| | | Reporting criterion |
|---|
| 05000333/LER-1996-001-01, :on 960125,failed to Implement RM Instrumentation Setpoint Changes Following Revision to Odcm. Caused by Personnel Error.Rm Alarm Setpoints Verified & Personnel Counseled |
- on 960125,failed to Implement RM Instrumentation Setpoint Changes Following Revision to Odcm. Caused by Personnel Error.Rm Alarm Setpoints Verified & Personnel Counseled
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(1) |
| 05000333/LER-1996-002-01, :on 960212,potential Common Mode Failure of Circuit Breakers in Both Safety Divisions Occurred Due to Design or Installation Error.Replaced Contacts in Failed Circuit Breakers |
- on 960212,potential Common Mode Failure of Circuit Breakers in Both Safety Divisions Occurred Due to Design or Installation Error.Replaced Contacts in Failed Circuit Breakers
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(viii) |
| 05000333/LER-1996-003-01, :on 960222,plant Shutdown Due to Degraded Control Rod Scram Times & Manual Scram.Caused by Leak in Main Turbine EHC Sys.C/A:Bypass Valves Replaced |
- on 960222,plant Shutdown Due to Degraded Control Rod Scram Times & Manual Scram.Caused by Leak in Main Turbine EHC Sys.C/A:Bypass Valves Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) |
| 05000333/LER-1996-004-01, :on 960228,multiple SRV Pilot Solenoid Failed Due to Foreign Matls,Vendor Deficiencies & Procedural Errors.Replaced Pilot Solenoid Valve W/Another Rebuilt Assembly |
- on 960228,multiple SRV Pilot Solenoid Failed Due to Foreign Matls,Vendor Deficiencies & Procedural Errors.Replaced Pilot Solenoid Valve W/Another Rebuilt Assembly
| |
| 05000333/LER-1996-005-01, :on 960506,error in Safety Limit Minimum Critical Power Ratio (MCPR) Calculation Occurred.Caused by Error in Calculation of Methodology.Administrative Controls Re Operating MCPR Instituted |
- on 960506,error in Safety Limit Minimum Critical Power Ratio (MCPR) Calculation Occurred.Caused by Error in Calculation of Methodology.Administrative Controls Re Operating MCPR Instituted
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2) |
| 05000333/LER-1996-006-01, :on 960511,isolation of Reactor Core Isolation Cooling Sys Occurred.Caused by Failure of Master Trip Unit. Master Trip Unit Replaced W/Vendor Current Model |
- on 960511,isolation of Reactor Core Isolation Cooling Sys Occurred.Caused by Failure of Master Trip Unit. Master Trip Unit Replaced W/Vendor Current Model
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2) |
| 05000333/LER-1996-007-01, :on 960522,sys Isolations & Standby Gas Treatment Initiation Occurred.Caused by False High Radiation Trip Signal.Detector Replaced W/Vendor Current Model |
- on 960522,sys Isolations & Standby Gas Treatment Initiation Occurred.Caused by False High Radiation Trip Signal.Detector Replaced W/Vendor Current Model
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) |
| 05000333/LER-1996-008-01, :on 960906,HPCI Sys Declared Inoperable Due to Failed DC to AC Power Inverter.Failed C11 Capacitor Located in HPCI Inverter 23INV-79 Replaced |
- on 960906,HPCI Sys Declared Inoperable Due to Failed DC to AC Power Inverter.Failed C11 Capacitor Located in HPCI Inverter 23INV-79 Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000333/LER-1996-009-01, :on 960722,EDG B Failed to Complete Startup Sequence.Caused by Incorrect Installation of Agastat Relays. Calibr & Placed Devices 93-62-1EDGB01,93-62-1EDGB12 & 93-52A-1EDGB01 in Correct Locations |
- on 960722,EDG B Failed to Complete Startup Sequence.Caused by Incorrect Installation of Agastat Relays. Calibr & Placed Devices 93-62-1EDGB01,93-62-1EDGB12 & 93-52A-1EDGB01 in Correct Locations
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2) |
| 05000333/LER-1996-010-01, Forwards LER 96-010-01,plant Shut Down Due to Human Error Re Inadvertently Connecting Two Terminals While Calibrating Protective Relay.Revises Rept to Include Corrective Action for Human Performance Deficiencies.W/Status of | Forwards LER 96-010-01,plant Shut Down Due to Human Error Re Inadvertently Connecting Two Terminals While Calibrating Protective Relay.Revises Rept to Include Corrective Action for Human Performance Deficiencies.W/Status of Commitments | |
| 05000333/LER-1996-010, :on 960916,plant Was Shut Down Re Inadvertent Connection of Two Terminals While Calibrating Protective Relay Due to Human Error.Personnel Responsible for Initiating Event Have Been Counseled |
- on 960916,plant Was Shut Down Re Inadvertent Connection of Two Terminals While Calibrating Protective Relay Due to Human Error.Personnel Responsible for Initiating Event Have Been Counseled
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000333/LER-1996-011-01, :on 961028,both Standby Liquid Control Subsystems Determined Inoperable.Due to Inoperable Pump Discharge Pressure Relief Valves.Slc Sys Pump Discharge Pressure Relief Valve 11SV-39A Was Replaced |
- on 961028,both Standby Liquid Control Subsystems Determined Inoperable.Due to Inoperable Pump Discharge Pressure Relief Valves.Slc Sys Pump Discharge Pressure Relief Valve 11SV-39A Was Replaced
| 10 CFR 50.73(a)(2)(1) |
| 05000333/LER-1996-012-01, :on 961111,primary Containment Accumulative Leakage in Excess of Maximum Allowed by TS Occurred.Caused by Build Up on Valve Seat Areas.Efes Were Completed for Each Failed Valve |
- on 961111,primary Containment Accumulative Leakage in Excess of Maximum Allowed by TS Occurred.Caused by Build Up on Valve Seat Areas.Efes Were Completed for Each Failed Valve
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(1) |
| 05000333/LER-1996-013-01, :on 961116,reactor Protection & Primary Containment Isolation Sys Actuation on False Low Reactor Water Level Occurred Due to Personnel Error.Instrument Surveillance Procedure Changed |
- on 961116,reactor Protection & Primary Containment Isolation Sys Actuation on False Low Reactor Water Level Occurred Due to Personnel Error.Instrument Surveillance Procedure Changed
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000333/LER-1996-014, :on 961215,manual Scram Occurred Due to Leak in Main Turbine electro-hydraulic Control Sys.Failed Actuator Seal Was Repaired & Equipment Failure Evaluation of 29BPV-4 Actuator Seal Was Completed |
- on 961215,manual Scram Occurred Due to Leak in Main Turbine electro-hydraulic Control Sys.Failed Actuator Seal Was Repaired & Equipment Failure Evaluation of 29BPV-4 Actuator Seal Was Completed
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2) |
| 05000333/LER-1996-015-01, :on 961218,determined Bypass Flow Path Around Offgas Isolation Valve.Caused by Design Deficiency.Installed Check Valve in Common Drain Line to Prevent Reverse Flow from Steam Jet Air Ejector Discharge |
- on 961218,determined Bypass Flow Path Around Offgas Isolation Valve.Caused by Design Deficiency.Installed Check Valve in Common Drain Line to Prevent Reverse Flow from Steam Jet Air Ejector Discharge
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2) |