MONTHYEARML20204E4141999-03-18018 March 1999 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52,proposed NSHC Determination & Opportunity for Hearing.Amends Would Revise TS by Deleting Sections 3.3.7 & 3.3.8 ML20198A1021998-12-10010 December 1998 Notice of Consideration of Issuance of Amends to FOLs NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Modify Section 3.8.3, Diesel,Fuel Oil & Starting Air, of Joint Improved TS ML20237D6231998-08-20020 August 1998 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Would Revise TS Section 4.6.5.1.b.2 Re SR for Ice Condenser Ice Bed ML20237A2611998-08-11011 August 1998 Notice of Consideration of Issuance of Amend to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Revise Ts,Deleting Surveillance Requirement 4.8.1.1.2.i.2 ML20248A9991998-05-27027 May 1998 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Revise SR 4.4.3.3 to Verify That Pressurizer Heaters Capable of Being Powered from EP Supply ML20217K5791998-04-23023 April 1998 Notice of Partial Denial of Amends to Facility Operating Licenses & Opportunity for Hearing.Nrc Staff Concluded That Licensee Proposed Changes Described Above Unacceptable & Denied ML20107J7161996-04-22022 April 1996 Corrected Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Rev Necessary to Change Filing Date from 960515 to 960516 ML20106J7121996-04-0909 April 1996 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Change Containment H Mitigation Sys TS ML20094N0401995-11-15015 November 1995 Notice of Consideration of Issuance of Amend to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Modify Section 6.0, Administrative Controls, of Listed Licensees ML20064C8121994-02-22022 February 1994 Notice of Consideration of Issuance of Amend to License NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Would Change Method of Measuring RCS Flow Rate During 18 Month Surveillance for Facility ML20059K8011994-01-19019 January 1994 Notice of Consideration of Issuance of Amend to License NPF-35 & Proposed NSHC Determination & Opportunity for Hearing.Amend Would Revise TS 3/4.2.5.3 Re Reactor Coolant Sys (RCS) Flow Rate ML20128P4481993-02-18018 February 1993 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Reflect Application of Core Analysis Methodlogy Developed by Licensee ML20117A7141992-11-17017 November 1992 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Revises TS for Liquid Effluent & Gaseous Release Rate Limits & TS Wording ML20114D9041992-08-25025 August 1992 Notice of Consideration of Issuance of Amend to License NPF-35 & Proposed NSHC Determination & Opportunity for Hearing.Amend Allows Use of Interim Tube Plugging Criteria by Changing TSs 3/4.4.5 & 3/4.4.6 ML20101U2051992-07-14014 July 1992 Notice of Consideration of Issuance of Amend to Licenses, Proposed NSHC Determination & Opportunity for Hearing Re Amend to Revise TS for Unit 1 Cycle 7 Reload ML20083C3191991-09-16016 September 1991 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Change TS Re Min Allowed Air Flow Through Control Room Area Ventilation Sys ML20066E9281991-01-11011 January 1991 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Change Tech Specs to Increase Weight of Ice Required in Containment Ice Condenser Baskets ML20034B6151990-04-25025 April 1990 Notice of Consideration of Issuance of Amends to Licenses & Proposed NSHC Determination & Opportunity for Hearing to Revise Tech Spec 3/4.9.11 to Change Carbon Adsorber Test Method ML20207K6311988-10-0606 October 1988 Notice of Withdrawal of 880506 Application for Amends to Licenses NPF-35 & NPF-52.Application Withdrawn Because New Valves & Penetrations No Longer Required,Per ML20197D5331988-05-27027 May 1988 Notice of Issuance of Amends 45 & 38 to Licenses NPF-35 & NPF-52,respectively.Amends Modify Tech Specs to Cover Operation of Sys & Components Associated W/Monitor Tank Bldg ML20149K1451988-02-11011 February 1988 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Revises Tech Spec 3/4.2.3 to Reduce Required RCS Total Flow from 396,100 Gpm to 387,600 Gpm ML20236F2781987-10-21021 October 1987 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52.Amends Would Revise Tech Spec 3/4.4.5, Steam Generators & Associated Basis & Involve Changes to Steam Generator Tube Plugging Criteria ML20236A6201987-10-15015 October 1987 Environ Assessment & Finding of No Significant Impact Granting Util 870612 Request to Remove Upper Head Injection Accumulator Sys at Plant NUREG-1191, Notice of Issuance of License NPF-52.Tech Spec (NUREG-1191) Encl1986-05-15015 May 1986 Notice of Issuance of License NPF-52.Tech Spec (NUREG-1191) Encl ML20137E8071985-12-30030 December 1985 Notice of Consideration of Issuance of Amend to License NPF-35 & Proposed NSHC Determination & Opportunity for Hearing.Amend Reviseds Tech Specs to Eliminate Typos,Provide Clarification,Improve Consistency & Adjust Nomenclature ML20137N8891985-11-22022 November 1985 Notice of Finding of No Significant Antitrust Changes & Time for Filing Requests for Reevaluation ML20127J6671985-05-23023 May 1985 Notice of Receipt of Antitrust Info ML20127N8631985-05-0606 May 1985 Notice of Issuance of Amend 3 to CPPR-117,modifying CP to Reflect Issuance of 850423 Limited Schedular Exemption Re Installation of Protective Devices & Consideration of Certain Dynamic Effects ML20116L6871985-04-17017 April 1985 Notice of Environ Assessment & Finding of No Significant Impact Re Util 840511 Request for Exemption from GDC 4 to 10CFR50,App a to Exempt Util from Installing Protective Devices to Consider Effects of Postulated Pipe Breaks ML20031B1021981-08-31031 August 1981 Notice of Receipt of Antitrust Info Accompanying OL Application ML19345H6421981-05-0808 May 1981 Notice of Receipt of Addl Antitrust Info DD-81-01, Notice of Issuance of Addendum to Directors Decision DD-81-01 Denying Carolina Environ Study Group Petition That Commission re-examine Certain Issues Re Facility1981-02-0606 February 1981 Notice of Issuance of Addendum to Directors Decision DD-81-01 Denying Carolina Environ Study Group Petition That Commission re-examine Certain Issues Re Facility ML20148B9921978-10-19019 October 1978 Notice of Issuance of Amend 1 to CPPR-117,adding North Carolina Municipal Power Agency 1 as co-owner & co-applicant of Facility 1999-03-18
[Table view] Category:TEXT-CODE OF FEDERAL REGULATIONS
MONTHYEARML20204E4141999-03-18018 March 1999 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52,proposed NSHC Determination & Opportunity for Hearing.Amends Would Revise TS by Deleting Sections 3.3.7 & 3.3.8 ML20198A1021998-12-10010 December 1998 Notice of Consideration of Issuance of Amends to FOLs NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Modify Section 3.8.3, Diesel,Fuel Oil & Starting Air, of Joint Improved TS ML20237D6231998-08-20020 August 1998 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Would Revise TS Section 4.6.5.1.b.2 Re SR for Ice Condenser Ice Bed ML20237A2611998-08-11011 August 1998 Notice of Consideration of Issuance of Amend to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Revise Ts,Deleting Surveillance Requirement 4.8.1.1.2.i.2 ML20248A9991998-05-27027 May 1998 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Revise SR 4.4.3.3 to Verify That Pressurizer Heaters Capable of Being Powered from EP Supply ML20217K5791998-04-23023 April 1998 Notice of Partial Denial of Amends to Facility Operating Licenses & Opportunity for Hearing.Nrc Staff Concluded That Licensee Proposed Changes Described Above Unacceptable & Denied ML20107J7161996-04-22022 April 1996 Corrected Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Rev Necessary to Change Filing Date from 960515 to 960516 ML20106J7121996-04-0909 April 1996 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Change Containment H Mitigation Sys TS ML20094N0401995-11-15015 November 1995 Notice of Consideration of Issuance of Amend to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Modify Section 6.0, Administrative Controls, of Listed Licensees ML20064C8121994-02-22022 February 1994 Notice of Consideration of Issuance of Amend to License NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Would Change Method of Measuring RCS Flow Rate During 18 Month Surveillance for Facility ML20059K8011994-01-19019 January 1994 Notice of Consideration of Issuance of Amend to License NPF-35 & Proposed NSHC Determination & Opportunity for Hearing.Amend Would Revise TS 3/4.2.5.3 Re Reactor Coolant Sys (RCS) Flow Rate ML20128P4481993-02-18018 February 1993 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Reflect Application of Core Analysis Methodlogy Developed by Licensee ML20117A7141992-11-17017 November 1992 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Revises TS for Liquid Effluent & Gaseous Release Rate Limits & TS Wording ML20114D9041992-08-25025 August 1992 Notice of Consideration of Issuance of Amend to License NPF-35 & Proposed NSHC Determination & Opportunity for Hearing.Amend Allows Use of Interim Tube Plugging Criteria by Changing TSs 3/4.4.5 & 3/4.4.6 ML20101U2051992-07-14014 July 1992 Notice of Consideration of Issuance of Amend to Licenses, Proposed NSHC Determination & Opportunity for Hearing Re Amend to Revise TS for Unit 1 Cycle 7 Reload ML20083C3191991-09-16016 September 1991 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Change TS Re Min Allowed Air Flow Through Control Room Area Ventilation Sys ML20066E9281991-01-11011 January 1991 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amends Would Change Tech Specs to Increase Weight of Ice Required in Containment Ice Condenser Baskets ML20034B6151990-04-25025 April 1990 Notice of Consideration of Issuance of Amends to Licenses & Proposed NSHC Determination & Opportunity for Hearing to Revise Tech Spec 3/4.9.11 to Change Carbon Adsorber Test Method ML20207K6311988-10-0606 October 1988 Notice of Withdrawal of 880506 Application for Amends to Licenses NPF-35 & NPF-52.Application Withdrawn Because New Valves & Penetrations No Longer Required,Per ML20197D5331988-05-27027 May 1988 Notice of Issuance of Amends 45 & 38 to Licenses NPF-35 & NPF-52,respectively.Amends Modify Tech Specs to Cover Operation of Sys & Components Associated W/Monitor Tank Bldg ML20149K1451988-02-11011 February 1988 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52 & Proposed NSHC Determination & Opportunity for Hearing.Amend Revises Tech Spec 3/4.2.3 to Reduce Required RCS Total Flow from 396,100 Gpm to 387,600 Gpm ML20236F2781987-10-21021 October 1987 Notice of Consideration of Issuance of Amends to Licenses NPF-35 & NPF-52.Amends Would Revise Tech Spec 3/4.4.5, Steam Generators & Associated Basis & Involve Changes to Steam Generator Tube Plugging Criteria ML20236A6201987-10-15015 October 1987 Environ Assessment & Finding of No Significant Impact Granting Util 870612 Request to Remove Upper Head Injection Accumulator Sys at Plant NUREG-1191, Notice of Issuance of License NPF-52.Tech Spec (NUREG-1191) Encl1986-05-15015 May 1986 Notice of Issuance of License NPF-52.Tech Spec (NUREG-1191) Encl ML20137E8071985-12-30030 December 1985 Notice of Consideration of Issuance of Amend to License NPF-35 & Proposed NSHC Determination & Opportunity for Hearing.Amend Reviseds Tech Specs to Eliminate Typos,Provide Clarification,Improve Consistency & Adjust Nomenclature ML20137N8891985-11-22022 November 1985 Notice of Finding of No Significant Antitrust Changes & Time for Filing Requests for Reevaluation ML20127J6671985-05-23023 May 1985 Notice of Receipt of Antitrust Info ML20127N8631985-05-0606 May 1985 Notice of Issuance of Amend 3 to CPPR-117,modifying CP to Reflect Issuance of 850423 Limited Schedular Exemption Re Installation of Protective Devices & Consideration of Certain Dynamic Effects ML20116L6871985-04-17017 April 1985 Notice of Environ Assessment & Finding of No Significant Impact Re Util 840511 Request for Exemption from GDC 4 to 10CFR50,App a to Exempt Util from Installing Protective Devices to Consider Effects of Postulated Pipe Breaks ML20031B1021981-08-31031 August 1981 Notice of Receipt of Antitrust Info Accompanying OL Application ML19345H6421981-05-0808 May 1981 Notice of Receipt of Addl Antitrust Info DD-81-01, Notice of Issuance of Addendum to Directors Decision DD-81-01 Denying Carolina Environ Study Group Petition That Commission re-examine Certain Issues Re Facility1981-02-0606 February 1981 Notice of Issuance of Addendum to Directors Decision DD-81-01 Denying Carolina Environ Study Group Petition That Commission re-examine Certain Issues Re Facility ML20148B9921978-10-19019 October 1978 Notice of Issuance of Amend 1 to CPPR-117,adding North Carolina Municipal Power Agency 1 as co-owner & co-applicant of Facility 1999-03-18
[Table view] |
Text
-
4 7590-01 NUCLEAR REGULATORY COMMISSION DOCKET NO 50-414A DUKE POWER COMPANY, NORTH CAROLINA MUNICIPAL POWER AGENCY 1, AND PIEDMONT POWER AGENCY NOTICE OF FINDING OF NO SIGNIFICANT ANTITRUST CHANGES AND TIME FOR FILING REQUESTS FOR REEVALUATION l
The Director of Nuclear Reactor Regulation has made an initial finding in accordancewithSection105c(2)oftheAtomicEnergyActof1954,asamended, that no significant (antitrust) changes in the licensee's activities or proposed activities have occurred subsequent to the previous construction
^
permit review of Unit 2 of the Catawba Nuclear Power Station by the Attorney General and the Commission. The finding is as follows:
"Section 105c(2) of the Atomic Energy Act of 1954, as amended, provides for an antitrust review of an application for an operating license if the Commission determines that significant changes in the licensee's activities or proposed activities have occurred subsequent to the previous construction permit review. The Commission has delegated the authority to make the "significant change" determination to the Director, Office of Nuclear Reactor Regulation. Based upon an examination of the events since issuance the of the Catawba 2 construction permit to the Duke Power Company, et al., the staffs of the Antitrust and Economic Analysis Section of the Site Analysis Branch, Office of Nuclear Reactor Regulation and the Antitrust Section of the Office of the Executive Legal Director, hereafter referred to as " staff", have jointly concluded, after consultation with the Department of Justice, that the changes that have occurred since the antitrust construction permit review are not of the nature to require a second antitrust review at the operating license stage of the application.
8512040256 851122 DR ADOCK 05000414 PDR
i l "In reaching this conclusion, the staff considered the structure of the electric utility industry in the Piedmont Carolinas, the events relevant to the Catawba 2 construction permit reviews and the events that have occurred subsequent to the construction permit reviews.
"The conclusion of the staff's analysis is as follows:
'During the construction pennit antitrust reviews of Duke Power Company's (Duke's) nuclear plant applications, the Attorney General and the petitioners for antitrust hearings were primarily concerned l
with Duke's dominance in the relevant market. The thrust of the review centered upon any increase in that dominance that would occur l
by the addition of the Oconee. McGuire and Catawba nuclear units to f
Duke's integrated electrical system, and Duke's refusaT to allow smaller electrical systems in the area where Duke serves to share in the ownership of the nuclear units or to interconnect with Duke and coordinate power supply se'rvices.
Following negotiations, Duke agreed to a set of antitrust comitments which were to be attached as antitrust license conditions to its nuclear plant construction pennits and operating licenses. These license conditions required Duke to interconnect and provide power supply services to smaller f
electric utilities in the area where it serves, including 3
notification of plans to construct future nuclear units, but did not j
specifically require Duke to provide ownership access to the Oconee, McGuire or Catawba nuclear units.
' Subsequently, Duke entered into agreements with municipal and cooperative power agencies in both North Carolina and South Carolina, providing these agencies with ownership interests in Catawba Units 1 and 2, and with ancillary services to make this ownership economical. Specifically, the North Carolina Electric Membership Corporation and the Saluda River Cooperative Inc. have been provided an ownership interest in Catawba 1.
Similarly, the North Carolina Municipal Power Agency I and the Piedmont Municipal
Power Agency have been provided an ownership interest in Catawba 2.
The ownership agreements have been supplemented by interconnection agreements which provide (1) interim power supply from Duke's other nuclear units prior to commercial operation of the Catawba units (2) emergency backup power among the nuclear units whereby each nuclear unit is supported by the others, (3) a buy-back arrangement by Duke to allow the municipals and cooperatives to gradually increase their capacity allotments, (4) transmission services, and (5) supplemental purchases and sales by Duke to pennit the municipals and cooperatives to match their energy requirements from hour to hour.
'The NRC staff believes that the above changes are consistent with the comitments made by Duke during the construction permit antitrust negotiations and are consistent with the Department of Justice and Nuclear Regulatory Comission desires to enhance the competitive process in bulk power supply markets. Staff's investigations and analysis have disclosed no anticompetitive connection between the activities of the applicants and the changes that have occurred since the construction pennit application reviews for Catawba 2.
The changes that have occurred in rate schedules, inquiries regarding power purchases and sales, and changes in membership and nuclear plant ownership shares of the municipal and l,I cooperative organizations have had negligible competitive impact upon the bulk power supply in the Piedmont Carolinas. Accordingly, the NRC staff is not recomending a "significant change" finding with respect to the Catawba 2 operating license application.'
" Based on the staff's analysis, it is my finding that a formal operating license antitrust review of the Catawba Nuclear Power Station, Unit 2 is not required."
Signed on November 19, 1985 by Harold R. Denton, Director of Office of Nuclear Reactor Regulation.
l
,mm.,,---
.y
.-, -..,-.- _ _ _ -. _. _,,,, -,.., _ + _..
_,.,,,,-_-e-,
l Any person whose interest may be affected by this finding may file with full particulars a request for reevaluation with the Director of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Comission, Washington, DC 20555 for 30 days from the date of publication of this Federal Register notice. Requests for a reevaluation of the no significant change determination shall be accepted after the date when the Directors' finding becomes final but before l
the issuance of the OL only if they contain new infomation, such as l
information about facts or events of antitrust significance that have occurred since that date, or infomation that could not reasonably have been submitted prior to that date.
FOR THE NUCLEAR REGULATORY COMMISSION BJ S.
Donald P. Cleary, Acting
'ief 3
Site Analysis Branch Division of Engineering Office of Nuclear Reactor Regulation I
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _