| ML20137H911 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 08/14/1985 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20137H916 | List: |
| References | |
| NUDOCS 8508300001 | |
| Download: ML20137H911 (1) | |
Text
l'.
-
g
~
AUG 141985
.
Docket No. 50-344
!
,
Portland General Electric. Company
!
121 S. W. Salmon Street Portland, Oregon 97204 l..
I Attention:
Mr. Bart D. Withers (
l Vice President Nuclear
!
Gentlemen:
Subject: NRC Inspection of the Trojan Nuclear Plant This refers to the routine inspection conducted by Mr. D. B. Pereira of this office on July 29 thru August 2, 1985, of activities authorized by NRC License No. NPF-1, and to the discussion of our findings held by Mr. Pereira with
.
!
Mr. Orser and other members of your. staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with
,
personnel, and observations by the inspector.
No violations of NRC requirements were identified within the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to l
discuss them with you.
l Origfnal 56n d bi.
l
Sincerely, o, p, n;7g
'
i D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Enclosure:
Inspection Report
No. 50-344/85-23
l
cc w/ enclosure:
W. S. Orser, PGE
J. W. Durham, Esq., PGE
C. P. Yundt, PGE
W. Dixon, DOE
bec: RSB/ Document Control Desk (RIDS)
Mr. J. Martin
Resident Inspector
i
G. Cook, RV
)
~ RV ///f
Nh
N
h
.
!
-
DP#1'eira :dh
RDodds
AChaffee
DKirsch
8//3 /85
8/l3 /85
8/IS /85
8/$/85
1
B508300001 850014
l
ADOCK 0 % 344
&i
Ni
)