ML20140B811
| ML20140B811 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/14/1986 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20140B816 | List: |
| References | |
| TAC-59319, NUDOCS 8603240522 | |
| Download: ML20140B811 (2) | |
Text
TK-dy
~
c
+
p:
+
,1 e
r h 4
}
+
6 MAR.1141986 '
- g
- v. m J.
y
<,, +,
s
~
- Docket No. 50-3977
+'-
--Washington Public Power Supply System. -
P. 0.' Box 968 Richland, Washington 99352.
Attention:
G. C..Sorensen, Manager 1
-Regulatory Programs-
- Gentlemen:
NRR has prepared a Safety Evaluation Report (SER),~ enclosed, relative to the Appendix.R nonconformance' issue that was identified in our letter: Kirsch,'
NRC RV to Sorensen, Supply System;."Nonconformance of Safe Shutdown Equipment Eto. Appendix R" dated June 7, 1985,.and addressed by the Supply System in your letter: Sorensen~, Supply System to Kirsch, NRC RV; " Nuclear Plant No. 2
.Nonconformance of Safe Shutdown Equipment to Appendix R Requirements" dated June-17, 1985.
i; -
- A copy of the.SER is being forwarded to you for.implomentation, particularly
'the paragraphs that deals with ltem 7 on the RHR valves. Your corrective actions will be verified during a future inspection.
Your cooperation with-us is; appreciated.
Sincerely,
/5/
D. F. Kirsch, Director
' Division of Reactor Safety and Projects
Enclosure:
As' Stated bec: RSB/ Document Control Desk.(RIDS)
'- RV/j k ~
QUALLS [dl YOUNG P. JOHNSON KIRSCH 3/' /86 3//g/86 3/6/86 3/i /86 i
8603240522 860314 PDR ADOCK 05000397 F
PDR y
Lz.
l
/,
UNITED STATES 8
i NUCLEAR REGULATORY COMMISSION r
REGION V 0,
% +....,o'g 1450 MARIA LANE, SUITE 210 WALNUT CPEEK, CAllFORNI A 94596 MAR' 141986 Docket No. 50-397 Washington Public Power Supply System P. O. Box 968 Richland, Washington 99352 Attention:
G. C. Sorensen, Manager Regulatory Programs Gentlemen:
NRR has prepared a Safety Evaluation Report (SER), enclosed, relative to the Appendix R nonconformance issue.that was identified in our letter: Kirsch, NRC RV to Sorensen, Supply System; "Nont.onformance of Safe Shutdown Equipment to Appendix R" dated June 7, 1985, and addressed by the Supply System in your letiter: Sorensen, Supply System to Kirsch, NRC RV; " Nuclear Plant No. 2 Nonconformance of Safe Shutdown Equipment to Appendix R Requirements" dated June 17, 1985.
A copy of the SER is being forwarded to you for implementation, particularly the paragraphs that deals with item 7 on the RHR valves. Your corrective actions will be verified during a future inspection.
Your cooperation with us is appreciated.
Sincerely,
~
D. F. Kirsch, Director Division of Reactor Safety and Projects
Enclosure:
As Stated e..