Provides Category B Rept Re Order Determining Plant Compliance W/Conditions in Initial Decision
ML20141K185
Person / Time
Site: Oyster Creek, Crane
Issue date: 01/26/1966
From: Gaske W
Advisory Committee on Reactor Safeguards
To: Okrent D, Silverman L
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20091A092 List: ... further results
References
FOIA-91-282 NUDOCS 9203180410
Download: ML20141K185 (1)


Text

. _ _. _

I

(

03 re e

o i

\\,

et L. Siloormen, Oyster Creek Subeemmittee Chairama W 36, B. ht j

Esrv a C.

Gaske

11. C. Seeke$1rned, M18 Staf f 4, d

~

CAI% GORY g REPOET - Of8TER CaKEK - ORDER DETERMINIK. CearL14NEX Wrts l

CONDITIONS IN INITIAL BBC1810E l

On January 10, 1966, the Licensing Seerd for the preter Creek reseter issued as Order Determinian comoliance with Ceeditions islaitLQ pecision in asterance to Provistenst Ceestructies permit. The Board stated that, eith the additiemal informatten presented at the seguest of the Board, it had a sistsee bot odeemste basis for a asocinstan that the facility sem be esestructed and operated at 1600 thr(t) withmet

- 1 undue risk to the health and safety of the ymblic. The heard meted as increase in the prope64d SISe of the emetteWCY dies #I ReGer$ter eBd

,gg g ested that installatios ef two pas 11er meserster units stakt secreage safety.

The Regulatory stati might be asked eether they still regard the pre-vision of a stagle meergemey diesal gamecasar at the Oyster Creek facility as acceptable med eether the general problem of what somatitutes an ecceptably rettable emergency staetrical power system for resster facilities is being gives seasiderattom by the Regulatory Staff.

Attachsent:

Order, dated 1/10/66

?

?

Y pt f

E omci>

1.CR5..

McG:vb

$URMAME>

...l.$ 6]6 6,.

orrr >

rurm Amo-sta caer, e-an n...... n,.m..ma wn.,

g 9203180410 910807 j j

<\\\\

PDR F01A

^ 9 fj ;) l(,:

DEKOK91-282 PDR

./r S

.L - - - -

.