ML20138E140

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Supporting C-E Owners Group Rept CEN-387-P,Rev 1, Pressurizer Surge Line Thermal Stratification Evaluation
ML20138E140
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/29/1993
From: Norris J
Office of Nuclear Reactor Regulation
To: Goldberg J
Florida Power & Light Co
Shared Package
ML20136C539 List: ... further results
References
FOIA-96-485, TAC M72169, TAC M72170 IEB-88-011, IEB-88-11, NUDOCS 9307080320
Download: ML20138E140 (3)


Text

.f.

,fs s*

UNITED STATES 5

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055!Km01 June 29, 1993 Docket Nos. 50-335 and 50-389 4

Mr. J. H. Goldberg President - Nuclear Division Florida Power and Light Company

}

P. O. Box 14000 Juno Beach, Florida 33408-0420

[

Dear Mr. Goldberg:

SUBJECT:

SAFETY EVALUATION FOR COMBUSTION ENGINEERING OWNERS GROUP REPORT CEN-387-P, REVISION 1, " PRESSURIZER SURGE LINE THERMAL STRATIFICATION EVALUATION" (BULLETIN 88-11) (TAC NOS. M72169 AND M72170)

By letters dated March 6, April 4, and July 31, 1989, you responded to NRC Bulletin 88-11 a'nd indicated that you were participating in the Combustion Engineering Owners Group (CE0G) effort to evaluate pressurizer surge line thermal stratification. The staff and its consultant, Brookhaven National Laboratory, have completed their review of the CEOG Report CEN-387-P,

" Pressurizer Surge Line Flow Stratification." The staff concludes that the CEOG analysis adequately demonstrates that the bounding surge line and nozzles meet ASME Code stress and fatigue requirements for the 40-year design life of the facility considering the phenomena of thermal stratification and thermal striping.

The staff's safety evaluation of CEN-387-P, Revision 1, is enclosed.

Action 1.d of Bulletin 88-11 required licensees to update their stress and fatigue analyses to ensure compliance with applicable Code requirements. The CEOG Report can be used to update plant-specific Code stress reports as required by Action 1.d.

Please verify the applicability of the CEOG bounding analysis in CEN-387-P, Revision 1 to St. Lucie Units 1 and 2.

In addition, please confirm that all actions required by Bulletin 88-11, including the updating of the plant-specific stress and fatigue analyses required by Action 1.d, have been completed. Your response is requested within 60 days of receipt of this letter.

j This request is covered by Office of Management and Budget Clearanco Number 3150-0011, which expires June 30, 1994. The estimated averaae number of sygam 4#

acintcana copy 9

4' \\'a m

i'.

?-

J. H. Goldberg June 29, 1993 i

t burden hours was already accounted for in the original bulletin, NRC Bulletin 88-11, " Pressurizer Surge Line Thermal Stratification," dated March 29, 1989.

Sincerely, (Original Signed By)

I Jan A. Norris, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Safety Evaluation i

i cc w/ enclosure:

See next page PDII-2 RF S. Varga G. Lainas H. Berkow E. Tana J. Norris OGC ACRS (10)

M. Sinkule, RII orricE LA:PDII-2 PMI -2 D:PDL/A uw ETana f(f Jhah HBdrkk i

DATE 06/// /93 06M/93 06/JS/93 OFFICIAL RECORD COPY - DOCUMENT NAME: C:\\ AUTOS \\WPDOCS\\STLUCIE\\SL72169.SE I

i l

~.

<r d.

Mr. J. H. Goldberg Florida Power and Light Company St. Lucie Plant cc:

Jack Shreve, Public Counsel Mr. Bill Passetti i

Office of the Public Counsel Office of Radiation Control i

c/o The Florida Legislature Department of Health and 111 West Madison Avenue, Room 812 Rehabilitative Services Tallahassee, Florida 32399-1400 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Senior Resident Inspector St. Lucie Plant Regional Administrator, RII U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission 7585 S. Hwy A1A 101 Marietta Street N.W., ouite 2900 j

Jensen Beach, Florida 34957 Atlanta, Georgia 30323 Mr. Joe Myers, Director Mr. R. E. Grazio j

Div. of Emergency Preparedness Director, Nuclear Licensing Department of Community Affairs Florida Power and Light Company 2740 Centerview Drive P.O. Box 14000 Tallahassee, Florida 32399-2100 Juno Beach, Florida 33408-0420 Harold F. Reis, Esq..

Newman & Holtzinger i

1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 34982 Mr. Thomas R.L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 i

.