05000458/LER-1985-006, :on 850916,reactor Protection Sys Actuated While in Noncoincident Trip Mode When Malfunction in Undervoltage Printed Circuit Board on Alternate Supply Breaker Tripped Electrical Protection Assembly

From kanterella
(Redirected from ML20138B917)
Jump to navigation Jump to search
:on 850916,reactor Protection Sys Actuated While in Noncoincident Trip Mode When Malfunction in Undervoltage Printed Circuit Board on Alternate Supply Breaker Tripped Electrical Protection Assembly
ML20138B917
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/15/1985
From: Kosmala R
GULF STATES UTILITIES CO.
To:
Shared Package
ML20138B899 List:
References
LER-85-006, LER-85-6, NUDOCS 8510220078
Download: ML20138B917 (2)


LER-1985-006, on 850916,reactor Protection Sys Actuated While in Noncoincident Trip Mode When Malfunction in Undervoltage Printed Circuit Board on Alternate Supply Breaker Tripped Electrical Protection Assembly
Event date:
Report date:
4581985006R00 - NRC Website

text

f 5

L l

s MAC Pere 30.

Ua NUCLEAR ReOULATOmv er IM Ascaoveo one =o nm_.

LICENSEE EVENT REPORT (LER)

, ACsLITY NAans (11 DOCS ET isumesR (33 FAes m River Bend Station o l5 l0 l0 lol 4l5l8 i lorl0 12 TITLS 444 Reactor Protection System Actuation EVENT DAYS te.

Lt A mynesa let REPORT DATE 179 OTNGR 7ACIL87tes 88fv0LweO tel MohTM OAV YEAR YEAR

*y n'"

MonTM DAV TEAR

  • ACi uT v. sauce 00CKET huweentep 0 15101010 1 I I 0l 9. d6 8

5 9l5 0l 0 l6 O !0 lb I! 5 8! 5 0 1 5 I0 1 0 t 0 I I I fwie am o sumenTTso PU-T To me neouemenseafTe on is C,a t <Cn

.< s. a==-

e, ein "U'O E 5

Massel 3e 80stel

{

se 731sH3Hael g

maeswtute es.3 4.Hu se_rs=Haim 73.71w s

s Se 40edeH1Hul es 731sH3HG es 73witu.el ruu.I sim 010 t0 Se ass =HiHn es.3e4.H3) oymap pga,g et.731sH3HoulHA8 JSRM 3e 4EelsH1 Heel es.73wt3Hal es.F3emiGHeeHet R40stsH1HW es.73teH3Het at.73taH3 Hat LICEMeG5 CO8f7ACT POR Twee LOS 1123 4AME TELtPMONE NuM80m AmE A COct R. J. Kosmala. Technical Staff Sr. Control Systems Engineer 5 0; 4 4 4;6l g 8l6l5; 1 i

COMPLif t ONE Leht FOR EACH COedPONENT FAILunt OtsCateED IN TMg atrom? 113)

'O g,','[fI CALSE SYSTtu CCu*CNE%T

'O "I

CAvst Sv tttu Cowe04 TNT f

Pa B

El D I I 51 2 G101812 i

t t t I

I I I I l l I

! ! I I I I i

eUPPLEMENT AL AGPORf EXPECTED 1148 WCNTM DAY vtAm SL e u.SS.C N vg g w,a. e.m.m gartCTIO SGcusssiCN CA ff!

%0 l

l l

a:T AeT a-,. m....

.~, u,

.,.. --.,.. n..

At 07S7 on 9-16-85, with the unit suberitical, the Reactor Protection System (RPS) actuated while in the non-coincident trip mode for fuel loading.

RPS Channel A was in the alternate power feed mode to support Division I Emergency Core Cooling System testing during which a spurious trip on an electrical protection assembly in the RPS Channel A alternate power feed occurred.

RPS Channel A was switched to the normal supply and the trip was reset.

The cause was due to a malfunction in the undervoltage printed circuit board on the alternate supply breaker. The breaker was repaired on 9-20-85 and returned to service.

8510220078 851015 PDR ADOCK 05000458 S

PDR

,~, 2.

l NPRDS will not be functional at River Bend Station until full power operation.

b -

\\

i l

AC.

rJ433

7.e.

me.

u e =veum aruuro.7 co

..o.

UCENSEE EVENT REPORT (LER) TEXT CONTINUATl2N a,.aovts o e o 3 EIpiAtl 3/31 $g 8aCrury asasse en 00CatT ww.seem t2l Lte asunsete W pace m

" t O l-

? Met "aa River Bend Station o l5 l0 l0 l0 l4 l 5l8 8l5 0l0l6 0l 0 0 l2 or 0 l2 run <,

anc w m.w on At 0757 on 9-14-85, with the unit ~suberitical, the Reactor Protection System (RPS) actuated while in the non-coincident trip mode for fuel loading. RPS Channel A was in the alternate power feed mode to support Division I Emergency Core Cooling System testing during which a spurious trip on an Electrical Protection Assembly (EPA)

C71*S003E in the RPS channel A alternate power feed occurred.

The breaker had experienced spurious trips before and Maintenance Work Request (MWR) No. 8770 (8-26-85) and MWR No. 8516 (8-27-85) were written to investigate the problem.

Investigation on 8-26-85, 8-27-85, and 8-28-85 showed no apparent problem.

On 9-19-85 the cause of the breaker spurious trip was traced to a malfunction in the undervoltage timer section of the electrical protection logic card (GE 47D523796G1 S/N 185).

Remedial corrective action was to place RPS channel A on the normal power supply and reset the RPS actuation.

Generic corrective action to correct the problem with the breaker was to replace the printed circuit board. The printed circuit board was tested and returned to service.