t TENNESSEE VALLEY AUTHORITY OFFICE OF NUCLEAR.P0'ER W
SEQUOYAH NUCLEAR PLANT ,,
MONTHLY OPERATING REPORT TO THE
- NUCLEAR REGULATORY COMMISSION January 1986 LWIT 1 i l
DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 >
UNIT 2 DOCKET NUMEER 50-328 LICENSE NUMBER DPR-79 Submitted by: .
P. R. Wallace, Plant Manageri 8604240325 860131 7 -
PDR ADOCK 0500 d
t TABLE OF CONTENTS
+
I. Operational Summary Page Performance Summary 1 Significant Operational Events 1 Fuel Performance and Spent Fuel Storage Capabilities 2 PORVs and Safety Valves Summary 2 Licensee Events and Special Reports 2-3 Offsite Dose Calculation Manual Changes 3 II. Operating Statistics A. NRC Reports Operating Data Reports 4-5 Unit Shutdowns and Power Reductons 6-7 Average Daily Unit Power Level 8-9 B. TVA Reports Unit Outage and Availability 10-11 Nuclear Plant Operating Statistics 12 Reactor Histograms 13 III. Maintenance Summary Electrical Maintenance 14-16 Instrument Maintenance 17-26 Mechanical Maintenance 27-29 Modifications 30-33 ,
IV. Environmental Qualification (EQ) Summary 34-41 O
r -
8 l
d OPERATIONAL SU? DIARY 4
9 a
1 l
Operations Summary January 1986 The following summary describes the signific^ ant operational activities -
for the month of January. In support of this summary, a chronological --
log of significant events is included in this report.
The units remained in an administrative shutdown the entire month due to documentation concerns relating to the environmental qualification of various electrical equipment (NUREG 0588). Outage related maintenance and modifications are being performed. Unit I has been off-line 162 dcys. Unit 2 has been off-line 163 days.
Significant Operational Events Unit 1 Date Time Event 01/01/86 0001C The reactor was in mode #5. The administrative shutdown due to NUREG 0588 concerns continues.
01/31/86 2400C The reactor was in mode #5. The administrative shutdown due to NUREG 0588 concerns continues.
Unit 2 Date Time Event 01/01/86 0001C The reactor was in mode #5. The administrative shutdown due to NUREG 0588 concerns continues.
01/31/86 2400C The reactor was in mode #5. The administrative shutdown due to NUREG 0588 concerns continues.
l
- m>
O 1
g -
Fuel Performance Unit 1 The core average fuel expesure accumulated during January was 0 MWD /MTU with the total accumulated core average fuel exposure of 0 MWD /MTU.
Unit 2
- The core average fuel exposure accumulated during January was 0 MWD /MTU with the total accumulated core average fuel exposure of 8097.51 MWD /MTU.
Spent Fuel Pit Storage Capabilities The total storage capability in the spent fuel pit (SFP) is 1,386. However, there are five cell locations which are incapable of storing spent fuel. Four locations (A10, All, A24, A25,) are unavailable due to a suction strainer conflict and one location (A16) is unavailable due to an instrumentation con-flict. Presently, there are a total of 348 spent fuel bundles stored in the SFP. Thus, the remaining storage capacity is 1,033.
PORVs and Safety Valves Summary No PORVs or safety valves were challenged in January 1936.
Licensee Event Reports The following licensee event reports (LERs) was reported to the Nuclear Regulatory Commission in January 1986.
LER DESCRIPTION OF EVENT 1-85050 A containment ventilation isolation (CVI) occurred at 2350C, December 7,1985, due to loss of power to radiation monitor 1-RM-90-112A. It was determined that dirty connection pins were the probable cause.
1-85049 On December 6,1985 a review was made of the surveillance schedule, and it was found that the monthly functional' test for the waste gas hydrogen and oxygen analyzers was not performed for October 1985 within the required timeframe. The method of scheduling monthly and quarterly performances of this SI caused the error.
1-85051 On December 6, 1985, due to boron solidification and buildup in the drain line of the floor drain collector tank from the condensate demineralizer waste evaporator, water backed up into the area of the overflow drain. Health Physics declared the 2A-S auxiliary -.
feedwater (AFW) terry turbine room, 2A centrifugal changing pump room, unit two penetration room, and 669 pipe chase as contaminated areas with stringent dress out requirements for these areas. As a result, fire watches were not conducted for seven hours in AFW terry turbine room and for twelve hours in the centrifugal charging pump room, penetration room and pipe chase.
e 2-l
9 LER DESCRIPTION OF EVENT (cont.)
2-85012 With both units in mode 5, it was discovered that the reagent air for the unit two "A" train containment hydrogen analyzer was connected to a nonessential air source. It was declared inoperable --
at 1200 CST, December 11, 1985. The reagent air had been changed -
from essential air to a nonessential air source as part of a ~
modification performed during the unit two cycle two refueling j outage. ,
l Special Reports j
There were no special reports for the month of January 1986. I l
Offsite Dose Calculation Manual Changes No cnanges were inade to the Sequoyah Offsite Dose Calculation Manual during '
the month. l l
)
l l
1 9
3
., y - - - - . - - , , - ,.---,,----nay, - - _- - ,- p. ,
mwe--w- *e #- 3-y-
i4 ap.- _ a __ = a 2., , m _h. 2 _ . m, - 2 _ 4._a_ _ a -m _ _.A-s.,4 .,
i .
4 k
e m.
]
- I
==
s J
t t
.I i
j CPERATING STATISTICS (NRC REPORTS) 1 A
l l
i 6
i 4
4 I
3
- e 1
4 l
l 4
- i
.1 t
y I
- s6HATiWC DATA /EFCRT i .
l DOCI(ET NO. GO-327 i DATE FEBRUARY 6,1906 1
COMPL ETED DY D. C. CUPREl-TELEPHONE (610)S70-6S44 JERATIM E T/. TU 3 _
l .
I j 1. . WIT NAME ECUOYAH U:L;AR PLANT,' UNIT 1 NOTE 3- - '
O. .: EP CR T P EH I C': JANUAFY ' ~1-
- 2. ICENEED THERi1AL PCWERi 'iT- 3411.0
- 4. NAMEPLATE RATING (GROSE N :- 1220.6 l S. DESIGN ELECTRICAL RATI% NET MWE): 1148.0 1
- 6. MAXIMUM EE2ENDAOLE CApoc:TV / GROSS MNE>: 11 E'J. O
- 7. S'AXIMUM CEPENDABLE CAPA: ITY ' NET .'1WE ) : 1148.O S. I. CHANGES GCCUR IN CAF.)?ITY RATINGS (ITEMS NUN 3EPS
- THRGUGH SINCE LAST EF CR T , SIVE REASONS.
9 r'TWER LEiiL TO WHICH H E.3 T R I C TED, IF ANY ( NE T MWE ) :
j 10. ECA50NS 'OR RE3TPICTICW.I U NY s
'1 THiS MONTH YR.-TG-DATE C UNUL AT I('E
- t.
.. - .'. t.L~a2
.n .' .' .-' n. r' ; .t m.
m > I m.L r4.
,* 7,0 ' -'. - 't vw
. M <I O de . ^, v^
4 12. Tu.M B E R OF ,00RS REACTGR WAS CPITICAL O.00 0.00 24444.91
- 12. REACTGR 'IFSERVE SHUTDOWN HOURS C. 00 O. GO O. CO !
- 14. HGURS GEisERaTGR ON-LIDE O.00 O.00 23G71.13
- 15. UNIT RESEPVE SHUTDCuiJ HOUR O.00 O.00 O.00
- 16. GPCSS THERnAL ENEROY GENERATED fMWH) O.00 O.00 77060971.91
, 17. GROSS ELEC1RICAL ENERGY GEN. { i WH ) O.00 O.00 23976586.00
- 19. NET ELECTN'F'.L ENERGY GENE?ATEu (MWH) -3193.CO -3193.00 24939544.00
- 17. LNIT SERVICE FACTOFi O.00 O.00 59.34
- 20. UNIT AVAILABILITY FACTOR O.00 0.00 59.34 E1. UNIT CAPACITY FACTOR (USING FDC NET) 0.00 0.00 54.01
- 22. ball CAPACITY FACTOR (USING CER NET) O.00 O.00 54.01 i
- 23. UNIT FCRCED CUTAGE RATE 100.00 100.00 20.30
- 24. EHUTDOWN3 GCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, ANO DURATION C.: EACH):
s'
- 23. SHUTCOWN or END GF REPCT'T P F F I CD, ESTIMATED DATE OF STARTUP-FNDINO G2ESEFENT GF THE <-. NUCLEAR POWER PROGPAM BY THE tiANAGEli OF i NUCLEAR i; C W ER .
NOTE THAT THE THE YR.-TO-DATE AND CUMULATIVE VALUE5 HAVE CEEN UPI'A!ED.
I 1
,-- n -.-a-,.,,-~~ _-.-------.~n,------.....--------,n- .
-.w-v-,., _ _ , vnn,,-arn.-.,,,,
CFER ATIN ; DATA REPGRT DOCnEi' NO. 50-328 DATE FEBRUARY 6,1986
, CCMPLETED DY D. C. DUPRIN i
TEi.EPHONE (615)870-654'i e
t_ PER A T I Nv STAILS -
- 1. UNIT NAME SEOUGYAH NUCLEAR PLANT,' UNIT 2 NOTES:
- 2. EFFORT PERICD: JANUARY 1W6
- 3. LICENEED THERMAL POWER (MWT): 3411.O
- 4. N#-NEP LATE R AT I NG (CROSS :!WEi. 1220,6
- 5. UESIGN ELECTRICAL RATING (NET MWE)- 1118.O
- 6. MAXIMUM DEFENOAriLE CAPACITY ( CROSS i%E ) : 1100.2
- 7. MAXIMUM DEFENCaBLE CAP ACITY ( NET Mt;'I) : 114E.O
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMDERS 3 THROUGH )SINCE LAST REPCRT, GIVE REASONE:
- 9. PCNER LEVEL TO UHICH itESTRICTED, IF ANY(NET MNE):
- 10. PEASONS FC'3 RESTRICTIONS, IF ANY: -
i j --- _ _
THIS MCNTH YR.-TO-DATE C UMULAT I t.'E i 11. KUR S IN RE4 ORTING PEhICD 744.00 744.00 32185.00
- 12. NWEER O.0 HCUR5 REACTCR WAS CRITICAL O.00 0.00 21984.54
- 13. ECACTOR REEERVE SHUTDOWrJ HJi AS 0.00 O.00 O.00
- 14. KJ.!R S GET.dRAiC? ON-LIM O. CO O.00 21494.42 4
- 15. UNIT FESERVE 2HUTDOWN HOURS 0.00 0. C O O.00
- 16. GEOSS THERMAL ENERGY GENEFATED (MWH) O.00 O.00 69)27977.22 i 17. GROSS ELECToICAL ENERGY GEN. (MWH) O.00 O.00 23336780.00 1S. NE~ ELECTRICAL ENERGY GENE 5?.TFD (MUHi -2 2 2 ':. 0 0 -3216.00 2262E741.cC
- 19. UNIT SERVICE FACTCR O.00 O.00 e6.78
- 20. UNIT AVAILADILITY FACTCR O.00 0.00 66.78 i 21. UNIT CAPAC!TY FACTOR (USING MDC NET) O.00 O.00 61.24
{ 22. UNIT CAPACaTY FACTOR (USING DER NET) O.00 O.00 61.24
- 23. UNI" FORrEC OUTAGE RATE 100.00 100.00 21.25
- 24. SHUTDCWNS SCHEDULED OVER NEXT 6 MOlJTHS (TYPE, DATE, AND DURATION CF EACH):
- 25. ! <T SHUTDOWN AT c.ND OF REPORT PERIOD, E3TIMATED DATE OF STARTUP:
FE!JDING ASSESFMENT OF THE TVA VJCLEAR POWER PROGRAM BY THE MANAGER OP NUCLEAR POWER.
i NOTE THAT THE THE YR.-TO-DATE AND CUMULATIVE VALUES HAVE BEEN UPDATED.
I e
- , , . , - . , - . . - , , , . ,4.-- -,,, - ---,,-. ,-, , -
-.,,y, , , , , . ,,,w,w ,-w.-,--,-.,,-.y ,,,.,.y.
i 4
UNIT SlIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-327 UNIT NAffE Sequoyah One DATE February 4,1986 COMPLETED BY D. C. Dupree REPORT !!ONTil JANUARY 1986 TELEPNONE (615 M70-6544 n
w o $
- gg Q oyo I.icemiec g-7, pn Cause & Corrective Mc Date c gg o ygg Event ug oy Action to y [o g cyC Report # go gu crevent Recurrence sv x o .r: u
.a Z u) n h
891220 F E 7 744 9 Ten (10) CFR 50.49, Environmental Qualification of electrical equipment important to safety.
1 i i
- j. i
.)
2 Reason: 3 Method: 4 Exhibit G-Instructions 3
t F: Forced S: Scheduled A-Equipment Failure (Explain) 1-11anual for Preparation of Data B-!!aintenance or Test 2-!!anual Scram. Entry Sheets for Licensec C-Refueling 3-Antomatic Scram. Event Report (LER) File D-Regulatory RestricLion 4-Cont, of Existing (NUREG-0161)'
l E-Operator Trainini; & License Examination Outage t j F-Administrative 5-Reduction
! G-Operational Error (Explain) 9-Other SExhibit I-Satt Source' i ll-Other (Explain) -
i
. 6 i' !
l UNIT SiluTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-328
' UNIT NAlfE Sequoyah Two DATE February 4, 1986 COMPLETED BY D. C. Dupree REPORT ?!0NTl! JANUARY 1986 TELEP110NE (615)870-6544 I m i w o E j gg N oyy Licensee gg g'n, Cause & Corrective
- No. Date c f gg o jdg Event gg oy Action to q g go g ggc Report il g. o gu Prevent Recurrence av cx
- es .c o o n m h. n
, 9' 850821 F 744 F 4 Ten (10) CFR 50.49, Environmental Qualificatio n af electrical equipment important to safety.
4 i
2 e
l 1
1 F: Forced 2 Reason:
3 Hethod: 4 Exhibit G-Instructions i S: Scheduled A-Equipment Failure (Explain) 1 -!!a nua l for Preparation of Data B-11aintenance or Test 2-!!anual Scram. Entry Sheets for Licensee ;
! C-Re fueling 3-Automatic Scram. Event Report'(LER) File D-Regulatory Restriction 4-Cont. of Existing (NOREG-0161) 3
- E-Operator Trainini; & Licen
- ;c Examination Outage 4
F-Ailministrative 5-Reduction G-Operational Error (Explain)' 9-Other sExhibit I-Same Source-
- ll-Other (Explain) -
i '
7 i'
} .
SEQUOYAH NUCLEAR PLANT AVERAGE DAILY POUER LEVEL
-DOCKET NO. : 50-327 .
UNIT :DNE j DATE : FEBRUARY 6,1986 i
j COMPLETED BY : D.C. DUPREE TELEPHONE :(615)870-G544 MONTH JANUARY 1986 i
AVERAGE DAILY POWER LEVEL cVERAGE DAILY POOER. LEVEL a
DAY (MWe Net) DAY (MWe Net) 1 01 0 17 0 j O2 0 18 0 1
03 0 19 0 i 04 0 20 0 05 0 21 0 1
06 0 22 0
. 07 0 23 0 08 0 24 0 09 0 25 0 i j 10 0 25 0 11 0 27 0 12 0 28 0 1
13 0 29 0 1 ,
4
- 19 0 30 0 1
i 15 0 31 0
'16 0 l
.i 1
8 4
f
i I
l l
i l
SEQUOYAH NUCLEAR PLANT i AVERAGE DAILY POWER LEVEL '
' DOCKET NO. : 50-329 UNIT :TWO DATE : FEBRUARY 5,1986 COMPLETED BY : D. C. DUPREE ,
1 TELEPHONE :CE15)S70-5544 l
MONTH JANUARY 1986 i
AVERAGE DAILY POWER LEVEL AUERAGE' DAILY POWER LEVEL l
DAY (MWe Net) '
DAY (MWe Net)
- 01 0 17 0 1
02 0 18 0 i
03 0 19 0 04 0 20 0 05 0 21 O l
J Os O 22 O 07 0 23 0 ,
09 0 24 0 09 0 25 0 '
10 0 25 0 !
11 0 27 0 l 12 0 28 0 i
13 0 29 O i ..
- 14 0 30 0 4
15 0 31 O j is O ,
4 i
l 9
_ . - =_ .. .aa- ..s a .-a .au. . . -,. u >-- - -- -- .~--~ ,
, _.an- _, -
4 i
1 f
W.
h 1
]
]
I !
J,
't
)
i
^
OPERATING STATISTICS (TVA REPORTS) i
.i l
I i
a j
4
(
i f
i i
i i
>f l i -- l l
1 V
i
- i - !
I i
1 ll 1 - e i
)
l
x v$i:.J i I
v>Z l
<dE
$e e,p*e* I
> 2 '
Q
= ,
EwJx ex l. s k, N Oh a
- ' l' ! ..
eqW f
= - ::=2 q I E?
2 c
<~; .g Il 1 i
/,
-755 r e .
l ,O.
I e
('
we ~ l
\
o
%:2b N : Q *~
<t' j' l il m mV {
CSb l f b 1 J
m O l'l
- .. z q
2 y c < e- c l 3 U 4 J $
> 4 C e t 2 < u.
-J 5 O F" z =~
- d, 4 + >
d El, Y
< 'm I\
\
, > o.
si l Q
5 I o .
w .
u 2.--.- - . - . -- . - -.- . - - -- - - -.. .. - _ _ --
- = _ ,
?e y gW 3c -.. - _ , . _ - .
3 a- -../ . - .
Z 3 -
4 l*l I '
[
fl V
- \
E e !O! o h o!C okeke efC C o! 7C eo oo ok ef o!ol e o olo'o o!c o T s jo go }o j o' o; o? oj e oo C o c
g L oLel C!-Q- ot.
- .4 o' _C, el C.-.ojc1_c,;o
, 3 -. . - . -
_fC.
et .oj o to.lo rolo - -
_j fiq%$2]A j--@ ~t A A-h@~!dd% A4%!Z~tfe d AA $2; A ~!A;~NN $y - --,-
3 s to o e alejoj e eie, leio ele eIoicio e e o i o o ele o 3- sl'S cI'Slcll o, ei o oolo o o o, o o; o; c oj o o;o ol oi c ol'e!o o oc o
,.. o or.o- .. . io . q- ..,
2 4 - .. _i -g_..-- - - , - .
j i g._ q2
~
2!d ,ioLe
!$r i~I ; 1-.. i A
nl Zl !~ ! ,1f4 lf A 2 -
nq%
!%la i : A- r A :
=.: o e eie 2 c=' e e o e, e e; o. e e o,io e o a
'g g =[=5 +c g: et ooiocio J ., oi ci cl ot 4 - L. ..--.
oto c 4- L ' Jc.:q cj L oj . o+ o: c.c.eiooo=j o: e'e
_L 4 t-+j o eho e o ooo o o
- '( _ -
- - -4 -
2-.y j%%%lZjZlZjZ A % 2lA. 2lZlZlZl%AlAl2l2AlRl2%Z2.-
% 3%in
$ 8 E!
z .* *** o 'o!co!alo
- o. ? oeoleelo!aleloclolo!co!olo!clcleeololele o 3 I;hia!?;*+lc
.* = . = ,?h o L=.= ,=u2L -l u=WPL* TP
- L*P- *.
- _ :da a l n z a :y* !d ddd ::W: WebW: 25Wa s
- f. = -
, i i n -
! 5 l l i
1s -
a 1 . -o z =.
2 l
+ c p ;
l 12y : <
c s e o'o b lo e oco jo,'o o o o c'elo,eleteto e o e,o e l oloie ojole o oto!elo o
-l . y -.
s ...a_j a cio
-. _ o o.. _ .
- o}co;o]o{oo4.
+
o o g
. .J-_,.-,.-.-_ ojo4ojo -odjoo oo io'o od-b y o ~s 3
V a o o oicioto o o o o otolot jo ojo clotelajo o}ofe_-.._
" f, Q lo !C oPio jolo o e o io!c o ,
-,o 1
]
- ; O F.C olo ClCi o f Ciolo p r o!olC of!Olo l 4 o C C
- f-e r ,
c c o oicio,e,ciojo.e o o'oicio e ojo e olo o ciotolo e c io to o o 9 5 5, -2 3 _2.. --P.P. P P,- ,I.4-I P.P { P.I i- - P .o.,P o- -otolo o P o
+ P.. -_l+-
3 -
4 ,j _l' g
E ggp a 6 6 g
u , m s c w .p m e h = q .
! I II FM
~
o BE Es=
<uc
\
3 ufE 20~ 2 e
r; u
= ur a 4
< 4 ~w \ i
=,
=
4 er It
~ < j >i 4 0- ! ,
. i , i t i i --
4 5 ,
l .'
i 5 mey ! !i!'l I l !
e-
=
=st 9i l
j i
o
.t c-t 55zwwac #
00 i ,!'
g, n
p<
t1 l 1 i f l.IlIll1 l i i
g) l hd_5$
z -u c- = 3 < t u
n rx -
z ,
f;:
u l 4 1
2
~
l w z s
o i c < e.i 5 $ $
> a3 c l b * -
4 = .i J %
5 i D {
< " P I
,1 g te
- .i
< C- ,
$ o c5 '
o E H 2:
< e i I
\/
LJ .
EE 5
- --+- - - - --- - -
l
- . - - ~~. - - - m f.
E=
5
! l.
l
/
S e.
g r:
~6 s -
5
-[--l - -..- --
lll -
q--.- - - - - --
N z =
a ll
--vl-+l.- l I !
o ojo X-c}otojc!cio etelC o C4 edof o o o d y at o d e o ci of o;o oio
,, gjo!c.olofofo dQ o
-4 L14 L t L o- L1-. 14 L apo;Ooo'lciQoqoi aJ t- .- - -o o Cdi C40 cioJ Lt--
IIY M99*
- iiii'*Nii#iii#i* *.1o- 9** * $999 s ele o e d eio oe O of of q y o O O o o Q Q O! o oj el old cl ol cl e o o dold e o
. =
oooolotoio Z 4 2 of oloel el el ool oolo oosoci oo 4 5
~
f $ $ N -(N$p$' $ $ N-Y II c4lN Y $yed-calp y Ni e4 Yd i ;
' QNIN3 ~-' TN c4; N $ 'Y T'. ~Q*V 74 % $ Y 5
g 2 s o!clc ojo ojojo;ojo o I o!oIo!co oof b o! ol c) b b ocI o oo ol cl olof oo o! c o o a ol cd o o -
! ofosoiofa oi of ot C o o -
g y - .
s y 4- -.- -.
4--y4 p- - -ci+.o- - -o oloi -g- olo
- $ Z; % Zhy 5 %,nif.!Y.l2lY . i 2 2 Y.
%Z- ----
%Z Yh Y.i2-Y4!A!A Z.-Z Af AH. YdZ es' g
t c
Igo C o o I oIof o' olC C o o$C of C Ce d o oI o el o! e oj o c. ca o o oj Cl og o; oi O C4 o ojojcleo ofo -.-a-. o olo o o eo ojo o oo
'oo oo e 4 -L4j_ -4q-r4 La L..od o -.,- + s -. p a - L - y
.3-
[ t
,lfa- Ys Y4 YY Y Ys Yo Ye Y 4 Ya Y Ye Y4 Y4 a
-4 Ye Ye Y r :
^
g E I
I _ _ .I . - -. . ._. _ . - ..- .--.- - . - - - .,-_ --
--.3-I .
, a -
3 3 ' +
$ ? O 4
.? M I OC e o o) l m *
% { J G o o o'lo Cie o o o o C o ofC o o o l
cl o C o olo e o CCoo e,C o o o.e.
w e.
~
- *=
c t
e
-..-, - .4-i coo o; c o cio p+ - ep o o. c c --q oto- -p '. oo,-o..o o cisoo--
b, I o oo o!o o.o e o c CI#o ol h C o! o! cl ol olo oo o!o ofo o o o Cs. O o y
.e4 I o -o,o _
o.cio,o e o{C O Ci ol of of o, C. O o ot o' Ci o C olC of c o
$r c E E d "
o! o! cloIo!C o! aI o C!o o I 7
w 3,
- 3 e
, e ofoo!o!'clo!o!c oo ojo o o'o o!otoio'oiceo o o oo o t oIoIofofo!o!o oq Cic o!clo o o ofo!cOIo o,o cio c
1 H -l- Ho--- ! clc+ o!o 1-
- t- f- + T t - -
1 ,S %
6 r ole otolo,oio ololol ol o o--- o e o ele l -olo t- +l e-. o-o --f o lo.o clo-y - y ig I ojo otojo!ojo o o!oto,o'olofo!ojo C o ooo ojogo ,
o o o o! ol v o f j
" "* * " # # "
- 7 322 i f 2 1 $ k EN S $ E h a .5 6 6 1 I i r _.a
TV A D82 A (DNP+8tl
. NUCLEAR PLANT OPERATING STATISTICS Sequoyah Nuclear Plant
[ Period Hours 744 Month .IANUARY 19 8 6 ,,_
ltem No. Unit No. UNIT ONE UNIT TWO
~
PLANT l Average Hourly Gross Load. kW 0 0 0 2 Maximum Hour Net Generation. MWh 0 0 0 3 Core Thermal Energy Gen. GWD (t)2 0 0 0 4 Steam Gen. Thermal Energy Gen., GWD (t)2 0 0 0
- ,y 5 Gross Electrical Gen., MWh 0 0 0 3 6 Station Use. MWh __
3,193 3,216 6,409 8 7 Net Electrical Gen., MWh -3,193 -3,216 -6,409 U 8 Station Use, Percent N/A N/A N/A 9 Accum. Core Avg. Exposure. MWD / Ton 1 0 8,098
~ 8,098 10 CTEG This Month.106 BTU 0 0 0 11 SGTEG This Month,106 BTU 0 0 0
, I?
13 Hours Reactor Was Critical O.0 0.0 0.0 14 Unit Use. Hours. Min. 0:00 0:00 0:00
- 15 Capacity Factor, Pe cent 0.0 0.0 0.0 g 16 Turbine Avail. Factor. Percent 3.0 0.0 0.0 j 17 Generator Avail. Factor. Percent 0.0 4 0.0 0.0 c 18 Turbooen. Avail. Factor. Percent 0.0 0.0 I
0.0 l 19 Reactor Avail. Factor. Pes cent 0.0 0.0 0.0 l 0 20 Unit Avail. Factor. Percent 0.0 0.0 0.0 I 21 Turbme Startuos 0 0 0 '
22 Reactor Cold Startues 0 0 0 e 7_
y 24 Gross Heat Rate. Btu /kWn N/A N/A N/A i f 25 Net Heat Rate. Blu/kWh N/A N/A N/A i h
26 '
L: 27 l 4'
g 28 Throttle Pressure, psig N/A N/A N/A !
a & 29 Tnrottle Temperature, "F N/A N/A 4 N/A 30 Exh'aust Pressure, InHg Abs. N/A N/A N/A E 31 Intake Water Temp., F N/A N/A N/A -
32 33 Main Feedwater. M lb/hr N/A N/A N/A
- i 34
$ 35 36 ,
l 37 Fufi Power Capacity, EFPD 404.86 363.65 768.51 j 38 Accum. Cycle Full Power Days. EFPD 0.0 210.8416 210.8416 j 39 Oil Fired for Generation, Gallons 2 9,636 40 Oil Hegna Value. Otu/ Gal.
138,000
_ 41 Diesel Generation. MWh 146 t*
l Max. Hour Net Gen. Max. Day Net Gen.
~ Load MWh Time Date MWh Date Factor, %
3 43 N/A N/A N/A N/A N/A N/A I
o f
Remarks: 1ror BFr:P this value is MWD /STU anct for SONP and WBNP this value is MWD /MTU.
l ,[ 2(t) .ndicates Thermal Energy.
4 4 %
i
.I r l o
Date Submitted m *ID N " ' ' L r Date Revised *
- t
~
17 Plant Suoerintenrient
- . - - - . - . - . - - . - - , - - - - . - . . - ~ . , . - , _ . . . - - - - . . - _ - - _ . ~ . - _
i a !
SEQUOYAH ONE REACTOR HISTOGRAM 110 100 - , _
i-90 - --
e 80 --
D
@ 70 -
(Al 1
60 -
5 g 50 -
O 40 -
0 l'
t b 30 -
6 m 20 -
10 -
O-l
-10 , , , , , , , , , , , , , , , ;
O 4 8 12 16 20 24 28 32 JANUARY 1986 SEQUOYAH TWO REACTOR HISTOGRAM 100 90 -
l 80 -
70 -
$ l O i 6 60 -
n.
50 -
f a
@ 40 -
e O 30 -
U --
20 -
h 10 -- ~
O ,
-10 i , , ,- , , , , , , , , , , ,
O 4 8 12 16 20 24 28 32
~
JN4UARY 1986 13
. , - , . , e 3-,s ,.--r- , - , - , ,-,,-,----m-- + , - , - - - ,.,-,g 9,,,- w ,~,, , - -vg--
>+m- 4 >-M e -- -- -s -- 4--- --. ,- -- , -. L L- -.-*>-.
I e I r
i 4 1 I
+
i m.
a *' e !
- . (
- ~~
t t
-l 4
J t
i MAINTENANCE SUte!ARY (ELECTRICAL) l l
h k
4 I
1 1
I f
l 4
4 3
t
- og 1
.r E
l 1
1 4
e i -
1 i
a U '
e
- w. - -
.7 -, y p- -3 ,--ww.- - - - - - .--y-,m.,-.---w.---y.- ,..,y,.,.v.-pw9, wpy y- y w- -m-- . 9- , - -, .. --- - ,-w-y,p.y r- y,-..,-m ,-
--wy ,r--r ,,-,-q%.
, . ~.- ___ = =-- - _ _ _ _ _ _ _ _ _ - -
I .
l 15:27:56 62-04-86 ELECTRICAL MAlllTEllANCE MONTHLY REPCRT FCR JAHUARY PAGE 1 i DATE.... COMPONENT. . . . . FAILURE CESCRIPTI0ti...... CAUSE OF FAILURE......... CORRECTIVE ACTI0tt........ MR.NO.. ,
85-08-01 1-ZS-063-0071 A 'THE RED INDICATOR LICHT THE ACTUATOR ROD WAS NOT REPLACED SNAP LOCK SUITCH A560253 ,
3 W0llLD NOT BURN WitEN VALVE L0tlG ENOUGil At4D IllSTALLED A LONGER IS IN OPEN POSITION ROD TO ACTUATE LIMITS
, 85-10-01 2-MTR B-040-007 ktPAIR SUMP PUMPS A AND B ERCW SUMP PLF;PS A NO D REPLACED PUrPS A NO 9 A529893 2A, B- A DN SUMP 2A-A UERE BAD AHD ALSO HAD BAD AND REPLACED LE'.'EL SUITCH LEVEL SWITCH THEN CHECKED FOR PROPER OPERAT10!1.
85-12-05 0-PNLA-013-002 TROUBLE ALARM IS IN ON BAD DETECTOR REPLfiCED DETECTOR APO Y109722
{ 0 PANEL AND WILL NOT CLEAR PERFORMED SI-234.2 STEP It1 HEATING VENTILATION 7.1 THRU 7.5
- ROOM I
85-12-07 0-MTRB-032-006 COMPRESSCR APPEARS TO DE MOTOR STARTER CONTACTS REPLACED f.LL THREE PHA%S Y109859 O-A ' OCKED UP, MOTOR ATTEMPTS WERE BURNED WITH NEW CONTACTS NO
' TU RUN BUT COMPRESSOR CHEC1/ED FOR PROPER 4 WILL NOT RUN OPERATION OF COMPRESSOR
) 85-12-10 2-FCV-061-0122 CLOSE LIMIT SWITCH WAS LIMIT SWITCH ACTUATORS ADJUSTED LIMIT SWITCH Y109634 j NOT DROPPING OUT WHEN WERE GUT OF ADJUSTMENT ACTUATORS TO GIVE PRCPER VALVE WAS CYCLED SO VALVE OPERATION AfD LIC-tit WOULD NOT REMAIN OPEN It01 CATION
! 85-12-15 0-Pti. A-013-001 ALARM IS IN ON. ZONE 372 FIRE PROTECTION DETECTORS REPLACED TWO DETECTORS Y109718 4 AND 373 U-1 ant 4ULUS WERE BAD AND PERFORMED SI-234.5
)
85-12-16 0-LOCL-013-001 TROUBLE ALARI1 WOULD NOT BAD DETECTOR REPLACED DETECTOR Ato Y109619 I
9 CLEAR DN ZONE 220 IN MAIN CHECKED FOR PROPER CCNTROL ROOM OPERATION 4- 85-12-17 O-TS-082-5008 HEATER WAS NOT BAD RELAY REPLACED DVERLOAD RELAY Y100250-
- /2 MAINTAINING PROPER BLOCK
] TEMPERATURE TO HEAT DIL 85-12-17 O-BCTB-026-000 THE ACB FOR COMPARTMENT BROKEN CLOJING SPRItG AtlD REBENT EYE ON SPRING Ato Y107931 J ,
i 14 j '
, I'
15:27:56 02-04-86 ELECTRICAL MAINTENANCE MONTHLY REPORT FOR JANUARY PAGE 2 DA1E.... IInPONENT. . . . . FAILURE DESCRIPTION. . . . . . CAUSE OF FAILURE......... CORRECTIVE ACTION........ T.R . NO. . .
41-B 3C UGULD NOT RECHARGE THE BRUSH HOLDER ON CHARGING DISASSEMBLED MOIOR #10 CLOSING SPRING SPRING MOTOR WAS LOOGE TIGHTENED BRU"Ji HOLDER, ALSO BRUSli UA2 UDRN REINSTALLED (LL 8 RUSHES 85-12-19 1-FCV-070-C013 VALVE WOULD NOT FULLY LIMITS WERE OUT OF FET LIMITS FOR PROPER Y103126 CLOSE ELECTRICALLY ADJUSTflENT OPERATION
. 85-12-23 2-PCV-001-0030 ADJUST OPEN AND CLOSE LIMITS OUT OF ADJUSTMENT ADJUSTED LIMITS AND Y103131 1 LIllITS TO GET REMOTE AND COMPLETED SI-166.6 LOCAL STROKE TIhES WITHIN LIMITS 85-12-29 2-ZS-063-0071 VALVF HAD EDTH RED M1D LIMIT SUITCH BRACKET UAS ADJUSTED LIMIT SUITCHES Y105990 2-A GREEN INDICATING LIGHTS LOOSE PREVENTING LIMITS AND CHECKED FOR PROPER ON WHEN VALVE IS IN FR6N MAKING UP PO3ITION INDICATION CLOSED POSITION AND HAD
, ONLY RED INDICATOR LIGHT UHCH IN OPEN POSITION.
86-01-04 2-MV0P-063-017 2-FCV-63-175 UOULD NOT BAD CIRCUIT PLACED JUMPER OH VALVE , Y105408 5-8 OPEN ELECTRICALLY AND HAD OPERATIONS STROKE VALVE THEN REMOVED JUMPER 86-01-06 2-nV0P-063-007 LIflIT CUITCH INTERLOCK ON LIMIT StJITCH DUT OF ADJUSTED LIMITS AND B112522 2-A VALVE IS NOT ADJUSTED ADJUSTMENT CHECKED FOR PRODER PRUPERLY TO ALLOW OPERATION 2-nV0P-63-8 TO OPEN 86-01-08 2-AHU-061-0002 REPLACE TIMER ON AIR BAD AHU TIMER REPLACED TIER AND B105784 A HANDLING UNIT CHECKED FOR PROPER OPERATION 86-01-11 1-AHU-061-0004 Aliu 4A MOTOR WAS NOT BAD THERMAL OVERLOAD REPLACED THERMAL OVERLOAD B105909 A RUNNING AND CIECkED FOR PROPER OPERATION l
l i 15 '
. i
15:27:56 02-04-84 ELECTRICAL MAINTENANCE MONTHLY REPORT FOR JANUARY PAGE 3 DATE.... QX;P0HENT. . . . . FAILURE DESCRIPTION...... CAUSE OF FAILURE......... CORRECTIVE ACTION........ MR.NO.. .
86-01-15 2-PUC-083-0002 THE HYDROGEN RECONDINER SETPOINT DRIFT READJUSTED FI'TER CARD ON B108021
-0 KU METER SHOUS 28-D TO READ ZERO UATTS APPROXIMATELY 6VU WHEN THE POTEliTIOMETER IS AT FULL OFF POSITION 86-01-15 2-PUC-053-0001 TiiE HYDROGEN RECONBINER SETPOINT DRIFT READJUSTED FILTER CARD TO 8108020
. -A KU IIETER SHCWS READ ZERO WATTS APPROXIMATELY 64U WHEN THE POTENTIOMETER IS AT FULL OFF POSITION 86-01-20 241TR B-002-024 REPAIR PRESSURE SUITCH PRESSURE SUITCH MODE WAS ADJUSTED PRESSURE SUIICH B105221 1
OUT OF ADJUSTMENT. FOR PROPER MODE AfD COMPRESSOR FAILED TO STOP CHECKED FOR PROPER UllEN CONTACTS OPEN EVEN OPERATION
. , WITH SUITCH UIRES LIFTED 86-01-21 2-SCTA-20?-CJ BREAKER UGULD NOT TRIP COIL IN BREAKER HAD REPLACED TRIP COIL 8105472
/11 BURNED LP 20 records listed.
i 1
4 i 16 ,
i k
L t
f
~.
4 i .
t i t i
4 a
f i i l i
i ;
i ,
l !
MAINTENANCE SUM 2fARY ,
I (INSTRUMENTATION)
{-
t i
i 4
d
)
i i
I k
INSTRUMENT MAINTENANCE Unit 1 Completed refilling of reactor vessel level instrume.ntation system (RVLIS). -
upper plenum sense lines on both trains A.and B. The high point vents and -
reactor cavity sensor bellows fill tee caps were seal welded by Mechanical Maintenance to prevent air inleakage. All RVLIS and reactor coolant system (RCS) wide range pressure transmitters were calibrated after welding was pe rfo rmed .
A varped cover was found on Barton model 763 t ransmitter for RCS wide range pressure (1-PT-68-69). Received a memo from Festinghouse stating that covers could be interchanged on Barton model 763 and 764 transmitters. A cover from a spare transmitter was used to replace the defective cover and the I.D. tags were swapped for proper identification.
During performance of SI-94.1, pressurizer pressure transmitter 1-PT-68-340 was found out of calibration so as to cause the associated loop bistables to be out of Tech Spec allowable limits (PRO-1-86-009). The transmitter was recalibrated and returned to service.
UNIT 2 Completed workplan 11887 which finishes the CVI logic modification on unit 2.
However, during performance of this workplan, the train A RHR suction valve was inadvertantly isolated. PRO 2-86-007 was written on this event and it explains that removal of a fuse in the output bay of the SSPS cabinets caused a separation relay to deenergize which caused the RHR valve to isolate. The fuses will be tagged to alert personnel in the future to prevent reoccurrence.
Diodes were found shorted on GE-MAC power supply outputs in the Gould trans-mitter loops 2-F-3-147, 155, 163, 170 during initial EQ verification (Binder IFT-001). Six (6) diodes have been found defective to date. Investigation of this problem was performed and the probable cause is a metal clip in the rear of the cabinet that appears to have shorted across the outputs of the power supplies. Proposed solution is to fabricate and install a plastic shield over the rear connector. This work is being coordinated with 0.E. and is still ongoing.
COMMON Completed the field conversion of the strain gage connection from slip connectors to hard solder joints for Barton models 763 and 764 Lot 2 transmitters. This was required for environmental qualification and the work was performed by special maintenance instructions SMI-1-317-23 and 2-317-23.
Continued support for the environmental qualification program. Major work items involve verification of QMDS requirements and resolution of equipment deficiencies. Current status on EQ verification indicates approximately 62% com;lete on unit 1.and 64% complete on unit 2 and Common. ,
h 17
. , _ ~ " ' - '"
i INSTRlt1EllT MAINTENANCE MONTHLY SUr81AR 02-04-86 PAGE 1 CGtP ,
MRoCOMP U FUNC SYS ADDRESS. DATE.... DESCRIPTION............................. CORRECTIVE ACTION.......................
4 A296553 0 PX 090 SN359 01/15/86 0-PX-090-SN359 , REPAIR AND FUNCTIONALLY UNKNOWN. FUNCTIDW4LY TESTED AND HO PROD
] CFECK PUR SUP UAS FHD A296563 2 RM 090 403 01/26/86 2-FM-090-403 ,DDES NOT RESPOND TO ELOW FUSE, BAD POWER SUPPLY REPLACE COMMANDS FROM CT FUCC PCUER SUPPLY A300831 2 FEV 003 48 01/09/86 2-FCV-003-43 , mHPRDu PERFORM If1I 99 RT ASSOCIATED DEVICES OUT OF AD E TMENT.
601 A NO B ON THIS VLV TO VERIFY ADJUST VLV Ata RETURN TO SERV MR A300831 CORRECT RESPONSE TIME FOR VLV CLOSURE REFER CATS 85203 A300832 2 FEV 003 90 01/09/86 2-FCV-003-90 ,nNPRDu PERFORM IMI 99 RT ASSCCIATED COMP 0 TENTS OUT OF ADJUSTMENT.
601A AND 8 DN THIS VLV TO VERIFY CORRECT ADJUST VLV TD f1EET RESPO:EE TIf1E TESTING i
) RESPONSE TIME FOR VLV CLOSURE REFER EPECIFICATIONS TR A300832 l CATS 85203
{ A300340 1 PX 003 110 01/06/86 1-PX-003-110 , kNPRDu POWER SUPPLY i PUR SUP MOD PER UCRK PLAN 10709 FMO NOT VGLTAGE FOUND HIGH 58.62V DURING BEEN PERFORMED.ItGTL PWR SUP CONVERSIO:4 i
PERFORf1ANCE OF GMDS TABG KIT PART A450G RW. VERIFY PUR SUP VCLT RETURN TO SERV A300841 1 PX 003 106 01/06/86 1-PX-003-106 , nNPRDu POWER SUPPLY PWR SUP MOD PER WORK PLAN 10709 FMD NOT
' VOLTAGE FOUND HIGH 56.28V DURING BEEN PERFORMED. INSTL PWR SUP CONVERSIGN PERFORMANCE OF CriDS TABG REG B-6 ON EG KIT PART A450CRW VERIFY PWR SUPPLY VOLT
! BIl0ER RETURN TO SERV A300842 1 PX 003 97 01/05/86 1-PX-003-97 ,PWR SUPPLY VOLTAGE FOUND PWR SUP f10D PER WORK PLAN 10709 iMO NOT
' HIGH 58.51V DURING PERFORMANCE OF OMDS BEEH PERFORMED.IMSTL PUR SUP C0tNERSICH TAD G KIT PART A450CRW VERIFY PWR SUP VOLT; RETURN TO SERV i A30084i 1 PX 003 43 01/07/861-PX-003-43 , NNPRDu POWER SUPPLY VOLTAGE FIELD CABLE C0t#ECTED TO PUR SUP HAD A FOUND LOW 8.83 DURING PEff0RMANCE OF SHORT BETUEEN THE BLACK C0;DUCTOR Ato Of1DS TAS G REG B-6 THE SHIELD REPAIR THE FIELD CABLE A523581 1 TI 068 398 01/25/86 1-TI-068-398 ,ut@RDu IND DRIFTING HIGH NDHE FOU 0. tDE 4 A531366 2 PJ1 090 450 01/26/86 2-RM-090-450 , RAD MON CONTINUES TO ALARf1 LOW BACKGROUND C(USING LOW COUNT RATE
{
FAILUTE. NONE
- A332304 1 PI 030 311 01/03/86 1-PI-030-311 ,NFPRDSN INDICATOR IOS TAGS SWAPPED ON 1 PI 030 0310 Ato 1 PI
] READING ABNORMALLY HIGH SUSPECT BAD 30 31 INSTALL TAGS ON PROPER INDICATORS '
PRESS INDICATOR AS41777 2 PS 003 144A 01/25/86 2-PS-003-144A , LOGIC CONTACTS DO NOT NONE COULD BE FOLIO. taE
- CLO3E PROPERLY FOR A TRIP AS41786 1E 092 VARIOUS 01/30/861-XE-072-VARIOUS , PULL BACK PUR RANGE
' NONE. RETURN TO NORf1AL (FTER REFCELIN DETECTORS TD f1AINT POSITION UNTIL COMPLETE REFUELING OPER IMVE BEEN COMPLETED.THIS
] IEEDS TO BE PERFORf1ED PRIOR TO CAVITY FLOODING. RACK BACK A542329 1 PDIS 090 40101/23/86 I-PDIS-090-401,UWiSLE TO CHECK FLOW SW NONE. RECALIBRATE SWITCH i
. 18 I
INSTR!. MENT MAINTENANCE MONTHLY
SUMMARY
02-04-86 PAGE 2 COMP ~
MR. COMP U FLNC SYS ADDRESS. DATE. . . . DESCR IPTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . CORRECTIVE ACT I0tl. . . . . . . . . . . . . . . . . . . . . . .
(OTUATION BECAUSE OF LOW FLOW AS42330 1 FI 090 402 01/28/861-FI-090-402 , FLOW IND cat 1NOT BE SET PER DIRTY UPSTREAM FILTERS. REPLACE FILTERS SI 402 A542332 1 FI 090 400 01/28/86 1-FI-070-400 ,CAllt0T CHECK FLOW IND PG UATER IN LINES. DIRTY FILTERS. CLEA'4 SI 482 LINES, REPLACE FILTERS AS42463 1 16 030 106 01/25/86 1-HS-030-106 ,UPON COMPLETION OF MR I;0NE. N0lE A546033 DN FC0 30 106 VERIFY THAT STATUS LIGilTS ON HS 30106 IN TI;E filTO 110DE CliA!1CE FR0n OPEN TO CLOSED ON AUX BLDG ISOL SIGNAL A542471 0 101 090 21101/13/86 0-RM-070-211,ROTGiETER DIRTY DIRTY ROTOMETER. CLEAN ROTOTTER A545208 1 RE 090 293 01/22/861-RE-090-273 , MON WILL f!OT COURCE DIECK liONE FOUto. tt01E REPAIR A54SS69 1 PNL 003 331 01/26/861-Pt:L-003-381, REATTACH LASELS FOR ALL DOUBLE SICE TAPE LOST ITS STICKY.
IfGTRUMEtlTS IllSIDE PANEL 1-L-381 REATTACH U/NEW DOUBLE SICED TAPE A548092 1 PDT 030 45 01/01/061-PDT-030-45 ,CIECK SPLICES AT XrITR Ata CONDULET COVER pit:CifIllG WIRES. REPLACE CfECK CAL 02 RECAL IF REG'D XMTR PIGTAIL A550318 2 FT 003 163/170 01/07/86 2-FT-003-163/170 ,PAtEL JUNCTIOi4 BOX IMPROPER PREVIOUS It!STALLATION. CEAL CONDUIT ENTRY PORT t:0T SEALED PER CMDS C010UIT DIl0ER EGIEG IFT-001 A-4 TAS C WHEN COMPLETE SEl4D COPY TO INST TO BE INCLUDED IN Gli PACKAGE A550319 2 FT 003 147/155 01/07/86 2-FT-003-147/155 , PANEL JUfCTION BOX IMPROPER PREVIOUS IllSTALLATION. EEAL COEUIT ENTRY PORT 110T SEALED PER CMDS CONDUIT BIl0ER llSGNEG IFT-001 A-4 TA3 G WHEN COMPLETE SEND COPY TO INST TO BE INCLUCED IN GM PACKAGE A550589 0 099 SN0014 01/25/86 0--099-SN0014 , TROUBLESHOOT AfD REPAIR DEFECTIVE Z7 CHIP, 05 AtO G6 CARD TRAt4SISTORS. REPL/,CE CHIP AND TRANSISTORS A550668 0 TR 082 503614 01/25/86 0-TR-082-5036 4 , REPLACE FORCE BALA"CE VARIOUS CAD PARTS. REPLACE BAD PARTS MOTOR A550670 2 PDIC 065 82 01/08/86 2-PDIC-065-02 ,PDIC-65-82 WILL NOT DWG D 306CK13 513 INCORRECT. TAKE CCNFORM TO GKDS TNi G, f1AINT REG-B-5 MEASUREMENTS ON PROPEER TERMINALS. VOLT BINDER SGIEG-XnTR-003 NEA3URED VDC=53.04 AT 4MA WS 33.3VDC 0 4MA 24.07 A550671 2 PDIC 065 80 01/08/86 2-PDIC-065-80 ,WILL } 0T CONFORM TO CUG D 0060K13-513 INCORRECT. TAKE BINDER li SGtEG-XMTR-003, Gnas TAS G MEAGUREMENTS GM PROPER TERMIrlALS VOLT AT MAINT REG B-5 4MA WAS 34.2VDC A550675 2 RM 090 12101/23/86 2-RM-090-121, PERFORM SI 206.2 DN HCNE. PERFORN SI
- MONIl0R WHEN BLOUDOWN FLOW IS
.y ,
19
INSTRLt1ENT MAINTEi4ANCE M0!1THLY SUTS1ARY 02-04-86 PACE 3 COMP MR. COMP U FUNC SYS ADDRESS. DATE.... DESCRIPTION............................. CORRECTIVE ACTIOl4.......................
ESTABLISHED A550676 2 RM 090 -120 01/23/86 2-Rt1-090-120 , PERFORM SI 206.2 ON NONE. PERFDRM SI MONITOR UNEN CLOUDOWN FLOU IS '
ESTABLISHED A5506CO 2 LT 003 11101/18/86 2-LT-003-111, nNPRDSu THE TRNGNITTER A INITIAL INSTALLATION UAS IMPROPERLY L(EFR50.49 DEVIE IS NOT 00UNTED PERFORNED. ItSTL XfiTR PER UESTINCl10USE PROPERLY PER UESTIIGIOUSE DRAUING DUG 8765D45 FJ765D45 A550681 2 LT 003 56 01/18/86 2-LT-003-56 , THISuNPRDSnTR A!GMITTER IllITIAL IIGTALLATI0ti UAS IMPROPERLY A10CFR50.49 DEVICE IS NOT NOUNTED PERFCRMED. INSTL XMTR PER UESTINGIOUSE PRODERLY PER UESTING!!OUSE DRAUING DUG 0765045 8765D45 A550632 2 LT 003 97 01/18/86 2-LT-003-97 , nNPRDSu THIS TnANSf1ITTER It!ITIAL INSTALLATION WAS InPROPERLY A10CFR50.49 DEVICE IS tiOT MOUNTED PERFORTIED. IlGTL XHTR PER RESTIICfGUSE PROPERLY PER RESTIIGiOUSE DRAUIIC DUG 0765D45 8765D45 A5506S4 2 LT 003 106 01/18/86 2-LT-003-106 ,utiPRDSu THIS TRAIGNITTER INITIAL INSTALLATION UAS IMPROPERLY A10Ca'R50.49 DEVICE IS 140T PRGPERLY PERFORt1ED. INSTL XMTR PER RESTItGHOUSE MOUNTED PER UESTIt{!OUSE DRAUIIS 0765D45 CUG 8765D45 A550685 2 LT 063 177 01/22/06 2-LT-063-177 ,KNPRDSu THIS TRN EMITTER IllITIAL IIGTALLATION CAS IGROPERLY A10CFR50.49 DEVICED IS NOT PRGPERLY PERFORt1ED. ItGTL XMTR PER RESTIIC10USE MOUNTED PER UESTItGIOUSE DRAUItG 8765D45 DUG 8765D45 A55G686 2 LT 06'3 93 01/18/86 2-LT-063-93 , MNPRDSu THIS TRfJGMITTER INITIAL IlGT(LLATIG!i UAS IMPROPERLY A10CFR50.49 DEVICE IS tl0T PROPERLY PERFORMED.ItSTL XHTR PER UESIItCMOUSE MOUNTED PER UESTIt4100SE DRAultG 8765D43 dug 8765D45 '
e550687 2 LT 003 39 01/22/86 2-LT-003-39 ,nNPRDSn THIS TRA;GMITTER INITIAL INSTALLATION CAS InPROPERLY A10CFW50.49 DEVICE IS NOT PROPERLY PERFORMED.IiGTL XNTR PER UFSTItCHOUSE F10UNED PER UESTINQ100SE DRAUIlG 8765D/5 DUG 8765045 A530688 2 LT 063 179 01/22/86 2-LT-043-179 ,MNPRDSu THIS TRNEMITTER INITIAL INSTALLATION UAS It" PROPERLY A10CFR50.49 DEVICE IS NOT PROPERLY PERFORt;ED.ItGTL XMTR PER UrSIINGHOUSE MOUNTED PER UESTIlCHOUSE DRAUIiG 8765D45 DUG 8765D45 A550489 2 LT 063 178 01/22/86 2-LT-063-178 ,NNPRDSu TiiIS TRAfGT1ITTER INITIAL IiGTALLATICtt WAS IGROPERI,Y
, A10CFR50.49 DEVICE IS 140T PROPERLY PERFORMED.ItGTL XMTR PER LFSTINGHOUSE f10UNTED PER UESTItGiOUSE DRAUIfC 8765D45 DUG 8765D45 A550690 2 LT 063 176 01/22/86 2-LT-063-176 ,NNPRDSM THIS TRANSNITTER A INITIAL INSTALLATION UAS IMPROPERLY ,
10CFR50.49 DEVICE IS NOT PRCPERLY PERFORMED.ItGTL XMTR PER LFSTItCHOUSE MOUNTED PER UESTItHOUSE DRAUItG 8765D45 DUG 8765045 i
A550691 2 LT 003 42 01/18/86 2-LT-003-42 ,uNPRDSM THIS TRANSMITTER
! INITIAL ItGTTLLATION UA5 IGRCPERLY A10CFR50.49 DEVICE IS 'NOT MOUNTED PERFCRITED.INSTL XMTR PER UES11NGH:USE PROPERLY PER UESTItG10USE DRAUIfG CUG 8765D45 8765D45 20 ,
IMSTRLt*ENT MAINTENANCE MONTHLY SL"i31ARY 02-04-86 PAGE 4 COMP ~
MR. COMP U FUNC SYS ADDRESS. DATE. . . . DESCR IPTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . CORRECTIVE ACTION. . . . . . . . . . . . . . . . . . . . . . .
i A550692 2 LT 003 98 01/18/85 2-LT-003-98 ,mHPRDSu THIS TRANSMITTER INITIAL INSTALLATION WAS IMPROPERLY A10CFR50.41 DEVICE IS 140T MOUNTED PERFORMED.INSTL mTR PER UESTINCHOUSE I
PROPERLY PFR UESTIt4 HOUSE DRAUI!4G 8765D45 DUG 0765045 '
A550693 2 LT 003 94-F 01/18/86 2-LT-003-94-F ,THIS TRANSMITTER A 10CFR INITIAL INSTALLATI0tl WAS IMPROPERLY 50.49 DEVIE IS i;0T PROPERLY MOUNTED PER PLRFORMED.INSTL XMTR PER UESTIIEll0USE UESTIt:CHOUSE CRAUIt!G 8765D45 CUG 8765D45 A330694 2 LT 003 52 01/18/86 2-LT-003-52 ,THIS TRANSMITTER A 10CFR Ir4ITIAL ItGTALLATION UAS IMPROPERLY 50.49 DEVIE, IS IDT PROPERLY MOUNTED PERFORMED.ItGTL XM1R PER UESTINGHOUSE PER UESTItOfDUSE DRAUING 8765045 DUC 0765D45 A550695 2 LT 068 339 01/22/06 2-LT-068-339 ,TilIS TRANSMITTER, A 10CFR INITIAL ItGTALLATION CAS IMPROPERLY 50.49 DEVIE, IS FOT PROPERLY MOUNTED PERFORMED. INSTL Xff1R PER UESTItGHOUSE DER UESTINGHOUSE DRAUING 8765D45 DUG 8765D45 A350696 1 LT 068 320 01/02/06 1-LT-068-320 ,n0UNTING PLATE TO PANEL DCLT MISSING. REINSTALL MISSItC SOLT 1%S 1 COLT HISSING. HEEDS TO BE INSTALLED TO SATISFY GMDS TAG REA A-3 IN bit 0ER SCIEQ XMTR-0001 nCDIFICASTIOl4 SHOULD SE REGUI A550697 2 LT 003 43 01/18/86 2-LT-003-43 ,THIS TRANSMITTER A INITIAL INSTALLATION UAS ' IMPROPERLY 10CFR50.49 DEVICE IS NOT MOUNTED PERFORMED.INSTL XMTR PER UESTItCMGUSE, TROPERLY PER UESTINGHOUSE CRAUING CUG 8765D45 8765D45 A559962 1 LT 068 372 01/50/861-iT-068-372 , REC 04HECT HL 3 PROCESS N0lE. NONE LIFE TO SENSOR BELLOUS HOUSING GPEN HL 3 AND UPPER PLENUM PRDCESS ISCL VLVS GD BACKFILL PROCESS LINES i A362000 2 LEV 003 172 01/09/86 2-Li,V-003-172 ,uNPRDS4 LCV IS NOT COMING 2 LIC 003 172 A FAILED TO OPER O!1 l
FLLLY OPEH UITH HS IN MCU Ato TURN TO DEMAND.BECAUSE CF A DEFECTIVE CAPACITOR 4
11E OPEN POSITION TO APPROX 3 MIN CIRC BRD ASSEMBLY (:ND CABLE ASSEMBLIES.REPLA E CAPACITORJCIRC BRD ASSENDLY AND CABLE ASSENSLIES.f2 A562000 A564783 2 LT 068 335 01/22/86 2-LT-063-333 ,THIS TRAtGThTTER A 10CFR INITIAL IfGTALLATIDH UAS IMPROPERLY 50.49 DEVIE, IS IUT PROPERLY MOUNTED PERFORMED. IfGTL XHTR PER UESTItDDUSE PER UESTINGHOUSE DRAUING 8765145 DIl4 DER DUG 8765D45 SC'EG-XnTRO--I
! BIOO900 0 TR 082 5036/28 01/23/86 0-TR-082-5036/28 , REPLACE PLASTIC
' UORN BRUSH ASSEMDLY. REPLACE CRUSH ,
CONTACT BRUSH ASSEMBLY ASSEMBLY B101657 0 FI 090 51328 01/24/86 0-FI-090-51328 , STACK VOLUME READOUT CFM OUT OF CALIBRATION. RECALI1 RATE IS NOT READING FRCFERI.Y FOR Il0ICATED INDICATCR STACK VELOClTY M/00'JT B101770 2 FE 072 34 01/30/86 2-FE-072-34~, uNTR3m VENT ANJ BACKFILL SENSE LINES lEED DACKFILLING EACKFILL
' SOISE LINES BETUED1 FLAU ELEMENT A!D SENSE LINES 21
ZNSTRtt1ENT MAINTENANCE MONTHLY
SUMMARY
02-04-06 PAGE 5 COMP t1R. COMP U FUNC SYS ADDRESS. DATE. . . . DESCR IP TION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . CORR ECTIVF ACTI 0tl. . . . . . . . . .
FLOW XMTR B101771 2 FE 072 13 01/30/86 2-FE-072-13 , MNPRDu VENT Ato BACKFILL SD!SE LItiES TEED BACKFILLING. BACKFILL SDiSE LINES BETWED4 FLOW ELD 1El4T AND SD4SE LILIES FLOW XMTR 8102500 2 FS 030 200 01/23/86 2-FS-030-200 , NIn REPLACE CIRC BRD ELECT C0i1P0tEllT 0l1 CIRC ERO DEFECTIVE.
DKOREN C0f1PONENT REPLACE CIRC BRD B102509 2 001 TP'iO5E 01/27/86 2-001-TP505E ,RErUK BROKEN TERMIllAL x ABt10R11AL STRESS. REPLACE TESI POItir FROM TP 505E R 18 A!O REPLACE U/ SPARE TERT 1INAL FROM R 19 B102606 2 FX O( ,
155 01/23/86 2-PX-003-155 , uMPR0m TROUBLES 100T LOOP
' ' UtiXh0UN. !!ONE *
' TO' DETERl1INE CAUSE OF LUR SUP OIODE LURNING UP B102706 2 099 TRNA 01/07/86 2--099-TRNA ,uNPRD1 TROUBLESNOOT 1 UtG010UN; NONE. tiG E.
REPAIR IF REQ'D TIE PROB CAUSING RELAY K620 TO DE Et:ERGIZED B102714 1 FCAN 043 200 01/21/86 1-l!2AN-043-200 , min CLEAN ANAL TIGHTDi NONE. CLEAN (ML;TIGliTEN COVER ON IIOT COVER ON HOT 00X IF REG'D BOX B102715 1 IGAN 043 210 01/21/06 1-H2All-043-210 , uIu CLEAN (WAL-TIGHTEN NONE. CLE/M ANAL TIGHTEN COVER ON HOT BOLTS ON HOT BOX COVER IF REG'D BOX B102714 1 ENS 082 IBD 01/16/861-GEN 3-082-ISB ,ItGTL PLOTTER / RECORDER I40tE. INSTL RECORDER FOR ENG TO TACHOMETER ON 04G TO GIVE ACCELERATION TEST. REMOVE LUEN TEST ACCELERATION CURVE PLOT TIf1E VERSUS RPM. COMPLETE SUPPORT TECH T1AINT TESTS B102939 1 003 174 01/22/661-003-174 , VERIFY PRESS TO POSITIONER NONE. VERIFY AIR PRESS ADJUSIED AS lEC ,
TO BE IN COMOLIAliCE W/GMDS TAB G B102940 1 003 175 01/22/861-003-175 , VERIFY PRESS TO POSITIONER tiONE. VERIFY AIR PRESS ADJUSTED AS NEC TO BE IN COMPLIANCE U/GNOS TAB G B102941 2 003 174 01/23/06 2-003-174 , VERIFY PRESS TO POSITIONER HONE. VERIFY AIR PRESS A0 JUSTED AS tEC TO BE IN COMPLIAN& W/Of1DS TAB G B102942 2 003 175 01/23/86 2-003-175 , VERIFY PRESS TO POSITIONER NONE. VERIFY AIR PRESS A0 JUSTED AS TO BE IN C0riPLIANCE W/GMDS TAB G HEC.
B503112 2 lE 068 01/13/86 2-TE-068- , utiPRDu COMPLffER PNT T0426A IS LOOP REMOVED FROM SERV ON 17/18/85 BY UtGELIABLE AND GIVING FALSE ALARMS HOLD CRDER 5009.NONE B103307 2 RR 090 254 01/10/86 2-RR-090-254 ,RECEDER IS ERRATIC EXCESSIVE GREASE BUILD Up CAUSING BINDING. CLEAN PD4 CUIOE ROD AND CRIVE ,
GEARS B103314 0 F31 090 SPARE 01/24/86 0-RM-090-SPARE ,M000LE HAS NO SIGNAL BAD A101 AND A107 Op AMPS REPLACE CR AMPS B303315 0 RM 090 225 01/16/86 0-RM-090-225 ,THE HIGH VOLTAGE TST POINT GROUND CONN LODSE ON TL?' POINT. REPAIR (TP-6) IS BROXE OR LODSE PLEASE INVEST GROUND AND REPAIR 3
22
c _.
INSTRltENT MAINTENANCE MONTHLY
SUMMARY
02-04-86 PAGE 6 COMP MR. COMP U .
FUNC SYS ADDRESS. DATE. . . . DESCR IP TION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . CORRECTIVE ACTION. . . . . .
B103318 2 099 1RNA 01/08/86 2-099-TRNA , miSRDn UHILE PERFORMil4G TI BECAUSE OF IRREGULARITIES IN DATA SHEETS 73 STEP 5.2.8. SL//E TEST LIGHT LIT AND It4STRUCTIONS StEETS OF RT 601A;STED B103324 0 Pfl 090 4.2.14 UAS SXIPPED.NONE.
140A 01/16/86 0-Rn-090-140A , NIPRDSN TEST POINT 3 IS BROKEff TEST POIllT. REPAIR TEST POINT DROKE CR LOOSE PLEASE ItiVEST AND REPAIR B10'3328 2 PX 003 147 01/21/86 2-PX-003-147 ,uNPRDSM VERIFY LOOP DEFECTIVE DIDDE IN PUR StP. REPLACE VOLTAGE 8103329 2 PX 003 DIODE. UR 0103328 155 01/16/86 2-PX-003-155 , NNPRDS VERIFY LOOP VOLTAGE DIODE IN PUR SUP IttSTLD IHCORRECTLY. NEW DIODE INSTLD CORRECTLY. INCORRECT DIODE B103333 2 PM 001 REi10VED. UR B103329 5B 01/26/86 2-Pn-001-58 ,nNPRDu UHILE PERFORMING SI DEVICE OUT CF CALIB. REC (LIR LEAD / LAG 90.72A DETERMItED ABOVE MODIFIER CAL TO MODULE. UR 8103333 CE HIGH CAUSING BISTABLES 2 PS 15 A/B
& 2 PS 15 B/A TO DE ON EDGE 0F TOLERNICE BZO3521 1 PI 063 19 01/24/861-PI-063-19 , nNPRD3m PIS CALIBRATE PRESS PRESS IND OUT OF CALIB. RECAL PRESS Ito ItOICATOR 1-P1-63-19 FOR THE PERFGRMN IE OF SI-129 B103538 1 FIS 074 12 01/24/861-FIS-074-12 ,NNPRJSn PIS CALIBRATE FLOW FLOW IND SU CUT (F CALIB. RECALIR FLOU INDICATOR 1-FIS-74-12 FOR PERFCRMANCE OF INDICATING SU. UR B103533 SI-128 B103543 1 FI 063 150 01/24/86 1-PI-063-150 ,atFRDSn PIS CALIBRATE PRESS IND OUT OF CALIB ON. RECAL PRESS PRESS INDICATOR 1-PI-63-150 FOR THER It0 PERFORMANCE OF SI-129 8104155 1 PS 082 5026/4 01/26/861-PS-002-5026/4 , TEED CRANKCASE PRESS 110NE. REMOVE DEVICE TO FACILITATE GEAR DETECTOR REMOVED TO INSPECT GEAR TRN B104354 0 FEV 077 43 01/30/86 0-FCV-077-43 ,VLV UON'T OPEN. TRN It4SPECTI0tt.REINSTL UHEtl CCMPLETE WEIR FLOW AT 14000 GPM. ItCPSASE FLOL' TO B105218 1 En 090 15000 GPM TO CLE/R ISOLATICH 106 01/18/861-RM-090-106 ,FIL'TER FAILURE ALARM MICROSUITCH GUT OF ADJUSTMENT. REA0JUST COMING IN EVERY 15 MINUTES. PAPER HAS MICROSUITCH BEEN CHECKED BY CIEn LAB, POSSISLE THE FILTER IS NOT TURNING B105219 2 LI 070 99A 01/23/86 2-LI-070-99A , MNPRDSn LEVEL TRANSMITTER 2 FSV 70 66 UAS CLOSED BECAUSE A RAD NEEDS TO BE RECALIBRATED MON HAC INITIATED A HIGH RAD VLV CLOSURE.THIS IN TL7H CAUSE0 A VAC ON ,
TIM.0 PEN SOLENDID TO RELIEVE VAC VERIFY PROPER RE/ DINGS;RETURH TO SERV 8105222 1 !GAN 043 UR B105219 200 01/24/861-H2Ni-043-200 ,HAS A ' LOW GAS PRESS ALAEn.
ZERO H2 CAL GAS (40 1%H2 CAL GAS BOTTLE B105461 0 Rn 090 EMPTY. IllSTL NEW DUTTLES 122 01/30/06 0-RM-070-122 ,Rn READING TOO HIGH FOR LODSE GR0014D UIRE. SECURE GROUND WIRE 23 +
IriSTRLt104T MA!NTDW1CE MONTHLY
SUMMARY
02-04-06 PAGE 7 COMP MR. COMP U FlNC SYS ADDR ESS. DATE. . . . DESCR IP T ION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . LORRECTIVE ACT ION CELEASE HAS DEEN FLUSfED U/3 DDTTLES GF 2TDA ETBA ACID CUT DID NOT DO ANY GOOD B105498 1m 090 160A 01/25/861-RM-090-160A , FILTER FAILED ALARM KEEPS DEFECTIVE MICROSUITCif. REPL(CE COMING IN 'lEPEATECLY MICROSUITCH B105553 2 RE 090 112 01/14/06 2-RE-090-112 , ALARM'S 2N COTNROL RM CUT LGOSE UIRE ON RELAY K2 TERMIf!AL.
NONE CHOUING DH LICliTS ON RAD MON IN (m RETERMINATE WIRE SLD i
8105799 1 FI 070 155 01/09/86 1-FI-070-155 , nNPRDn METER PEGGED llIGli 1FT070 155 llAD A BOX AM?LIFIFR 00ARD.
U/1.0U FLOW B10'.800 2 XI 092 5001 01/13/06 2-XI-092-5001,NIS 31 TRD;DED UP SCALE ItGTALL 11EU AMPLIFIER BRD UNXHOUN. TROUBLESHOOT LOCu AND NO PRC3 U/NO REACTIVITY CHAtCE IN PROCRESS UAS FND 6105982 0 15 311 203 01/27/86 0-TS-311-203 ,SUITCH NEEDS REPLACIliG UDRN CUT. IlGTL tEU SW C(d'T ADJUST B107042 1 >E 052 100 01/18/86 1-XE-052-100 , REPLACE ACCELEOROMETER 1 Hf.RD LI!E CASLE TO TR(JGOUCER TOO SHORT.
XE 52100 DUE TO T,ROKEN CONNECTOR USED REPLACE TR(#EDUCER (OD 3 FT OF MICRUDOT FOR SIGNAL CABLE CACLE B107046 2 099 TRN B 01/30/06 2-097-TRN B ,Lt.iILE PERFORMING TI 52 FID CAD UllIVERSAL CARD, REPL(LL UNIVERSAL BAD LOGIC ON SU A POSITION 19 AND 20 C/RD 0107057 2 FIS 074 24 01/25/86 2-FIS-074-24 ,alPRDSu CALIBRATE FLOW ~
FLOW IliDICATItG EU GUT OF' CALIB. RECAL It01CATOR 2-FIS-74-24 B110350 2 LT 068 FLOU INDICATItG SU UR B107857 339 01/30/86 2-LT-063-339 , nNPRDa min ItGTR MAINT TO PIGTAIL TOO SHORT DECAUSE OF PERVIOUS REPLACE EXISTItG PIGTAIL OF 2 LT 68 339 INSTALLATION. INSTALL tEL PICTAIL ITT BARTON MODEL 764 SERIAL 600 U/tEU ASSEMBLY CONN PN 07412218 8 REPLACE D RINGS PER GMDS B110801 2 PI 069 30101/13/86 2-PI-068-301, CALIBRATE PRESS LOOP IF XMTR 2 PT 68 0301 OUT OF CALIB.RECALIB LOOP I!AS BEEN CALIBRATED WITHIN THE PASY PRESS XMTR 30 DAYS THIS UR DOES i:0T HAVE TO SE WORKED B111828 1 LI 003 106 01/27/861-LI-003-1C6 , VERIFY CORRECT LUL XMTR 1 LT 3106 E REFER LEGS TEED Il01 CATION FAN RM 1 R111831 1 LI 003 93 01/30/E61-LI-003-93 ,5NPRDSu VERIFY CORRECT CACKFILLIfG. BACKFILL REFER LEGS TRANSf1ITTER REFERENCE LEGS FEED LEVEL It0ICATION BACKFILLItC. BACKFILL SDISItT, LINES AS B111834 1 LI 003 NECESSARY UR B111831 51 01/27/86 1-LI-003-51 , VERIFY CCRRECT LVL 1 LT 003 0051 D P.EFER LEG tEEDED ItOICATION FAN RM 2 ,
BACKFILLING. BACK FILL REFER LEG UR 8111837 1 LI D111C34 003 30 01/30/86 1-LI-003-38 ,utPRDSN VERIFY CORRECT TRMGMITTER REFEPINCE LEG tEEDS LEVEL ItCICATOR B113696 2 PX 003 Dr.CKFILLING. EAC17ILL REF RDiCE LEG 163 01/16/86 2-PX-003-163 , VERIFY LOCP VCLT Ato DEFECTIVE DIODE IN PUR EU . REPLACE RESISTANCE TO FULFILL CMDS TAB G REG A-3 DIODE UR B113696 24
It;STRLt.ENT MAINTENANCE MONTHLY
SUMMARY
02-04-86 PACE 8 COMP MR. COMP U .
FUNC SYS ACDRESS. DATE. . . . DESCR IP TION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . CORR ECT I VE ACTION. . . . . .
8113697 2 PX 003 170 01/16/86 2-PX-003-170 ,VERIYF LOCP VOLT N4D DEFECTIVE DIODE PUR SUP. REPLACE RESISTANCE TO FULFILL GMDS TAS C REG DEFECTIVE DIODE. UR D11369/
A-3 B113698 2 PX 003 155 01/14/86 2-PX-003-155 , VERIFY LOOP VOLT 3 NONE. VOLT (JO RESISTANCE READINr. WITHItt RESISTANCE TO FULFILL GMDS TADG REO A3 TOLERfJ4CE HDIE REQ'D B113699 2 PX 003 147 01/14/06 2-PX-003-147 , VERIFY LOOP VOLT 1 Note. VOLT AND RESISTNCE READItCS RESISTANCE TO FULFILL GMOS TABC MAINT WITilIN TOLER/J4CE HDHE RE0'D REG A3 B113705 2 LEV 003
' 173 01/07/36 2-LCV-003-173 , AIR PRESSURE DOWN STREAt1 CONTROLLER DUT OF CALIB. RECALIB FGRDM RECULATOR UAS DUT OF TOLERANCE CGNTROLLER VALVE 8 POSITIO!ER MUST BE RECALIDRATED PER SGNE0ILCV-001 8113721 2 PDT 030 42 01/07/06 2-PDT-030-42 , ANPRDn REPLACE PRCCESS CAD PROCESS CCieECTIOtt GASKETS. ItGTL CGNtECTI0tG ON CONT PRESS XMTR NEU GASKETS At40 TORCUE SCREUS B113732 1 LEV 003 174 01/13/86 1-LCV-003-174 , REPLACE TWO MISSIt1G PERSONtEL DID t!OT REPLACE CR TIGHTEN.
SCREUS IN POSITICER COVER PLATE ItlSTL LEU CCREUS 8113734 2 LEV 003 175 01/14/86 2-LCV-003-175 , REPLACE MISSItG SCREW TO PERSONNEL DID tt0T REPLACE OR TIGHTDt.
POSITIONER COVER IIGTL HEU SCREUS B113743 1 PT 030 310 01/25/86 1-PT-030-310 , TOS/R TRAtGMITTER - TEED UtMNOWN. USE STENCIL TO X OUT 12 UCRKItG TO I.D. X OUT SAFE UCRKIIG PRESSURE ON METfL PRESS. STAMP IN S/FE UCRKIt!G PRESS OF 150 TAG B113744 1 PT 030 311 01/25/86 1-PT-030-3.~ 1, TOS/R TRANSNITTER TEED TO UN;040UN. USE STEtCIL TO XOUT 12 UORKItG X DUT SAFE WORKING PRESSURE Ott METAL I.D. TAG PRESS.STt@ Ill SAFE UCRKING PRESS OF 150 8813745 2 PT 030 310 01/25/86 2-PT-030-310 ,TOSTR XMTR TEED TO X OUT UNKNOUN. USE STDCIL TO X OUT 12 SAFE WORKItC PRESS ON METAL ID TAG UORKING PRESS. STAMP IN SAFE UORKItG PRESS OF 150 B113747 0 LT 027 B 225 01/23/86 0-LT-027-225 ,REPL/,CE BOLTS CH CAPSULE UtlKNDUN. REPLACE BOLTS MOUNTING BRACKET B113754 2 FM 003 163A 01/13/86 2-FM-003-163A , tNPRDn ItGTRUMENT UAS ticiE. NDtE DEVICE IN TOLERAtCE CALIBRATED UI~ METE #537786 UNICH UAS FOUND 00T CF .JLER/JEE AT THE LAB.
B113755 2 FI 030 S242A 01/-86 2-FI-030-5242A ,1tGTRU UAS CALIBRATED It!DICATOR CAL. OK, MODIFIER UITH A DIGITAL MULTIMETER #4S6462 UHICH 2-F'1-030-5242 UAS FOUND OUT OF ,
UAS FOUt0 OUT OF TOLERANCE 8113804 2 PT 030 TOLERANCE. RECALIDRATE MODIFIER 31101/25/86 2-PT-030-311,TO BAR XMTR NEED TO X OUT UfNNOWN. USE STEtCIL TO XCUT 12 UCRKING SAFE UCRKING PRESS ON METAL ID TAG PRESS. STAMP IN S/fE UCRKIF PRESS CF 150 25 '
. i
>M %
IllSTRU1CNT MAINTENANCE MONTHLY Sutt1ARY 02-04-86 Cortp PACE $
f1R2. . . . U -
FLNC SYS ADDRESS. DATE. . . . DESCR IPTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . CORRECTIVE ACTION. . . . . . . . . . .
A523576 1 M1 092 50028 01/30/861-X11-092-50020 ,NR 32 INGP REPAIR BAD HICH VOLTAGE POWER SWPLY. REPLACE POWER SUPPLY B100152 1 LT 068 372 01/27/861-LT-068-372 ,1 Tm0UE URENCH E02485 UAS TEST EQUIP OtR OF TOLERAFCt. REPLACE F0tLD OUT OF TOLERANCE. IT WAS USED ON 0-RING NO 11ETAL GACKET #D RETONOUE TIE SDtSOR DELLOUS FOR THIS INSTRUTIENT.
' RECIECK TOROUE CF SDCOR ll0USING DOLTS Sill-0TE j 13 records listed.
t s
h 9
26 i
. j i
. . . - . . - .- . . -. . .. .. . - . _ . .=_ - . ,
9 J
l
. \
f I
l l
i l I
1 .
i 1
a I
< l 4
l l
' MAINTENANCE SUPDIARY 1
(MECHANICAL) f f
l i
.1 r
I
- l 4
1-a t
1 1
l 1
l 1
b i
4 1
e 1
4 1
I
. . , . - - - - ~ , . _ _ . , . . _ . . . . . . , _ . , - _ , , , , , , , , , _ . _ _ _ . . _ _ _ _ , , _ , , _ , _ _ _ , . , , _ . , , _ , _ , , , _ . ,. , .. .
MONTHLY REPORT JAN. 1986 ~
MECH. MAINT.
UNIT 1
- 1) RAN 1R CCP RFTER PUTTIf1G OIL It1 AtJD TIGHTEf1ING PACKItJG tJUT.
- 2) FItJISHED HORK ON 18B BAT. PUMP.
- 3) TOOK BOLT STRETCH READIf4GS Of1 RCP #4. -
- 4) PEBUILT SOLEtJOID OtJ 1-FSV-1-14A.
5> REMOVED IfJDICATIOf45 Ot1 FEEDWATER ISOLATION VALVE BONNETS.
- 6) INSTALLED FJEW INNER SPRIrJG Ir# 2-LCV-6-106R.
- 7) ItJSTALLED NEW PACKING IN 1-FCV-1-22. '
- 8) REBUILT ASCO SOLEtJOID VALVE 1-FCV-1-78.
- 9) MACHItJED BONtJET OM 1-FCV-3-47.
! 10) RECEIVED 1-VLV-3-568 BACK FROM MUSCLE SHOALS AtJD INSTALLING.
l 11) COMPLETED SOLEf40ID CHANGE OUT OfJ 1-FCV-43-22.
, 12) COMPLETED WORK Ott 1-FCV-3-33.
- 13) MACHIfJED BONNET ON 1-FCV-3-87 AND REPACKED.
- 14) TOROUED 1-FCV-3-47.
- 15) COMPLETED WORK ON 1-VLV-3-568.
- 16) tJOZZLE COVER HORK COMPLETED.
- 17) PREFORMED SI-648 Ot1 RIR LOCK DOORS.
i 4
.]
d 4
4 4
1 l
3 4 i 27 ,
I e
MONTHLY REPORT JRtJURRY 1986 MECH. MRItJT.
UNIT 2
- 1) CHANGE OUT 2BB RHR PUMP SERL WATER HTX
- 2) RLIGNED 2BB BRT. PUMP.
! 4) INSTRLLED 8 STUDS IN 2-FCV-3-100.
- 5) RESOLVED SCRATCHES ON SERT AND WEDGE OF 2-FCV-3-87.
q 6) REPLRCED OIL PUMP COUPLING ON SPEED IrJCRERSER OF 2RR-CCP.
- 7) CHANGED GRERSE IN 2-FCV-67-130,131,133,134.
7 8) COMPLETED WORK Of2 2-STRN-26-148.
. 9) TOROUED 2-FCV-3-33,47,87,100.
- 10) INSTRLLED 1-MVOP-67.131,133,139.
- 11) COMPLETED HYDRO Of4 BRT PIPItJG.
- 12) COMPLETED If1SPECTION ON 379 OF 695 SNUBBERS PER SI-162. .
} .
i E
j .
i' l
.a i
j
, 28 i
. .- . . _.- .-- . _ - . - .- . . - . - - . . - . ~ .. . ._ .=_ _ _ - -. . .-
1 1
1 3
MONTHLY REPORT JANUARY 1986 MECH. MAINT.
COMMON
) 1) CHANGED OUT HPFP STRAIf1ERS.
- 2) COMPLETED HORK Of1 ERCH SUMP PUMP.
- 3) INSTALLED DENSITY CELL If4 CDWE.
- 4) INSTALLED NEW MECHANICAL SEAL IN 1RA BAT. PUMP.
- 5) COMPLETED MONTHLY INSPECTION OF 1BB D/G.
- 6) PERFORMED P.M. ON LORRAIN CRANE.
- 7) NORK COMPLETE Ot1 'B' AIR COMPRESTOR.
- 8) COMPLETED HORK ON WASTE GAS VALVES-TANKS A,B,C,D.
- 9) ALIGNED CDWE RECIRCLfLATION PUMP AND INST 6LLED NEN SEAL LERKOFF TUJIfAG.
- 11) INSTALLED NEH Ef4GIfJE DRIVEN FUEL OIL PUMP RND STRAINERS. ,
- 12) COMPLETED MONTHLY INSPECTION ON 1AR D/G. -
l 13) COMPLETED MONTHLY INSPECTION ON 2AA D/G.
I
{
k t
l i ; 29 , ,
. 4 j -
4 .
l; .
i
(
e i,
t . .. .
4 i
t 4
1 1
4
- 1 1
i 4
4 i
d 1
.i MAINTENANCE SUPE!ARY (MODIFICATIONS) i l
l 4
i i
i I
c i
t i
l J
i e
i i -
4 1
.i e
-- ,-ae,w---semwwaww-+e-++e-w~+u- w e we w e - wee . esam-e-ow twe re we-w r ee n* W
SUMMARY
OF WORK COMPLETED MODIFICATIONS JANyARY 1986
^
Ten (10) CFR50.49 ~~
ECN 6032 - H 2 Analyzer Relocation A workplan was written, approved, and placed in work to provide an air supply from an essential air-source to a unit 2 train only. This work is continuing.
ECN 6231 - Remove Interferences ali ERCW piping has been rerouted, hydro tested, a.J returned to.
service. Some minor hanger work remains. An additional support in unit 1 valve room was identified as requiring modification to allow access to a motor operator. A workplan was prepared and is in the
, approval cycle.
ECN 6552 - 0588 Solenoids The workplan was written and placed in the approval cycle to replace 12 solenoids. Work will begin upon approval.
ECN 6561 - Modify Valve Room Doors and HVAC for Floo[1 Protection A workplan was written, approved, and placed in work for this activity. Work continues.
APPENDIX R ECNs 5265, 5435, and 6343 - Fire Doors i
Doors C-49 and C-50 have been completed, which completes ECN 5265.
Two doors at the diesel generator building (ECN 6343) have been replaced, and three other doors are in work on that workplan. The preparation of a workplan for the remaining doors is in progress.
ECN 6235 - Reroute Various Cables Field work and workplan writing were restarted. !
i l
ECN 6305 - Elevation 714 Fire Barrier l The firewall was declared operable. Minor pdini work and cleanup remain. .
ECN 6311 - Operator Extension on PORV Awaiting startup for final PM'T.
ECN 6315 - Replace Fuses Fuse installation is on hold for material.
30
APPENDIX R (Continaed)
ECN 6319 - Fire Protectica Piping The installation of piping and hangers on vario,us elevations of the _. --
auxiliary building continues. -
OTHER ITEN3 ECN 2768 - REVLIS A workplan to modify the head vent support was prepared and approved, and work was started.
ECN 5009 - ERCW Piping Changeout From Carbon Steel to Stainless Steel
.i All mechanical work is complete. Insulation installation remains incomplete.
ECNs 5034, 5'13, 5743, and 6064 - Various Platforms in Lower Containment The installation of plat forms becween Nos. 2 and 3 steam generators and the bridge from the reactor coolant pump platforms to this platform continues. The application of protective coating continues.
ECN 5252 - Label Node Voltages in Manholes No progress on this job this period; four manholes remain.
ECN 5347 - Replace Doors C-49 and C-50 (Electrical Portion)
This work is on hold until door C-50 passes the leak test.
ECN 5373 - Condensate Demineralizer Air Compressor I This work was completed except for final PMTs.
ECN 5620 - Add Instrumentation for Auxiliary Feedwater Pump Work is on hold.
! ECN 5645 - Replacement of Flow-Control Valve 2-329 All mechanical work was completed. Insulation installation remains incomplete.
ECN 5657 - Installation of MSR Drain Valves All valves have been installed. Reinsta11ation of the insulation remains.
O 31
- ,- - - . - - . , . - , . + - , . - - -
,-_.mw .-,. .--- - - . ,. - - - - . .,w,.,..-, -, ,.-,-n,,--._, ,-- - - - . , , , ,-., - m .
l i
] OTHER ITEMS (Continued)
ECN 5667 - Double Isoldtion Valves for Flow Orifices (Unit 2) l l
The workplan for unit 2 was prepared, approved, and placed in work. i Four of the twelve orifice flanges have been co,mpleted. The ,.
remaining 8 will be worked as time and resources allow during the -
unit 2 outage. '
i ECN 5703 - Reinforcement of Block Walls A workplan was written and placed in the approval cycle. Work will begin upon approval.
ECN 5795 - Field Services Building Fire detection system work is on hold for materials.
ECN 5914 - Improve Reliability of Steam Dump Conauit is complete; one valve remains to be wired in.
ECNs 5938, 6305, and 6571 - Replace Feedwater IIcater and Eroded Pipe The level controllers were found to be high, and are being cut out and lowered. This work is continuing. Reinsta11ation of insulation continues. <
h ECN 6057 - Cable Tray Covers i
Approximately 240 out of 290 cable tray covers have been remanufactured or replaced.
j ECN 6147 - Airlock Packing Nut i
Final testing of the airlocks on unit 2 remains incomplete.
ECN 6196 - Pressurizer llangers and Valves j Cleanup and PffT activities remain incomplete on unit 1, and cleanup j remains inccmplete on unit 2. ;
ECN 6204 - Electrical Penetration Overcurrent Protection Fuse r elacement and fuse block installation are complete. We 1 are awaiting a technical specification change to place the circuits 2
in operation.
ECN 6227 - Modification of Demineralizer Tank Internals --
1 The internals for the anion and. storage tanks have been replaced, which completes this modification. -
1 l
\ -
i
\
32 4 l
l OTHER ITEMS (Continued) '
l ECN 6259 - Moisture Separator Reheater Tube Bundle Replacement l Welds have been repaired, and the doghouses were installed. Flushing of all moisture separator reheaters except one was completed. _
l Insulation activities continue. - '
ECNs 6402 and 6439 - Pressurizer Instrumentation Relocation -
The unit I work was completed. The unit 2 work is nearing completion.
ECN 6417 - Install Alternate Seal Water for Pumps, CD'dE Electrical drawings remain to be issued.
ECNs 6491 and 6534 -:ERCW Supports Wc_k on 32 of 41 supports is complete, and work on the remaining 9 continues.
ECN 6548 - Additional Support for Incore Drive Cart The workplan was written, approved, and placed in work. The mechanical work on both units is complete. Paint and cleanup remain incomplete.
ECN 6601 - Removal of EGTS Backdraft Dampers The preparation of this workplan has begun. The ECN and USQD have l not been received from OE. l i
- Dry Active Waste Building (DCR 1898)
J Work was completed on oismantling the old carpenter shop and cleaning up the site to begin construction. The workplan for excavation and i concrete foundation has been approved. Concrete foundation work will be done as weather permits. !
i l
)
I J
e e4 0
a
~
1 l
l
- l 3 !
33
-me ----ror <v _ - - , --- ,-, s -,,-,,am - - - - , - - , , ,- ------v w er ww- -e--n-- ,- < - ~ ~ - - - - + ,-
r + = - - - - -nn,m--n n
-1 .
! . i i
5 i _. .
?
\ .
'! t
}
i j
i i
= .
i f
i 2
4 j ENVIRONMENTAL QUALIFICATION l (E.Q.) sum!ARY i
4 j
1 t'
l t
i l
3 g l
{
f i
1 I
f 1
_ _ _ . - _ ~ , _ _ , . _ _ _ _ . _ _ _ . _ . _ . . _ _ _ . - _ . , . _ _ _ _ - _ , - . _ . . _ . . - _ _ _ . - _ , . _ - _ . _ ,. . _ _ _ _
c Date: 2/5/86 >
Estimated j Date of l Completion
! SCR No. Description ECN Engineer Workplan No. U-l U-2 Comments ~
EQP 8501 Disconnect l- and 2-HS-62-61 6524 Peters 11901 C C U-2 QIR submitted.
i EQP 8302 Replace penetrations 23 and 48 6490 Peters 11801, 11802, C C Complete QIR suomitted.
11810, 11811 EQP 8503 Relocate RE-90, 273, -274 6500 Peters 11810, 11811 C N/A Complete field verification sheets are in binder. No QIR needed.
! EQP 8504 Splice methods not correct N/A Stockton 80 !!Rs C C Complete QIR submitted. ,
i l EQP 8505 Drawing N/A N/A N/A N/A N/A l EQP 8506 Seal containment isolation 6514 Kimsey 11880 2/9 2/9 seals installed, need new gaskets i valve top hat. Delivery scheduled for 4 2/7.
fEQP8507 Rewire MOV N/A Rutledge 11866, 11853 2/10 C on U-1, all rewired, 105 j functioned, 31 MOVATS.
i j EQP 8508 Ju weepholes (press) 6523 Alas 11898 C C Complete QIR sbbmitted.
) EQP 8509R1 Conduit sea'Is 6529 Kimsey 11903, 11904 2/8 2/4 Workplans in work.
1 1
EQP 8509R2 Conduit seals
) EQP 8510 Disconnect local handswitches 6527 Peters 11901 C C l
' EQP 8511 Submerged JB inside 6549 Peters 11901 C N/A containment l ,
I I
I l
1 1
- 34 f ,, ,
j .
Date: 2/5/86 Estimated Date of Completion SCR No. Description ECN Enqineer Vorkplan No. U-l U-2 Comments
, EQP 8512R2 Rewire JB N/A Amburn 11855, 11856 2/8 C On U-1, 82 of 128 rewired, including EQP 8543. 4 boxes added.
EQP 85?3 Weep holes (moisture) 6547 Alas 11898 C C Complete QIR submitted.
EQP 8513R2 Weep holes (moisture) 6565 Alas 11937 C C Complete QIR submitted.
EQP 8514 Motor insulation 74-1, -2 6540 Branham 11906 N/A C Complete Q1R submitted.
EQP 8515 Replace 2-PDT-30-43 6554 Legg 11912 1/23 C U-1 tubed.up; turned over to IMs 1/23.
g EQP 8516 Replace 2-LT-3-174 N/A Instrument N/A N/A 2/10 Procedure on hold due to binder; Maint. revision has been submitted.
Estimate 1 week for binder revision. IMI PORC date of 2/7 4
and implementation as shown.
EQP 8517 ABGTS humidity control 6578 Gonzales N/A C ABGTS B-B complete.
EQP 8518 Submerged cables 6533 Various/6 Various 2/15 C One circuit requires retest, termination, and pressure test.
EQP 8519 Tee drains N/A Electrical N/A C C Complete QIR submitted.
Maint.
EQP 8520 Expired cables 6553 Gonzalez 11902 2/15 C EQP 8521 Delete TB and rework splices 6550 Stockton 11914, 11915 2/15 C Page 2
. 35 ,
l 1
Date: 2/5/86 Estimated Date of Completion i
SCR No. Description ECN Engineer Workplan No. U-l U-2 Comments i 1
f EQP 8522 Rewire local panels N/A Stockton 11914, 11915 2/15 C i
1 EQP 8522R2 Newire local panels instrument 3/22 2 of 8 are complete. 2 more will jl Maint. be functioned today. Remaining 4 i
will be worked with EQPs 8601 and 8607.
b l EQP 8523 Missing bolts and washers N/A Stockton 11914, 11915 2/15 C and misplaced brackets I
- EQP 8524 Change setpoints 6551 Instrument 11916 C Workplan in work. System 12 j Maint. temperature switches on train B remain. One remains to be replaced.
EQP 8525 Reterminate hydrogen N/A Electrical N/A C C Completed by Electrical Maint.
recombiner (MR) Maint.
EQP 8526 Replace FSVs, U-1 1, U-2 11 6552 Mechanical 11897 2/19 2/12 Workplan in approval cycle.
l Mods. Still not available.
EQP 8327 Coat TB, U-1 3, U-2 8 N/A Stockton 11914, 11915 1/30 C U-2 QIR submitted.
(MR) f EQP 8528 Solder strain gauge Barton IMI Instrument N/A C C QIR submitted 1/24.
I t rans alt ters Maint.
EQP 8529 PDT-30-42, -43 6554 Legg 11912 1/27 C U-l tubed up; turned over to IMs l 1/23.
1 l
I 1 Page 3 1
l ; 36 i .
I,'
l _.-__-_.__.____.__: A- _-__ _ . - --- - _ _ _ _ _ _ _ _ - _ _ _ _ _ - - m -r--- _ _ _ . _ _ _
__ ___._m____ __ _ _______ _ _ _ _ _. ._ , . . _ _ . . _ _ . ~ . _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _
i
- i .
Date: 2/5/86 Estimated Date of
, Completion
) SCR No. Description ECN Engineer Workplan No. U-l U-2 Comments
)! '
EQP 8530 Gasket, Namco L/S N/A Electrical N/A 1/31 1/24* 2 gasket and 2 mounting problems to
] (MR) Maint. resolve.
- Reviewing all paperwork; will declare completion
! at end of review.
EQP 8531 Delete MOV heaters 6544 Rutledge 11866, 11853 C C
! EQP 8532 Delete L/S 1 , 2-43-201, 6563 Alas 11920 2/8* 1/27* Workplan in approval cycle.
I -202, -207, and -208 Technical issue has arisen on . ;
testability of valve per Section r 1
XI. OE evaluating alternative. l j
- Decision will be made 2/7.
i l EQP 8533 Delete dual voltage splice N/A Rutledge 11866, 11853 C C l
} EQP 8534 Resplice valve positioner Maxwell MR C C Complete QIR submitted.
3-174'and -175 '
- I EQP 8535 Replace limit switches, 6556 Stockton 11927, U-2 2/8 2/16 Workplan should be available 2/6.
U-1 10, U-2 12 11928, U-l t
EQP 8536 Valve room submergence 6561 Mechanical 11939 2/8 2/8 Mechanical Mods. workplan in Cap drains 6609 Mods. approval cycle.
- . Electrical Cable will need rerouting. !
j Mods.
1 fi EQP 8536R1 Valve room submergence 6612 i
6
! ~
Page 4 l
! +
37
j , f
l l .
4 Date: 2/5/86 s
l ,
Estimated ;
) Date of 1 Completion .
l SCR No. Description ECN Engineer Workplan No. U-l U-2 Comments
, EQP 8537 Rebuild or replace JB 3078 6579 Amburn N/A 3/1 Found another junction box; initiated Category D FCR. When
, ECN is out, will write workplan to .
j accomplish repair of both boxes.
f EQP 8538 Replace capacitors FCO ,31-475, N/A Maxwell 11977 N/A 2/17 Workplan in approval cycle.
l -476 Capacitors on ordet. Delivery i expected 2/13.
l k' EQP 8539 Replace capacitors N/A Instrument Unkn. Unkn. Capacitors onsite will not ,
Maint. physically fit. EQP evaluating
! possible substitute.
EQP 8540 Replace pigtails to Target 6581 Maxwell 3/5 2/28 Writing workplan. Resolving bet.d
, Rock solenoid valves radius problem. Estimate i j resolution 1/22. Material
, delivery to be 2/22.
i I E9P 8541 Delete brakes 6582 Branham N/A 1-FCV-63-93, -94. Brake issue j resolved.
s EQP 8542 Replace unqualified cables N/A 11311 Various 2/15 N/A Cables will be replaced in accordance with EQP 6518. .
EQP 8543 Replace JB wire N/A Amburn 11855, 11856 2/8 2/10 2 U-2 boxes remain. U-1 status in .
EQP 8512R2. 4 boxes added to EQP 8512.
}
- Page 5
! 38 i ; .
i
th
, Date: 2/5/86 i
Estimated i Date of Completion 4 CCR No. Description ECN Engineer Workplan No. U-l U-2 Comments
- EQP 8601 Replace 1 , 2-PT-1-2A, -27A; 6588 Elkins 3/22 Will require replacement. Transfer ,
- upgrade 2-PT-1-2B, -27B -from WBN in progress. Material delivery set for 3/15. Upgrade kits have 5- to 7-week delivery.
! 08 is pursuing alternates.
EQP 8602 Reroute control cables for ************************************************** No longer an issue.
1 , 2-PCV-70-87, -89 r
EQP 8603 Replace portion of PP711B Kimsey Will require replacement or relocation.
] EQP 8604 Cable IPL3241A not qualified ************************************************** No longer an issue.
i l EQP 8605 1 , 2-TS-74-43, -44, -45, -46 6589 Stockton Replacement required. Material j not qualified delivery due 2/24.
i EQP 8606 Undervoltage concern on 6611 Rutledge i feedwater isolation valve
! brakes -
EQP 8607 Delete TB fcr 1 , 2-PT-1-2A,, Instrument 3/22 New item. Will work same time as
-27A Maint. EQP 8601.
1 EQP 8608 Enable / disable MOV brakes Rutledge New item. Disable 8; enable ?O.
1 EQP 8609 Replace cable IV7973B N/A New item.
EQP 8610 0-RE-90-134 (ERCW) cables Hew item.
routed belot flood level due '
to RHR line break l Page 6 1
39 i ,
..! a
Date: 2/5/86 Estimated Date of Compietion SCR No. Description ECN Engineer Workplan No. U-l U-2 Comments
'N/A Move surge suppression network 5773 Kimsey 11883 IIold C U-2 complete. On U-1, 1-PCV-68-340 for PORV in hold. IIolding for maintenance to complete.
EES 8523 Penetration overcurrent 6606 Legg 3/3 During closure process, it was found that 6 circuits had not been addressed by ECNs. ECN 6606 addresser this.
N/A Work FCR to delete 1 , 5883 Itall C C Need SI-lbt.
2-PS-3-160A, -160B, -165A, and -165B N/A Replace 1-FT-1-3A, -3B, -10A, 6347 Instrument N/A 2/21 N/A
-10B, -21A, -21B, -28A, -28B Maint.
NEB 8510 Relocate LT-68-320, 6439 Carrasquillo various C PT-68-323, -320 Peters Remount 63-71,68-308 C496 Legg 11865 C C Replace LS-65-4, -5 6504 Legg 11865 N/A C MEB 8410d3 Replace LS-77-127 6525 Legg 11865 N/A C 6585 Delete brakes FCV-62-61 6521 Branham 11905 C C U-2 comp 12te; valve timed 8.13 seconds. U-l changed out 1/24; timed 8.23 seconds. ,
Page 7 40 i
e Date: 2/5/86 Estimated Date of Completion SCR No. Description ECN Enqineer Workplan No. U-l U-2 Commen*s EEB 8517 Replace pressure switches 6488 Branham 11931 2/17 2/17 Rewriting workplan.
65-80 and 65-82 4
Page 8 41 i
/
- TENNESSEE VALLE ' AUTHORITY Sequoyah Nuclear Plant P. O. Box 2000 Soddy-Daisy, Tennessee 37379 February 11, 1986 Nuclear Regulatory Commission ,
Of fice of Management Information and Program Control Washington, DC 20555 Gentlemen SEQUOYAH NUCLEAR PLANT - MONTHLY OPERATING REPORT - JANUARY 1986 Enclosed is the January 1986 Monthly Operating, Report to NRC for Sequoyah Nuclear Plant.
Very truly yours, TENNESSEE VALLEY AUTHORITY P. R. Wallace Plant Manager Enclosure cc (Enclosure):
Director, Region II Nuclear Regulatory Commission Office of Inspection and Enforcement Suite 3100 101 Marietta Street Atlanta, GA 30323 (1 copy)
Director, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, DC 20555 (12 copies)
Mr. A. Rubio, Director Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy)
INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 (1 copy)
Mr. K. M. Jenison, Resident NRC Inspector 0&PS-2, Sequoyah Nuclear Plant 7 Ii 8 l 1983-TVA SOTH ANNIVERS ARY An Equal Opportumty Employer j