Approves Reactor Coolant Piping Sys IGSCC Insp & Repair During Reload 7 Refueling for 18-month Cycle to Determine Crack Growth & Weld Overlay.Insp/Mod Plans for Recirculation Sys & Piping Requested Prior to Next Outage
ML20137A386
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/07/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20137A391 List:
References
GL-84-11, NUDOCS 8601140337
Download: ML20137A386 (2)


Text

January 7, 1986 DISTRIBUTION Docket File DVassallo Docket No. 50-265 NRC PDR GHolahan Local PDR BWD #1 Reading RBernero OELD Mr. Dennis L. Farrar RBevan Director of Nuclear Licensing CJamerson Commonwealth Edison Cempany ELJordan Post Office Box 767 JPartlow Chicago, Illinois 60690 BGrimes ACRS (10)

Dear Mr. Farrar:

Gray File WKoo

SUBJECT:

INSPECTION AND REPAIR OF REACTOR COOLANT SYSTEM PIPING Re:

Quad Cities Nuclear Power Station, Unit 2 The NRC staff has reviewed the submittals from Commonwealth Edison Company regarding the inspection and repair performed on the Quad Cities, Unit 2 reactor coolant piping systems during the Reload No. 7 refueling outage.

We conclude that the intergranular stress corrosion cracking inspection and repair performed during this outage in response to Generic Letter 84-11 provides assurance that the Quad Cities, Unit 2 plant, with respect to crack growth and weld overlay repair, can be operated safely for the next 18-month operating cycle.

Because of uncertainty regarding the long-term behavior of the piping, your plan for inspection and/or modifications of the recirculation system piping and other reactor coolant pressure boundary piping systems during the next refueling outage should be submitted for our review and comment at least 3 months before the start of the outage.

Sincerely, ORIGINAL sicNED BY John A. Zwolinski, Di'>ctor BWR Project Directora-

  1. 1 Division of BWR Licensing

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page DBL:PD#1 DBL:PD#1 DBL:PD#1 CJamersor RBevan:jg JZwolinski i / 3 /86 l/L/86 1/6/86 0601140337 060107 PDR ADOCK 05000265 0

PDR

Mr. Dennis L. Farrar Quad Cities Nuclear Power Station Commonwealth Edison Company cc:

Mr. B. C. O'Brien James G. Keppler President Regional Administrator Iowa-Illinois Gas and Region III Office Electric Company U. S. Nuclear Regulatory Commission 206 East Second Avenue 799 Roosevelt Road Davenport, Iowa 52801 Glen Ellyn, Illinois 60137 Robert G. Fitzgibbons, Jr.

Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Mr.. Nick Kalivianakis Plant Superintendent Quad Cities Nuclear Power Station 22710 - 206th Avenue - North Cordova, Illinois 61242 Resident Inspector U. S. Nuclear Regulatory Commission 22712 206th Avenue North Cordova, Illinois 61242 Chairman Rock Island County Board of Supervisors Rock Island County Court House Rock Island, Illinois 61201 The Honorable Tom Corcoran United States House of Representatives Washington, D. C.