ML20134N947
| ML20134N947 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/19/1997 |
| From: | Jaudon J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beard P FLORIDA POWER CORP. |
| Shared Package | |
| ML20134N951 | List: |
| References | |
| NUDOCS 9702250039 | |
| Download: ML20134N947 (17) | |
Text
n February 19, 1997 i
Florida Power Corporation Crystal River Energy Complex Mr. P. M. Beard, Jr. (SA2A)
Sr VP, Nuclear Operations ATTN: Mgr.. Nuclear Licensing 15760 West Power Line Street Crystal River. FL 34428-6708
SUBJECT:
MEETING
SUMMARY
MANUAL CHAPTER 0350 RESTART PANEL CRYSTAL RIVER - DOCKET NO. 50-302
Dear Mr. Beard:
This refers to the meeting held February 12. 1997, in your Nuclear Administration Building Conference Room.
Enclosed is a list of attendees, the meeting agenda, your System Readiness Review Plan briefing slides, your System Readiness Review Plan, Revision 0, and a copy of your Restart Issues Matrix, Revision 3.
At our next meeting, which we shall schedule separately, we request that you brief us on the status of items on your Restart Issues Matrix, with particular attention to any decisions which you may have reached concerning how you plan to resolve specific restart issues.
In accordance with Section 2.790 of NRC's " Rules of Practice, "Part 2, Title 10 Code of Federal Regulations, a co)y of this letter and its enclosures j
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely.
Originol signed by Johns P. Jaudun Johns P. Jaudon Director Division of Reactor Safety Docket No. 50-302 License Nos. DPR-72
Enclosures:
1.
List of Attendees 2.
FPC Meeting Agenda 3.
FPC System Readiness Review Plan with Slides 4.
FPC System Readiness Review Plan 5.
FPC Restart Issues Matrix cc w/encls:
Continued see page 2 Official Copy 9702250039 970219 i
PDR ADOCK 05000302 1 i
'J(f
_ _ ~ - -...
l L
L FPC 2
cc w/encls:
Continued l
J. Cowen. Vice President Nuclear Production (SA2C)
Florida Power Corporation l
Crystal River Energy Complex t
15760 West Power Line Street L
Crystal River, FL 34428-6708 i
B. J. Hickle, Director Nuclear P1 ant.0perations (NA2C) l Florida Power Corporation l
Crystal River Energy Complex
(
15760 West Power Line Street l
Crystal River. FL 34428-6708 D. Kusemiller. Director (SA2A)
Nuclear Operations Site Support Florida Power Corporation Crystal River Energy Complex 15760 West Power Line Street Crystal River, FL 34428-6708 R. Alexander Glenn l.
Corporate Counsel
. Florida Power Corporation i
MAC - ASA j
l P. O. Box 14042 l
St. Petersburg,.FL 33733 l
Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 i
Bill Passetti Office of Radiation Control l
De)artment of Health and lehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Joe Myers. Director Division of Energency Preparedness Department of Community Affairs 2740 Centerview Drive
' Tallahassee, FL 32399-2100 e
Chairman Board of County Commissioners Citrus County 110 N.'Apopka Avenue Inverness, FL 34450-4245 cc w/encls: Continued see page 3 l
l i
FPC 3
cc w/encls:
Continued Robert B. Borsum B&W Nuclear Technologies 1700 Rockville Pike. Suite 525 Rockville MD 20852-1631 l
i I
f f
4 Q
l
l l
FPC 4
l Distribution w/ encl:
L. Raghavan, NRR B. Crowley, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Road l
Crystal River, FL 34428 1
nrncr
./
n SIGNATURE y'
hAME EMellen KLa i DATE 02 / 1 3 / 97 Q / h / 97 02 /
/ 97 02 /
/ 97 02 /
/ 97 02 /
/ 97 COPY?
( YES )
NO
[YES)
NO YES NO YES NO YES NO YES NO Or t iCI At KtLUKu C0r 1 M UMthi NAMt: 6:\\crystai\\ meeting \\CK5UMFeD W i
I
4 i
l LIST OF ATTENDEES Florida Power Corooration I
R. Anderson Senior Vice President l
J. Baumstark. Director Quality Programs l
P. Beard. Senior Vice President. Nuclear Operations R. Bright. Site Support J. Cowan. Site Vice President D. Daniels. Manager NSAT l
F. Frando. Licensing l
A. Glenn. Corporate Counsel l
B. Gutherman Manager. Nuclear Licensing G. Halnon. Assistant Director. Nuclear Operations Site Support M. Hendrix. Corporate Relations l
B. Hickle. Director Nuclear Plant Operations l
J. Holden. Engineering Director H. Koon. Restart Manager l
D. Kunsemiller. Director Nuclear Site Support R. Maughan, Corporate Relations N. Marrone. Consultant D. Miskiewicz, Senior Nuclear Safety Analysis Engineer i
B. Rossfeld Manager Site Nuclear Services i
E. Smith Licensing Technician D. Stevens Senior Quality Assurance Specialist i
l F. Sullivan Manager N0E J. Terry. Manager. Nuclear Plant Technical Support R. Widell. Director Nuclear Operations Training l
R. Yost, Manager Nuclear Quality Assurance l
A. Zarechnak. Systems Readiness Review Coordinator Nuclear Reculatory Commis7ign S. Cahill. Senior Resident Inspector Crystal River T. Cooper. Resident Inspector. Crystal River R. Hannah. Public Affairs l
F. Hebdon. Director. Directorate 11-3. NRR J. Jaudon. Director. Division of Reactor Safety. Region II L. Raghavan. Project Manager Project Directorate 11-1. NRR R. Schin Reactor Inspector. Region II Members of the News Media Members of the Public
l 1
i g*#*'l.;
FPC / NRC Restart Panel Meeting
=-_ A 4
- ."' ' -sse, Agenda February 12,1997 g% soap #
l l
1 System Readiness Jim Terry 1
1 l
Milestone Schedule Hoyt Koon l
l
. Corrective Action Program Dave Daniels l
BruceHickle 1
4 l
l l
ENCLOSURE 2
j 8
,1 a
1 l
i k
)
4 6
4 1
Y 1
4 J
i i
l System Readiness Review Plan 4
t N
e, u.ac a"
' ' (:.. i.18; - JU' *[ *. -
'N- '9^Y S'.:
j
- g.'Q.
k;
- Y,y ?: % -4f*GQ.ifi.{
hh.jl ' A
': "A
%E asyPd::'ilfj;yd'"fs.u.g f
. 3 Q :j g ';7AJ:fh';;1 h.g.d jj;
. ~.
nw~ ?.aw(yn?'p"'"",0 4,,- MW%gn@py*
$s. h g; 'ss..g. m - 7h
?'"?' x"3%
}
?, '
v.
.e
" Q,;e, khdff gt@N-
.,.. gf Oui.b.
'42 dis 1
N* '.
c gi@!kk,1?d.f 9ka D
't~'"t.Ns&t qq:: M>Pps 4htw.w:;;flME:. $
' 3 1
',rO d
Wef"../"" ~ca 4
sbEQ gi i
Z,jAfQui(n%sspy*9eM,.
.. c, i
... ear w e rWE...
]
hs ^"^ l *Q
.E
.g p l a.3'} -
- 4. ?'
Ij #N '
,f
%. ' 'g Q
.p
)
~,.
3,,...
1 r~
{
j GJ....
t.,,, g
,.,* W e
4'. !.,..
]
g
- .'to 6,..,
l
'5 rwgd%W i
4rgsq
?Y h;
ir j
Crystal River Unit 3 i
e f
1 1
4 FLORIDA POWER CORPORATION J
ENCLOSURE 3 i
j,.
i' i
)
SYSTEM READIXESS i
REVIEW i
e Project Mission Statement j
Provide Reasonab e l
Assurance System Operation Is:
4
-Capable of Meeting Fuctional i
i Requirements i
i j
-Within Jesign Basis i
i
]
-Within Licensing Basis i
i 4
j FLORIDA POWER CORPORATION i
l.
l SYSTEM READIXESS i
REVIEW
- f I
i l
e Implementation Process
)
Select Systems for Appropriate Levels of Reviews (Level 1,2 or 3) i i
Perform Review Identify Specific Issues Review of Results to Identify l
Generic issues l
Disposition items i
l Report of System Readiness Turnover to Operations i
4 i
i j
FLORIDA POWER CORPORATION l
?
e
'l l
LEVEL 2 FOCUSED REVIEW i
l I
i l
l l
i RESULTS FROM
)
LEVEL 1 ASSESSMENT GENERIC ISSUES i
Open item Reviews l
& Walkdowns LEVEL 2 s
FOCUSED i
Des.ign/ Licensing REVIEW Bas,s Topics i
5 j
FLORIDA POWER CORPORATION
1-I i
l SYSTEM READIXESS 1
l REVIEW l
e System Selection Process i
3 Multiple Fission Product j
Barrier Approach l
j Analytical Process I
i l
Engineering Judgement anc l
Assessment Performance 1
i l
1 FLORIDA POWER CORPORATION I
SELECTION RESULTS i.
i l
e System Readiness
}
Certification (Level 1)
j EDG Support Systems l
Engineered Safeguards System i
Make up & Purification System l
Decay Heat Removal System l
Emergency Feedwater initiation &
j Control System
]
Core Clood System l
i i
FLORIDA POWER CORPORATION l
l-SELECTION RESULTS i
l i
e System Readiness Assessment (Level 2)
?
AC Elec. Distribution 4
DC Elec. Distribution
{
Air Handling (subsystems) n l
Nuclear Services Closed Cycle Cooling (SW)
Raw Water Decay Heat Closed Cycle Cooling (DC) 3 I
n Rod Drive System Main Steam Waste Disposal Radiation Monitoring Annunciator System i
a
]
Building Spray Feedwater j
n Chemical Addition i
Spent Fuel i
Nuclear Instrumentation 1
Containment Access (RA) j FLORIDA POWER CORPORATION i
l l
l TEST OF
)
REASOXABLEXESS i
e All Maintenance Rule Risk l
Significant Systems are Leve 1
or Level 2 i
j e Based on PSA, Risk Reduction j
Worth perspective, and excluding contribution to risk due to human l
- error, 1
j Level 1 Systems are relied upon in l
accident sequences which account
]
for 87% of the core damage j
frequency.
l Level 1 & 2 Systems are relied upon in accident sequences which account j
for 100% of the core damage j
frequency.
J FLORIDA POWER CORPORATION
i-CURREXT STATUS i
e Teams are formed i
j e Training for Contractor support j
and FPC support complete.
4 l
e Mobiized in trailer on site.
j e System Readiness Review Plan j
Approved.
l e Backfill of System Engineering j
resources ongoing.
4 Engineers from DESI on site.
j 2 additional in mobilization process.
i l
)
i FLORIDA POWER CORPORATION
.' i>
Nuclear Plant Technical Support / System Readiness Review i
[KTwy,Buurt i
llularPlusTuluicdSgpat l
l 1
I I
I l
Pd.lledexal Setlidad 500eecd pmg RapidRuponniaan Coquud K1Fitpaid AGWnitun RAWenen S.F.th W.lkvar gg,%
Sgernsor Sqnsor Sgem FPCCowdsulu Sqnsor Sgem i
I AZsecluut ilRassese WR0sediser SIRDet Bese IM IM Claical Lisemig I
I l
l l
l EFEFIC EDG CF DH EU ES RCS RWgner Rayl$mith P.Elibag KLiles P.Hsines T.Sisuert Alau
[
I I
I I
I I
l I
I I
I I
I I
I I
I I
I I
I l
tunrem Itpn Alernpr ABnmed RWenu tButumn ESude 1Bety aWadw E.Smen RM 1Wds aWmu IBuhm ARemu l
i t
l
l TIMELINE EFFORT l
BEXEFITS t
4 I
l l
e Recurring Events at a l
Component Level j
e Periods of High Activity at a t
System Level l
e Previous Activities Effect on Current Design / Licensing Basis i.
e Database of Activities l
e Hard Copy of Documents l
i 1
)
i i
FLORIDA POWER CORPORATION
-_