Letter Sequence Other |
---|
|
|
MONTHYEARML20100A8111984-11-27027 November 1984 Forwards Matl Re Sludge Samples Collected on 841123 & 25 from Initial Holdup Pond of Waste Water Treatment Sys at Plant.Removal of Sludge Will Continue Based on Concurrence That Presence of Cs-137 Does Not Alter 841109 Approval Project stage: Other ML20141C5361986-03-19019 March 1986 Proposed Tech Specs Indicating Second Potential Radioactive Liquid Effluent Release Point on Figure 5.1-4.Justification & Significant Hazards Consideration Encl Project stage: Other ML20141C5211986-03-19019 March 1986 Application for Amends to Licenses NPF-9 & NPF-17,revising Tech Specs to Indicate Second Potential Radioactive Liquid Effluent Release Point on Figure 5.1-4.Fee Paid Project stage: Request ML20155J6391986-05-20020 May 1986 Application for Amends to Licenses NPF-9 & NPF-17,revising Tech Specs to Allow Emergency one-time Release of Radioactivity from Conventional Wastewater Basin.Supporting Documentation Encl Project stage: Request ML20206M3481986-06-25025 June 1986 Forwards Application for Disposal of Contaminated Sewage from Waste Treatment Sys & Data on Generic Disposal Proposal.Methods of Disposal Include Landfarming & Publicly Owned Treatment Works Project stage: Request ML20215E4281986-10-0808 October 1986 Forwards Request for Addl Info Re 860319 Application for License Amends,Revising Tech Specs to Add Alternate Path for Radioactive Liquids Released to Unrestricted Areas.Response Requested within 45 Days of Ltr Receipt Project stage: RAI ML20214W9691986-12-0303 December 1986 Forwards Responses to NRC 861026 Request for Addl Info Re Util 860319 Proposed Tech Spec Change to Allow Slightly Radioactive Water to Be Discharged from Conventional Waste Sys.Figure 1 Also Encl to Identify Sys Components Project stage: Request ML20214S5701987-06-0404 June 1987 Provides Addl Info in Response to Recent Discussions Re Proposed Tech Spec Change to Allow Slightly Radioactive Water to Be Discharged to Catawba River.Addition of Second Release Point Not to Increase Permissible Releases Project stage: Other 1986-03-19
[Table View] |
Proposed Tech Specs Indicating Second Potential Radioactive Liquid Effluent Release Point on Figure 5.1-4.Justification & Significant Hazards Consideration EnclML20141C536 |
Person / Time |
---|
Site: |
Mcguire, McGuire |
---|
Issue date: |
03/19/1986 |
---|
From: |
DUKE POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20141C526 |
List: |
---|
References |
---|
TAC-61179, TAC-61180, NUDOCS 8604070263 |
Download: ML20141C536 (4) |
|
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20133M5541997-01-13013 January 1997 Proposed Tech Specs Implementing performance-based Containment Leak Rate Testing Requirements of 10CFR50, App J,Option B ML20133D3991997-01-0606 January 1997 Proposed Tech Specs 3/4.6 Re Containment Systems ML20132F0001996-12-17017 December 1996 Proposed Tech Specs,Supplementing Amend Request to Change Surveillance 4.8.2.1.2.e Which Will Achieve Alignment W/ Improved STS SR 3.8.4.8 ML20135B0381996-11-26026 November 1996 Proposed Tech Specs 3.8.2 Re DC Sources ML20134M1541996-11-0101 November 1996 Proposed Tech Specs 3.8.2 Allowing Use of Low Specific Gravity Cells in Vital 125 Volt Dc Sys When Desired ML20129F7591996-10-22022 October 1996 Proposed Tech Specs 3.6.1.5 Re Containment Systems & Air Temp ML20117K1011996-08-29029 August 1996 Proposed Tech Specs,Replacing 960516 Response to Concerns Re Proposed Changes for Diesel Starting Air Sys Surveillance Testing ML20113C7201996-06-21021 June 1996 Proposed Tech Specs 3.9.6,revising Term Lifting Loads to Lifting Force Used in Manipulator Crane TS 3.9.6b.2 & Redefining Auxiliary Hoist Min Capacities ML20112A7571996-05-16016 May 1996 Proposed Tech Specs 3/4.8 Re Surveillance Requirements ML20101H6101996-03-15015 March 1996 Proposed Tech Specs Re Replacement of SGs ML20101C8281996-03-0808 March 1996 Proposed Tech Specs Reflecting Separate Vols for Unit 1 & Unit 2 ML20100R4601996-03-0404 March 1996 Proposed Tech Specs,Deleting Flow Monitoring Sys from TS 3.4.6.1 & Associated SRs ML20097G3911996-02-13013 February 1996 Proposed Tech Specs Re Listing of Core Operating Limit Methodologies for Editorial Correction ML20095E9571995-12-14014 December 1995 Proposed Tech Specs Action Statements & SRs for Dgs, Incorporating Guidance & Recommendations in NUREG-1366,GL 93-05,GL 94-01 & NUREG-1431 ML20095E8081995-12-12012 December 1995 Proposed Tech Specs,Making McGuire Afd Limit Equations Identical to Previously Approved by NRC for Catawba Nuclear Station ML20095B6221995-12-0505 December 1995 Proposed TS SR 4.8.2.1.2.e Re 60-month Battery Testing ML20093L2861995-10-17017 October 1995 Proposed Tech Specs Listings of Core Operating Limit Methodologies ML20098A4631995-09-18018 September 1995 Proposed Tech Specs,Providing Revised Record Pages for LTOP Protection in TS Amend ML20092K4481995-09-18018 September 1995 Proposed Tech Spec Table 2.2-1, Reactor Trip Sys Instrumentation Trip Setpoints ML20092B1571995-09-0101 September 1995 Proposed Tech Specs,Revising TS 3/4.6.5 to Reduce Required Ice Weight in Containment Ice Condenser of Each Unit from 2,099,790 Lbs to 1,516,800 Lbs 1999-09-13
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F3481999-10-15015 October 1999 Marked-up & Reprinted TS Pages,Changing TS Requirements for Insp of RCP Flywheels ML20217J6401999-10-0606 October 1999 Revised Pages to McGuire Nuclear Station Selected Licensee Commitments Manual ML20216E6601999-09-13013 September 1999 Marked-up & Revised TS Pages,Making Permanent One Time Only Changes Incorporated Into TS 3.7.9 Allowing Up to 24 Hours to Restore Control Room Pressure Boundary to Operable Status When Two Cravs Trains Inoperable ML20211G6711999-08-27027 August 1999 Proposed Tech Specs 3.1.4 Re Rod Group Alignment Limits ML20211A9881999-08-18018 August 1999 Rev 5 to DPC Nuclear Security Training & Qualification Plan ML20210R0131999-08-10010 August 1999 Revised Tech Specs Bases Pages B 3.4.14-2 & B 3.4.14-6, RCS PIV Leakage ML20196H7551999-06-24024 June 1999 Proposed Tech Specs 2.0, Safety Limits, TS 3.3.1, Reactor Trip Sys Instrumentation & TS 3.4.1, RCS Pressure,Temp & Flow Departure from Nucleate Boiling (DNB) Limits ML20195F2941999-06-10010 June 1999 Proposed Tech Specs,Facilitating one-time Addition of Condition G & Administrative Controls Note to TS 3.7.9, Cravs ML20212A2701999-05-28028 May 1999 Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valves Inservice Testing Program ML20206M9391999-05-0606 May 1999 Proposed Tech Specs,Revising List of Referenced Documents in TS 5.6.5b Re COLR Requirements ML20206Q9311999-05-0404 May 1999 Rev 29 to List of Effective Pages for Chapter 16 & Page 16.11-66 to McGuire Selected Licensee Commitment Manual. with ML20206S9401999-04-30030 April 1999 Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. with List of Effective Pages ML20206K3621999-04-30030 April 1999 Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual ML20206B0761999-04-0606 April 1999 Proposed Tech Specs Expanding Allowable Values for Interlocks P-6 (Intermediate Range Neutron Flux) & P-10 (Power Range Neutron Flux) in TS 3.3.1,Table 3.3.1-1, Function 16 ML20205L2251999-04-0505 April 1999 Proposed Tech Specs,Providing Revised SFP Storage Configuration,Revised SFP Storage Criteria & Revised Fuel Enrichment & Burnup Requirements ML20205L2431999-04-0505 April 1999 SFP Soluble Boron Credit Dilution Analysis (Summary of Applicable Portions) ML20205L2531999-04-0505 April 1999 Boraflex Degradation Analysis ML20205B6231999-03-23023 March 1999 Proposed Tech Specs Pages Mark Ups for Unit 1,changing Record for FOL NPF-9 Amend Submittal ML20204F6761999-03-18018 March 1999 Marked-up Tech Spec Pages Re License Bases Record Change to License Amend Submittals ML20207C6921999-02-22022 February 1999 Proposed Tech Specs Bases,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20198B9671998-12-0909 December 1998 Revised TS 3.7.11 LCO Bases to Specify That AB Filtered Ventilation Exhaust Sys Is Considered Operable When Associated Two Fans,Filters,Ductwork,Valves & Dampers Are Operable ML20198A4691998-12-0909 December 1998 Rev 14 to DPC McGuire Nuclear Station Process Control Program ML20196G6891998-11-23023 November 1998 Rev 26 to Selected Licensee Commitments (SLC) Manual ML20196C9211998-11-14014 November 1998 Rev 26 to Selected Licensee Commitments Manual. with Update Instructions ML20155B2111998-10-22022 October 1998 Proposed Revs to Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009 & DPC-NE-2009P ML20154L7191998-10-0505 October 1998 Rev 8 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20151Y2461998-09-15015 September 1998 Proposed Improved Tss,Resolving Items Identified by Util During Review ML20151U3521998-09-0808 September 1998 Proposed Tech Specs & Bases Converting to Improved Tech Specs ML20151Z7751998-09-0808 September 1998 Rev 25 to McGuire Selected Licensee Commitment Manual, Consisting of Revised Pages 16.7-9 & 16.7-10 ML20237B6241998-08-14014 August 1998 Proposed Tech Specs 4.6.5.1.b.2 & 4.6.5.1b.3 Relating to Ice Condenser Ice Bed Changing Portion of Surveillances Pertaining to Lower Inlet Plenum Support Structures & Turning Vanes from 9-month Frequency to 18-month Frequency ML20237B5721998-08-12012 August 1998 Proposed Tech Specs 4.6.5.1b.3 Re Ice Condenser Sys Components W/Respect to Accumulation of Frost or Ice ML20237A0411998-08-0505 August 1998 Suppl 8 to Improved TS Noting Differences Between Two Units. Proposed Changes Require That Specs & Surveillances Apply to Each Unit Individually,Unless Otherwise Noted,Consistent W/Version of Current TS Prior to Amends 166 & 148 ML20236U1531998-07-22022 July 1998 Proposed Revised Improved Tech Specs,Implementing W Fuel as Described in TRs DPC-NE-2009P & DPC-NE-2009 ML20236G5301998-06-29029 June 1998 Rev to Bases of TS 3/4.6/3,correcting Editorial Errors ML20249C2081998-06-0909 June 1998 Rev 24 to Selected License Commitments (SLC) Manual & SLC 16.10.1,dtd June 1998 ML20247E3891998-05-0808 May 1998 Proposed Tech Specs,Revising Power Range Neutron Flux High Trip Setpoints in Event of Inoperable MSSVs & Deleting References to 3-loop Operation in Current TS Section 3.7.1.1(b) & Table 3.7-2 ML20217F2841998-04-20020 April 1998 Rev 7 to DPC Nuclear Security & Contingency Plan, for Oconee,Mcguire & Catawba Nuclear Stations ML20217E6531998-04-20020 April 1998 Proposed Improved Tech Specs Re Section 1.0,2.0,3.0 & 4.0 ML20217B7871998-03-20020 March 1998 Marked-up Proposed Improved TS 3.6 & 5.5.2 ML20217N9311998-03-0303 March 1998 Proposed Tech Specs 5.5 Re Meteorological Tower Location ML20216B9851998-03-0202 March 1998 Proposed Tech Specs Responding to 980116 RAI Re Improved TS Sections 3.1 & 3.2.Suppl Changes to Improved TS Encl ML20203J9391998-02-19019 February 1998 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20198H5361997-12-17017 December 1997 Tech Spec Pages for TS 3/4.7.8 for Use in Lieu of ASME Section XI Requirements ML20197G4391997-12-17017 December 1997 Proposed Tech Specs Referencing Updated or Recently Approved Methodologies Used to Calculate cycle-specific Limits Contained in COLR ML20203E1911997-12-0101 December 1997 Revised McGuire Nuclear Station Selected Licensee Commitments, List of Effective Pages ML20217H5541997-10-13013 October 1997 Proposed Tech Specs Supporting Replacement of Three Safety Related Narrow Range Refueling Water Storage Tank Level Instruments W/Three Safety Related Wide Range Level Instruments ML20212A2511997-10-0606 October 1997 Proposed Tech Specs Deleting All References to Steam Line Low Pressure Safety Injection Function ML20216A8691997-09-0101 September 1997 Rev 0 to QAM-2.0, Order Entry ML20210K9281997-08-31031 August 1997 Cycle 12 Startup Rept ML20216B8171997-08-25025 August 1997 Rev 0 to PE-9778-1, Test Rept-Grinnell Hydraulic Snubber Freedom of Motion Test Under Duke Powers McGuire Nuclear Station MSLB Accident Temp Condition 1999-09-13
[Table view] |
Text
T- ,.- .-_ ._--
gu ATTACHMENT I i
b s su i
t~' ~
11!
,g:) ., i7= _c;b,
/
/ t
)- / \jii
!,k e,
!1 '\ , A l\ gl '
(/Tm
~;
I' ' f h $l ' ', \5E q f
0 jt ls5MA
= r3.
s y,\
u as 5
k,b y/ 'u}e,h ,
CJ \
\ ,
-N s
N
/
I wt h)f#
m NJ
/
1 6604070263 PDR 860319ADOCK 0 % 3 9 7 - - -
ATTACHMENT II Justification and Safety Analysis The proposed change to the McGuire Technical Specifications, Section 5.0, Design Features, incorporates a second potential radioactive liquid efflu-ent release point on Figure 5.1-4.
Normally.the turbine building sumps are discharged to the conventional wastewater treatment system (WC) for treatment of chemical wastes and removal of oils through a system of basins with chemical addition and aeration; the treated wastes are discharged to the Catawba River in com- .,
pliance with NPDES permit requirements. During primary to secondary leaks in' steam generators, the turbine building sumps will become contaminated; depending on the magnitude of the leak and the level of contamination, the turbine building sumps may continue to be released to the WC system or may be routed to the normal liquid effluent discharge line for release to the condenser circulating water or to the waste collection tanks for processing prior to release.
The decision of which alternative shocid be used would depend on the level of activity, anticipated volumes of sump effluent, anticipated volumes of liquid waste requiring processing, potential for an oil spill, and on the need to process chemical wastes. There is a finite volume of effluent which can be processed by the liquid radwaste system, 27,500 gallons per day; the system normally processes 12,200 gallons per day. Depending on the type of prima ~ry to secondary leak, a weeper for example, a long run time with the leak could be anticipated; the turbine building sumps add 120,000 gallons per day which would exceed the system capacity.
All releases will be made in accordance with present effluent release technical specifications and, therefore, will not result in unacceptably higher concentrations of radioactive effluents released offsite. Each effluent release path is currently monitored to ensure that instantaneous radioactive release rates remain within 10 CFR 20 Appendix B limits. No radioactive effluent monitors are affected by this change, either by physical modification or by setpoint change, so that assurance will be maintained that instantaneous release rates remain within 10 CFR 20 limits.
Technical Specification 3.3.3.8 (Table 3.3-12) lists operability require-ments for radioactive liquid effluent monitoring instrumentation. Table l 3.3-12 lists the following instrumentation which is provided in the conven-tional wastewater treatment line:
Item Description 2 EMF-31 (Radioactivity Monitor) 3.b Continuous Composite Sampler and Sampler Flow Meter .
9 4.d Flow Rate Measurement Device The table also requires compensatory action in the event any of these instruments are inoperable.
-w ,
I r
Page 2 This instrumentation, together with concentration and dose limits for liquid effluent releases (Tech Spec 3.11.1.1 and 3.11.1.2) will assure that the addition of a second release pathway will not result in increased risk to public health and safety. As noted in Specification 4.11.1.1.2 and 4.11.1.2.2, the methodology and parameters for use in determining the impact of ef fluent releases are contained in Duke Power's Offsite Dose Calculation Manual (ODCM), which will be revised to include the second release point. Site-specific characteristics make groundwater monitoring unnecessary. Groundwater recharge is supplied from lake Norman and local precipitation. The groundwater gradient flows directly to the Catawba River; therefore, contamination of groundwater from liquid effluents is highly improtable.
The laboratory performing the radiological environmental analyses shall participate in an interlaboratory comparison program which has been ap-proved by the NRC. This program is the Environmental Protection Agency's
/. EPA's) Environmental Radioactivity Laboratory Intercomparison Studies (Crosscheck) Program.
In' summary, the revisions to the Technical Specifications change only the physical descriptions of the station to reflect a second release point and do not af fect either the instantaneous liquid effluent release rates or the annual dose resulting foon all liquid effluent releases. Also unaffected is the existing radiological environmental monitoring program (Tech. Spec.
3/4.12-1, Table 3.12-1).
s
e' ATTACHMENT III Analysis of Significant Hazards Consideration The following evaluation, required by 10 CFR 30.91, concludes that the proposed changes do not involve a significant hazards consideration, as determined by the criteria presented in 10 CFR 50.92.
The proposed revision consists only of a figure change to show an addi-tional potential radioactive effluent release point, to more accurately reflect station design and practice when operating with a primary to secondary steam generator leak.
The proposed changes will not al.ter existing procedures or equipment; therefore, no impact on the probability or consequences of any accident whether previously analyzed in the Final Safety Analysis Report or not, is possible.
The proposed amendment will also not involve a significant reduction in a margin of safety because no setpoints of effluent monitors are affected, and limits on the release of radioactive effluents are not changed.
Based upon the above,'Ouke Power Company concludes that the proposed amendments do not involve a significant hazards consideration.
e s
, ~ - . - .