Forwards Proprietary & Nonproprietary Comparison of Data for Beaver Valley Power Station,Unit 2 W/WCAP-9736/9735 Data. Repts Suppl Info in WCAP-9735 & 9736 Re Multiflex 3.0 Methodology.Proprietary Rept Withheld (Ref 10CFR2.790)
ML20136H090
Person / Time
Site: Beaver Valley
Issue date: 01/03/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML19276D141 List:
References
2NRC-5-159, NUDOCS 8601090244
Download: ML20136H090 (2)


Text

--

'Af Duquesne Lidit lL',i.Z b!n*on P az s

B Idi g Suite 210 Pittsburgh. PA 15205 January 3, 1986 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Mr. Lester S. Rubenstein, Director PWR Project Directorate No. 2 Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Supplenentary Infonnation for Review of Nltiflex 3.0

REFERENCE:

DLC Letter 2NRC-4-203, dated Decenber 10, 1984 Gentlenen:

A portion of the structural analyses perfonned by Westinghouse (W) for Beaver Valley Power Station Unit No. 2 (BVPS-2) utilized the N1tiflex 3.0 methodology.

This variation of the previously-approved Nltiflex code was submitted in the reference.

A followup meeting was held on Septeaber 19, 1985, with the appropriate NRC reviewers, Duquesne Light Canpany (DLC), and W in order to address NRC review questions on Nltiflex 3.0.

The intent oT this transmittal is to supplenent the infonnation in WCAP-9735, addressing requests for BVPS-2 plant-specific data and to resolve NRC conments which arose during the Septenber 19 review meeting.

Included are:

(1) Five copies of WCAP-11004 (Proprietary), which is supplenental information related to WCAP-9735, Rev.1 (Proprietary).

(2) Five copies of WCAP-11005 (Non-P roprietary), which is supple-mental infonnation related to WCAP-9736 (Non-Proprietary)

As iten (1) contains infonnation proprietary to W, it is supported by an affidavit signed by W, the owner of the infonnation~ The affidavit sets forth the basis on whicfI the infonnation may be withheld fran public disclo-sure by the NRC and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.790 of the NRC's regulations.

Accordingly, it is respectfully requested that the infonnation which is proprietary to W be withheld fron public disclosure in accordance with

~

10CFR Section 2.790 of the NRC's regulations.

Correspondence with respect to the proprietary aspects of the Application for Withholding or the supporting W af fidavit should reference CAW-85-080 and should be addressed to R.

A.

Wiesenann, Manager, Regulatory and Legislative Aff airs, Westinghouse Electric Corporation, P.O. Box 355, Pittnburgh, PA, 15230.

8601090244 C40103 ADOCK 0 % 4y2 g,

20 hi iop

^

i WM.lf4 fQ pf e

(f

-l vdo s

m.,

FOR (BENAH0YA,

United States Nuclear Regulatory Comission Mr. Lester S. Rubenstein Supplanentary Infonnation' for Review of HJ1tiflex 3.0 Page 2 With' the enclosed infonnation and documentation, DLC believes that-Confinaatory Issue No. 21 identified in Table 1.4 of the BVPS-2 Safety Evalu-ation-Report can now be closed.

If you have any questions, please do not hesitate to call.

DUQUESNE LIGHT COMPANY By v

J :

Carey V'

resident RWF/wjs Attachment cc: Mr. P. Tan, Project Manager (w/o)

Mr. G. Walton, NRC Resident Inspector (w/o) t

-)