK - MINIMUM VOLUME IN DIESEL GENERATOR STANDBY FUEL TANK TECHNICAL SPECIFICATION CHANGE M60156 11/07/45 BMD1 DON 0 HEN g "S.
hh
$ g/
NMM COMPLETED ACTIONS MMM ACTION ITEM OYSTER CREEK 1 - DIESEL DENERATOR RELIABILITY TECH. SPECS. (OL 84-15)
M55885 D-19 09/20/84 BMD1 DONOHLH 10/07/85F 10/07/85C 04 W
W lli
l I
r I
S e
R-1208673-001 REOULAT0RY INF0RMATION TRACKINO
$YSTEM PAGE NO.s 51 DIVISION OF LICENSING e
LICENSING ACTIONS REPORT RUN DATE: 12/24/85 (HEAD 9UARTERS)
FACILITY: OYSTER CREEK 1 T
MULTI Y
NOTICE R
REV
RESPONSE
NUMBER ACTION R&IE E
EXPIRES 1 DRGH REVIENER RAI DATE
DATE C0191ENTS 1E mum COMPLETED ACTIONS NNN (CONTINUATION) r ACTION ITEM: OYSTER CREEK - FEBRUARY 11, 1985 CHANGES TO ISI/IST M56800 02/11/85 04/27/85 SHD1 DON 0 HEN 10/18/85C 10/18/85C REGION 1 04 e
RE01 CAPHTON 10/18/85P REOS NAVERKANP 08/09/85C REOS KUCHARSKI 10/18/85P RE01 JOHNSON 08/17/85C a
ACTION ITEM OYSTER CREEK - SALP MEETING FOR SEPTEMBER 1985 M57492 04/25/85 BND1 DON 0 HEN 10/28/85C 10/28/85C 04 PBIA MCKENNA
(
08/09/85C ACTION ITEM: OYSTER CREEK - REVISE ACTION STATEMENT FOR LON-LON REACTOR MATER LEVEL CHANNEL IN0PERASILITY-CYCL M59895 10/11/85 BND1 DON 0 HEN 11/19/85P 11/19/85C 04 i
4
=*
O W
e em W
e e
d 1
~
High Priority Actions dated January 22, 1986 1986 Staff Licensee /se TAC Title Branch Target Date Status #
60153 Cancel Modification Plant System February
- 02 Torus Pool Temperature Monitoring 60152 Cancel Modifications Plant System February
- 02 Torus Pool Thermal Mixing 59935 Revise Operability of Reactor System February
- 01 low-low RCS Water Level 59830 Cancel Modification to Plant System February
- 02 Install Pressure Relief 59829 Cancel Modification to Plant System February
- 02 Upgrade N2 Purge / Vent System 59828 Cancel of Purge / Vent Engineering March
- 01 Valve Replacement 59758 Scope Change for Reactor System February
- 01 Recirculation Loop Interlock, II.K.3.19 59400 Deferments from Cycle BPD#1 February
- 01 11R Outage 59342 Exemption to RCS Vent Reactor System February
- 01 58018 Generic Letter 84-09 Plant System February
- 02 58004 Discrepancy in SEP**
Integrated Safety February 01 Drawings Assess Directorate 49394 Tornado Missile Damage Plant System March ***
02
- SEP 49397 Emergency Condensar Engineering Ap ri l ***
02 Isolation 49398 Seismic Design - SEP**
Integrated Safety December 1985 02 Assess Directorate 49392 Wind Loads'- SEP**
Integrated Safety December 1985 02 Assess Directorate
. 1986 Staff Licensee /se
_ TAC Titie Branch
' Target Date S_tatus #
46466 Control Room Reactor System February
- 02.
Habitability 11270 Inservice Testing Engineering 02 08100 Appendix I TS BPD#1 February
- 01
- Actions involved with Cycle 11R outage which begins April 1986.
- Involved with licensee's work on IE Bulletins 79-14/02 and/or package is at Director's desk.
- Old SEP reviews with licensee's submittals with reviewer and needed for FTOL conversion.
This needs to be scheduled by the branch because plant is in the 7th year of the 10 year cycle.
- 01 =-licensee, 02 = staff reviewer, 03 = ORPM, 05 = licensing action in-Concurrence.
[.s 1
+
q STATUS OF LICENSING ACTIONS January 22, 1986 Technical Assignment (TAC)
TAC Numbers Active as. of 10/1/85 62 New TAC since 10/1/85 17 Total TAC 79 Completed TAC since 10/1/85(04) 19
~
TAC needing Licensing response (01) 13 TAC under staff review (02) 36 TAC with staff Project Manager (03) 06 TAC in staff concurrence (05) 05 Total TAC 79 4
i 4