ML20137N870
ML20137N870 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 11/22/1985 |
From: | Cleary D Office of Nuclear Reactor Regulation |
To: | Guild R PALMETTO ALLIANCE |
Shared Package | |
ML20137N876 | List: |
References | |
A, NUDOCS 8512040253 | |
Download: ML20137N870 (1) | |
Similar Documents at Catawba | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999
[Table view]Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08 Category:NRC TO PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA MONTHYEARML20147E6621988-01-19019 January 1988
[Table view]Partial Response to FOIA Request.App G Documents Already Available in Pdr.App H Documents,Re INPO Accreditation Training,Encl & Available in PDR ML20236K2621987-08-0404 August 1987 Partial Response to FOIA Request for Records Re AO Reporting.Forwards App D & E Documents.Documents Also Available in PDR ML20199G0641986-06-11011 June 1986 Further Response to FOIA Request for Records Re Comanche Peak Task Force.App V Records 1-192 Placed in Pdr.Records 93,123,130,131 & 171-192 & Portions of Other Listed Records Withheld (Ref FOIA Exemption 5) ML20210U3251986-05-29029 May 1986 Informs That Copies of NRC Correspondence to Util Re Issuance of OL Will No Longer Be Sent Due to Completion of Proceedings.Documents Will Be Available in PDR ML20205Q7071986-05-22022 May 1986 Further Response to FOIA Request for Records Re NRC Comanche Peak Task Force.App H Documents Encl & Available in Pdr. Portions of App H Documents Withheld (Ref FOIA Exemption 5). Review Continuing ML20198E6491986-05-0808 May 1986 Partial Response to FOIA Request for All Internal Documents Re IE Info Notice 86-005 & Operability of Main Steam Safety Valves.Encl App a Documents Available in Pdr.App B Documents Being Placed in PDR ML20137N8701985-11-22022 November 1985 Informs That Finding of No Significant Antitrust Changes Made Per OL Analysis.Fr Notice & Staff Analysis Encl ML20205E6381985-10-0808 October 1985 Final Response to FOIA Request for Four Categories of Documents Re Notices of Violation for Facility.Forwards Apps L & M Documents.Documents Also Available in Pdr.App M Documents Partially Withheld (Ref FOIA Exemption 7) ML20134D1481985-08-14014 August 1985 Ack Receipt of Unsigned Re Misconduct by Region II Personnel Involved in Handling Allegations of Harassment at Facility.Requests Basis for Allegations Be Provided to Ofc of Inspector & Auditor for Investigation ML20133K6061985-07-0202 July 1985 Fourth Partial Response to FOIA Request for Documents Re Four Categories of Info Concerning Notices of Violation at Plant.App H Documents in Pdr.Portions of Documents on Apps I & J & All on App K Withheld (Ref FOIA Exemptions 6 & 7) ML20126A5921985-06-0404 June 1985 Responds to Re Issues Supporting Request That NRC Take Enforcement Action Against Util.Region II Handling of Issue Defended.Director'S Decision Re Guild 840627 Request Encl.W/O Encl ML20129H9041985-06-0404 June 1985 Responds to FOIA Request for Records Re Insp Repts 50-413/84-89 & 50-414/84-40.Many Documents Available in PDR Under Names of Listed FOIA Requestors.More Documents Will Be Placed in PDR Upon Completion of Review ML20133C4111985-05-24024 May 1985 Third Partial Response to FOIA Request for Four Categories of Info Re Catawba Notices of Violation.App F Documents Encl & Available in Pdr.App G Document in Pdr.Search Continuing ML20129A0401985-05-0606 May 1985 Second Partial Response to FOIA Request for Info Re Notice of Violation.Forwards Documents Listed in App D.Documents Also Available in Pdr.App E Documents Partially & Completely Withheld (Ref FOIA Exemptions 5 & 7) ML20126D8001985-02-28028 February 1985 Further Response to FOIA Request for Six Categories of Documents Re Charleston Earthquake of 1886 & Seismic Design for Vogtle Nuclear Power Plant.App B Documents Forwarded & Available in Pdr.Review Continuing ML20125C4471985-02-14014 February 1985 Final Response to FOIA Request for Records Re Commission Decision to Hold 841210 Meeting to Consider Proposed Hydrogen Control Rule.Forwards App C Documents.App D Documents Available in PDR ML20127A9991983-10-24024 October 1983 Responds to Re Allegation of QA Breakdown at Facility.Ie May Request Further Info to Assist NRC in Understanding Safety Significance of Issues Raised ML20055A2671982-07-14014 July 1982 Ack Receipt of 820621 Notice of Change of Address. Organization Deleted from Svc List Since ASLB 820305 Memorandum & Order Treats Petition as Withdrawn ML20054H4481982-06-22022 June 1982 Confirms 820621 Conversation,In Which Charlotte-Mecklenburg Environ Coalition Agreed to Respond Informally to NRC 820430 First Set of Interrogatories & Document Production Requests. Discovery on Contentions May Continue on Voluntary Basis 1988-01-19 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217F8231999-10-13013 October 1999
[Table view]Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided ML20209E2701999-07-0101 July 1999 Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E3931999-06-28028 June 1999 Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl ML20196G8861999-06-24024 June 1999 Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant ML20196G6541999-06-17017 June 1999 Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720 ML20196A5781999-06-14014 June 1999 Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12 ML20195E9171999-06-0303 June 1999 Confirms Conversation with Bradshaw on 990526 Re Rescheduling 990607 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Repts 50-413/99-10 & 50-414/99-10.Conference Will Be on 990623 in Atlanta,Ga ML20195F4141999-06-0202 June 1999 Forwards Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503.Apparent Violation Identified & Being Considered for Escalated Enforcement Action.Violation Involved Failure to Maintain Unit 1 Ice Condenser Lower Inlet Door Operable ML20207D0671999-05-20020 May 1999 Informs That During Meeting on 990512,arrangements Modified for Administration of Licensing Exams at Catawba Nuclear Station During Weeks of 990524 & 0607,respectively ML20207C8721999-05-20020 May 1999 Forwards Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.Three Violations Occurred & Being Treated as non-cited Violations.Activities Generally Characterized by Safety Conscious Operations & Sound Engineering & Maint ML20207C8061999-05-19019 May 1999 Confirms 990510 Telcon with R Jones Re Predecisional Enforcement Conference Requested by NRC & Scheduled for 990607 in Atlanta,Ga to Discuss Apparent Violation Associated with Potential Inoperability of SSS ML20207C7761999-05-19019 May 1999 Informs That on 990618,NRC Will Meet with Mgt of Duke Energy Corp to Discuss Performance of Catawba Facility & Extends Invitation to Attend Meeting as Observer ML20206P4911999-05-14014 May 1999 Forwards Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206M4201999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation (NRR) Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt (DLPM) Created.Reorganization Chart Encl ML20206U4091999-05-10010 May 1999 Forwards Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424.One Violation Occurred & Being Considered for Escalated Enforcement Action Involving Inoperability of Standby Shutdown Sys from 981216-29 ML20206N4191999-05-0606 May 1999 Informs That Team Will Inspect Dam at Standby Nuclear Service Water Pond on 990609.Purpose of Insp Will Be to Confirm That Structure Conforms with Design Documents & Capability of Performing Design Functions ML20205S5491999-04-21021 April 1999 Forwards SE Discussing DPC Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. Response Acceptable ML20206B7941999-04-16016 April 1999 Confirms 990331 Telcon Between M Purser of Util & R Franovich of NRC Re Public Meeting Scheduled for 990618 in York,Sc to Discuss Results of NRC Recent Plant Performance Review for Catawba Nuclear Station ML20205N3471999-04-12012 April 1999 Forwards Safety Evaluation & Eri/Nrc 95-506, Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20205T3491999-04-0909 April 1999 Informs That on 990317,T Beedle & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Catawba Nuclear Station for Y2K.No Y2K Exam Scheduled.Initial Exam Requested for Apr 2001 for Approx 18 Candidates ML20205N0531999-04-0606 April 1999 Forwards Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313.DPC Conduct of Activities at Catawba Facility Generally Characterized by Safety Conscious Operations & Sound Engineering.Five Violations Noted & Treated as NCVs ML20196K9961999-03-30030 March 1999 Forwards Synopsis of NRC OI Completed Rept Re Alleged Compromise of Initial Licensed Operator Exam at Cns.Oi Did Not Substantiate Allegation That Initial Operator Exam Compromised.Plans No Further Action Re Matter ML20205M2651999-03-25025 March 1999 Discusses PPR Completed 990201.Advises of Planned Insp Effort Resulting from Catawba PPR Review.Forwards Plant Issues Matrix & Insp Plan ML20207L7741999-03-15015 March 1999 Requests That NRC Exercise Discretion Not to Enforce Compliance with Actions Required by Plant,Units 1 & 2 Re TS Limiting Conditions for Operation 3.3.7 & 3.3.8 ML20207M9091999-03-0505 March 1999 Informs That Info Submitted by Application, Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20207A5821999-02-17017 February 1999 Forwards Insp Repts 50-413/98-12 & 50-414/98-12 & Notice of Violation.One Violation Being Considered for Escalated Enforcement Action ML20203G5161999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203A2421999-02-0505 February 1999 Forwards SE Accepting Proposal to Revise Methodology in TR DPC-NE-3002-A,to Permit Use of single-node Model,Instead of multi-node Model,To Represent SG Secondary Sys for post-trip Phase of Loss of Normal Feedwater Analysis for Plant,Unit 2 ML20202J4751999-01-29029 January 1999 Responds to Concern Raised on 981020 Re Appropriateness of Interaction of NRC Headquarters Operations Officer with on-shift Operations Staff During Event ML20202C2511999-01-27027 January 1999 Forwards Request for Addl Info Re Util 980331 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Catawba Nuclear Station. Response Requested within 60 Days of Date of Ltr 1999-09-24 |
Text
November 22, 1985 Docket No.: 50-414A Mr. Hal B. Tucker, Vice President Duke Power Company P.O. Box 33189 Charlotte, NC 28242
Dear Mr. Tucker:
RE: CATAWBA UNIT 2 - NO SIGNIFICANT CHANGE FINDING With reference to the operating license antitrust review of the captioned nuclear unit, the Director of Nuclear Reactor Regulation has made a finding, in accordance with Section 105c(2) of the Atomic Energy Act of '954, as amended, that no significant (antitrust) changes in the licensec's activities or proposed activities have occurred subsequent to the previous. construction permit review.
The Director's initial finding is subject to reevaluation if a member of the public requests same in response to publication of this finding in the Federal Register. A copy of the notice that is being transmitted to the Federal Register and a copy of the staff review are enclosed for your informa tion.
Sincerely, Donald P. Cleary, Acting Chief Site Analysis Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosures:
- 1. Federal Register Notice
- 2. Staff Review Distribution:
Docket Files 50-414A W. Lambe SAB Reading File K. Jabbour W. Jchnston LPDR B. Vogler NRC PDR A. Toalston 8512040253 DR 851122 ADOCK 05000414 PDR OFC :DE:,SAB DE : : : : :
_____:__g_{_3___::. hg._____: 8 ___________:____________.____________:___...____...___ . _____
NAME :AToaiston:js:D. Cleary : : : : : :
DATE :11/ g/85 :11/ M/85 : : : : :
OFFICIAL RECORD COPY