to Serial NLS-85-444

' Proposed Technical Specification Pages Brunswick-1 (85TSB40).

l 8512160044 851210 PDR ADOCK 05000324 P

PDR

?

SUMMARY

LIST OF REVISIONS

~ BRUNSWICK-1

- Pajte Description 3/45-4

_ Revised " CONDITIONS" to " OPERATIONAL CONDITIONS".

Revised footnote concerning core spray system operability.

- 3/45-5 Revised " CONDITIONS" to " OPERATIONAL CONDITIONS".

Revised footnote concerning core spray system operability.

w

(BSEP-1-81)

EMERCENCY CORE COOLING SYSTEMS

'3/4.5.3. LOW PRESSURE COOLINC SYSTEMS

. CORE SPRAY SYSTEM LIMITING CONDITION FOR OPERATION 3.5.3.1 Two independent Core Spray System (CSS) subsystems shall be OPERABLE with each subsystem comprised of:

a.

One pump,-and b.

An OPERABLE flow path capable of taking suction from at least.one of the following OPERABLE sources and transferring the water through the spray sparger to the reactor vessel; i

1.

In OPERATIONAL CONDITION 1, 2, or-3, from the suppression pool.

-l 2.

'In OPERATIONAL CONDITION-4 or 5*;

l a)

From the suppression pool, or b)

When the suppression pool-is inoperable, from the condensate storage tank containing at least 150,000 gallons of water.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3, 4, and 5*.

ACTION:

a.

In OPERATIONAL CONDITION 1, 2, o'r 3; l

1.

With.one CSS subsystem inoperable, POWER OPERATION may continue provided both LPCI subsystems are OPERABLE; restore the

. inoperable CSS subsystem to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.

With both CSS subsystems inoperable, be in at least HOT SHUTDOWN.

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

%=

The core spray system is not required to be OPERABLE provided that the reactor vessel head 'is removed and the cavity is flooded, the spent fuel pool' gates are removed, and the water level'is maintained within the limits of Specifications 3.9.8 and 3.9.9.

BRUNSWICK - UNIT 1 3/4 5-4 Amendment No.

l

r (BSEP-1-81)

EMERCENCY CORE COOLING SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued) 3.

In the event the CSS is actuated and injects water into the reactor-coolant system, a Special Report shall be prepared and submitted to the Commission pursuant to Specificaton 6.9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date.

b.

In OPERATIONAL CONDITION 4 or 5*;

l 1.

With one CSS subsystem inoperable, operation may continue provided that at'least one LPCI subsystem is OPERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, suspend all operations'that have potential for draining the reactor vessel.

2.

With both CSS subsystems inoperable, operation may continue provided that at least one LPCI subsystem is OPERABLE and both LPCI subsystems are OPERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Otherwise, suspend el.1 operations that h' ave a potential for draining the reactor sp-sel and verify that at least one LPCI subsystem is OPERABLE

+ithin 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

3.

The provisions oE specification 3.D.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.5.3.1 Each CSS subsystem shall be demonstrated OPERABLE:

r g

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the condensate storage tank minimum required volume when the condensate storage tank is required to be OPERABLE.

b.

'At least once per 31 days by:

1.

Verifying that the system piping from the pump discharge valve to the system isolation valve is filled with water.

The core spray system is not required to be OPERABLE provided that the reactor vessel head is removed and the cavity'is flooded, the spent fuel pool gates are removed, and the water level is maintained within the limits of Specifications 3.9.8 and 3.9.9.

BRUNSWICK - UNIT 1 3/4 5-5 Amendment No.

.o e

to Serial NLS-85-444 Proposed Technical Specification Pages Brunswick-2 (85TSB4U)

SUMMARY

LIST OF REVISIONS.

BRUNSWICK-2 Page' Description 3/45-4 Revised " CONDITIONS" to " OPERATIONAL CONDITIONS".

Revised footnote concerning core spray system operability.

3/45-5 Revised " CONDITIONS" to " OPERATIONAL CONDITIONS".

Revised footnote concerning core spray system operability.

(BSEP-2-83) 1 EMERCENCY CORE COOLING SYSTEMS 3/4.5.3 LOW PRESSURE COOLING SYSTEMS CORE SPRAY SYSTEM LIMITINC CONDITION FOR OPERATION 3.5.3.1 Two independent Core Spray System (CSS) subsystems shall be OPERABLE

.with each subsystem compr sed of:

i Ja.

One pump, and An OPERABLE flow path capable of taking suction from at least one of

~

b.

.the following OPERABLE sources and transferring the water through the spray sparger to the reactor vessel:-

In OPERATIONAL CONDITION 1, 2, or 3, from the suppression pool.

l 1.

l 2.

In OPERATIONAL CONDITION 4 or 5*:

-a)

From the suppression pool, or b)

When the suppression pool is inoperable, from the condensate storage tank containing at least 150,000 gallons of water.

APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, 3, 4, and.5*.

l-

-ACTION:

In OPERATIONAL CONDITION 1, 2, or 3:

a.

With one CSS subsystem inoperable, POWER OPERATION may continue 1.

provided both LPCI subsystems are OPERABLEi restore'the inoperable CSS subsystem'to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

2.

With both CSS subsystems inoperable, be in at least HOT SHUTDOWN 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next The core' spray system is not required to be OPERABLE'provided that the fuel reactor vessel head is removed and the. cavity is flooded, the spent pool gates are removed, and the water level'is maintained within the

~

limits'of Specifications 3.9.8 and 3.9.9.

BRUNSWICK - UNIT 2 3/4 5-4 Amendment No.

(BSEP-2-83)

EMERCENCY CORE COOLING SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)

ACTION (Continued) 3.

In the event the CSS is actuated and injects water into the reactor coolant system, a Special Report shall be prepared and submitted to the Commission pursuant to Specification 6.,9.2 within 90 days describing the circumstances of the actuation and the total accumulated actuation cycles to date, b.

In OPERATIONAL CONDITION 4 or 5*:

1.

With one CSS subsystem inoperable, operation may continue provided that at least one LPCI subsystem is OPERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, suspend all operations that have a potential for draining the reactor vessel.

2.

With both CSS subsystems inoperable, operation may continue provided that at least one LPCI subsystem is OPERABLE and both LPCI subsystems are O.PERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. Otherwise, suspend all operations that have a potential for draining the reactor vessel and verify that at least one LPCI subsystem is OPERABLE within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

3.

The provisions of Specification 3.0.3 are not applicable.

SURVEILLANCE REQUIREMENTS 4.5.3.1 Each CSS subsystem shall be demonstrated OPERABLE:

a.

At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by verifying the condensate storage tank minimum required volume when the condensate storage tank is required to be OPERABLE.

b.

At least once per 31 days by:

1.

Verifying that the system piping from the pump discharge valve to the system isolation valve is filled with water.

The core spray system is not required to be OPERABLE provided that the reactor vessel head is removed and the cavity is flooded, the spent fuel pool gates are removed, and the water level is maintained within the Limits of Specifications 3.9.8 and 3.9.9.

BRUNSWICK - UNIT 2 3/4 5-5 Amendment No.

-