Letter Sequence Other |
|---|
|
Results
Other: 05000267/LER-1986-022, :on 860715,failure Point in 480-volt Ac Essential Bus 1 & 2 Undervoltage Relay Logic Identified. Caused by Misunderstanding of Basic Design Requirements. Designer & Independent Reviewer Reprimanded, ML20134A365, ML20135H559, ML20135H563, ML20137B356, ML20137K999, ML20137S363, ML20140H110, ML20206T734, ML20207R947, ML20212G867
|
MONTHYEARML20074A7561983-04-27027 April 1983 Clarifies Proposed Changes in Undervoltage Protection & Reiterates Schedule for Implementation of Design Changes & Mods.Existing non-Class IE Undervoltage Relays Will Be Retained as Protection for 4,160-volt Buses Project stage: Request ML20212N6621985-08-31031 August 1985 Technical Evaluation Rept for Proposed Change to Operation of Ginna Fuel Pool Charcoal Filter Sys, Informal Rept Project stage: Request ML20135H5631985-08-31031 August 1985 Truth-Analysis/Action-Reaction Review of 480-Volt Essential Bus Tie Breaker Control Scheme, Final Rept Project stage: Other ML20135H5591985-09-13013 September 1985 Forwards Truth-Analysis/Action-Reaction Review of 480-Volt Essential Bus Tie Breaker Control Scheme, Final Rept & Provides Evaluation of Control Logic Design Project stage: Other IR 05000267/19850171985-09-13013 September 1985 Insp Rept 50-267/85-17 on 850617-0816.Violation Noted: Failure to Rept Nine Circulator Trips in 1984 & Seven Trips in 1985 & No Differential Helium Pressure Maintained When Pcrv Pressure Above 100 Psia Project stage: Request ML20137S3631985-09-13013 September 1985 Corrected Page 1 to Responding to 850614 Commitment to Perform Evaluation of Emergency Diesel Generator Control Logic Circuitry.Ltr Number Changed Project stage: Other ML20134A3651985-10-23023 October 1985 Amends Correction Portion of Item 2 (286G1A & 286G1B) in Util Re Results of Proto-Power Corp Analysis Concerning Emergency Electrical Power Sys Independence Project stage: Other ML20137B3561986-01-0303 January 1986 Informs That Design Changes Involving Emergency Diesel Generator (EDG) Control Logic Circuitry Implemented.No Single Failure Will Interfere W/Proper Operation of Redundant EDG Project stage: Other ML20137K9991986-01-14014 January 1986 Notifies That Design Changes in Emergency Diesel Generator Control Logic Circuitry Implemented,Per 850913 Commitment. Changes Assure That Failure Will Not Interfere W/Operation of Redundant Generator.Ltr Supersedes Project stage: Other ML20140H1101986-03-31031 March 1986 Submits Info Re Startup Check List for Automatic Operation of Emergency Diesel Generators,Sys Operating Procedure 92-04,in Response to NRC .Numbers Will Be Assigned to All Valves in Emergency Diesel Generator Rooms Project stage: Other ML17251A7911986-03-31031 March 1986 Reactor Containment Bldg Integrated Leakage Rate Test Project stage: Request ML20206T7341986-07-0101 July 1986 Submits Summary & Schedule of Mods to Be Performed on Emergency Diesel Generator Control Circuitry in Response to 860515 & 21 Telcons.Mods Will Be Completed Prior to Startup from Current Equipment Qualification Outage Project stage: Other ML20213G5811986-08-0707 August 1986 Draft Review of Fort St Vrain Onsite AC Standby Power Sys W/Regards to Compliance to Single Failure Criterion & Ser Project stage: Draft Other 05000267/LER-1986-022, :on 860715,failure Point in 480-volt Ac Essential Bus 1 & 2 Undervoltage Relay Logic Identified. Caused by Misunderstanding of Basic Design Requirements. Designer & Independent Reviewer Reprimanded1986-08-14014 August 1986
- on 860715,failure Point in 480-volt Ac Essential Bus 1 & 2 Undervoltage Relay Logic Identified. Caused by Misunderstanding of Basic Design Requirements. Designer & Independent Reviewer Reprimanded
Project stage: Other ML20213G5641986-11-12012 November 1986 Forwards Onsite Class 1E Power Sys Design Features Review Status Rept Based on FSAR & NRC 860814 Meeting W/Licensee & Inel Draft Review of Fort St Vrain Onsite AC Standby Power.... Resolution to Problems Requested Before Restart ML20212D8641986-12-24024 December 1986 Summary of 861209 Meeting W/Util Re Plant Emergency Electrical Power Sys.Fsar Commitment Re Emergency Diesel Generators revised.Marked-up Draft Rept Re Ac Standby Power Sys Encl ML20212G8671987-01-0909 January 1987 Forwards Rev a to EE-92-0008, Engineering Evaluation of Load Shedding,Load Auto Start Prohibit,Load Sequencing,Bus Tie Breaker Alignment & Generator Breaker Closing Portions of Emergency Diesel Generator Control Circuitry Project stage: Other ML20207R9471987-03-0606 March 1987 Rev 1 to Review of Fort St Vrain Onsite AC `Standby Power Sys Re Compliance to Single Failure Criterion & Ser Project stage: Other ML20207R9381987-03-0606 March 1987 Forwards Rev 1 to EGG-NTA-7456, Review of Fort St Vrain Onsite AC `Standby Power Sys Re Compliance to Single Failure Criterion & Ser Project stage: Approval ML20207S6271987-03-12012 March 1987 Summary of 870210 Meeting W/Util Re Emergency Diesel Generator Electrical Independence.List of Attendees Encl Project stage: Meeting 1986-12-24
[Table View] |
Text
. _ _ _ _ -
y L
Public Service r
Company of Colorado P.O. Box 840 Denver, CO 80201- 0840 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 (303)S71 7511 September 13, 1985 Fort St. Vrain Unit No. 1 P-85313
' ] m @ P fl N 7 [ h Regional Administrator i:
Region IV p
U. S. Nuclear Regulatory Comission L
SFP 2 3 E jj 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 "y
1 Attn: Mr. Dorwin R. Hunter Docket No. 50-267
SUBJECT:
Emergency Electrical Power System Independence
REFERENCES:
(1) PSC Letter dated June 14, 1985 Warembourg to Johnson (P-85208)
.(2) NRC Letter dated July 10, 1985 Johnson to Lee (G-85268)
Dear Mr. Hunter:
In a letter dated June 14,1985 (Reference 1), Public Service Company (PSC) provided additional information in response to questions raised in the NRC's review of the Emergency Electrical Power Systen design as described in the FSAR.
In addition to the information provided, PSC comitted to perform an evaluation of the Emergency Diesel Generator (EDG) control logic circuitry and to provide the results to the NRC staff.
In a letter dated July 10, 1985 (Reference 2), the NRC issued a safety evaluation for continued operation in the interim until any necessary design changes are proposed and to reaffirm PSC's comitment to evaluate the control logic design.
This letter.is providing PSC's response to this comitment.
k Fort St. Vrain (FSV) was designed using a combination of principles,
/
i.e. redundancy, independence, diversity and single failure.
Each of 4
these principles was used and/or combined to achieve a highly [0) reliable onsite power system.
The FSAR comitments concerning independence, redundancy and single failure criteria as they relate g
to FSV's onsite power system cannot be taken to be solely the single g\\g v
(d/6 e5093000988509j67 I
\\
[ "
^""
J Interoffice Memo O Pubh. Service" fiDG-85-0601 c
Pub 5c Savice Company of Cokwado DATE:
September 19, 1985 l
T0:
P Letter Distribution FROM:
Peggy Alcarez i