Text
,A,-
O PublicService Company of Colorado 2420 W. 26th Avenue, Suite 100D, Denver, Colorado 80211 June 14, 1985 Fort St. Vrain Unit No. 1 P-85210 Mb} nib e i n IV U. S. Nuclear Regulatory Commission l-611 Ryan Plaza Drive, Suite 1000
}
M 7 1985 Arlington, Texas 76011 Attn: Mr. E. H. Johnson Docket No. 50-267
SUBJECT:
NUREG-0612, Control of Heavy Loads at Nuclear.
Power Plants
REFERENCES:
- 1) NRC Letter Wagner to Lee dtd 12/5/84 (G-84454)
- 2) PSC Letter Warembourg to Johnson dtd 2/5/85 (P-85050)
Dear Mr. Johnson:
PSC hereby transmits the Phase I report for the control of heavy loads at FSV for your review. This Phase I report is submitted as partial fulfillment of the Reference 1 request for PSC to re-evaluate the control of heavy loads, whereby heavy load is defined as approximately 1 ton or more.
Phase I identifies all overhead handling systems, loads and load paths, and eliminates certain overhead handling systems on the basis of incapability to handle loads of 1 ton or more.
Based on PSC's review of methods to meet NUREG-0612 requirements, we D
conclude that the intent of NUREG-0512 will be satisfied by verifying h) that equipment is available (outside of the load drop area) to safely shutdown the plant and maintain it in a safe configuration.
1 0
/
i Syf4'7I Sog62ggggygggggg6,
.fggp R//p w g
1 P
.s' a.
Therefore, in lieu of identifying all safety related equipment under load paths as originally stated in Reference 2, we will proceed with the above verification.
t PSC.is proceeding on this basis and will submit these results in the Phase II raport on August 15, 1985.
questions on this matter should be directed to Mr. M. H. Holmes Any(303)571-8409.
at l
Very truly yours,
- 10. 17. fl % + / q 1
D. W. Warembourg, Manrger Nuclear Engineering Division DWW/ RAG:pa i
1
(
l a