ML20141G266
Jump to navigation
Jump to search
| ML20141G266 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/31/1997 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20141G255 | List: |
| References | |
| NUDOCS 9705220245 | |
| Download: ML20141G266 (1) | |
Text
.,,
~ - -
.~. -. -. -
c CidMBA NUCLEAR STATION 1
MONTHLY OPERATING STATUS REPORT i
t March :.997 l'.
Personnel Exposure -
The total station liquid release for March has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent-of this limit.
1 The total station gaseous release for March has been compared with the Technical Specifications maximum annual.
dose commitment and was less than 10 percent of this limit.
l l
.]
q j
I I
l I
i l
l.
I I
I i
i 9705220245 970515
.POR ADOCK 05000413 j
R PDR z; l
i
<