Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed
ML20136H253
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/14/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136H257 List:
References
B16277, NUDOCS 9703190098
Download: ML20136H253 (1)


LER-1997-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(ii)
2451997009R00 - NRC Website

text

_..

___m

. _.. _. _ _.. _ _.. -. _ _......... _...., _.. _ __ _._ _ _. _ _.. ~. _ _. _. _

..____ _.~..._.

Northeast hone officesa Hope Ferry Rd., Waterford, Cr i

Utilities System P.o. w 128 Waterford, CF 06385-0128 (860) 447-179I l

March 14,1997 l

Docket No. 50-245 B16277 Re: 10CFR50.73(a)(2)(ii)

[

t U.S. Nuclear Regulatory Commission l

Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER)- 97-009-00, documenting an event that j

occurred at Millstone Nuclear Power Station, Unit No. I on February 12, 1997. This LER is j

submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made with.in I

this letter. All other statements made within this letter are for information only.

1 B16277-1 NNECO commits to review all calculations that have been completed as part of the Setpoint Verification Program to determine if other non-conservative setpoints exist l

by May 1,1997.

i i

B16277-2 NNECO will submit a TS change request or perform a new analysis to ensure that Emergency Core Cooling System and Primary Containment. Isolation System i

actuation will occur consistent with the plant's design basis including consideration ofinstrument uncertainties by April 15,1997.

Very truly yours, i

NORTHEAST NUCLEAR ENERGY COMPANY l

l

.}

CChn 'm J

19005r,
- PTTTinnenkamT U 1-Director, Unit Operations -

1

].21L i

Attachment: LER 97-009-00 i

l L

cc:. Dr. W. D. Travers, Director, Special Projects l

- H. J. Miller, Region I Administrator.

l S. Dembek, NRC Project Manager, Millstone Unit No. l 1

T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 t