__ - - - _ -

SAFETY EVALUATION FOR PRELIMINARY DEFUELING ACTIVITIES By letter dated October 24,1985 (Reference 1), GPUN requested NRC approval to allow movement of debris within the reactor vessel, in preparation for early defueling. GPUN has determined that some rearrangement of debris in the reactor vessel is necessary prior to the actual removal of fuel from the vessel, to allow installation of defueling equipment and to identify core debris samples for later removal for analysis by the Idaho National Engineering Laboratory.

These preliminary defueling activities are part of a larger group of activities proposed by GPUN in the safety evaluation report (SER) for early defueling (Reference 2) which is currently under review by the NRC. The activities proposed by GPUN in Reference 1 are limited to those early defueling activities that can be conducted entirely within the reactor vessel, and as determined by the staff, are similar to and bounded by activities previously approved by the staff.

The safety issues related to the movement of material in the reactor vessel have been identified and addressed in previous NRC safety evaluations of head lift, plenum removal preparatory activities, plenum assembly lift and transfer, and heavy load handling over the TMI-2 reactor vessel (References 3, 4, 5, and 6). This safety evaluation in part, sumarizes the conclusions of these earlier NRC safety evaluations as they apply to the proposed preliminary defueling activities. This evaluation is also based on specific relevant information provided in the context of our review of the SER for early defueling.

Safety Issues Decay Heat Removal Decay heat from the damaged reactor core continues to be adequately removed from the reactor coolant through the loss-to-ambient cooling mode. In Reference 3, the NRC approved GPUN's analysis demonstrating that decay heat removal via the loss-to-ambient mode was sufficient to maintain the RCS temperature well below the procedural limit of 170 F. The assumptions used in that analysis were more conservative than current conditions, because the proposed activities will be performed at a decreased decay heat level and with the reactor vessel water level at an elevation of approximately 327'6", as opposed to a level of only 314' assumed in the analysis.

Temperatures in the reactor vessel currently average about 85 F and are not expected to change significantly. Therefore, we find that the previous analysis is bounding, and that the loss-to-ambient mode of decay heat removal will be adequate during the proposed debris movement activities.

The RCS temperature will be monitored in accordance with the TMI-2 Technical Specifications and the Recovery Operations Plan during the proposed activities. In the unlikely event of RCS leakage, sufficient makeup capability will be available to maintain decay heat removal in the loss-to-ambient mode.

Boron Dilution High concentration of boron in reactor coolant is the primary means used by GPUN to assure against the possibility of a criticality event during 8511010528 851029 PDR ADOCK 05000320 p PDR

_2_

defueling activities. GPUN has recently submitted a revised boron dilution hazards analysis (Reference 7) in support of early defueling. This report provides an evaluation of all potential RCS boron dilution pathways and isolation barriers for these paths. Systems with potential boron concentrations below the current RCS concentration of 4950 ppm will be isolated via multiple barriers to assure that they vill not be credible dilution sources. The hydraulic fluid used in the operation of defueling tools, which has been tested to demonstrate its miscibility and compatibility with RCS water, will be borated to eliminate its potential for RCS dilution. Reference 7 also describes sampling locations and frequencies and provisions for level monitoring which will provide the capability for early detection and subsequent mitigation of a potential dilution event. Based on a review of Reference 7, the staff concluded that: the potential for a dilution event is small, early detection of a '

dilution event is likely, and effective remedial action can be taken if dilution occurs.

The RCS will be maintained at a boron concentration of 4950 ppm during the proposed activities, thereby providing an additional margin above the Technical Specification liait of 4350 ppm, the value used in the analysis of Reference 7. Thus, sufficient time will be available for the detection and mitigation of an unlikely dilution event.

Heavy Load Drop Accident Analysis Reference 6, the NRC safety evaluation for heavy load handling over the i reactor vessel, is applicable to the proposed preliminary defueling activities, which are restricted to the reactor vessel. In that evaluation, the staff determined that the worst case accident resulting from a postulated heavy load drop over the reactor vessel would be the simultaneous failure of the 52 incore instrumentation tubes resulting in a total leakage rate of 20 gpm. In the safety evaluation approving Technical Specification Change Request No. 46 (Reference 8), the staff concluded that reliable sources of borated makeup water will be available via gravity feed from the Borated Water Storage Tank and the operation of the Reactor Building Sump Recirculation System to substantially exceed the worst case RCS leakage rate of 20 gpm. Also in Reference 6, the staff approved a bounding analysis performed by the licensee that assumed an instantaneous release of all unaccounted for Vsr-85 from the core due to a heavy load d rop. This conservative analysis resulted in a dose of 9.7 millirem to the whole body for an individual located at the site boundary and a whole body

, dose of 1.8 millirem to an individual located at the Low Population Zone Boundary. These doses are several orders of magnitude below the accident limits of 10 CFR Part 100. In Reference 6, the staff also approved the licensee's proposed lift height / weight matrix which will preclude failure of the defueling work platform due to postulated load drops of certain defueling equipment.

1 On these bases, we conclude that the potential for a load drop accident during the proposed limited defueling activities is remote, that adequate

, controls exist restricting lift heights and that measures are available to mitigate the consequences of a postulated accident.

i

Criticality By letter dated March 15, 1985 (Reference 9), the NRC approved GPUN's Reactor Coolant System Cr iticality Report. The report concluded that for an RCS boron concentration of 4350 ppm, the damaged core will remain sub-critical with a shutdown margin of at least one percent for any postulated fuel configuration. This conclusion applies to all reactor disassembly and defueling activities, including the proposed preliminary defueling activities. During the proposed activities, the RCS will be maintained at a boron concentration of not less than 4950 ppm, the administrative limit.

This concentration will provide an additional margin to preclude the potential for criticality due to a boron dilution event or the introduction of foreign materials into the RCS. GPUN has analyzed the effects of foreign materials (tools, fluids, etc.) on RCS reactivity and will implement administrative controls to limit the potential for the inadvertent introduction of such materials into the RCS throughout defueling. The NRC staff has reviewed GPUN's analysis and concludes that the potential for introduction of foreign materials into the RCS during preliminary defueling activities is very small and that the resulting effects on RCS reactivity would not significantly reduce the existing shutdown margin. In addition, procedures will be in place to prevent the inadvertent grappling of an incore instrumentation tube, which, if damaged, could result in unisolable RCS leakage. In the unlikely ever.t of RCS leakage due to failure of an incore instrumentation tube, adequate makeup capability exists to ensure that subcriticality is maintained.

Release of Radioactivity The proposed preliminary defueling activities are similar to previous activities performed in the reactor vessel, and as such, are not expected to result in a significant increase in background radiation levels in the reactor building or in a significant off-site release of radioactivity.

During the separation of end fittings and partial fuel assemblies from the plenum, radiation levels did not increase significantly, despite the displacement of core debris. During the proposed activities, all gaseous release pathways from the reactor building to the environment will be filtered and monitored to prevent an uncontrolled release. The licensee also has the capability to completely isolate the reactor building from the environment.

The tools and equipment used for the preliminary defueling will be flushed as they are removed from the reactor vessel water to limit the sprea' of contamination and prevent any uncontrolled removal of fuel. Monitoring of alpha-emitting particulates at potential release points will be performed in compliance with the TMI-2 Environmental Technical Specifications. In Reference 2, GPUN estimated that potential off-site releases of Kr-85 during normal defueling operations would result in doses less than 1% of the limits specified in 10 CFR 50 Appendix I. Potential Kr-85 release points will be monitored and an alarm indicating high levels will be located in the control room. We find these measures adequate to assure that the potential for significant releases of radioactivity will be

. acceptably low during the proposed activities, f

l

i Occupational Exposure The same measures described in Reference 2 to maintain worker radiation exposures as low as reasonably achievable (ALARA), will be implemented by GPUN during preliminary defueling activities. As for past activities performed in the reactor building, GPUN's Radiological Controls Department

will determine monitoring requirements and evaluate the use of respirators for the proposed activities. Worker training has been conducted on the Defueling Test Assembly to simulate the activities to be perfomed, and thereby improve efficiency and minimize worker exposures. During preliminary defueling both a Radiological Controls Technician and a licensed FHSR0 will be stationed on the defueling platform, to provide radiation monitoring and to assess existing radiation protection measures.

Typical dose rates on the defueling platform are expected to range from 10-20 mR/hr. A dose rate of 30 mR/hr on the defueling platform has been established as a point for evaluation of radiological conditions prior to 4

the continuation of activities. Activities will be halted if platform dose rates reach 300 mR/hr, except as specified in procedures.

Radiation shielding and other radiation protection measures that will be in place for preliminary defueling were designed to protect workers during the full scope of early defueling activities. Since fuel will not be loaded into canisters nor removed from the reactor vessel during preliminary defueling, dose rates should not increase significantly, and the protective

! measures taken will provide a high degree of assurance that worker

exposures will be maintained ALARA.

1 The staff has reviewed the radiation monitoring program that will be in

, place. The staff concludes that this program will provide adequate data and alarm functions. Procedures have been established by Radiation Controls personnel to take appropriate actions should radiation levels be significantly higher than those expected. GPUN also has a program to 4

maintain occupational exposure to ALARA. An integral part of this ALARA program is the management reviews to be performed during these preliminary defueling activities to assure that ALARA objectives are met and feedbacks of ongoing activities are reviewed for improvement.

Conclusions Our review of the proposed preliminary defueling activities was based on information provided in Reference 1 and in discussions with GPUN staff.

Additionally, we evaluated relevant information submitted in the course of our review of proposed early defueling operations. Also, as the proposed preliminary defueling activities are similar to and bounded by previous 4

cleanup activities, the conclusions of earlier NRC safety evaluations were l referenced, as appropriate. Based on our review, we find that:

! (1) adequate decay heat removal is provided in the " loss-to-ambient" mode, (2) there is little potential for core recriticality due to fuel reconfig-uration, introduction of foreign materials into the RCS, or baron dilution, (3) there is little potential for a release of radioactivity significantly above the trace amounts discharged routinely as a result of cleanup i activities, (4) the potential for a heavy load drop into the reactor vessel

has been minimized and adequate measures exist to mitigate the consequences of a potential load drop accident, (5) GPUN has implemented an acceptable

l

.s.

program to maintain worker exposures ALARA during the proposed activities.

We further conclude that the proposed activities are within the scope of activities assessed in the PEIS (NUREG-0683). The proposed activities, being similar in nature to previously conducted activities, do not constitute an unreviewed safety issue. They will not increase the probability of occurrence or the consequences of an accident or malfunction of equipment important to safety as previously evaluated. The proposed activities also do not create the possibility for an accident or malfunction of a different type than any evaluated previously or reduce the margin of safety. Therefore, we conclude that the proposed preliminary defueling activities can be safely conducted, thereby protecting the health and safety of the onsite workers and offsite public.

4 l

l l

, . . - . - - + _ - - , - , . ,

1 l

REFERENCES

1. Letter from F. R. Standerfer, GPU, to B. J. Snyder, NRC, " Commencement of TMI-2 Preliminary Defueling Operations," October 24, 1985.
2. GPU Safety Evaluation Report for Early Defueling - Revision 4, October 10, 1985.
3. NRC Safety Evaluation of Reactor Pressure Vessel Head Lif t, letter from B. J. Snyder, NRC, to B. K. Kanga, GPU, July 17, 1984.
4. Letter from B. J. Snyder, NRC, to F. R. Standerfer, GPU, Safety Evaluation for Plenum Removal Preparatory Activities, September 14, 1984.

j 5. NRC Safety Evaluation of Plenum Assembly Lift and Transfer, letter from B. J. Snyder, NRC, to F. R. Standerfer, GPU, May 7,1985.

i

6. NRC Safety Evaluation of Heavy Load Handling Over the TMI-2 Reactor Vessel, letter from B. J. Snyder, NRC, to F. R. Standerfer, GPU, May 2, 1985.
7. GPU Hazards Analysis: Potential for Boron Dilution of Reactor Coolant System, Rev. 2, September 1985.
8. Letter from B. J. Snyder, NRC, to F. R. Standerfer, GPU, transmitting Amendment of Order for Technical Specification Change Request #46, 1

August 8, 1985.

9. Letter from B. J. Snyder, NRC, to F. R. Standerfer, GPU, Review of TMI-2 Reactor Coolant System Criticality Report, March 15, 1985. .

l I

' ~

. Dr. Thomas Nrley kt111s efaby. Site Manager Regional Administrator. Region I U.S. Department of Energy U.S. haclear Regulatory Comission P.O. Boa 88 631 Part Avenue Middletown. PA 17057 0311 King of Prussia. PA 19406 Da v id J. Mc Go f f John F. bolfe. Esq.. Chalman. Dietsten of three Mile Island Programs Administrative Judge ht.23 3409 Shepherd 5t.

  • U.S. Department of Energy Chevy Chase, MD. 20015 hashington. 0.C. 20545
  • Dr. Oscar M. Paris William Lochstet Administrative Judge 104 Davey Laboratory Atomic safety and Licensing Pennsylvania State University Board Panel Uptversity Park. PA 166C2 e.5. n uclear segulatory Comission hashington. 0,C. 20555 Randy yM ers, tdttorial The Patriot Dr. Freierick M. Shon 812 Marnet St.

Adatatstrative Judge herrisburg, PA 17105 Atootc Safety and Licensing

$ card Panel Robert 8. Borsum U.5. huclear Regulatory Comission Babcock & Wilcon washington. 0.C. 20555 huclear Power Generatton Ot tsien Suite 220 .

tartn W. Carter 7910 Woodmount A.e.

Assistant Attorney General Bethesda. MD. 20814 505 Isecutive Mouse

. P.0, som 2357 Michael Churchht11. Isg.

harrisburg, PA 17120 P!LCOP Dr. Judith M. Johnsrud 1315 W41aut St.. Sutte 1632 Philadelphia. PA 19107

~-- Instronmental Coalition on nuclear Power Linda W. Little

_I 433 Orlando Ave. 5000 Mermitage DR.

-'- State College. PA 16801 Ealeigh.NC 21:12

L s George F. Treweridge Esq. Marvin I. Lewis 9- sha.. Pittran. Potts and 6504 Bradford Terrace g- Tro= bridge Philadelphta. PA 19149

-a. 1800 M. St.. nn.

'l bashington. 0.C. 20036 Jane Lee

-M 183 Valley Rd.

g Atomic Safety aad Licensing Board Panel Etters.PA 1731g

%. u.5. Nuclear Begulatory Comission

,7. " " hashington. 0.C. 20555 A J.B. Liberman. Esovire

,h Atcaic Saf ety and Licensing Appeal Panel 8erlack.Israels. Liberman 26 dreadway

. f; . U.S. huclear segulatory Comission a ' hew York hv 10004 wasnington. 0.C. 20555 h secretary Walter W. Cohen. Consumer Advocate Department of Justice

~

u.5. haclear segulatory Comission Strawberry Souare.14th Floor ATT h: Chief. Doctettag & Service Branch Harrisburg PA 17127 hashieston. 0.C. 20555 Mr. Larry Mochendoner Edward O. $= art causain County Comissione" Board of Supervisors P.O. Los 1295 Londonderry Township ha rr i s bu r g .

  • PA 17108-1295 RFD #1 Geyers Church ad' Middletown. PA 17:57

John t. Minnich. Chairperson.

Dauchin County Board of Comissioners , Robert L. Knupp. Esovire Dauphin County Courthouse Assistant solletter Knupp and Andrews Front and Market Streets P.O. Son P Marrisburg PA 17101

> J.; 407 h. Front St.

Dauphin Cou n ty Office of Emergency Marrisburg. PA 17108 Prepa red nes s Court House. Room 7 John Levin. Esquire

Marrisburg PA 17101 P.O. Bos 326$

Marrisburg. PA 17120 U.S. [nytrornental Protec tion Agency

~ Segion !!! Office ATTN: E!$ Coordinator Curtis Butiding (51sth ricer) 6th & Walnut Streets 3 Philadelphia, PA 19106 Mr. Edwin sintner Esecutive Vice President Thomas M. Gerusty. Director General Public Utiltttes huclear Corp.

J- 100 Interpace Part.ey 1 Eureau of Radtation Prstection

' Cepartment of Environmental pesources Perstepany. kJ 07054 i,

P.O. Bos 2063

[, ' Marrisburg PA 17120

\

{.?

  • Den Kennedy be tratte y t . n c . , s ,, g,,

Cf fice e' in.nomental Pleantac .,%

t,eoarwt r* Inytronmentai pesource! t .est n et Strert r' PG '4' 200

[ her-tspu-;. PA 17120 l '.-

,g,.

  • L