05000302/LER-1996-003, Submits LER 96-003-00 Re GL 96-01 Testing Deficiencies.Fpc Review & Corrective Action Expected Prior to Startup from Current Outage R-1.Suppl Reporting Related Logic Sys Testing Deficiencies Expected by 970630

From kanterella
(Redirected from ML20136A669)
Jump to navigation Jump to search
Submits LER 96-003-00 Re GL 96-01 Testing Deficiencies.Fpc Review & Corrective Action Expected Prior to Startup from Current Outage R-1.Suppl Reporting Related Logic Sys Testing Deficiencies Expected by 970630
ML20136A669
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/03/1997
From: Holden J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136A673 List:
References
3F0397-02, 3F397-2, GL-96-01, GL-96-1, NUDOCS 9703100027
Download: ML20136A669 (1)


LER-1996-003, Submits LER 96-003-00 Re GL 96-01 Testing Deficiencies.Fpc Review & Corrective Action Expected Prior to Startup from Current Outage R-1.Suppl Reporting Related Logic Sys Testing Deficiencies Expected by 970630
Event date:
Report date:
3021996003R00 - NRC Website

text

e

- g Florida E9X?r Cryste Nver Unit 3 Docket No. 50-3o2 March 3, 1997 3F0397-02 U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C.

20555-0001

Subject:

Licensee Event Report (LER) 97-003-00

Dear Sir:

Please find the enclosed Licensee Event Report (LER) 96-003-00 regarding Generic Letter-(GL) 96-01 testing deficiencies.

Florida Power Corporation's (FPC) GL 96-01 review and corrective action is expected to be completed prior to startup from the current outage, tracked as Restart Issue R-1.

Subsequent logic system testing deficiencies identified as part of FPC's GL 96-01 review, and whose cause is determined to be cognitive human error are related to the deficiencies identified in this report. Therefore, using the guidance contained in NUREG-1022 Revision 1, Second Draft, a supplement to this LER will be submitted to report related logic system testing deficiencies.

FPC expects to provide the supplement by June 30, 1997.

This report is submitted by Florida Power Corporation in accordance with 10 CFR 50.73.

i Sincerely, f

[$~

J. J. Holden, Director

\\

Nuclear Engineering and Projects

\\ I JJH/WJL pb Attachment xc:

Regional Administrator, Region II Project Manager, NRR Senior Resident Inspector 9703100027 970303 DR ADOCK 0500 2

gg g gj l gg g

CRYSTAL RIVER ENFRGY COMPLEX: 157eo w Pow., un sr + cry ed aver. Fiorld. 3442e-s70s + (35217ss-esse A Flande Progrese Cormany