o f Mc y.
$0 g
UNITED STATES y
g NUCLEAR REGULATORY COMMISSION 3
- C REGloN i o,
475 ALLENDALE RoAo KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 15, 1995 Memorandum To:
J. Linville, DRP C. Marschall, DRP G. Kelley, DRS G. Barber, DRP J. Stolz, NRR L. Olshan, NRR gff From:
J. White, Chief
[
Reactor Projects Section 2A
Subject:
SALEM EPPR RECOMMENDATION 3 FOR SALEM ASSESSMENT PANEL CONSIDERATION On May 30, 1995, an EPPR was conducted to assess performance at the Salem Generating Station for the period between November 6, 1994, and May 16, 1995.
Since both Salem units were shutdown for an extended period shortly after this EPPR. Subsequently, the Salem Assessment Panel (SAP) was commissioned to plan and coordinate all NRC inspection-related activities for the Salem units.
Consequently, the EPPR recommendations were not initially implemented, but rather deferred for consideration by the SAP. Notwithstanding, the SAP should consider the outcome of the EPPR to assure that the issues are addressed within the scope of planned NRC activities to confirm restart readiness.
i The following is a synopsis of the May 30, 1995, Salem EPPR assessment and V
recommendations:
e Qgerations Operators did not consistently communicate or document plant problems and deficiencies. Support from the maintenance and engineering organizations was inconsistent and tended to vary with the quality of information communicated and documented.
Equipment deficiencies provided frequent challenges to operators at a rate that appeared unchanged and without any perceived achievement of performance improvement. In many instances, operators were remiss in their application of technical specifications. Operability determinations (00) were of inconsistent quality, i.e., generally, ODs that were documented reflected consultation with engineering; while undocumented ODs often exhibited insufficient safety bases or rationale to support a positive operability conclusion.
EPPR Recommendation Consider whether DRP and/or DRP should perform focused inspection relative to the quality of ooerability determinations involving degraded equioment and workarounds. Additionally, the EPPR Tetter should discuss
=
~
Q 9701030051 961226
~
i i
7 8
7 NRC concerns relative to the generally poor quality of operability determinations that has been exhibited.-
]
Maintenance l
High profile maintenance activities receive a high level of management attention. Consequently. the efforts are usually well managed, coordinated, and executed; and the outcomes for such efforts are usually i
successful. Other efforts are usually less that adequate. Some maintenance activities were performed without procedures. The.
]
maintenance organization consistently failed to involve engineering support for the resolution of repetitive equipment failures. Weak root 4
cause (or failure to perform root cause assessments) was evident.
Consequently, corrective actions were usually unsuccessful in effecting i
lasting remediation of equipment problems. Maintenance almost always applied a " broke-fixed" approach to equipment problems involving B0P i
issues; and generally attempted resolution of safety-related equipment in the same manner, with some variance.
I EPPR Recommendation 1
l Regional initiative inspection (Modu'e 62700; 2 to 4 insoectar waah) to j
assess the aggregate safety'effect of the growing tLacklog of unattended I
or uncorrected degraded ' conditions affecting POP and safety-related equipment. The effort should dialnose deficient equipment performance, particularly in systems having several EMIS tags, to determine if
-i increased risk exists relative to failure of the system to perform as
)
designed or expected.
j l
Enaineerina The engineering organization has not aggressively addressed frequent-4 Hagan module configuration control problems. The licensee's level of t
effort reflects 'only minimal progress resolve the issue relative to equipment upgrades or refurbishment. The assembly of resources and establishment of a plan to address the matter has been slow even though a long history of problems exist.
The system engineering organization does not always aggressively pursue or resolve difficult issues. Decision-making is often delayed by extended analysis of issues; and a tendency exists to accept as the root cause the most plausible or perceivable reason for an equipment failure.
Management and operations does not challenge the rationale or basis for conclusions, or expect more than what is delivered.
Incident reports rarely contain well documented root cause assessments. Consequently, corrective action efforts are generally ineffective.
Systemic. problems appear to prevail relative to parts and sunnlies
'available to support modifications, renairs._and design efforts. ~
__m_
V l
l..
V-l EPPR Recommendation Regional initiative inspection (Module 62704/38702) to review and assess the extent of problems involving Hagan modules and the resultant safety-effect of the existing configuration control ~ problems. The focus of the initiative is to be on root cause and effectiveness of corrective actions. Additionally, assure that the olannad OS"I effort includes review of procurement engineering effectiveness re' ative to parts control.
l e'
PLANT SUPPORT l
Radiation protection progr.am activities, including radioactive waste
]
handling and effluent controls, were well established and performed.
i Emergency preparedness activities were we11' control and managed. The j
security program was generally sound, but assessment aid performance is l
degrading, such that NRC intervention has been necessary to ensure that adequate upgrading is planned. Fire protection programs, including Appendix R requirements, were generally well performed, excepting reactor coolant pump (RCP) oil collection specifications as described in 10 CFR 50, Appendix R.
Inspectors observed that not all plug and flange locations were considered as credible leak sites. Timely resolution i
does not appear inevitable.
EPPR Recommendations Initiate conference call with licensee to discuss their plans to resolve RCP oil collection concerns in light of letter from NRR clarifying
' ele #
Appendix ~R Pequirements (Kelleys Harrison). Security section to initiate meeting with licensee to discuss.NRC concerns relative to l
degraded assesemant aide (Shankman, Smith).
cc:
R. Cooper, DRP W. Lanning, DRP
l i
ACilUITY PLAN REPORTS MASTER INSPECTION PLANNING SYSTEM DATE: 09/28/95 i
BY INTEGRATED PLANNING SCHD TIME: 11:05:54 SORTED BY SITE /SALP/ START DATE/ACTVITlY/ PROCEDURE PAGE:
81 REG!ON NUMBER : 1-REQUEST FROM DATE: 9/04/1995 REQUEST TO DATE: 1/31/1997 SITE NAME: SALEM
[
FAC ACTIVITY /
RESP LEAD TM START ACTL PLND PLND ACTL CMPLTN IR PRI SALP ENO A88R PROCEDURE TITLE IPE ORG EMP SZ DUR DATE ST ST HR$
HRS DATE END NUMBER DATE l
SALM1 73753 01 INSERVICE INSPECTION Co 1313 5 00/00/00 C N 32.00 0.00 3/02/96 ISI CORE INSPECTION 82301 01 EP EXERCISE FOR PWR CO 1413 00/00/00 2
0.00 0.00 3/02/96 CY 1995 0FF YEAR / RESIDENT TO REVIEW 82302 01 REVIEW EXER OBJ & SC CO 1413 00/00/00 N
0.00 0.00 3/02/96 tY 1995 0FF YEAR 82701 01 OP STATUS OF EP PROG CO 1413 5 00/00/00 N 12.00 0.00 3/02/96 PLS SCHED FOR NEW SALP - BEGINS 11/6/94 84750 01 RAD WSTE TRTMNT & EF CO 1412 5 00/00/00 N 20.00 0.00 3/02/96 EFFLUENTS PLS SCHED FOR NEW SALP - BEGINS 11/6/94 84750 03 RAD WSTE TRTMNT & EF CO 1412 3 00/00/00 N 20.00 0.00 3/02/96 CONFIRM MEASURE PLS SCHED FOR NEW SALP IF APPLIC. 8EGINS 11/6/94 92703 01 CONFIRMATORY ACTION RI 00/00/00 N
0.00 0.00 3/02/96 92903 60 FOLLOWUP ENGINEERI AF 1232 BVM 08/26/95 C C
0.00 11.00 09/09/95 $013 3/02/96 83750 02 OCCUPATIONAL RADIATI CO 1411 JIN 5 09/18/95 M M 40.00 21.80 95018 3/02/96 0UTAGE RADCON 2515/111 01 ELEC O!S8RTN FLLWUP $1 1314 LSJ 5 LG446 96 C 92.00 74.50 05/20/95 95011 3/02/96 86750 01 SLD RDWSTE MNGMNT & CO 1411 JIN 5 jto/ 95 N 14.00 0.00 3/02/96 2515/122 01 ROSEMOUNT PRESSURE T $1 1314 J, 0 2/04/95 Z
0.00 0.00 3/02/96 NOT REQUIRED PER HQ 37550 02 ENGINEERING Co 1314 J9C 5 01/01/96 N 18.00 0.00 3/02/96 VISIT #2 DATE T80 37550 03 ENGINEERING CO 1314 J9C 5 01/01/96 N 70.00 0.00 3/02/96 TEAM SIZE =2 EXACT CATE TBD ODM 1/01/96 64704 01 FIRE PROTECT 10N PROG CO 1314 LMK 5 01/01/96 M M 18.00 4.50 95010 3/02/96 ACTUAL DATE T80 81700 02 PHYSICAL SECURITY PR CO 1415 GGS 5 01/02/96 N 27.00 0.00 3/02/96 VISIT #2 N04 INITIAL OPERATOR EXA 1342 PS8 3 5 01/22/96 3/02/96 101 SURVE1LLANCE DBSERVA 1231 CME 1 03/02/96 3/02/96 61726 01 SURVEILLANCE 06SERVA CO 1231 03/09/96 C N
0.00 0.00 3/02/96 DUMMY OCCURRENCE 00 NOT DELETE 61726 02 SURVEILLANCE OBSERVA CO 1231 AA4 28 02/01/95 C C 10.00 11.00 02/25/95 95002 3/02/96 2/01/95 61726 04 SURVEILLANCC O6SERVA C0 1231 AA4 28 04/01/95 M M 10.00 9.00 95002 3/02/96 4/01/95 61726 06 SURVEILLANCE OBSERVA CO 1231 AA4 28 06/01/95 C C 10.00 3.50 06/24/95 95010 3/02/96 6/01/95 61726 08 SURVEILLANCE OBSERVA CO 1231 CME 28 08/01/95 C C 10.00 19.50 08/26/95 95017 3/02/96 8/01/95 61726 10 SURVEILLANCE O6SERVA CO 1231 TMF 28 10/01/95 M M 10.00 2.00 95017 3/02/96 10/01/95 INFORMAfl0N ON THIS PAGE IS FOR 0FF!CIAL USE ONLY.
)
]
I 1
ACT10lTY PLAN REPORTS MASTER INSPECTION PLANNING SYSTEM DATE: 09/28/95-BY INTEGRATED PLANNING SCHD TIME: 11:05:54 SORTED BY SITE /SALP/ START DATE/ACTVIT!Y/ PROCEDURE PAGE:
85 REGION NUMBER : 1 REQUEST FROM DATE: 9/04/1995 REQUEST 10 DATE: 1/31/1997
' $1TE NAMES SALEM FAC ACTIVITY /
RESP LEAD TM START ACTL PLNO PLND ACTL CMPLTN IR PRI SALP END AG8R PROCEDURE TITLE IPE ORG EMP $2 DUR DATE ST ST HRS HRS DATE END NUM8ER DATE SALM3 82301, 01 EP EXERCISE FOR PWR CO 1413 00/00/00 Z
0.00 0.00 3/02/96 CY 1995 OFF*YE/.R/ RESIDENT TO REVIEW 82302 01 REVIEW EXER 08J & SC CO 1413 00/00/00 N
0.00 0.00 3/02/96 CY 1995 - 0FF YEAR 82701 01 OP STATUS OF EP PROG CO 1413 5 00/00/00 N 12.00 0.00 3/02/96 PLEASE SCHEDULE FOR NEW SALP
- BEGINS 11/6/94 84750 01 RAD WSTE TRTMNT & EF Co 1412 5 00/00/00 N 20.00 0.00 3/02/96 EFFLUENTS - PLEASE SCHEDULE FOR NEW SALP
- BEGINS 11/6/94 84750 03 RAD WSTE TRTMNT & EF Co 1412-3 00/00/00 N 20.00 0.00 3/02/96 CONFIRM MEASURE
- PLEASE SCHEDULE FOR NEW SALP
- BEGINS 11/6/94 86750 02 SLD R0WSTE MNGMNT & CO 1411 00/00/00 N 20.00 0.00 3/02/96
'83750 02 OCCUPAfl0NAL RADIATI CO 1411 JIN 09/23/95 M M
0.00 21.80 95018 3/02/96 0UTAGE RADCON
C 92.00 81.50 15/20/95 95011 3/02/96 86750 01 SLO RDWSTE MNGMNT & CO 1411 JIN 5
10g95 N 14.00 0.00 3/02/96 HOURS CHANGED FROM 12 TO 20 2515/122 01 ROSEMOUNT PRESSURE T $1 1314 12/04/95 Z
0.00 0.00 3/02/96 NOT REQUIRED PER HQ 37550 02 ENGINEERING to 1314 J9C 5 01/01/96 N 18.00 0.00 3/02/96 Visif #2 - EXACT DATE T80 37550 03 EPGINEERING CO 1314 J9C 5 01/01/96 N 70.00 0.00 3/02/96 TEAM $1ZE=2
- DATE T80 QDM 1/01/96 64704 01 FIRE PROTECTION PROG Co 1314 LMK 5 01/01/96 M M 18.00 4.50 95010 3/02/96 ACTUAL DATE TBD 81700 02 PHYSICAL SECURITY PR' CO 1415 GGS 5 01/02/96 N 27.00 0.00 3/02/96 VISIT #2 NO3 INITIAL OPERATOR EXA 1342 PS8 3 5 01/22/96 3/02/%
102 ONSITE ENGINEERING 1231 1 03/02/96 3/02/96 37551 01 DNSITE ENGINEERING CO 1231 03/09/96 N
0.00 0.00 3/02/96
- DUMMY OCCURRENCE
- DO NOT DELETE 37551 02 ONSITE ENGINEERING CO 1231 CNE 28 02/01/95 C C 10.00 25.00 02/25/95 95002 3/02/96 2/01/95 37551 04 ONSITE ENGINEERING Co 1231 CME 28 04/01/95 C C 10.00 29.00 04/29/95 95007 3/02/96 4/01/95 37551 06 ONSITE ENGINEERING CO 1231 THF 28 06/01/95 C C 10.00 53.00 06/24/95 95010 3/02/96 6/01/95 37551 08 ONSITE ENGINEERING CO 1231 THF 28 08/01/95 C C 10.00 31.00 08/26/95 95017 3/02/96 8/01/95 37551 10 ONSITE ENGINEERING Co 1231 THF 28 10/01/95 M M 10.00 13.00 95017 3/02/96 10/01/95 37551 12 ONSITE ENGINEERING CO 1231 28 12/01/95 N 10.00 0.00 3/02/96 INFORMAfl0N ON THl3 PAGE is FOR 0FFlC1AL USE ONLY.
l/'
i k
3.-h.aE&J.A.4%N~J.& Ah.
a_
s e h 54h e A.m,h.4.'JMh,N.hMhW-6m.M*.e.5227"J.mxW-.a.,44c.s J ma J
,'.sm,-mJ.mJim.,=me.,s..u a ag4 - m m a easim% m em #a.m
,m, m
--w waam,-,g,,,
J a
I N
A sg
)
I
\\
t
\\
i I
s i
j t!-
i e
i I
1 k
1 i
e a
i J
i i
i J
t i
l 2
+
4
--e
- ~,.-., - -,,.,-- --,,
--- --- ----.