ML20133P619

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/85-18 & 50-366/85-18 on 850524-0628 & Notice of Violation
ML20133P619
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 07/22/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20133P623 List:
References
NUDOCS 8508140396
Download: ML20133P619 (2)


See also: IR 05000321/1985018

Text

i

0$0C!O'\\

,

-

.

'

I

JUL 2 21985

eorgia Power Company

i

ATTN:

Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT NOS. 50-321/85-18 AND 50-366/85-18

On May 24 - June 28,1985, NRC inspected activities authorized b/ NRC Operating

License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violation, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Roger D. Walker

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

'

2.

Inspection Report Nos. 50-321/85-18

and 50-366/85-18

cp w/encls:

,

Ld. T. Beckham, Vice President and

eneral Manager-Nuclear Operation

'

]

C. Nix, Site General Manager

i

. E. Fornel, Site QA Supervisor

,

I

i

/.Gucwa, Chief,NuclearEngineer

i

l

bcc w/encls:

(See page 2)

y

DR

A

PD

)

m

e

120l

-

_

_ _ .

--

_.

_.

..

..

_ . - .

- _

-

..

'

MUL 221965

.. ,

Georgia Power Company

2

w/encls:

Resident Inspector

gh S. Jordan, Executive Secretary

Document Control Desk

State of Georgia

,

,

j

,

i

l

!

!

,

1

9

i

.1

d

I

RI

RJ

RI )

TNinh:lb

R rroll

VP nciera VBroy/85

nlee

7//7/85

7//p

7//fr/85

7

/85

1

,

---

,,

e

,- - - , . ,

,

- , - , - , -- . .- ,-

-