Notifies That Util Recently Identified Overhead Handling Sys Which Can Be Excluded by Insp from Phase I & II Evaluation Re Control of Heavy Loads.Phase II Rept Submittal Date Revised to 851015
ML20134E419
Person / Time
Site: Fort Saint Vrain 
Issue date: 08/08/1985
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR P-85280, TAC-11025, TAC-52230, TAC-56302, NUDOCS 8508200206
Download: ML20134E419 (3)


Text

.

s os h PublicService ren.....

2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 company of colorado t

August 8, 1985 Fort St. Vrain Unit No. 1 P-85280 Regional Administrator j' $ @ U 0' l)

Region IV

!,j U.S. Nuclear Regulatory Commission AUG151985 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 j

Attention: Mr. Eric H. Johnson Docket No. 50-267

SUBJECT:

NUREG-0612, Control of Heavy Loads at Nuclear Power Plants

REFERENCE:

1) PSC Letter Warembourg to Johnson dated 6/14/85(P-65210)
2) NRC Letter Wagner to Lee dated 12/5/84 (G-84454)
3) PSC Letter Warembourg to Johnson dated 2/5/85(P-85050)

\\

Dear Mr. Johnson:

In connection with PSC's Phase I Report for th control of heavy loads at FSV (as requested by NRC in Reference 2 and submitted via Reference 1), PSC has recently identified overhead handling systems which can be excluded by inspection from Phase I/ Phase 11 evaluation.

These handling systems are in addition to the ones listed as excluded in Table 2.1.2-1 of the Phase I report and are grouped according to the basis for exclusion as follows:

1) Hoists not required to handle heavy loads, i.e., I ton or more.

)

8500200206 050 e

t PDR ADOCK 05000267 3

d

c. m 7 W pF p s

/0

Location Label ID No.

Description Elevation C14 G-7208 Strontium Monitor Cask 4829 RB Electric Hoist and Trolley CIS G-7206 Reactor Outlet 4829 RB Coolant Thermocouple Monorail C19 G-7210 Cooling Water Filter 4849 RB and Demineralizer Tanks Trolley C22 G-7506 Service Water Return 4791 TB Pumps Manual Chain Hoist and Trolley The above handling systems are being derated to 3/4 ton by PSC to reflect the capacity necessary to accommodate actual load operations.

2) Cranes / Hoists excluded on basis of no spent fuel or heavy load shutdown model equipment within load impact region.

Location Label ID No.

Description Elevation C5 G-7214 Helium Circulator 4740 RB Turntable Rail Removal Jib Crane C8 G-7207 Gas Wastc Compressors 4740 RB and 1A and IB Manual Hoists C9 and Trollies C10 G-7209 Helium Transfer 4740 RB Compressor Trolley C21 G-7502 Machine Shop Electric 4791 TB Hoist and Trolley Condenser Water Box 4791 TB C33 Monorails C34 Machine Shop Building Outdoors 15 Monorail with Electric Hoist and Trolley

_ -~._

r C35 Welding Shop Building Outdoors 16 Monorail with Manual Chain Hoist and Trolley Turbine Building Sump 4791 TB C36 Pump Monorail Please note that other handling systems may be excluded in the process of this study's ongoing evaluation and refinement.

Due to the complexity of detailed walkdowns and document reviews necessary to verify the presence of shutdown equipment below each unique handling system and account for all credible load drop scenarios, PSC is revising the submittal date for the Phase II report to October 15, 1985.

Any questions on this matter should be directed to Mr. M. H. Holmes at (303) 571-8409.