ML20141G262
| ML20141G262 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/30/1997 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20141G255 | List: |
| References | |
| NUDOCS 9705220242 | |
| Download: ML20141G262 (10) | |
Text
.
OPERATING DATA REPORT DOCKET NO 50-413 DATE May 15. 1997 UPERATINS STATUS CCMPLETED BY R.A. Willians TELEPf0NE 704-382-5346
- 1. Unit Nase: Catawba 1
- 2. Reporting Period: Aprit 1, 1997-April 30, 1997
- 3. Liter. sed Thersal Power (MWt):
3411
- 4. N.neplate Rating (Gross MWe):
1305*
Notes tNaseplate Rating
.5. 1,< sign Electrical Rating (Net MWe):
1145 (6tess KWe) calculated as
- 6. Maxisus Dependable Capacity (Gross MWe):
1192_
1450.000 MVA x.90 power
- 7. Maxisas Dependable Capacity (Net MWe):
1129 factor per Page 111, B. If Changes Occur in Capacity Ratings (!tess Number 3 Through 7) Since Last NUREG-0050.
Report. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWe):
- 10. Reason For Restrictions, If anyi,
~_
This Month Yr.-to-Date Cuaulative
- 11. Hours in Reporting Period 719.0 2879.0 103776.0
- 12. Nusber 0f Hours Reactor Was critical 719.0 2B79.0 B1112.8
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator Du-Line 719.0 2879.0 79776.8
- 15. Unit Reserve Shutdown Hours -
- --0--
- 16. Stoss thersal Energy Generated (MWH) 2453437 9786123 260489584
- 17. Bross Electrical Energy Generated (MWH) 831664 3526198 92145604
- 10. Net Electrical Energy Benerated (MWH) 836854 3348957 86704323
- 19. Unit S2rvice factor 100.0 100.0 76.9
- 20. Unit Availability Factor 100.0
.100.0 76.9
- 21. Unit Capacity Factor (Using MLC Net) 103.1 103.0 73.0
- 22. Urit capacity Factor (Using DER hat) 101.7 101.6 73.0
- 23. Unit Forced Outage Rate 0.0 0.0 7.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut l'own At End Of Report Period. Esticated Dat7eiStartup:
- 26. Units in Test Status (Prior tc Cossercial Operation):
Foruast Achieved INITIAL CGITICALITY INITIAL ELECTRICITY C MMERCIAL OPERAi!DN
~
9705220242 v/OS15 PDR ADOCK 05000413 R
~4
t OPERATING DATA REPORT DOCKET NO 50-413 UNIT Catawba 1 DATE May 15,1997 COMPLETED BY R.A. Willians 1
TELEPHONE 704-322-5346 i
fl0 NTH April,1997 E.Al AVERAGE DAILY POWER LEVEL D
AVERASE DAILY POWER LEVEL E
(MWe-Net)
(MWe-Net) i 1168 17 1167 E
1168 18 1167 3
1167 c8 1166 4
1164 20 1165 El 1161 21 1160 i
6 1157 22 1158 7
1161 23 1163 8
_tlls 24
!!62 9
!!68 25
!!64 l
10
!!70 26 1166
!!69 27
!!64 12 1160 28 1158 13 1164 29 1156 j
14 1170 30 1155 15 1168 16
!!66
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413-i UNIT NAME tamwesa 1 DATE ud/1d/ s i REPORT MONTH April 1997 COMPLETED BY x.
a.
niillams TELEPHONE tsvei-Jaz-dsee (1)
(2)
(3)
(4)
(5)
R MET-E HOD e
T A
OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT
. PREVENT RECURRENCE ACTION TO DATE E
HOURS N
R/X NO.
CODE
- CODE NO SHUTDOWNS OR REDUCTION S i
l L
P (1)
(2)
(3)
(4)
F Forced
_ Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueiing 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-@erator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other i
i 4
--s m. -----..
--r-____..__.__;w-
.-2
~ -
. m
. mm m m
-.. -.. -.~.
. - ~ -
i l-l l-f r
' i
+
l i
t
(
I i
DOCKET: 50-413 UNIT: Catawba 1 i
l l'
i l
Date: 05/:3/97.
i 1
i NARRATIVE
SUMMARY
f MOffm: April,1997 Catawba Unit 1 began the month of April operating at 100% full power. The unit operated at or near 100%
full power for the entire month.
l' l
('
t i
o l'
l l
!~
i l
L Preparedby: R. A. Williams Telephone: (704)-382 5346 i
1i' DOCKET: 50-414 4
2 e
n w.
i I
e MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name:
Catawba. Unit 1 2.
Scheduled next refueling shutdown: November 1997 3.
Scheduled restart following refueling: January 1998 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 i
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. -
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
I Ifyes,what willthese be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. '
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuelassemblies (a) in the core: j9).
9 (b) in the spent fuel pool: fil 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
9.
Projected date oflast refueling which can be accommodated by present license capacity:
November 2009 DUKE POWER COMPANY DATE: May 15.1991 Name of
Contact:
R. A. Williams Phone: (704)- 3823J46 1
I' l-l
1 i
OPERATING DATA REPORT l
l i
90CKETNO 50-414 DATE May 15. 1997 OPERATING STATUS COMPLETEL BY R.A. Willians TELEPHONE 704-382-5346
- 1. Unit Name Catawba 2
- 2. Reporting Period: April 1, 1997-April 30, 1997
- 3. Licensed Thersal Poner (Mt):
3411
- 4. Nameplate Rating (Bross Me):
1305t Notes *Naseplate Rating
- 5. Design Electrical Rating (Net Me):
il4d (Bross He) calculated as
'6. Maxieue Dependable Capacity (6ross We):
1192 1450.000 MA x.90 power
- 7. Maxieue Dependable Capacity (Net Me):
1129 factorperPagelit,
- 8. If Changes Occur in Capacity Ratings !!tess Nueber 3 Through 7) Since Last NURE6-0020.
Report, liive Reasons:
- 9. Power Level To Which Restricted, if Any (Net He):
10.ReasonforRestrictions,Ifany:
1 I
-)
ThisMonth Yr.-to-Date Cuaulative i
!!. Hoers in Reporting Period 719.0 2879.0 93792A l
- 12. Number of Hours Reactor Was Critical 0.0 1906.3 74275.4
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Benerator On-Line 0.0 1904.8 73151.0
- 15. Unit Reserve Shutdown Hours
- ^--
- --0--
i.
. 16. Sross Thereal Energy Benerated ( W H) 0-6249010
'236961066
- 17. Gross Electrical Energy Generated ( W H) 0 2246646 84095279
- 18. Net Electrical Energy Generated ( MH)
-9931 2119515 79265407 i
- 19. Unit Service Factor 0.0 66.2 70.0
- 20. Unit Availability Factor.
0.0 66.2 78.0.
- 21. Unit Capacity Fetter (Using MDC Net) 0.0 65.2 74.7-
- 22. Unit Capacity Factar (Using DER Net) 0.0-64.3 73.8
- 23. Unit Forced Outage Rate 0.0
-).0 8.5
- 24. Sheldown Scheduled Over Next 6 tienths (Type, Date, and Duration of Eachl:-
'l
'I
- 25. If Shut Down At End Of Report Period. Esticated Date of Startup:
1
~
- 26. Units In Test State.a (Prior to Cosearcial Operatioh):
Forecast Achieved 1
INITIAL CR!TICALITY INITIAL Li.CCIRICITY COMMERCIAL DPERATION 4
1
e OPERATING DATA REPORT DOCKET ND 50-414 UNIT Catawba 2 DATE M4Y 15.1997 COMPLETED BY R.A. Willises TELEPHONE 704-382-5346 MONTH April. 1997 Q31 AVERAGE DAILY POWER LEVEL LA1 AVERAGE DAILY POWER LEVEL A
-(MWe-Neti (MWe-Net) 1 0
17 0
2 0
IB 0
3 0
19 0
0 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
6 0
24 0
1 9
0 25 0
10 0
26 0
j 11 0
27 0
l 12 0
28 0
l' 13 0
29 0
14 0
30 0
15 0
4 16 0
1 UiTIT SHUTDOWNS AND POWER REDUCTIONS.
DOCKET NO.
50-414 UNIT NAME ca1Antsa z DATE ud/13/3/
REPORT MONTH April 1997 COMPLETED BY x.
A.
niillams TELEPHONE t ius s
.s es z-d.s e e (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
REPORT TEM COMPONENT
-ACTION TO DATE E
HOURS N
RX NO.
CODE CODE PREVENT RECURRENCE 1
97 1 S
719.00-C RC FUELXX END-OF-CYCLE 08 REFUELING OUTAGE
{b i
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data i
B-Maintenance or test 2-Manual Scram Ent U Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-@erator Training & License Examination F-Administrative (5) i (Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other i
r UNIT: Catawba 2 Date: 05/15/97 r
NARRATIVI.!
SUMMARY
MONTH: April,1997 Catawba Unit 2 began the month of April in end -of-cycle 08 refueling and steam generator replacement outage. De unit was in the refueling outage the remainder of the month i
1 i
l 1
l i
l 1
l Prepared by: R. A. Williams Telephone: (704)- 382-5346 I
1
4 l
MONTHLY REFUELING INFORMATION REOUEST I
l l
1.
Facility name:
Catawba. Unit 2 i
j
. 2.
Scheduled next refueling shutdown: Currently Refuelina I
l 3.
Scheduled restart following refueling: May 1997 i
THE PROJFCT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF j
ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 l'
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
l-4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee j
regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
I 7.
Number of Fuel assemblies (a) in the core: J91 9
l (b) in the spent fuel pool: 6_0Q 8.
Present licensed fuel pool capacity:.1418 Size of requested or planned increase: - ::
9.
Projected date oflast refueling which can be accommodated by present license capacity:
May 2012 DUKE POWER COMPANY DATE:
1 hiqL 1J.991 Name of
Contact:
R. A. Williams Phone: (704b 382-5346 i
l L'
i i
i i
J
.-.