Forwards Radiological Safety Insp Rept 50-293/85-32 on 851117-22 & Notice of Violation.Concerns Identified in Technical Adequacy & Quality of Procedures Being Developed to Satisfy Radiological Improvement Program
ML20136E975
Person / Time
Site: Pilgrim
Issue date: 12/31/1985
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20136E983 List:
References
CON-#487-5022 2.206, NUDOCS 8601070174
Download: ML20136E975 (3)


See also: IR 05000293/1985032

Text

DESIGNATED CRIGGM

'

Certified By:)} Mb 'rXQ t <

s

DEC 311985

Docket No. 50-293

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject: Inspection Report No. 50-293/85-32 l

A routine radiological safety inspection was conducted by Mr. R. L. Nimitz on l

November 17-22, 1985 of your Pilgrim Nuclear Power Station. The findings of

the inspection were discussed with Mr. A. L. Oxsen at the conclusion of the

-

inspection.

The inspection covered implementation of your Radiological Improvement

Program, radiological controls for fuel pool re-racking and radwaste

concentrator removal, and calibration and testing of effluent monitors.

Regarding fuel pool and concentrator work, some concerns were identified in the

area of management oversight of the work. These concerns have been discussed

and acknowledged by your staff, and corrective actions are being implemented.

In-field radiological cont.rols for the concentrator work were commendable.

Regarding the Radiological Improvement Program (RIP), some concerns were

identified in the area of technical adequacy and quality of procedures being

developed to satisfy RIP commitments. Your staff has taken action to resolve

this concern.

Two violations were identified. The first involved failure to perform monthly

tests on waste gas monitors. Please reply to this matter in accordance with

the enclosed Appendix A. The second violation involved failure to perform a

proper search of a package brought into the protected area.

Our review of this security problem indicated inadequate corrective action was

taken by your contracted security force when this problem was brought to their

attention by our inspector. Although BEco Security staff took timely correc-

tive action for this problem once they became aware of it, we are concerned

about the adequacy of the response to this problem by your contractor. Please

respond to this matter in accordance with the enclosed Appendix B. In your

response, you should identify what actions have been taken to improve the

response of your security contractor to identified problems.

~

8601070174 851231 3

PDR ADOCK 050

G

OFFICIAL RECORD COPY IR PILGRIM 85-32 - 0001.0.0

' 12/18/85 lI

O".y

I.w.

<

,

+

1

%

Boston Edison Co. M/C Nuclear 2

DEC 311985 i

The replies requested by this letter are not subject to clearance by the

Office of Management and Budget under the Paperwork Reduction Act of 1980,

PL 96-511.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Your cooperation with us in these matters is appreciated.

Sincerely,

'i

u _.O % d L] i

M t. Q 0 0 5c W q

ggi Thomas T. Martin, Director-

x Division of Radiation Safety

and Safeguards

Enclosures:

1. Appendix A, Notice of Violation .

2. Appendix B, Notice of Violation (which contains Commercial or Financial

Information (C0FI)

3. NRC Region I Inspection Report No. 50-293/85-32

cc (w/o portion of Appendix B which contains C0FI):

A. V. Morisi, Manager, Nuclear Management Services Department

C. J. Mathis, Station Manager

Joanne Shotwell, Assistant Attorney General

Paul Levy, Chairman, Department of Public Utilities

W. J. Nolan, Chairman, Plymouth Board of Selectmen

Plymouth Civil Defense Director

Senator Edward P. Kirby

E. R. MacCormack, Senior Regulatory Affairs and Program Engineer (Receives

Safeguards /COFI Only)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/C0FI)

Commonwealth of Massachusetts (2)

.

. 0FFICIAL RECORD COPY

J

o

s poston Edison Co. M/C Nuclear 3

,

bec (w/o portion:_of Appendix B which contains C0FI):

Region I Docket Room (witE concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

W. Raymond, SRI, Vermont Yankee (w/C0FI)

T. Shedlosky, SRI. Millstone 1&2 (w/C0FI)

H. Eichenholz, SRI, Yankee (w/C0FI)

P. Leech, LPM, NRR

,

,

.

,

'

RI:DRSS R :DRSS L DRSS

\Y

RI:DRSS

Nimitz/gcb Kg ig Bellamy

/85 p-zo-etf Pascip[k

gy p g)([

12/2)h

(p. t

'

0FFICIAL RECORD COPY IR PILGRIM 85-32 - 0001.0.2