Advises That Evaluation of Control of Heavy Loads Will Be Submitted in Two Phases.Phase I Rept,Identifying All Cranes, Loads & Load Paths,Will Be Submitted on 850615.Phase II Rept Scheduled for Submittal on 850815
ML20099B538
Person / Time
Site: Fort Saint Vrain 
Issue date: 02/05/1985
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR P-85050, TAC-11025, TAC-52230, TAC-56302, NUDOCS 8503110020
Download: ML20099B538 (2)


Text

0-A'

{

O e

eii.

Company of Colorado P.O. Box 840 80201- 0840 2420 W. 26th Avenue, Suite 100D, Denver, CO 80211 Dg,c February 5, 1985 Fort St. Vrain Unit No. 1 P-85050 MDWM F I

Regioral Administrator h

Region IV F S 2 51985 1

U. S. Nuclear Regulatory Commission

}

lif y

611 Ryan Plaza Drive, Suite 1000 Mb Arlington, Texas 76011 Attn: Mr. E. H. Johnson

SUBJECT:

NUREG-0612, Control of Heavy Loads at Nuclear Power Plants

REFERENCE:

G-84454 Letter from P. Wagner to 0.R. Lee dated December 5, 1984

Dear Mr. Johnson:

PSC has been requested to reevaluate the control of heavy loads at FSV using a load of approximately 1 ton as guidance for what constitutes a " heavy load." PSC agrees to do this work and due to the large number o' handling systems,- is planning to submit the evaluation in two phases.

Phase I will identify all cranes, loads, and load paths.

In addition, Phase I will eliminate loads that weigh less than one ton from the evaluation, eliminate temporary trollies, and identify safety-related equipment under load paths. The scheduled submittal date for the Phase I report is June 15, 1985.

Phase II of the heavy load evaluation will include the review of alternate shutdown paths, will document the analysis of cranes and the analysis of lifting devices, structural impact analysis, and defining of safe load paths as required.

Phase II will also include a schedule for proposed Technical Specification changes, proposed plant modifications, and interim compliance measures as required r/005'1 0 gzynw ORnwaL 8503110020 850205 Tb 4 W PDR ADOCK 05000267 P

PDR

,.s P-85050 Page 2 i

based on the heavy load evaluation. The scheduled submittal date for the Phase II is August 15, 1985.

This schedule has been developed based on the large number of load handling systems at FSV capable of lifting at least a one ton load, and the time required to perform an adequate review of each system.

+

If you have any questions please contact Mr. M. H. Holmes at j

-(303) 571-8409.

Very truly yours, b

h /Y. W M ~

Don W. Warembourg, Manage Nuclear Engineering Division 1

DWW/ RAG:pa l