MEMORANDUM TO:
David B. Matthews, Director Project Direttorate 11-1 Division of Reactor Projects I/II l
Office of Nuclear Reactor Regulation FROM:
Richard J. Barrett, Chief l
Containment Systems and Severe Accident Branch Division of Systems Safety and Analysis Office of Nuclear Reactor Regulation I
SUBJECT:
SAFETY EVALUATION - ST.LUCIE CONTAINMENT HEAT REMOVAL SYSTEMS COMPLETION TIMES 1
By application dated November 2, 1994, the Florida Power & Light Company (the licensee) requested changes to the St. Lucie Units 1 & 2 Technical Specifications (TS). The proposed TS changes would clarify the actions required j
l in the event of inoperable equipment associated with the containment I
depressurization and cooling systems, and would provide consistency between Unit l
1 and Unit 2 requirements. TS 3/4.6.2.1, " Containment Spray System" and 3/4.6.2.3, " Containment Cooling System" would be combined into a single specification 3/4.6.2, " Containment Spray and Cooling Systems.
4 i
Fan cooler surveillance requirements would also be affected to the extent that the 31-day surveillance intervals need not be established on a " staggered test basis."
l The Containment Systems and Severe Accident Branch (SCSB) has reviewed the application as requested by J. Norris' Work Request of November 7,1994. A safety evaluation (SE) is attached. If you need further information please contact W. Long on 504-3026.
Attachment:
As stated DISTRIBUTION Central File SCSB R/F(2)
RBarrett RLobel JNorris WLong CMoon I
i L
4.c........-.kiDt l
l
,DOCU. MENT NA,ME:....
. - -. LUCIE A:ST
...c..~.-
. ~. ~..
OFFICE SCSB:DSSA V SCSB:DSSA X
C:S(S#gS8A NAME WLong:wol:lbk:wol RLobel _
RJBa//6/tt,.
DATE c) Sit 12-Pt M
" 11/ f h 9 l
OFFICIAL RECORD COPY C94l220o!M 9 NRC IEE GENTER COPY l
w b 4cCD1 dI