ML20141C521
| ML20141C521 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 03/19/1986 |
| From: | Tucker H DUKE POWER CO. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20141C526 | List: |
| References | |
| TAC-61179, TAC-61180, NUDOCS 8604070261 | |
| Download: ML20141C521 (4) | |
Text
r- -
e t
DUKE POWER GOMPANY P.O. HOX 33180 CH AMLOTTE, N.C. 28242 II AL il rt.*CKEn EtEPHONE s s..e emawee er (7'kt) 073-4508
=artram pm ame rwa 9
March 19, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. B.J. Youngblood, Director PWR Project Directorate No. 4
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Technical Specification Amendment Release of Radioactivity from the Conventional Wastewater Treatment System
Dear Mr. Denton:
Attached are proposed license amendments to Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.
The proposed change to the Technical Specification is concerned with Section 5.0, Design Features. The proposed change to this section would show a second potential radioactive liquid effluent release point on Figure 5.1-4.
It may be necessary during primary to secondary steam generator leaks to continue to release the contaminated turbine building sumps through the conventional wastewater treatment system (WC) in lieu of routing them to the present liquid effluent discharge line and, release into the condenser circulating water. Turbine building sumps are a large volume, low activity waste stream which compete with normal radioactive liquid effluents for release time.
Attachment I contains the proposed changes to the Design Features Section.
Attachment II contains a Justification and Safety Analysis in support of the proposed changes, and Attachment III is an analysis performed in accordance with the Standards contained in 10CFR50.92 as required by 10CFR50.91.
These analyses conclude that no Significant Hazards Considerations are involved.
This request involves one application for amendment to McGuire's Technical Specifications. Accordingly, pursuant to 10CFR170.21 a check for $150.00 is enclosed.
\\
g* ME'ch,
[
e w J 4 ~ y s <o
r-
\\
Harold R. Denton March-19, 1986 Page 2 Please feel free to contact us if you require any additional information.
Sincerely,
- 4 k-Hal B. Tucker SAG /jgm Attachment xc:
Dr. J. Nelson Grace, Regional Administrator U.S. Nuclear Regulatory Commission - Region II 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. W.T. Orders Senior Resident Inspector McGuire Nuclear Station
~
Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services
-Department of Human Resources F,0. Box 12200 Raleigh, NC 27605 e
Mr. Harold R. Denton, Director Maren 19, 1986 Page 3 IIAL B. TUCZER, being duly sworn, states that he is Vice President of Duke Power Ccinpany; that he is authorized on the part of said Company to sign and file With the Nuclear Regulatory Comrsission this revision to the McGuire nuclear Station License Noo. NPF-9 and NPF-17 and that all statements and matters set froth therein are true and correct to the best of his knowledge.
C
'7
~ ss /h-Gre;ch. -
Hal B. Tucker, Vice President Subscribed and sworn to before me this 19th day of March, 1986.
n nnm Notary Public My Commission Expires:
M
.2 o
/979
/
/
Rarold R. Lenten March 19, 1926 Page 4 bxc: M.L. Birch R.L. Gill R.T. Simril E.O. McCraw MC-813.20 i
.