.s4 ang Ig UNITED STATES E'
g NUCLEAR REGULATORY COMMISSION 3'
j WASHING TON, D. C. 20555 o,
,f MAY 0 31985 MEMORANDUM FOR:
Harold R. Denton, Director Division of Nuclear Reactor Regulation FROM:
Richard H. Vollmer, Chairman Fire Prorection Policy Steering Comittee
SUBJECT:
UPDATED RECOMMENDATIONS ON FIRE PROTECTION POLICY AND PROGRAM ACTIONS
Background:
In a memorandum to Mr. Dircks dated October 26, 1984, the Fire Protection Policy Steering Comittee (SC) provided recomendations designed to resolve a number of issues associated with fire protection policy and imple-mentation of fire protection features for nuclear power plants.
In response to the Committee's recommendations, Mr. Dircks directed certain actions by memo-randum to you and Messrs. Stello and DeYoung dated December 10, 1984, including release of the SC's work for public comment.
The purpose of this memorandum is to provide you the SC's recommendations and guidance documents for your action in completing items one and four of the memorandum of December 10. The SC's recommendations and guidance documents on fire protection have, to some extent, been altered by the actions directed and the current status of the issues involved.
Discussion:
1.
The report of the SC was released to the public, and as of April 15, 1985, 13 letters of public coment had been submitted. The individual public coments, except for four that were received very late, and their reso-lution have been reviewed by the Steering Comittee and are included in.
As a result of these coments, those received from NRC Offices and Regions, and in consideration of the current status of some of the issues, a number of changes to individual SC recomendations have been made.
The SC has carefully evaluated its previous recomendation regarding an expedited inspection program for reviewing fire protection compliance.
Although we still believe that an expedited fire protection inspection would be beneficial, because of resource constraints the SC has modified its recommendation to place more emphasis on the priority selection >of plants to be visited within current resources allocated for fire protec-tion. The SC recommends that, while continuing the present program of inspection of plants completing their Appendix R modifications and those plants close to receiving an operating license, the regions be given flexibility to inspect plants where implementation problems are believed to exist.
In addition, the staff should support a licensee's request for an inspection which may avoid costly design and implementation decisions with which the staff may disagree.
This is particularly important since the Interpretations of Appendix R gives the licensee more implementation flexibility without prior staff review.
8508090557 850503 PDR REVCP NROFIRE PDR
_ ;N
s Harold R. Denton 2
MAY 0 3 1985 2.
The proposed Generic Letter on Fire Protection to be issued as a generic letter to all licensees and operating license applicants has been revised in several areas:
(a) The inspection program discussion reflects the recommendations indicated above.
(b) Documentation recessary to show compliance with fire protection requirements has been clarified.
(c) The application of quality assurance to fire protection has been clarified. Although the SC believes that the QA requirements of GDC-1 are applicable to fire protection features, the QA provisions in most fire protection programs, in addition to the recent proposed rulemaking on important to safety, provide sufficient near and long term assurance in this area.
(d) Section F has been added to provide rationale for a standard license condition and to request licensees to submit this standard fire protection condition as a license amendment.
The revised Generic Letter is included as Enclosure 2.
3.
Very minor changes have been made to the Interpretations of Appendix R and the Guidance for Enforcement Action concerning fire protection require-ments. These revised documents are included as Enclosures 3 and 4.
4.
A number of changes to the question and answer package have been made as a result of public comments and comments from other NRC offices. The revised guidance document is included as Enclosure 5.
5.
The SC has reviewed and approved a proposed standard license condition and several proposed technical specification changes based on fire protection requirements. These changes were developed in order to promote consistency of fire protection requirements at all operating reactors whether they are covered under Appendix R or not.
These documents are included as Enclosures 6 and 7.
Recommendations:
Promptly issue the enclosed Generic Letter (Enclosure 2) with the a.
Interpretations of Appendix R, Responses to Industry's Questions, and the Fire Protection License Condition as enclosures.
Note that the Commission wishes to review this guidance before it is issued to industry.
b.
Conduct fire protection inspections in accordance with currently allocated fire protection resources. Regional workshops should be conducted in order to provide latest information to inspection teams. A referee team should be established to promptly settle disagreements between the licensee and inspection teams.
a 1
Harold R. Denton 3
MAY 0 31985 c.
Endorse a standard fire protection license condition in accordance with to all future operating licenses and encourage licensees to review their licenses to conform.
d.
Utilize the proposed technical specifications where appropriate in future operating licenses and as guidance to the NRR tech spec Improve-ment Project for inclusion in their current effort.
e.
Adopt the guidance in Enclosure 4 as the agency criteria for enforce-ment of fire protection requirements.
Following adoption of this guidance, pending fire protection enforcement cases should promptly be processed by IE.
To keep you informed of status on approved recommendations and other fire protection matters, the Steering Committee will make periodic reports to you on this matter.
For the Fire Protection Policy Steering Committee:
Original Signed By Richard H. Vollmet Richard H. Vollmer, Chairman
Enclosures:
1.
Resolution of Comments on Recommendations of the Fire Protection Steering Committee 2.
Revised Generic Letter 84-01 3.
Revised Interpretations of Appendix R 4.
Revised Enforcement Guidance on Fire Protection Requirements 5.
Proposed Standard License Condition Regarding Fire Protection Requirements 6.
Proposed Revised Technical Specifications Regarding Fire Protection 7.
Revised Questions and Answers Regarding Fire Protection cc w/ enclosures:
Distribution:
F. Rosa, NRR cc w/o enclosures:
SD Richardson W. Shields, ELD W. Dircks, EDO RH Vollmer /
T. Wambach, NRR T. Rehm, ED0 W. Johnston, NRR V. Stello, DEDR0GR V. Benaroya, NRR S. Richardson, IE ORP:IE DD:
N. Grace, RII SD Richardson cd RH ol mer T. Martin, RI 5/
/85 5/3 /85 W. Olmstead, ELD J. Olshinski, RII L. Spessard, RIII
m 4
E_NCLOSURE 1 RESOLUTION OF COMMENTS ON THE RECOMMENDATIONS OF THE FIRE PROTECTION POLICY STEERING COMMITTEE (50FR2056 JAN. 15, 1985; G.L. 85-01) 1.0 PUBLIC COMENTS:
1.1 Nuclear Utility Fire Protection Group: Letter from J. M. McGarry to H. R. Denton dated February 14, 1985.
1.1.1 Coment (A.1):
Schedular Relief "The discussion at pages 1-2 of the draft Generic Letter indicates that schedular relief under 10 C.F.R. I 50.48 can no longer be obtained. The Group is concerned that this discussion could be read as precluding the filing of schedular exemption requests under 10 C.F.R. 9 50.12.
It is the Group's understanding from discussions with the Staff that schedular exemptions under 10 C.F.R. f 50.12 continue to be available despite the expiration of the Section 50.48 deadlines.
To avoid any misunderstanding, the Group would recommena that the Staff's Generic Letter state explicitly that the filing of a schedular exemption request under Section 50.12 is not precluded by the expiration of the Section 50.48 deadlines."
Resolution:
The NUFPG comment indicates a misunderstanding of the Steering Comittee recomendation on schedular exemptions, which have always been issued under 10 CFR 50.12. The Steering Comittee recommended that no further schedular exemptions be granted, and that schedules (for licensees whose 50.48 deadlines have passed) will be set in the enforcement context. Therefore, their understanding that schedule exemptions would still be available if this recommendation is adopted is not correct.
However, this does not preclude the filing of a schedular exemption request under 10 CFR 50.12 based on a justified "living schedule" which has been approved by the NRC.
The proposed Generic Letter has been revised (footnote, Pg. 2) to clarify this point.
1.1.2 Comment (A.2):
Inspection Process a) This comm'ent addresses the Steering Committee recomendation for an accelerated fire protection inspection program and presents reasons why such inspections should be postponed until the new guidance package has been reviewed and approved by the Commission.
The conclusion of this comment states:
"For these reasons, we believe that the most efficient use of Staff and licensee resources would result from postponing j
the inspections (absent a safety concern or an indication of readiness on the part of the licensee) until the new l
interpretations and guidance have been reviewed and approved by l
the Commission. 2/"
1
..~.n-
.-..n
.,. ---.,,..-.,.-..,--..~, ----
.--.,-,,,n
t.
b) The above cited footnote states:
"2/
In connection with the discussion of the inspection
'p7ocess, the Group strongly supports the Steering Conunittee's recommendation regarding the establishment of a referee team, j
headed by senior NRR management, to resolve significant differences between inspection personnel and the licensee.
The l
Group understands that the resolution of such differences will be accomplished expeditiously by the referee team, with a decision issued generally within one week, but in any event before the inspection report would be released."
Resolution:
a) The inspection program will be conducted as expeditiously as present resources allow with priority given to utilities not yet inspected and those requesting early inspections.
b) The understanding of the NUFPG regarding the composition and expected performance of the " referee" team is correct.
If the recommendation for formation of a referee team is approved by the Commission, the substance of this comment will be fna cluded in t ts Ci1arter.
1.1.3 Comment (A.3): Documentation Required to Demonstrate Compliance
"---Tne proposed Generic Letter states (at page 3)-
Failure to have such an evaluation available for an area where compliance with Appendix R is not readily demonstrated will be taken a: prima facie evidence Viat the area does not comply with NRC reouirements, and may result in enforcement action. 3f (Emphasis added.)
It is the Group's understanding from our discussions with the staff that the term "readily demonstrated" is intended to include situations where compliance is apparent by observation.
Thus, if compliance with Appendix R is apparent by observation of the features in question, failure to have an evaluation available will not be con::idered evidence of noncompliance. With this understanding expressly incorporated into the Generic Letter, the Group has no objection to this part of.the proposed Generic Letter."
i Resolution:
The understanding is correct. The proposed Generic Letter and the Guidance for Enforcement Actions have been revised to incorporate the NUFPG understanding.
~
1.1.4 Comment (A.4): Quality Assurance Requirements This comment takes exception to the introductory sentence to section D of the proposed Generic Letter which states:
Fire protection systems must meet the requirements of General Design Criterion 1 of Appendix A to 10 CFR Part 50."
Specifically, the objection is to the citation to GDC 1 because this impacts the current rulemaking regarding the safety classification issue, i.e.,
the important-to-safety vs. safety-related controversy.
It further states that the QA guidance provided in BTP CMEB 9.5-1 (also cited in the proposed Generic letter) is adequate for this purpose and has generally been followed in the industry.
Therefore, it recom-mends deletion of the citation to GDC-1.
Resolution:
This comment is considered valid. The references to GDC-1 can be deleted without loss of the point being made regarding adequate QA for fire protection equipment. The rulemaking now in progress on the safety classification issue will clarify that licensees are expected to carry out QA commitments already present im the FSAR and other licensing documents. The proposed Generic Le+.ter has been revised to delete reference to GDC 1 and to more completely describe the appropriate QA guidance.
1.1.5 Comment (B.1): Size of the Fire This comment recommends that the Interpretations of Appendix R be revised to include guidance concerning the size of an assumed initiating fire.
Specifically, it is recommended that the following footnote be added to Section 3, Fire Damage:
i "For purposes of the fire protection program, Staff practice has been to assume a relatively small amount of combustible material as the initiation source, i.e., absent special considerations indicating high or low potential combustible initiators, typically in the range of 5 gallons of flammable liquid."
A
,,r--.
w-
.-m--
f
. Resolution:
We do not concur in this recommendation. Guidance concerning the size of an assumed initiating fire could be helpful in evaluating the fire severity within a fire area in a mechanistic way. How-ever, the proposed guidance is not representative of expected transient combustibles in most plant areas, does not specify the configuration of the transient fuel and incorrectly states the staff practice.
The expected transient combustibles vary throughout the plant.
For example, in some areas, the expected transient combustible may be oil; however, the amount and configuration of the oil would be dependent on the reason for it to be there.
In the control room, paper (drawings and computer runs) and plastic scrap is the expected transient.
In cable spreading rooms, cables and cable drums have been the most prevalent transient combustibles identified. On the refueling deck, wood and polyethylene sheets would be expected.
In other areas, drums of plastic (protective clothing) are present.
Each configuration of these transient combustibles poses a different threat because of the differing characteristics of fire growth, fire duration and heat release rate.
The present guidelines recommend that the appropriate transient com-bustible for the particular area be considered. The Fire Hazard Analyses are based on this assumption. Therefore, the proposed addition was not incorporated.
1.1.6 Comment (B.2): Fire Area Boundaries This connent questioned whether each individual unsealed opening in a fire barrier must be evaluated, and stated that it was their understanding ".... that the staff would permit an evaluation of openings by groups, e.g., according to size of the openings and distance from comburtible material."
Resolution:
The stated understanding is not correct. Unsealed openings should be grouped by the fire barrier which they penetrate.
The evaluation of the overall offectiveness of the barrier should then consider the size and distribution of these openings, the combustible leading, and the proximity of such loading on both sides of the barrier.
A clarifying revision to the Interpretations has been made.
1.1.7 Comment (C.1): General Guidance The comment stated the understanding that Section IB of the Guidance for Enforcement Actions Corcerning Fire Protection Requirements does not require a separate list of safe shutdown equipment; that "the necessary equipment need only be identifiable from the fire hazards analysis and SERs."
. Resolution:
This understanding is correct. No revision is considered necessary.
1.1.8 Comment (C.2): Severity Categories The comment stated the understanding that the word " dedicated" used in Sections 2.A. 2.B and 2.C of the Guidance for Enforcement Actions Concerning Fire Protection Requirements "is meant to refer to the equipment identified in the fire hazards analysis for safe hot or cold shutdown."
Resolution:
This understanding is correct. A clarifying revision to that-effect has been made.
1.1.9 Coment (D.1): Current Requirements The comment states that the proposed license condition is unnecessary for plants licensed prior to January 1, 1979 because license condi-tions were issued upon completion of the staff's review of con-formance to the positions in Appendix A to BTP APCSB 9.5-1; that for plants licensed after January 1,1979, a license condition has been imposed; that all modifications must be reviewed and reported pur-Juant to 10 CFR 50.59; and that 10 CFR 50.72 and 50.73 provide relevant reporting requirements. Therefore, adequate enforceability is already present without aiditional actions.
The comment also recommended that the response to Question 8.3 (which inquired whether an exemption is required from Appendix R sections other than III.G, III.J and 111.0 for future modifications that do not comply with such sections) be changed from "yes" to "no."
This was based on the interpretation of Appendix R as not requiring exemptions for modifications that were made to features which were approved by the staff under Appendix A of RTP APCSB 9.5-1.
The Statement of Considerations to Appendix R (45F,t76602, Nov.19,1980) was cited to support this.
RJsolution:
A standard license condition is considered necessary for the following The license curditions which were imposed on plants reasons.
licensed prior to January 1, 1979 only addressed the modifications that were required. Those parts of a plant's fire protection program including the fire hazards analysis, found acceptable by the staff in the Fire Protection Safety Evaluation Report with nc modifications necessary were not addressed by the license condition.
. i The NRC has found during inspections that some licensees do not con-sider the Appendix A to BTP APCSB 9.5-1 items of their fire pro-tection programs as binding and have either changed them or ignored them.
For plants licensed after January 1,1979, while all such plants have a license-condition regarding fire protection, the scope of what is covered by the condition and the wording of the condition varies widely. This results in varying degrees of compliance and uneven enforcement. Therefore, we believe that a " standard license condition" is necessary for consistent and fair regulation.
How-ever, the license condition has been revised to include specific identification of the documents providing the basis for the license 4
condition.
Regarding the applicability of 10 CFR 50.59, in many cases, includ-ing all plants licensed prier to January 1,1979. the fire protaction program and the fire hazards analysis are not described in the FSAR.
Therefore, the provisions of 10 CFR 50.59 art not directly appli-cable. Accordingly, the license condition has been revised to specify the applicability of 10 CFR 50.59 for the evaluation pro-cess and 10 CFR 50.71(e)(2) for the reporting process. Addi-tional revisions are described in comment resolutions 1.1.10 and 1.1.11.
Regarding the comment on Question 8.3, this comment is not con-sidered valid. The cited Statement of Considerations does not address the applicability of Appendix R in regard to modifica-4 tions made to features previously approved by the staff. The staff position in this regard is clearly supported by 10 CFR 50.48(b). A revision to the response to Question 8.3 has beeri made to clarify this point.
1.1.10 Comment (D.2): Hearing Requirements 1
Under the proposed license condition, any change to the program must be analyzed for its effect on overall fire protection sefety.
Even minor modifications such as adding one cable to a room or a change in the location of a fire extinguisher would have to be 1
analyzed, and, if found to lower the level of fire protection, no matter how minor, would require a license amendment with full notice and hearing rights, an expensive and time-consuming process with-out a commens. urate benefit to safety. Therefore, the proposed license condition should not be adopted.
Resolution:
i The proposed license condition has been revised to make it clear that only those changes to the fire protection program that "significantly" decrease the level of fire protection would require prior Commission approval and a license amendment; changes which do not "significantly" decrease the level of fire protection may be l
3
-n,.~,..,_
.--._n,
- made in accordance with 10 CFR 50.59 and reported annually with FSAR revisions as required by 10 CFR 50.71(e).
1.1.11 Comment (D.3): Section 50.59 In regard to paragraph 3 of the proposed license condition the i
comment states:
a)
---that the requirement to submit the supporting analyses would impose an undue paperwork burden on both the licensees and the Staff.
Significantly, Section 50.59 does not require actual submittal of the analyses performed in accordance with that section.
Instead, licensees re pursuant to 10 C.F.R. Q 50.71(e) (2) port to the NRC annually on what Section 50.59 changes have been made.
We would recommend that a similar procedure be used for fire protection changes, and therefore would recommend not imposing a requirement for actual submittal of the analyses."
b)
---there is no safety reason to require that "All changas to the approved program" be reported to the NRC annually.
For.
example, changing the location of a fire extinguisher or adding one cable to a room may have no practical bearing on safety.
Yet, pursuant to the license condition as postured, it may need to be reported. We maintain that such a requirement is unjusti-fied and unwarranted."
Resolution:
a) The proposed license condition has been revised to remove the requirement for submittal of the analyses and to specify the applicability of 10 CFR 50.59 and 10 CFR 50.71(e).
b)
It is not intended that changes that "---have no practical bear-ing on safety" be reported; it is expected that licensees would exercise reasonable judgment in this regard. A revision was made to indicate this intent.
1.1.12 Comment (E): Standard Technical Specifications The comment supports the Steering Committee effort to revise the fire protection Te'chnical Specifications to the extent that it is directed toward simplifying and generalizing them to be more workable.
It recommends that any proposed TS changes be reviewed as part of the overall staff consideration of Technical Specifications in general, and requests an opportunity to comment on proposed changes.
i e
._y_..__m_.__.,,-_.
9
' Resolution:
The course of action to be followed should be defined by the Steering Committee. The options available are:
(1)
Include the revised fire protection Technical Specifications in the package being submitted for CRGR review and subsequently for Comission approval.
This option would provide a complete package for " resolution" of the fire protection issue; the " Commission approved" fire protection TS could then te incorporated in the STS without delay, and implementation in OLs and ors cauld proceed immediately.
(2) Handle the fire protection Technical Specifications separately (from the CRGR/ Commission package), i.e., sutunit the proposed revision to the Technical Specification Review Group (TSRG)
(E. Butcher) for eventual inclusion in the STS.
It is our understanding that the TSRG is presently revising the STS to include all clarifying changes which reflect present practice and which will not require CRGR review. The TSRG intends to make substantive type changes, which will then be submitted to the CRGR on a single issue basis, at a later date.
The proposed fire protection TS changes are in this second category. Therefore, CRGR approval and subsequent implementa-tion of the TS on OLs and ors would be delayed significantl Also, the direct Commission approval afforded by option (1)y.
would not be available to support backfitting the revised TS on ors.
(3) Defer action on fire protection TS until some action is taken by NRR on the recommendations of the Technical Specification Improvement Project (TSIP) (S. Bryan [formerly under D. Beckham]) which are scheduled for September 1985.
This option has the same detrimental aspects in regard to implementation of the TS as option (2) except that the delay involved would probably be greater.
It is recommended that option (1) be selected.
It is also recasi-mended that the TS not be issued for public comment, unless so directed by the Commission.
Substantive changer to Technica?
Specifications normally only require CRGR review.
_g_
1.1.13 Coment (F.1): Question 3.2.3 (Fire Door Modifications)
The coment notes that according to UL and FM any modification of a fire door will invalidate its label.
Therefore, the following portion of the response to Q3.2.3, "An exemption is required if fire doors installed in a fire barrier used to satisfy Section III.G.2 are modified such that the labeled rating no longer applies," could be interpreted to require an exemption for modifi-cations to incorporate security hardware or flooding protection.
It is recomended that the response be revised to state that an exemption is required only after a boundary analysis which considers the fire loading on both sides of the boundary shows that adequate margin no longer exists.
Resolution:
The cement is valid. To be consistent with Section #4 of the
" Interpretations," the response to Q3.2.3 has been revised to in-dicate that evaluation of fire door alterations is part of a fire boundary analysis not requiring an exemption.
1.1.14 Coment (F.2): Question 3.6.2(InterveningCombustibles)
The comment notes that the response to Q3.6.? classifies cables in covered cable trays as " intervening combuiMeles" while the response to Q3.6.3 states that cables in conduit are rat corisidered inter-vening combustibles.
It is recomended that the response to Q3.6.2 be revised to state that "--cable in fully enclosed cable trays does not constitute an intervening combustible for Appendix R purposes."
Resolution:
The response to Q3.6.2 has been revised to state tnat cables in cable trays which do not have solid sheet metal bottom sides and top arS considered intervening combustibles. The respnse to Q3.6.3 has been revised to state that cables in metal conduits or in cable trays or raceways which have solid sheet metal bottom, sides and top are not considered intervening combustibles.
1.1.15 Comment (F.3): Question 3.6.3(UnexposedCombustibles)
"The resp ~onse to this question states that oil in closed containers that conform to NFPA Standard 30 is not considered an intervening combustible, while oil in sumps is so considered. The Group believes that oil in closed sumps should be treated as equivalent to oil in NFPA Standard 30 containers, and therefore should not be classified as an intervening combustible. The Group does not object, however, to classifying oil in open sumps as an intervening combustible."
t
. Resolution:
The comment is valid. The requested revision has been made.
1.1.16 Coment (F.4): Question 5.3.8 (High Impedance Faults)
The coment questioned the need for including multiple high impedance faults in associated circuits subject to fire damage in short circuit coordination studies;Section III.G.2 of Appendix R was cited as expressly "not" requiring consideration of multiple high impedance faults ~.
Resolution:
The coment is not valid.Section III.G.2 does require considera-tion of " hot shorts" and " shorts to ground," and these terms encom-pass high impedance faults.
Given a major cable fire, multiple high impedance faults will probably occur. However, the response to Q5.3.8 was revised to clarify staff practice in regard to when short circuit coordination studies need or need not be performed.
The revision also corrected the typographical error identified in the coment.
1.1.17 Coment (F.5): Question 8.11 (Plants Licensed After January 1,1979)
"The response to Question 8.11 states that plants licensed after January 1, 1979 are subject to, inter alia, BTP CMEB 9.5-1.
Some plants in this category, however, were licensed to the APCSB version of BTP 9.5-1 rather than the CMEB version.
There are some material differences between the two versions, and if a plant that was licensed to the APCSB version were required to follow the CMEB version, exemption requests and modifications could be necessary. We expect the response was merely an oversight on the Staff's part.
We would recomend modifying the response to Question 8.11 to read: 'BTP CMEB 9.5-1 or BTP APCSB 9.5-1, if so provided as part of a license condi-tion or licensing commitment, which includes....'"
Resolution:
The coment is valid. A revision his been made to clarify this point.
1.'1.18 Coment (F.6): Question 8.19(a)(ExemptionRequests)
"There appears to be an oversight in the response to Question 8.19(a).
That response contains a cross-reference to the responses to Question 8.21.1 through 8.21.6, but the responses referred to do not appear in the document. We understand that the Staff will add the promised responses.
The Group reserves the right to comment when these responses are provided."
. Resolution:
The cited cross-reference has been corrected to read "--response to Questions 8.19.1 through 8.19.4."
1.2 Duke Power Company: Letter from H. B. Tucker to the Secretary of the Comission dated February 14, 1985.
(Endorses the NUFPG coments and provides the following specific comments) 1.2.1 Coment (1): Quality Assurance Requirements The coment states that reference to GDC 1 of Appendix A to 10 CFR 50 in Section D of the proposed Generic Letter is clearly inappropriate, and that "The QA program for fire protection should be reviewed to requirements of the GDC 3, BTP or SRP as, applicable."
Resolution:
This is included in the resolution of coment 1.1.4 above.
1.2.2 Coment (2): Question 3.2.1 (Fire Barrier Qualification -
Acceptance Criteria
" Staff Position is that maximum heat transfer (sic) across a penetration seal, subjected to ASTM-E119 Fire Endurance test, is 325'F.
Coment - 1) ASTM-#119 criteria is 250 F above ambient which frequently is greater than 75'F. 2) Appendix R,Section III.M. states acceptance criteria for temperature as
'...sufficiently below the cable insulation ignition temper-ature...'.
This interpretation (the staff's position [added])
is clearly contrary to the intent and verbage of Appendix R."
Resolution:
- 1) The response to Q3.2.1 clearly states that 75*F is generally recognized as an acceptable norm.
No revision is warranted.
- 2) Question 3.2.1 addresses criteria for qualification of cable tray fire, wrap material while Section III.M.2 of Appendix R addresses criteria for qualification of cable penetration seals. While Section III.M.2 is not explicitly applicable to cable wrap material, applicability is implied.
Therefore, we have revised the response to Q3.2.1 to clarify that a qualifi-cation criterion less than 325'F may be justified by an analysis demonstrating that the maximum recorded temperature is sufficiently below the cable insulation ignition temperature.
Also see resolution 1.3.1.
O
i
. 1.2.3 Comment (3): Question 3.3.4 (Cable Tray Support Protection)
" Staff Position is that '... cable tray supports should be protected regardless (emphasis added) of whether there is a sprinkler system..'. '.
There is no technical basis for this arbitrary position.
If a sprinkler system is provided and functions (as it is apparently given credit in reducing fire barrier rating from 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to I hour), the environment will be cooled below the temperature at which cable tray supports will be affected by heat fatigue.
In addition, each area should be reviewed individually to assess combustible loadings and other factors to determine if a potential fire could generate sufficient heat tc affect cable tray supports."
Resolution:
The comment is not entirely justified in that the quoted portion of the staff position is preceded by "In general " and is followed by two conditions (one based on qualification tests performed and the other on structural analysis performed) under which cable tray supports need not be protected. However, the staff agrees that a clarification regarding the analysis to be perfomed is desirable.
The response to Q3.3.4 has been revised accordingly.
1.2.4 Comment (4): Question 3.8.4 (Control Room Fire Considerations)
The staff position in the response to Q3.8.4 does not reflect staff practice during Appendix R inspections.
"The Staff Position is '...that the only manual action usually credited in the control room by this analysis is the reactor trip.
Any additional control room actions deemed necessary would have to be justified under the exemption process.'
Comment - During a recent Appendix R inspection we demonstrated the control room abandonment portion of our Hot Standby Opera-tions procedure to Region II, ONRR and BNL representatives.
We demonstrated reactor trip, turbine trip and main feedwater manual tr.ips (in case automatic signals did not function properly).
This is reasonable since the control room does not instantly become uninhabitable.
There was no question during the inspection about the capability to trip all of the subject systems therefore the new interpretation should be changed to agree with actions which have been reviewed and accepted."
Resolution:
The comment is valid.
The response to Q3.8.4 has been revised accordingly including removal of "Any additional control room actions deemed necessary would have to be justified under the exemption process."
. 1.2.5 Comment (5): Question 5.1.3 (III.L Backfit)
"The question is Why do Staff Interpretation memoranda (emphasis added) regarding the criteria for satisfaction of Section III.L. form the auditable basis for determining com-pliance to Appendix R...?
Comment - The response fails to address the rationale for considering Staff interpretative memoranda as part of the Rule.
If necessary, the Rule should be so amended."
Resolution:
The response does provide the basis for the applicability of Section III.L of Appendix R.
Because the bases cited in the response are deemed sufficient, there is no need for a rule change. Addition-ally, it should be noted that the explicit portions of " interpretive memoranda" describe methods acceptable to the staff for demonstra-ting conformance to Appendix R.
This does not preclude licensees from proposing and justifying other methods, e.g., see Section 1, Process Monitoring Instrumentation, of the Interpretations of Appendix R.
1.2.6 Comment (6): Question 5.2.4 (Post Fire Procedures Guidance Documents)
"The question pertains to Staff guidance documents of post fire operating procedures. The response is that there is no guidance other than criteria of Section III.L.
Comment - Licensees need to know the criteria used for evaluating post fire shutdown procedures.
In addition, without criteria how do various inspection teams plan to conduct consistent reviews?"
Resolution:
It is our judgement that the responses to Questions 5.2.1, 5.2.2, and 5.2.3 are appropriate and that the criteria for operating procedures in III.L are sufficient. As indicated in the aforementioned responses the methods for meeting these criteria are the option of each licensee.
The inspection process will be flexible in this regard as long as the licensee can show compliance with the criteria of Section III.L. The preceeding sentence has been added to the re-sponse to Q5.2.4.
1.2.7 Comment (7): Question 9.3 (NT0L Inspections)
" Response states that NT0L's will be subject to Appendix R inspections.
Comment - This is inappropriate for stations reviewed to technical requirements of Standard Review Plan 9.5.1 which differ significantly from requirements of Appendix R, Sections III.G and III.L."
~ - -
,,,,.----,,,,.,,,-,,--..,,-4,.,----,,,,n-_
,,n
,,_,c_
..,.c,_,
6 l Resolution:
The staff is aware of only one significant difference between Sections III.G and III.L of Appendix R and the corresponding posi-tions in BTP CMEB 9.5-1 which is part of Standard Review Plan 9.5.1.
See response to Question 8.11 in " Appendix R Questions and Answers."
1.2.8 Comment (8): General Question t
"For stations previously inspected, will inspection results be modified to meet -these new interpretations (i.e., will addi-l tional findings evolve based on new published interpretations)?"
Resolution:
~
For plants previously inspected and which have no remaining open fire protection items in an Inspection Report already issued, the answer is no. For previously inspected plants where open items remain in an issued Inspection Report, the new interpretations will be used in subsequent inspections perfonned to close out the open items.
In plants where an inspection has been made but the Inspection Report has not yet been issued, the new interpretations will be used as a basis for any findings.
It is recommended that the Steering Committee include the proceeding resolution in its report.
1.3 Toledo Edison Company: Letter (#1127) from R. P. Crouse to H. R. Denton dated February 14, 1985.
(Endorses the NUFPS comments and provides the following specific comments) l 1.3.1 Comment (1): Question 3.2.1(AcceptanceCriteria)
"The discussion in response to Question 3.2.1 of the draft GenericLetter85-01statesasfollows(page14):
' Conduit and cable tray enclosure materials accepted by the NRC as 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> barrier prior to Appendix R (e.g.,
i some Kaowool and 3M materials) and already installed i
by the licensee need not be replaced even though they E
may not have met the 325'F criteria.
However, new material should meet the 325'F criterion.
Justification of temperatures which exceed 325'F is required.'
L It is Toledo Edison's determination that the final quoted I
sentences should be modified to read, 'However, newly i
l identified conduit and cable trays requirin should use new material which meets the 325g such wrapping F criterion
)
or justification should be provided of temperatures ex-l ceeding the 325'F criterion.'
1 Utilizing the different wording would prevent situations occurring, such as one cond11t undergoing repair being partially wrapped by two differing materials."
\\
I
1
. Resolution:
The coment is valid.
The proposed revision,'with an editorial change, has been made. Also see resolution 1.2.2.
1.3.2 Coment (2): Question 5.3.8 (Short Circuit Coordination Studies)
"The response to Question 5.3.8, concerning Short Circuit Coordination Studias, states:
' Clearing such faults on non-essential circuits may be accomplished by manual breaker trips governed by written procedures.'
The word non-essential may allow misinterpretation with regard to essential vs non-essential circuits, Class IE vs. Non-Class 1E circuits, etc.
It is Toledo Edison's understanding that all loads not recuired to achieve and maintain safe shutdown, which may fault anc cause high impedance ground fault tripping of the supply breaker may be opened allowing reenergizing of the bus supply power.
Toledo Edison, therefore, recomunends that the words 'non-essential circuits' be removed and replaced by
' associated circuits which may effect safe shutdown'."
Resolution:
The recomended revision has been made. Also see resolution 1.1.16.
1.4 Boston Edison Company: Letter (BEco 85-037) from W. D. Harrington to H. L. Thompson, Jr. dated February 22, 1985.
(Requests a 30-day extension of the coment period and provides the following specific comments) 1.4.1 Coment (1): Schedular Relief The comment points out that a "living schedule" including fire pro-tection modifications beyond the 10 CFR 50.48 deadlines has been approved by the NRC. And that, therefore, "The Steering Comittee recomendation to follow the schedule dictated by 10 CFR 50.48 without granting the extensions already filed with the NRC will make the fire protection modifications the highest priority.
This will preclude the evaluation of other safety issues which could be equal or higher in safety priority than fire protection."
Resolution:
The comment is valid.
Section A of the proposed Generic Letter has been revised to clarify that schedular exemptions based on NRC approved "living schedules" are available and would be issued under 10 CFR 50.12. Also see resolution 1.1.1.
. 1.4.2 Comment (2): Question 3.6.2(InterveningCombustibles)
Same as comment 1.1.14.
Resolution:
Same as resolution 1.1.14.
1.4.3 Comment (3): Questior 4.1'(Illumination Levels)
"Section 4.1, "Ifiumination Levels", the clarification states
'where a licensee has provided emergency lighting per Section III.J of Appendix it, we would expect that the licensee verify by field testing.ttat this lighting is adequate to perform the intended tasks'. The term ' adequate lighting' could be inter-preted differently liy the licensee and the NRC inspection staff."
Resolution:
It is expected that the licensee and NRC inspection staff would use reasonable engineering judgement to arrive at a mutually acceptable assessment of " adequate lighting." No revision to the Q4.1 response was deemed necessary.
1.4.4 Coment (4): Question 7.1 (Fire Protection and Seismic Events)
~
" Item 7.1 of Enclosure E clarifies the guidelines for the seismic design of fire protection systems in relation to the reactor coolant pump lube oil system, and those situa-tions where seismic events are assumed to be initiators of a fire.
The NRC response does not address the intent of the question but establishes guidelines for the seismic design of fire protection systems.
Boston Edison takes exception to this clarification and rtates that a seismic event is not considered concurrent with a fire and the fire protection systems are not seismically designed."
Resolution:
It is agreed that all or parts of' fire suppression systems are not seismically designed.
The BTP politions cited indicate what con-siderations should be given to seismic design of these systems (Also, see response to Q7.2).
Certain items, such as the RCP lube oil system and the hydrogen lines,\\were addressed specifically with regard to seismically induced fire.
In both these cases, the fire protection measures specified do no;t involve a fire suppression system.
The BTP CMEB 9.5-1 cited ir the response does not apply to plants reviewed and approved prior t1 the issuance of that BTP.
The responses to 07.1 and 7.2 have been revised to make this clear.
. 1.5 Northeast Utilities: Letter (A04606) from W. G. Counsil to H. R. Denton dated March 1, 1985.
(Endorses the NUFPG coments and provides the following specific coments) 1.5.1 Coment (1): Proposed License Condition a) This coment quotes the following excerpt from Section II.
Regulatory Philosophy of NUREG-0885 Issue 4 U. S. Nuclear Regulatory Comission Policy and Planning Guidance 1985:
"The Comission intends to shift its regulatory emphasis away from detailed, prescriptive requirements toward general design and performance criteria."
and states that "While much of the fire protection policy steering comittee report runs contr'ary to the above quoted Comission policy, the proposed license condition is the most significant one."
b) Section 2 of the proposed license condition would require a license amendment for minor changes to the fire protection program having no safety significance (Essentially the same as coment 1.1.10).
c) Section 3 of the proposed license condition would impose reporting and review requirements for fire protection greater than those associated with other elements of operating a nuclear facility (Essentially the same as comment 1.1.11).
Resolution:
a) The staff acknowledges th? merit of the cited Comission policy guidance in general.
However, it should be recognized that in the case of fire protection GDC-3 has provided " general design and performance criteria", and that the regulation of fire protection requirements solely on that basis has proven in-effective.
As a result, the Commission determined, after analyzing the re-suits of the Browns Ferry fire, that the more prescriptive re-quirement.s embodied in the BTP and subsequently in Appendix R to 10 CFR 50 were necessary, and established the present regulatory requirements.
The proposed license condition adds no new requirements.
It only identifies in the license the fire protection program committed to by the licensee and ac-cepted by the staff in previous reviews.
It also includes an allowance for changes to be made to that program by the licensee
,_,--n.,,_,
-e----e---
~ -
=r-wv'
~~~ ' '~ '
e 2 without Commission approval, and a method for keeping record of such changes.
b) See resolution 1.1.10.
c) See resolution 1.1.11.
1.5.2 Comment (2)/ Resolution: Schedular Relief Same as comment 1.1 1., and same re:olution.
1.5.3 Comment (3)/ Resolution: Quality Assurance Requirements Same as comment 1.1.4, and same resolution.
1.5.4 Comment (4)/ Resolution: Documentation Required to Demonstrate Compliance Same as comment 1.1.3, and same resolution.
1.5.5 Comment (Sa)/ Resolution: Question 3.2.3 (Fire Door Modifications)
Same as comment 1.1.13, and same resolution.
1.5.6 Comment (5b): Question 3.1.1 (Fire Area Definition)
"The response to this question, referring to 10CFR50 Appendix R Section III.G.3.b, indicates that, for safety-related equipment and associated cabling the licensee must '(p)rovide the desigr.
criteria for protection of such equipment against inadvertent operation, careless operation or rupture of extinguishing systems.'
In contrast the regulation itself addresses
' rupture or inadvertent operation of fire suppression systems.'
i
\\
- If -
Reference (3) quoting 10;FR50 Appendix A General Design Criterion 3 (GDC) statet '(f) ire fighting systems shall be designed to ensure that their rupture or inadvertent operation does not significantly impair the safety' capability' of safety-related equipoer.t. We believe that the inclusion of the additional criterion cf ' careless operation,' is inappropri-ate.
It is not clear what additional concern the NRC intends for licensees to address by inclusion of this term."
Resolution:
The comment is valid.
The words " careless operation" have been deleted.
1.6 KMC, Inc.: Letter from P. F. Riehm to H. R. Denton dated February 14, 1985.
Comment / Resolution:
Same as comment 1.1.4, and same resolution.
1.7 Virginia Power: Letter (85-112) from W. L. Stewart to H.
F,. Denton dated February 14, 1985.
Comment:
The comment focused on the approach the Commission should take in achieving its fire protection goals rather than on specific mech-anisms for doing so.
It states, based on experience, that fire protection "---is a living evolving issue that does not Tend itself to definitive guidance nor swift ccmpliance."
Favorable views on the Steering Committee recommendations are expressed as follows:
"We are encouraged by such recommendations as:
establishing referees to resolve significant differences that arise during inspections, inspection team workshops, expediting inspections to obtain a clearer understanding of the status of industry in achieving compliance, and designating a central point of con-tact within NRC to resolve internal conflict.
We believe that recommend'ations such as these reflect not only our experience with fire protection, but indicate that NRC also recognizes that guidance must continue to evolve, that interpretations will change, and that exceptions to the regulations will arise and need to be addressed."
._____-_._._.,__,N.-_.,.-.-,
,_.m.-
i
> However, the following reservations in regard to the recommendations are cited:
"On the other hand, we are cencerned by'such recommendations elimination of schedular exemptions, more aggressive and as:
expedited enforcement actions, and more regulation (i.e.
standard license conditions) and apparent new requirements (e.g. meeting GDC-1). We believe that recommendations such as these fail to recognize the nature of the fire protection issue.
It is not reasonable to expect that fire protection issues will be resolved and" compliance will be achieved solely through mandate.
The history of fire protection in the nuclear industry provides ample evidence to support this.
Rather, they will be resolved and achieved through better understanding and continued active communication'between NRC and industry.
The issuance of the Steering Committee's policy recommeadations for comment is a positive step in that direction and we encourage the NRC to continue in this manner."
In summary, the comment states:
" ---and we encourage the NRC to adopt the Steering Committee's policy recommendations that supporc resolution of fire protection issues through understanding and communications."
Resolution:
The comment is acknowledged.
The approach being taken by the Steering Committee is, we believe, in accord with the thrust of this comment and is consistent with the overall fire protection objectives of the Commission.
1.8 New York Power Authority: Letter (IPN-85-08, JPN-85-15) from C. A. NcNeill to H. R. Denton dated February 23, 1985.
(Endorses the NUFPG comments and provides the following specific comments).
Comment / Resolution:
The comments are essentially the same as comments 1.1.1 and 1.1.2 (and 1.2.8), and 1.1.3, and the scme resolution.
1.9 Georgia Power' Company: Letter (NED-05-088)fromL.T.Gucwato H. R. Denton dated February 14, 1984.
(Endorses the NUFPG comments and provides the following specific comment).
Comment / Resolution:
Same as comment 1.1.2, and the same resolutica.
4 5
s ENCLOSURE 2 GENERIC LETTER ON FIRE PROTECTION TO ALL LICENSEES AND APPLICANTS FOR OPERATING LICENSES Gentlemen:
SUBJECT:
IMPLEMENTATION OF FIRE PROTECTION REQUIREMENTS In the Spring of 1984, the Commission held a series of Regional Idorkshops on the implementation of NRC fire protection requirements at nuclear power plants.
At those workshops, a package of recently-developed NRC guidance was dis-tributed to each attendee which included NRC staff responses to industry questions and a document titled " Interpretations of Appendix R."
The cover memo for the package explained that it was a draft package which would be issued in final form via Generic Letter following the workshops.
The guidance approved by the Commission is appended to this letter, and is in the same format as the draft package, i.e., " Interpretations of Appendix R" and responses have been modified from the draft package, and a number of in-dustry questions raised at or subsequent to the workshops have been added and answered.
This package represents the official agency position on all issues covered, and where this guidance differs from previously issued guidance (in-cluding Generic Letter 83-33) on this subject, this guidance takes precedence.
In the lettered sections below, some additional topics are covered which also bear on the interpretation and implementation of NRC fire protection require-ments.
The topics are:
(A) schedular exemptions (B) revised ins program, (C) documentation required to demonstrate compliance, (D)pection assurancerequirementsapplicabletofireprotectionsystems,and(kuality) notifi-cation of the NRC when deficiencies are discovered.
A.
Schedular Exemptions The Appendix R implementation schedule was established by the Commission in 10 CFR 50.48(c), promulgated together with Appendix R in November of 1980.
Allowing time to evaluate the need for alternative or dedicateri shutdown systems, which require prior NRC approval before installation, and time for design of and NRC review of such systems, the Commission envisioned that implementation of Appendix R would be complete in four to five years, or approximately by the end of 1985. Many schedule extensions were granted by the staff under the " tolling provision," 50.48(c)(6), and under 10 CFR 50.12, the longest of which now extends into 1987.
Some Itcensees have proceeded expeditiously to implement Appendix R and are now finished or nearly finishod with that ef fort. Others have engaged in lengthy negotiations with the staff while continuing to file requests for schedule extensions, and thereby have barely begun Appendix R modifications needed to comply with Sections !!!.G
s 2
and III.L.
Schedule extension requests have been received seeking implementa-tion dates of 1990 or beyond.
As the 50.48(c) schedule was intended to be a one-time schedule commencing in the 1980-1982 time frame and ending in the 1985 time frame, extensions well.
beyond this schedule (particularly where major modifications remain to be completed) undermine the purpose of the schedule, which was to achieve ex-peditious compliance with NRC fire protection requirements.
The NRC will therefore grant no further extensions to the 50.48(c) schedules.
When a licensee's schedule expires, compliance is expected and appropriate enforce-ment action will be taken.
If compliance cannot be achieved by that date, the licensee will be required to submit and justify a minimum schedule for comple-tion of fire protection modifications, and to supply interim measures to compensate for the lack of compliance.
In submitting a schedule which goes beyond the current 50.48 deadline the licensee will be required to demon-strate that it has endeavored in good faith to complete modifications on schedule. A showing of good faith attempt to complete implementation on schedule may mitigate enforcement action for noncompliance with NRC requirements.
Licensees submitting "living schecules" for NRC approval should be aware that existing 50.48 schedules continue to apply.
Licensees intending to include fire protection modifications within a "living schedule" are ex-pected to assign within such schedules the relative safety priorities of remain-ing fire protection modifications.
If the NRC accepts a delayed implementa-tion date in the context of a living schedule, this would provide the basis for a schedular exemption which would then be issued under 10 CFR 50.12.
The NRC is currently reviewing all dockets of plants covered by the 50.48 schedule to determine schedule deadlines. When this review is completed, each licensee will be informed of the deadlines.
Revisedinspectionprogram[%
k Ny/pe/
B.
In 1982, the NRC developed an inspection program to verify compliance with the requirements of 10 CFR 50, Appendix R.
This program was primarily oriented towards reviewing safe shutdown features of those pre-1979 licensees that had completed Appendix R modifications and selected NTOL plants.
From 1982 to the present, approximately seven Appendix R compliance inspections have been perfonned.
In a number of cases, these inspections. have discovered that licensees had made significant errors in implementing a number of Appendix R requirements.
In order to expedite co'mpliarco verification and to provide the NRC staff with earlier indication of problems associated with implementation of fire pro-tection features, the NRC will conduct fire protection inspections of opera-ting plants and plants currently undergoing operating license review during
i 4 2.
Severity Categories A.
Severity I.
Violations of fire protection requirements estab-
^
listed to protect or enable operation of safe hot shutdown equip-ment concurrent with an actual fire which damages that equipment such that safe hot shutdown could not be achieved or maintained using the equipment identified in the fire hazards analyses for this purpose.
B.
Severity II. Violations of fire protection requirements established to protect or enable operation of safe cold shutdown equipment concurrent with an actual fire which damages that equipment such that safe cold shutdown could not have been achieved and maintained using the equipment identified in the fire hazards analyses for this purpose in accordance with the applicable requirements.
C.
Severity III. Violations of fire protection requirements established to protect or enable operation of safe shutdown equipment such that a fire in the area could damage that equipment to the extent that safe hot or cold shutdown could not have been achieved and maintained using the equipment identified in the fire hazards analyses for this purpose in accordance with applicable requirements. The NRC intends to initiate enforcement action where, for a given area, compliance with Appendix R is not readily demonstrable and the licensee does not have available a written evaluation for the area. The term "readily demonstrable"' includes situations where compliance is apparent by observation of the potential fire hazard and existing protective features.
D.
Severity IV. Violations of one or more fire protection requirements that do not result in a Severity Level I, II or III violation and which have more than minor safety or environmental significance.
E.
Severity V.
Violations of one or more fire protection requirements that have minor safety or environmental significance.
e 9
6 E
e ENCLOSURE 3 INTERPRETATIONS OF APPENDIX R 1.
Process Monitoring Instrumentation Section III.L 2.d of Appendix R to 10 CFR Part 50 states that "the process monitoring function shall be capable of providing direct readings of the process variables necessary to perfonn and control" the reactivity control function.
In I&E Information Notice 84-09, the staff provides a listing of instrumentation acceptable to and preferred by the staff to demonstrate com-pliance with this provision. While this guidance provides an acceptable method for compliance with the regulation, it does not exclude other alternative methods of compliance. Accordingly, a licensee may propose to the staff alternative instrumentation to comply with the regulation. While such a sub-mittal is not an exemption request, it must be justified based on a technical evaluation. The licensee may also propose alternatives to actual compliance with the regulation (e.g., instrumentation which does not provide a direct reading of the process variable) by filing an exemption request with adequate justification.
2.
Repair of Cold Shutdown Equipment Section III.L.5 of Appendix R states that when in the alternative or dedicated shutdown mode, " equipment and systems comprising the means to achieve and main-tain cold shutdown conditions shall not be damaged by fire; or the fire damage to such equipment and systems shall be limited so that the systems can be made operable and cold shutdown can be achieved within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />." This,is not to be confused with the requirements in Section III.G.1.b of Appendix R.
Section III.G.1.b contains the requirements for normal shutdown medes utilizing the control room or emergency control station (s) capabilities.
The fire areas falling under the requirements of III.G.I.b are those for which an alternative or dedicated shutdown capability is not being provided.
For these fire areas,Section III.G.1.b requires only the capability to repair the systems necessary to achieve and maintain cold shutdown from either the control room or emergency control station (s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, not the capability to repair and achieve cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as required for the alternative or dedicated shutdown modes by Section III.L (noted above).
With regard to areas irtvolving normal shutdown, however,Section I of Appendix R states that repairs must be made using only onsite capabilities.
After repairs are made, cold shutdown can be achieved on a reasonable schedule using any available pcwer source.
. 3.
Fire Damage Appendix R to 10 CFR Part 50 utilizes the term " free of fire damage."
In pro-mulgating Appendix R, the Comission has provided methods acceptable for assur-irg that necessary structures, systems and components are free of fire damage (see Section III.G.2a, b and c), that is, the structure, system or component under consideration is capable of performing its intended function during and after the postulated fire, as needed.
Licensees seeking exemptions from Section III.G.2 must show that the alternative proposed provides reasonable assurance that this criterion is met.
(Note also that Section III.G.2 applies only to equipment needed for hot shutdown.
Therefore, an exemption from III.G.2 for cold shutdown equipment is not needed.)
4.
Fire Area Boundaries The term " fire area" as used in Appendix R means an area sufficiently bounded to withstand the hazards associated with the area and, as necessary. to protect important equipment within the area from a fire outside the area.
In order to meet the regulation, fire area boundaries need not be completely sealed floor-to-ceiling, wall-to-wall boundaries. However, all unsealed openings should be identified and considered in evaluating the effectiveness of the overall barrier. Where fire area boundaries were not approved under the BTP process, or where such boundaries are not wall-to-wall, floor-to-ceil-ing boundaries with all penetrations sealed to the fire rating required of the boundaries, licensees must perform an evaluation to assess the adequacy of fire boundaries in their plants to determine if the boundaries will withstand the hazards associated with the area and protect important equipment within the area from a fire outside the area.
This analysis must be performed by at least a fire protection engineer and, if required, a systems engineer. Al-though not required, licensees may submit their evaluations for staff review and concurrence.
In any event, these analyses must be retained by the licen-sces for subsequent NRC audits.
5.
Automatic Detection and Suppression Sections III.G.2.b and III.G.2.c of Appendix R state that "In addition, fire detectors cad an automatic fire suppression system shall be installed in the fire area..."
Other provisinns of Appendix R also use the phrase " fire detectors and an automatic fire suppression system in the fire area..."
(see e.g.,Section III.G.2.e).
In order to comply with these provisions, suppression and detection sufficient to protect against the hazards of the area must be installed.
In this regard, de'tection and suppression providing less than full area coverage may be adequate to comply. th the regulation. Where full area suppression and detection is not in.alled, licensees must perform an evaluation to assess the adequacy of parti 61 suppression and detection to protect against the hazards in the area.
The evaluation must be performed by a fire protection engineer and, if required, a systems engineer. Although not required,
3-licensees may submit their evaluations to the staff for review and concur-rence.
In any event, the evaluations must be retained for subsequent NRC audits. Where a licensee is providing no suppression or detection, an ex-emption must be requested.
6.
Alternative or Dedicated Shutdown Section III.G.3 of Appendix R provides for " alternative or dedicated shutdown capability and its associated circuits independent of cables, systems or components in the area, room, or zone u,nder consideration." While "in-dependence" is clearly achieved where alternative shutdown equipment is out-side the fire area under consideration, this is not intended to imply that alternative shutdown equipment in the same fire area but independent of the room or the zone cannot result in compliance with the regulation. The " room" concept must be justified by submission of a detailed fire hazards analysis that demonstrates a single fire will not disable both normal shutdown equip-ment and the alternative shutdown capability.
i 4
l r
\\
- 1985 to include at least one site from each licensee who has not been subject to a previous NRC fire protection inspection.
This inspection will review completed modifications and, in the case of incomplete modifications, review licensee plans and schedules for completing such modifications.
C.
Documentation Required to Demonstrate Compliance The " Interpretations" document attached to this letter states that, where the licenee chooses not to seek prior NRC review and approval of, for example, a fire area boundary, an evaluation must be performed by a fire protection engineer (assisted by others is needed) and retained for future NRC audit.
Evaluations of this type must be written and organized to facilitate review by a person not involved in the evaluation.
Guidelines for what such an evaluation should contain may be found in:
(1) Section B of Appendix R and (2) Section C.1.b of Branch Technical Position (BTP) CMEB 9.5-1 Rev. 2 dated July 1981. All calculations supporting the evaluation should be available and all assumptions clearly stated at the outset.
The NRC intends to initiate enforcement action where, for a given fire area, compliance with Appendix R is not readily demonstrable and the licensee does not have available a written fire hazard analysis for the area. The term "readily demonstrable" includes situations where compliance is apparent by observation of the potential fire hazard and the existing protective features.
D.
Quality Assurance Requirements Applicable For fire protection systems the licensee should have and maintain a quality assurance program that provides assurance that the fire protection systems will be designed, fabricated, erected, tested, maintained and operated so that they will function as intended.
Fire protection systems are not " safety-re-lated" and are therefore not within the scope of Appendix B to 10 CFR Part 50, unless the licensee has committed to include these systems under the Appendix B program for the plant.
NRC guidance for an acceptable quality assurance pro-gram for fire protection systems, given in Section C.4 of Branch Technical Position CMEB 9.5-1 Rev. 2 dated July 1981, has generally been used in the re-view and acceptance of approved fire protection programs for plants licensed after January 1,1979.
For plants licensed prior to January 1,1979, similar guidance was referenced in footnotes 3 and 4 to 10 CFR 50.48.
They are contained in BTP APCSB 9.5-1 and Appendix A thereto and in " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Control and Quality Assurance" dated June 14, 1977.
E.
Notification of the NRC When Deficiencies are Discovered 1
Licensees are reminded of their obligation to notify the NRC of fire protection deficiencies which meet the criteria of 10 CFR 50.72 or 10 CFR 50.73 as applicable.
1
l ENCLOSURE 4 GUIDANCE FOR ENFORCEMENT ACTIONS CONCERNING FIRE PROTECTION REQUIREMENTS 1.
General Guidance A.
Fire protection requirements are delineated by 10 CFR 50 Appendix A General Design Criterion 3,10 CFR 50.48,10 CFR 50 Appendix R, Facility License Conditions, facility technical specifications and other legally binding requirements, as applicable. A hotice of Violation will be issued for violation of requirements.
How-ever, failure to meet fire protection connitments other than re-quirements will be designated as deviations.
B.
Failures to meet regulatory requirements for protecting trains of equipment required for achieving and maintaining safe hot or cold shutdown are serious violations. The specific violations should be reviewed individually and as a group to determine their rootcause(s). This guidance gives examples of violations at various severity levels and should be used to determine the appropriate enforcement action.
For purposes of this guidance, required structures, systems, and components are those which are necessary to achieve ano maintain hot and/or cold shutdown and which require the application of fire protection features as described in the licensee's fire hazards analysis report and NRC's safety evaluation report.
C.
Fire protection violations may involve inoperable or inadequate:
fire barriers, separation, suppression or detection systems, re-pair parts, procedures or other conditions or items required to prevent fires, protect safe shutdown equipment from fire and/or permit the operttion of safe shutdown equipment during a fire or to restore safe shutdown equipment to service following an actual fire.
D.
Numerous violations of fire protection requirements which in-dividually may be classified at lower severity levels may cumulatively be classified at a higher severity level due to inadequate implementation of the fire protection program.
l l
l l
l
. F.
Standard License Condition All licenses contain a section on fire protection.
License conditions for plants licensed prior to January 1,1979, contain a condition requiring imple-i mentation of modifications committed to by the licensee as a result of the BTP review.
These license conditions were added by amendments issued between 1977 and February 17, 1981, the effective date of 10 CFR 50.48 and Appendix R.
Two points should be noted in regard to these conditions: (1) they did not expli-citly cover required fire protection features where modifications to the exist-ing plant configuration or procedures were not required, and (2) some of the provisions in these conditions could have been superseded by Sections III.G.,
J, 0, and L of Appendix R.
2 License conditions for plants licensed after January 1, 1979, vary widely in scope and content. Some only list open items that must be resolved by a spe-cified date or event, such as exceeding five per cent power or the first re-fueling outage. Some reference a commitment to meet Appendix R; some reference the FSAR and/or the NRC staff's SER. These variations have created problems for licensees and for NRC inspectors in identifying the operative and enforce-able fire protection requirements at each facility.
These license conditions also create difficulties because they do not specify 4
when a licensee may make changes to the approved program without requesting a license amendment.
If the fire protection program committed to by the licensee is required by a specific license condition or is not part of the FSAR for the facility, the provisions of 10 CFR 50.59 may not be applied to mc,ke changes without prior NRC approval. Thus licensees may be required to submit amendment j
requests even for relatively minor changes to the fire protection program.
l A standard fire protection license condition is enclosed for your considera-tion.
Its purpose is twofold: (1) to identify clearly the approved fire pro-4 tection program for the facility, against which compliance with be measured, t
and (2) to specify when prior NRC approval is or is not required when changes to the approved program are contemplated. The condition also contains record retention and reporting requirements paralleling those of 10 CFR 50.71 for changes to the FSAR.
Note that this standard condition does not impose any new substantive requirements, but only documents existing licensee commitments approved by the NRC.
i i
[0ptional paragraph:
We request that each licensee submit, within 120 days of the date of this letter, a license amendment request proposing a license condition for its a
facility using the enclosed standard condition as guidance.]
j l
9 ENCLOSURE S FIRE PROTECTION LICENSE CONDITION 1.
The licensee shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility (or as described in submittals dated--------) and as approved in the SER dated--------(and Supplements dated--------) subject to provisions 2 and 3 below.
2.
The licensee may make no change to the approved fire protection program which would significantly decrease the level of fire protection in the plant without prior approval of the Commission.
To make such a change the licensee must submit an application for license amendment pursuant to 10 CFR 50.90.
3.
The licensee may make changes to features of the approved fire pro-tection program which do not significantly decrease the level of fire protection without prior Commission approval provided (a) such changes do not otherwise involve a change in a license condition or technical specification or result in an unreviewed sa#ety question (see 10 CFR 50.59), and (b) such changes do not result in failure to complete the fire protection program approved by the Commission prior to license issu-ance.
The licensee shall maintain, in an auditable form, a current record of all such changes, including an analysis of the effects of the change on the fire protection program, and shall make such records avail-e able to NRC inspectors upon request. All changes to the apprcved program shall be reported annually to the Director of the Office of Nuclear Reactor Regulation, along with the FSAR revisions required by 10 CFR 4
50.71(e).
4 5
e
-a.
_____...e,
_ _. - _, _ -,,,,, _ ~,. -, _,,
,-.,,. -,._,i,,,., - -,--.
,v-,.,
-m,
h e
Er4 CLOSURE 6
.,4 V
~
~
e' APPENDIX R QUESTIONS AND ANSWERS a
m.
s APPENDIX R QUESTIONS AND ANSWERS 1.
INTRODUCTION 2.
OVERVIEW 3.
III G, FIRE PROTECTION OF SAFE SHUTDOWN CAPABILITY 3.1 Fire Area Boundaries 3.1.1 Fire Area Definition 3.1.2 Previously Accepted Fire Area Boundaries 3.1.3 Exterior Walls 3.1.4 Exterior Yards 3.1.5 Fire Zones 3.1.6 Documentation 3.2 Fire Barrier Qualifications 3.2.1 Acceptance Criteria 3.2.2 Deviations from Tested Configurations 3.2.3 Fire Door Modifications 3.3 Structural Steel 3.3.1 NFPA Approaches 3.3.2 Previously Accepted Structural Steel 3.3.3 Seismic Supports 3.3.4 Cab'.i Tray Sopport Pivtection 3.4 Automatic SLppression System 3.4.1 Water Density 3.4.2 NRC Consultation 3.4.3 Sprinkler Location 3.4.4 Fixed Suppression System In Fire Area 3.4.5 Sprinkler Head Location 3.4.6 Previously Approved Suppression Systems 3.5 Separation of Redundant Circuits 3.5.1 Twenty-Foot Separation Criteria 3.5.2 Floor-to-Floor Separation 3.6 Intervening Combustibles 3.6.1 Negligible Quantities of Intervening Combustibles 3.6.2 In Situ Exposed Combustibles 3.6.3 Unexposed Combustibles APPENDIX R QUESTIONS & ANSWERS 1
3.7 Radiant Energy Shields 3.7.1 Fire Rating 3.8 Design Bases 3.8.1 Fire Protection Features NFPA Conformance 3.8.2 Design Basis Fire 3.8.3 Redundant Trains / Alternate Shutdown 3.8.4 Control Room Fire Consioerations 4.
III J, EMERGENCY LIGHTING 4.1 Illumination Levels 5.
III L, ALTERNATIVE AND DEDICATED SHUTDOWN CAPABILITY 5.1 Safe and Alternative Shutdown 5.1.1 Previously Accepted Alternative Shutdown Capability 5.1.2 Pre-Existing Alternative Shutdown Capability 5.1.3 III L Backfit 5.2 Procedures 5.2.1 Shutdown and Repair Basis 5.2.2 Post Fire Operating Precedures 5.2.3 Alternative Shutdown Capability 5.2.4 Post Fire Procedures Guidance Documents 5.3 Safe Shutdown and Fire Damage 5.3.1 Circuit Failure Modes 5.3.2
" Hot Short" Duration 5.2.3 Het E.utd:#;n Car:ti:n 5.3.4 Cooldown Equipment 5.3.5 Pressurizer Heaters 5.3.6 On-Site Power 5.3.7 Torus Level Indication 5.3.8 Short Circuit Coordination Studies 5.3.9 Diagnostic Instrumentation 5.3.10 Design Basis Plant Transients 5.3.11 Alternate / Dedicated Shutdown vs. Remote Shutdown Systems 6.
III 0, OIL COLLECTION SYSTEMS FOR REACTOR COOLANT PUMP 6.1 Lube Oil System Seismic Design 6.2 Container 7.
BRANCH TECHNICAL POSITION CMEB 9.5-1 7.1 Fire Protection and Seismic Events 7.2 Random Fire and Seismic Events APPENDIX R QUESTIONS & ANSWERS 2
8.
LICENSING POLICY 8.1 Fire Hazards Analysis / Fire Protection Plan Updating 8.2 Fire Protection License Condition 8.3 III G. J and 0 Exemptions for Future Modifications 8.4 Future Changes 8.5 Schedular and Blanket Exemptions 8.6 Trivial Deviations 8.7 Revised Modifications 8.8 Smallest Opening in a Fire Barrier 8.9 NFPA Code Deviations 8.10 " ASTM E-119" Design Basis Fire 8.11 Plants Licensed After January 1, 1979 8.12 Cold Shutdown Equipment Availability 8.13 Guidance Documents 8.14 Deviations from Guidance Documents 8.15 Staff Interpretations of Appendix R 8.16 Dissemination of New Staff Positions 8.17 Equivalent Alternatives 8.18 Coordination Study Updates 8.19 Exemption Request Threshold 8.19.1 Penetration Designs Not Laboratory Approved 8.19.2 Individual vs. Package Exemptions 8.19.3 Exemptiun Request Supporting Detail 8.19.4
-50.12 vs. 50.48 Exemption Requests 8.20 Post January 1, 1979 Plants and Exemption Requests 8.21 NRC Approval for BTP CMEB 9.5-1 Deviations 9.
INSPECTION POLICY 9.1 Safety Implications 9.2 Uniform Enforcement 9.2 NTOL Ir.3ps:-ic.,s 9.4 Future TI 2515/62 Revisions 9.5 Documentation Supplied by Licensee 5.6 Suosequent Inspections 9.7 NRC List of Conforming Items 9.8 Inspection Re-review 9.9 List of Shutdown Equipment D
APPENDIX R QUESTIONS & ANSWERS 3
i o
1 i
{
1.
INTRODUCTION A cajor fire damaging safe shutdown equipment occurred at'the Browns Ferry i
Nuclear Station in March 1975.
The fire damaged over 1600 electrical cables and caused the temporary unavailability of some core cooling systems.
Because 4
this fire did substantial damage, the NRC established a Special Review Group which initiated an evaluation of the need for improving the fire protection pro-grams at all nuclear power plants.
The group found serious design inadequacies regarding fire protection at Browns Ferry, and its report, " Recommendations Related to Browns Ferry Fire" (NUREG-0050, February 1976), contained over fifty recommendations regarding improvements in fire prevention and control in exist-ing facilities.
The report also called for the development of specific guidance for implementing fire protection regulations, and for a comparison of that guid-ance with the fire protection program at each operating plant.
NRC developed technical guidance from the technical recommendations in the Special Group's report, and issued those guidelines as Branch Technical Position Auxiliary Power Conversion Systems Branch 9.5-1 (BTP APCSB 9.5-1),l/ " Guidelines for Fire Protection for Nuclear Power Plants." This guidance did not apply to plants operating at that time.
Guidance to operating plants was provided later in Appendix A 2/ to BTP APCSB 9.5-1 which, to the extent practicable, relies on BTP APCSB 9.5-1.
The guidance in these documents was also published for public comment as Regulatory Guide 1.120, " Fire Protection for Nuclear Power Plants" (June 1976).
In response to public comment, the NRC issued an extensively revised version of Regulatory Guide 1.120 for further public comment.
In May 1976, the NRC asked licensees to compare operating reactors with BTP APCSB S.5-1, and in September 1976, those licensees were informed that the guidelines in Appendix A would be used to analyze the consequences of a fire in each plant area.
In September 1976 the licensees, were also requested to crovide a fire hazards arelysis that divided the plant 'nto distinct fire 2 eas and snow that redundant systems required to achieve and maintain cold shutcown are adequately protected against damage by a fire.
Early in 1977 each licensee responced with a Fire Protection Program E'.aluation which ir.cluded a Fire Hazard Analysis.
These evaluations and analyses identified aspects of licensees' fire protection programs that did not conform to the NRC guidelines.
1/Rather than serving as inflexible, legal requirements that must be followed by licensees, issuances such as regulatory guides and branch technical posi-tions are meant to give guidance to licensees concerning those methods the staff finds acceptable for implementing the general criteria embodied in the NRC's rules.
See, e.g., Petition for Emergency & Remedial Action, CLI-78-6, 7 NRC 400, 406 (1978); Gulf States Utilities Company (River Bend Station, Units 1 and 2) ALAB-444, 6 NRC 760, 772 (1977).
2/ Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 1, 1976.
APPENDIX R QUESTIONS & ANSWERS 1
i Thereafter,'the'st ff initiated discussions with all licensees aimed at achieving implementation of fire protection guidelines by October 1980.
The staff held many meetings with licensees, conducted extensive correspondence with them, and visited every operating reactor.
As a result, many fire protection items were resolved, and agreements were included in Fire Protection Safety Evaluation Reports issued by the NRC.
Several fire protection issues remained unresolved with a number of licensees.
By early 1980, most operating plants had implemented most of the guidelines in Appendix A.
However, as the Commission noted in its Order of May 23, 1980, the fire protection program has had some significant problems with implementa-tion.
Despite the staff's efforts, several licensees had expressed continuing disagreement with, and refused to adopt recommendations relating to several generic issues, including the requirements for fire brigade size and training, water supplies for fire suppression systems, alternate and dedicated shutdown capability, emergency lighting, qualifications of seals used to enclose places where cables penetrated fire barriers, and the prevention of reactor coolant pump lubrication system fires.
To establish a definitive resolution of these contested subjects in a manner consistent with the general guidelines in Appen-dix A to the BTP and to assure timely compliance by licensees, the Commission issued a proposed fire protection rule and its Appendix R, which was described as setting out minimum fire protection requirements for the unresolved issues (45 Fed. Reg. 36082 May 29, 1980).3/ The fire protection features addressed included protection of safe shutdown capability, emergency lighting, fire bar.
riers, associated circuits, reactor coolant pump lubrication system, and alter-nate shutdown systems.
The Commission stated that it expected all modifications (except for alternate and dedicated shutdown capability) to be implemented by November 1,19Ed.2/
As originally proposed (Federal Register Vol. 45 No. 1&5, May 22, 1980),
Appendix R would have applied to all plants including those for which the staff had previously accepted other fire protection modifications.
Af'ter analyzing comments on tb.e rule, the Commission determined that only three of the fifteen items in Appendix R were of such safety significance that they should apply to all nients. in9t' ding those for which alternative fire p~tection actions t' been approved previously by the staff.
These items are protection of safe shutdown capability (including alternate shutdown systems), emergency lighting,
" the reactor coolar.t p=p lubrication systen.
Accordingly, the final rule required all reactors licensed to operate before January 1, 1979, to comply with these three items even if the NRC had previously approved alternative fire protection features in these areas (45 Fed. Reg. 76602 Nov. 19, 1980).
- However, the final rule is more flexible than the proposed rule because Item III.G now provides three alternative fire protection features which do not require anal-ysis to demonstrate the protection of redundant safe shutd'own equipment, and reduces the acceptable distance in the physical separation alternative from fifty feet to twenty feet.
In addition, the rule now also provides an exemp-tion procedure which can be initiated by a licensee's assertion that any required fire protection feature will not enhance fire protection safety in the facility or that such modifications may be detrimental to overall safety (10 CFR 50.48(c)(6)).
If the Director, Nuclear Reactor Regulation determines 3/11NRC707,718(1980) 2/Id. at 719 APPENDIX R QUESTIONS & ANSWERS 2
that a licensee has made a prima facie showing of a sound technical basis for such an assertion, then the implementation dates of the rule are tolled until final Commission action on the exemption request.
Most licensees requested and were granted additional time to perform their reanalysis, propose modifications to improve post fire shutdown capability and to identify exemptions for certain fire protection configurations.
In reviewing some exemption requests, the staff noted that some licensees had made signifi-cantly different interpretations of certain requirements.
These differences were identified in the staff's draft SER's.
These differenc7s were also dis-cussed on several occasions with the cognizant licensee as well as the Nuclear Utility Fire Protection Group.
These discussions culminated in the issuance of generic letter 83-33.
2.
OVERVIEW Section 50.48 Fire Protection of 10 CFR Part 50 requires that each operating nuclear power plant have a fire protection plan that satisfies General Design Criterion 3 of Appendix A to 10 CFR 50.
It specifies what should be contained in such a plan and licts the basic fire protection guidelines for this plan.
It requires that the Fire Protecticn Safety Evaluation Report which has been issued for each operating plant state how these guidelines were applied to each facility.
Section 50.48 also requires that all plants with operating licenses prior to January 1,1979 satisfy the requirements of Section III.G, III.J and III.0, and other Sections of Appendix R where approval of similar features had not been obtained prior to the effective date of Appendix R.
By a separate action, the Commission approved the staff's requirement that all plants to receive
'their operating license after January 1,1979 also satisfy the requirements of Sections III.G, III.J and III.0 and that a fire protection license condition be established.
Deviations from Appendix R requirements for pre-1979 plants are processed under the exemption process.
Deviation from other guidelines are identified and evaluated in the Safety Evaluation Report.
A standard fire protection license condition has been developed and will be included in each new operating license.
Present operating licenses will be amerded to include the standard license condition.
The Regions initiated inspections of operating plants and identified several significant items cf non-compliance.
The Nuclear Utility Fire Protection Group requested interpretations of certain Appendix R requirements and provided a list of questicns that they thought shoul>J be discussed with the industry.
The NRC held workshops in each Region to assist the industry in understanding the NRC's requirements and to improve the Staff's understanding of the industry's concerns.
This document presents the NRC's response to the questions posed by the industry and supplemented with additional questions identified at the workshops as being of interest to the industry or the staff.
These responses may be used as guid-ance for design, review and inspection activities.
The questions have been reformatted according to their applicability to Sections of Appendix R, BTP CMEB 9.5-1, licensing policy or inspection policy.
APPENDIX R QUESTIONS & ANSWERS 3
i 3.
SECTION-III.G, FIRE PROTECTION OF SAFE SHUT 00WN CAPABILITY 3.1 Fire Area Boundar,iy 3.1.1 Fire Area Definition OUESTION Section III.G states the fire protection features required for cables and equipment or redundant trains of :ystems required to achieve and maintain hot shutdown that are located within th's same fire area.
Is the fire area of Section III.G, the same fire area referred to in BTP APCSB 9.5-1, Appendix A; and the supplementary guidance of September 1976?
RESPONSE
The definition of a fire area given in the BTP is somewhat more restrictive than that given in Section #4 of the " Interpretations of Appendix R."
- Clearly, where a licensee has reviewed its facility using the BTP criteria, this would
-meet Append;x R requirements.
The BTP criteria may continue to be used as guidance, but the minimum requirements for fire area boundaries are set out in Section #4 of the " Interpretations."
3.1.2 Previously Accepted Fire Area Boundaries QUESTION If a fire area boundary was described as a rated barrier in the 1977 fire hazards analysis, no open items existed in this area in the Appendix A SER, and the barriers have not been altered, ther need those barriers be reviewed by licensees or the Staff under Appendix R?
RESPONSE
If a fire area boundary was described as a rated barrier in the 1977 fire hazards m.s.,3, sac was eva kated ano accepted in a puolisned SER, tne fire area boun-dary need not be reviewed as part of the re-analysis for compliance with Sec-tion III.G of Appendix R.
Openings in the fire barriers, if any, should have Deen specifically identified and justified in the fire hazards analysis per-formed in the Appendix A process.
If openings in the fire area boundaries were not previously evaluated, such an evaluation should be perforced as a basis for assessing compliance with Appendix R.
See Items #4 and #6 of the "Interpreta-tions of Appendix R," and the response to question 3.1.1.
In BTP APCSB 9.5-1, Fire. Barrier is defined as:
" Fire Earrier - those components of construction (walls, floors, and roofs) that are rated by approving laboratories in hours for resistance to fire to preven'. the spread of fire.
The term " fire area" as used in Appendix R means an area sufficiently bounded to withstand the hazards associated with the fire area and, as necessary, to protect important equipment within the fire area from a fire outside the area.
In order to meet the regulation, fire area boundaries need not be completely APPENDIX R QUthTIONS & ANSWERS 4
sealed with floor to ceiling and/or wall-to-wall boundaries. Where fire area boundaries were not approved under the Appendix A process, or where such bound-aries are not wall-to-wall or floor-to-ceiling boundaries with all penetrations sealed to the fire rating required of the boundaries, licensees must perform an evaluation to assess the adequacy of fire area boundaries in their plants to determine if the boundaries will withstand the hazards associated with the area and protect important equipment within the area from a fire outside the area.
This analysis must be performed by at least a fire protection engineer and, if required, a systems engineer.
Although not required, licensees may submit their evaluations for Staff review and concurrence.
In any event, these analyses must be retained Dy tne licensees for subsequent NRC audits.
3.1. 3 Exterior Walls QUESTION Must exterior walls to buildings and their genetrations be qualified as rated barriers?
RESPONSE
Exterior walls and their penetrations should be qualified as rated barriers when (1) they are required to separate a shutdown-related division (s) inside the plant from its redundant (alternate) counterpart outside the plant in the immediate vicinity of the exterior wall, (2) they separate safety related areas from non-safety related areas that present a significant fire threat to the safety related areas, or (3) they are designated as a fire barrier in the FSAR or FHA.
Usually exterior walls are designated as a fire area boundary; therefore, they are evaluated by the guidelines of Appendix A.
A FHA should be performed to determine the rating of exterior walls, if required by the above criteria.
3.1.4 Exterior Yards QUESTION
% should a utility define the boundaries of fire areas ccmprising exterior yards?
RESPONSE
An exterior yard area without fire barriers should be considered as one fire area.
The area may consist of several fire zones.
The boundaries of the fire zones should be determined by a FHA.
The protection for redundant / alternate shutdown systems within a yard area would be determined on the bases of the largest " design basis fire" (see response to question 3.8.2) that is likely to occur and the resulting damage.
The boundaries of such damage would have to be justified with a fire hazards analysis.
The analysis should consider the degree of spatial separation between divisions; the presence of in situ and transient combustibles, including vehicular traffic; grading; available fire protection; sources of ignition; and the vulnerability and criticality of the shutdown related systems.
See Sections #3, #4 and #6 of the " Interpretations of Appendix R."
APPENDIX R QUESTIONS & ANSWERS 5
i l
3.1.5 Fire lones
[
QUESTION,
Appendix R,Section III.G.3 states " alternative or dedicated shutdown capability and its associated circuits, independent of cables, systems or components in the area room or zone under consideration...." What is the implied utilization of a room or zone concept under Section III.G of Appendix R? The use of the phraseology " area,-room or zone under consideration" is used again at the end of the Section III.G.3.
Does the requirement for detection and fixed suppres-sion indicate that the requirement can be limited to a fire zone rather than throughout a fire area?
Under what conditions and with what caveats can the fire zone concept be utilized in demonstrating conformance to Appendix R?
4 l
RESPONSE
Section III.G was written after NRC's multi-discipline review teams had visited all operating power plants.
From these audits, the NRC recognized that it is not practical and may be impossible to subdivide some portions of an operating 4
plant into fire areas.
In addition, the NRC recognized that in some cases where fire areas are designated, it may not be possible to provide alternate shutdown capability independent of the fire area and, therefore, would have to be evaluated on the basis of fire zones within the fire area.
The NRC also recognized that because some licensees had not yet performed a safe shutdown i
i analysis, these analyses may identify new unique configurations.
To cover the large variation of possible configurations, the. requirements of Section III.G were presented in three parts:
j l
Section III.G.1 requires one train of hot shutdown systems be free of fire damage and damage to cold shutdown systems be limited.
i
}
Section III.G.2 provides certain separation, suppression and detection
{
requirements within fire areas; where such requirements are met, analysis is not necessary.
l Section III.G.3 requires alternative dedicated shutdown capability for configuratiens that do not satisfy the requirements of ::!.G.2 or where i
fire suppressants released as a result of fire fighting, rupture of the system or inadvertent operation of the system may damage redundant equip-ment.
If alternate shutdown is provided on the basis of rooms or zones, the provision of fire detection and fixed suppression is only required in the room or zone under consideration.
Section III.G recognizes'that the need for alternate or dedicated shutdown j
capability may have to be considered on the basis of a fire area, a room or a fire zone.
The alternative or dedicated capability should be independent of the fire area wher,e it is possible to do so (See Supplementary Information for j
the final rule Section III.G).
When fire areas are not designated or where it 4
is not possible to have the alternative or dedicated capability independent of the fire area, careful consideration must be given to the selection and location l
of the alternative or dedicated shutdown capability to assure that the performance i
requirement set forth in Section III.G.1 is met.
Where alternate or dedirsted
{
shutdown is provided for a room or zone, the capability must be physically and 1
i APPENDIX R QUESTIONS & ANSWERS 6
electrically independent of that room or zone.
The vulnerability of the equip-nent and personnel required at the location of the alternative or dedicated shutdown capability to the environments produced at that location as a result of the fire or fire suppressant's must be evaluated.
These environments may be due to tr.e hot layer, smoke, drifting suppressants, common ventilation systems, common drain systems or flooding.
In addition, other interactions between the locations may be possible in unique configurations.
If alternate' shutdown is provided on the basis of rooms or zones, the provision of fire detection and fixed suppression is only required in the room or zone under consideration.
Compliance with Section III.G.2 cannot be based on rooms or zones.
See also Sections #5 and #6 of the "Interpretaticns of Appendix R."
3.1.6 Documentation QUESTION In Generic Letter 83-33 at pg. 2, the NRC Staff referred to the guidance in Appendix A to BTP 9.5-1 to establish the rating of the barrier.
What level of documentation must be provided to verify that the fire area meets the require-ments of Appendix R?
RESPONSE
The documentation required to verify the rating of a fire barrier should in-
~
clude the design aescription of the barrier and the test reports that verify its fire rating.
Reference can be made to UL listed designs.
3.2 Fire Barrier Qualification 3.2.1 Acceptance Criteria OUEST!0'1 Recently the Staff has applied a 325 F cold side temperature criterion to its ovaluation of the acceptability of one-hour and three-hcur fire barrier cable tray wraps.
This criterion is not in Branch Technical Position (BTP) APCSB 9.5-1, Appendix A as an acceptance criterion for fire barrier cable tray wraps and is not contained in Appendix R.
It appears to represent post-Appendix R guidance.
What is the origin of this criterion and why is it applicable to electrical cables where insulation degradation does not begin until jacket temperatures reach 450 F to 650 F?
RESPONSE
Fire barriers relied upon to protect shutdown related systems to meet the re-quirements of III.G.2 need to have a fire rating of either one or three hours.
S 50.48 references BTP APCSB 9.5-1, where the fire protection definitions are found.
Fire rating is defined:
" Fire Rating - the endurance period of a fire barrier or structure; it defines the period of resistance to a standard fire exposure before the first critical point in behavior is observe.d (see NrPA 251)."
APPENDIX R QUESTIONS & ANSWERS 7
i The acceptance criteria contained in Chapter 7 of NFPA 251, " Standard Methods of Fire Tests of Building Construction and Materials," pertains to non-bearing fire barriers.
These criteria stipulate that transmission of heat through the barrier "shall not have been such as to raise the temperature on its unexposed surface more than 250 F above its initial temperature." The ambient air tem-perature at the beginning of a fire test usually is between 50 F and 90 F.
It is generally recognized that 75 F represents an acceptable norm.
The resulting 325 F cold side temperature criterion is used for cable tray wraps because they perform the fire barrier function to preserve the cables free of fire damage.
It is clear that cable that begins to degrade at 450 F is free of fire damage at 325 F.
During the Appendix A review, licensees began to propose fire barriers to enclose cable trays, conduit, fuel lines, coolant lines, etc.
Industry did not have standard rating tests for such components or for electrical, piping or bus duct penetrations.
The NRC issued a staff position giving acceptance criteria for electrical penetration tests.
These criteria require an analysis of any temperature on the unexposed side of the barrier in excess of 325 F.
In the past, manufacturers designed their own qualification tests.
Nuclear Insurers, and the Institute of Electrical and Electronic Engineers have issued tests for some of these components.
These tests usually exposed the component to the ASTM E-119 time temperature curve, but all had different acceptance criteria.
Conduit and cable tray enclosure materials accepted by the NRC as 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> barrier prior to Appendix R (e.g. some Kaowool and 3M materials) and already installed by the licensee need not be replaced even though they may not have met the 325*F criteria.
However, for newly identified conduit and cable trays requiring such wrapping new material which meets the 325'F crite-rion should be used, or justification should be provided for use of material which does not meet the 325 F criterion. This may be based on an analysis demonstrating that the maximum recorded temperature is sufficiently below the cable insulation ignition temperature.
3.2.2 Deviations from Tested Configurations evee-,c, Due to obstructions and supports, it is often impossible to achieve exact dupli-c;C M ;f the specific tested configuration of the one-nour fire barriers whicn are to be placed around either conduits or cable trays.
For each specific in-stance where exact replication of a previously tested configuration is not and cannot be achieved, is an exemption necessary in order to avoid a citation for a violation?
RESPONSE
No.
Where exact replication of a tested configuration cannot be achieved, the field installation should meet all of the following criteria:
1.
The continuity of the fire barrier material is maintained.
2.
The thickness of the barrier is maintained.
3.
The nature of the support assembly is unchanged from the tested configuration.
APPENDIX R QUESTIONS & ANSWERS 8
j 4.
The application or "end use" of the fire barrier is unchanged from the tested configuration.
For example, the use of a cable tray barrier to protect a cable tray which differs in configuration from those that were tested would be acceptable.
However, the use of structural steel fire proofing to protect a cable tray assembly may not be acceptable.
5.
The configuration has been reviewed by a qualified f' ire protection engineer l
and found to provide an equivalent level of protection.
3.2.3 Fire Door Modifications QUESTION Where labeled and rated fire doors have been modified to incorporate security hardware or for flooding protection, is an exemption from Appendix R required?
RESPONSE
Where a door is part of a fire area boundary, and the modification does not effect the fire rating (for example, installation of security " contacts"), no further analysis need be performed.
If the modifications could reduce the fire rating (for example, installation a vision panel), the fire rating of the door should be reassessed to ensure that it continues to provide adequate mar-gin considering the fire loading on both sides.
Since this reassessment per-tains to the establishment of a valid fire area boundary, an exemption is not required.
See Section #4 of the " Interpretations of Appendix R."
- 3. 3 Structural Steel 3.3.1 NFPA Approaches OVESTION Does the NRC's definition of structural steel supporting fire barriers com-clateh accommodate arproaches described in NFPt. gu dance d:ct e-ti aad st ndst::7 i
RESPONSE
The NRC does not define the structural steel supporting fire barriers.
This steel is identified by the licensee.
Our position regarding the need to protect the structural steel, which forms a part of or supports fire barriers, is con-sistent with sound fire protection engineering principles as delineated in both NFPA codes and standards, and The Fire Protection Handbook.
3.3.2 Previously Accepted Structural Steel j
QUESTION Is it necessary to protect structural steel in exisitng fire barriers where those barriers were approved in an Appendix A SER?
RESPONSE
No.
O APPENDIX R QUESTIONS & ANSWERS 9
L
3.3.3 Seism'ic Supports 0UESTION Does structural steel whose sole purpose is to carry dynamic loads from a seismic event require protection in accordance with Section III.G.2a of Appendix R?
RESPONSE
No, unless the failure of any structural steel member due to a fire could result in significant degradation of the fire barrier.
Then it must be protected.
3.3.4 Cable Tray Support Protection QUESTION Should cable tray supports be protected if there is a sprinkler system in the fire area? Under what condition:; may cable tray supports be unprotected? Do unprotected supports require an exemption?
RESPONSE
In general, cable tray supports should be protected, regardless of whether there is a sprinkler system.
However, they need not be protected if (1) the qualifi-cation tests were performed on wrapped cable trays with unprotected supports, and the supports are shown to be adequate, or (2) an analysis is performed, which takes into account the fire loading and automatic suppression available in the area, and which demon-strates that the unprotected support (s) will not fail and cause a loss of the cable tray fire barrier required for the postulated fire.
An exemption is not required; however, the qualification tests and applicability or the structural evaluation should be documented and available for audit.
7 2 : +--= tic W --assion Syst n 3.4.1 Water Density QUESTION Staff guidance provided in Generic Letter 83-33 concerning automatic suppression coverage of fire are n interprets the phrase "in the fire area" in Section III.G as meaning "throughout the fire area." What delivered water density or occupancy standard as specified in NFPA-STD-13 must be achieved to meet this guidance?
RESPONSE
Individual plant areas are diverse in nature.
The designer should determine the particular water density or occupancy classification.
Those areas which contain a limited quantity of in-situ and anticipated transient combustibles and which feature contents such as tanks and piping, may be cor.sidered as
" Ordinary Hazard (Group 1)," as defined by NFPA Standard No. 13.
For those areas containing large amounts of cables or flammable liquids, an occupancy classification of " Extra Hazard" may be warranted.
The decision as to which t.
APPENDIX R QUESTIONS & ANSWERS 10
classification should be applied should be made by a qualified fire protection engineer.
Once the occupancy classification is determined, the minimum water density should be based on the Density Curves in table 2.2.1(B) of NFPA 13.
Any den-sity equal to or in excess of the curves would be in conformance with our guidelines as delineated in Section C.6.c of BTP CMEB 9.5-1.
3.4.2 NRC Consultation QUESTION Section 4.1.2 of NFPA-STD-13 allows for " partial installations" or partial coverage.
The standard states that "the authority having jurisdiction shall be consulted in each case." With the NRC as authority in this instance, must consultation occur only through the exemption process?
RESPONSE
No.
The staff is always available to consult with utility representatives and provide guidance as to the acceptability of a particular fire protection con-figuration in individual plant areas.
See also Section #5 of the "Interpreta-tions of Appendix R."
3.4.3 Sprinkler Location OVESTION How does a suppression system designer know whether the term "throughout the area" means that sprinkler heads must be above or below cable trays when, in his judgment, the hazard of concern is a floor based fire?
RESPONSE
- 5. ;;cn C.6.c(3) cf STP C::ES 9.5-1 states:
"(3) Fixed water extinguishing systems should conform to requirements of appropriate standards such as NFPA-13, ' Standard for the Installation of Sprinkler Systems," and NFPA-15, " Standard for Water Spray Fixed Systems"."
This question pertains to those sprinkler systems covered by NFPA-13.
Chapter 4 of NFPA-13 provides guidance as to the location of sprinkler heads in relation to common obstructions.
In general, to achieve complete area-wide coverage, sprinklers should be located at the ceiling, with additional sprinklers provided below significant obstructions such as wide HVAC ducts and " shielded" or solid bottom stacked cable trays.
To the extent that an existing or proposed sprin-kler system design deviates from this concept, the design would have to be justified by a fire hazards analysis.
See also Section #5 of the "Interpreta-tions of Appendix R."
APPENDIX R QUESTIONS & ANSWERS 11
(
3.4.4 Fixed Suppression System In Fire Area QUESTION Are fixed suppression systems required by Section III G.3 to be throughout the fire area, room or zone under consideration?
RESPONSE
No, but partial coverage must be properly justified and documented.
See Item #5 of the " Interpretations of Appendix R."
"... suppression less than full area coverage may be adequate to comply with the regulation.
Where full area suppression and detection is not installed, licensees must perform an evaluation to assess the adequacy and necessity of partial suppression and detection in an area.
The evaluation must be performed by a fire protection engineer and, if required, a systems engineer.
Although not required, licensees may submit their evaluations to the staff for review and' concurrence.
In any event, the evaluations must be retained for subsequent NRC audits..."
3.4.5 Sprinkler Head Location QUESTION If stacks of horizontal or vertical cable trays extend from ceiling to ficor, are sprinkler heads required (1) under the lowest horizontal trays, near the floor for vertical trays; (2) at some intermediate level between the floor and ceiling, and (3) at the ceiling?
RESPONSE
Sprinkler heads should be located at the ceiling.
Sprinkler heads at other locations may be necessary depending upon the hazard and the cumulative effect or tne costructions to the discharge of water from the sprinkler head.
The sprinkler system design should meet NFPA 13.
3.4.6 Previously Approved Suppression Systems QUESTION Must suppression systems approved and installed under BTP APCSB 9.5-1, Appen-dix A be extended or altered to meet the total area requir'ements of Section III.G (as interpreted by the Staff) or does this " requirement" only apply to new installations?
RESPONSE
Suppression systems installed in connection with Appendix A may or may not have to be extended as a result of III.G.
The licensee must analyze each area where suppression is required by III.G, and where only partial suppression has been provided, determine if the coverage is adequate for the fire hazard in the area.
The licensee may consult with the staff during this review.
In any event, the APPENDIX R QUESTIONS & ANSWERS 12
Appendix R analysis showing that the suppression provided is adequate must be retained and available for NRC audit.
See also Section #5 of the "Interpreta-tions of Appendix R."
3.5 Separation of Radundant Circuits 3.5.1 Twenty-Foot separation Criteria QUESTION Assuming that a licensee is utilizing the 20-foot separaticn for circuit protec-tion, could an exemption request be granted for a portion of the circuit that did not maintain the 20-foot minimum separation if that partion was protected by one-hour barrier until 20-foot was achieved? This barrier would not be firewall-to-firewall, and the circuit protection would not be claimed under the one-hour barrier rule.
RESPONSE
With the erection of a partial qualified one-hour rated barrier for portions of the circuits with less than 20 ft. separation, if 20 feet of horizontal separation existed between the redundant unprotected portions of the circuits without intervening combustibles or fire hazards, and if the fire area was pro-tected by automatic fire detection and suppression, compliance with Section III.G.2.b would be achieved.
These types of configuration have to be evaluated on a case-by-case basis by the NRC.
3.5.2 Floor-to-Floor Separation QUESTION Where redundant circuits are separated by floor elevation but are within the same fire area due to open hatchways. stairs, etc., what is the NRC's positier with regard to separation criteria? If train A is located twenty feet from an open hatchway on the icwer elevation and train B is located ten feet from the same opening on the next elevation, would this be considered adequate separati0 ?
1
RESPONSE
If a wall or floor / ceiling assembly contains major unprotected openings such as hatchways and stairways, then plant locations on either side of such a bar-rier must be considered as part of a single fire area.
Refer to Section #4 of the " Interpretations of Appendix R."
As to the example provided, if train A was separated by a cumulative horizontal distance of 20 feet from train B, with no intervening combustible materials or fire hazards, and both elevations were provided with fire detection and suppres-sion, the area would be in compliance with Section III.G.2.b.
APPENDIX R QUESTIONS & ANSWERS 13
~
3.6 Interve'nino C mbustibles 3.6.1 Negligible Quantities of Intervening Combustibles QUESTION Twenty feet of separation with absolutely no intervening combustibles is a rare case in most nuclear plants.
What is the most acceptable method of addressing intervening combustibles?
How are various utilities addressing this subject, and what would be sufficient justification to support an exemption raquest?
RESPONSE
If more than negligible quantities of combustible materials (such as iselated cable runs) exist between redundant shutdown divisions, an exemption request should be filed.
[ Negligible quantity" is an admittedly judgmental criterion, and this judgment should be made by a qualified fire protection engineer and documented for later NRC audit.]
Justifications for such exemptions have been based on the following factors:
1.
A relatively large horizontal spatial separation between redundant divi-sions; all cables qualified to IEEE-383.
2.
The presence of an automatic fire suppression system over the intervening combustible (such as a cable tray fire suppression system);
3.
The presence of fire stops t0 inhibit fire propagation in intervening cable trays; 4.
The likely fire propagation direction of burning intervening combustibles in relation to the location of the vulnerable shutdown division; 5.
The availability of compensating active and passive fire protection.
Any 'c'."re changes in the catic configuration due to. modifications could be handled under 50.59.
See the provisions of the license condition in the response to question 8.2.
3.6.2 In-Situ Exposed Combustibles QUESTIONS Within Appendix R,Section III.G.2.b, the phrase " twenty f.eet with no interven-ing combustible or fire hazards" is utilized.
What is the definition of "no intervening combustible?"
Is the regulation focused predominantly on the absence of fixed combustibles?
RESPONSE
There is no specific definition of "no intervening combustible." The regulation is focused on the absence of in-situ exposed combustibles.
Non combustible materials would not be considered as intervening combustibles.
In BTP CMEB 9.5-1, noncombustible material is defined as:
APPENDIX R QUESTIONS & ANSWERS 14
" Noncombustible Material a.
A material which in the form in which it is used and under the conditions anticipated, will not ignite, burn, support combustion, or release flamma-ble vapors when subjected to fire or heat, b.
Material having a structural base of noncombustible 51aterial, as defined in a., above, with a surfacing not over 1/8-inch thick that has a flame spread rating not higher than 50 when measured using ASTM E-84 Test
" Surface Burning Characteristics of Building Materials."
In Generic Letter 83-33, we state:
" Staff Position:
Section III.G.2.b requires the " separation...with no inter-vening combust.ibles..." To meet this requirement, plastic jackets and insula-tion of grouped electrical cables, including those which are coated, should be considered as intervening combustibles."
For fire protection, "no intervening combustibles" means that there is no sig-nificant quantities of in-situ materials which will ignite and burn located between redundant shutdown systems.
The amount of such combustibles that has significance is a judgmental decision.
As wi*? other issues, if the licensees fire protection engineer is concerned that the quantity of combustibles between shutdown divisions may not be considered insignificant by an independent reviewer, an exemption could be requested, or the staff consulted.
Transient materials are not considered as an intervening combustible; however, they must be considered as part of the overall fire hazard within an area.
Cables that are in cable trays which do not have solid sheet metal bottom, sides and top should also be considered as intervening combustibles.
Coated cables with a fire retardant material are also considered as intervening combustibles.
3.6.3 Unexposed Combustibles CUESTION Are unexposed combustibles, such as oil in sumps, closed cans, or sealed drums, or electrical cable in conduits, considered as " intervening combustibles?"
RESPONSE
Only oil in closed co'ntainers which are in accordance with NFPA 30 or electrical cables in metal conduits (or in cable trays or raceways having solid sheet metal bottom, sides and top) are not considered as intervening combustibles.
In situ oil in open sumps is considered to be an intervening combustible; in-situ oil in closed sumps equivalent to NFPA Standard-30 containers is not considered to be an intervening combustible.
APPENDIX R QUESTIONS & ANSWERS 15
i l
3.7 Radiant Ererg Shield 3.7.1 Fire Rating QUESTION Recently, the NRC Staff indicated that non-combustible radiant energy shields should be tested against ASTM-TD-E-119 based, apparently, on the requirements of BTP CMEB 9.5-1, Rev. 3, a document issued after Appendix R was promulgated.
This new requirement would not appear to be required by Appendix R or BTP APCSB 9.5-1 Appendix A.
Could the Staff clarify the requirements in this area?
RESo0NSE 1
During the Appendix A reviews, we observed that inside some containments, there were large concentrations of cables converging at electrical penetration areas.
l In somc cases, where the penetrations were grouped by division, shields were placed between the divisions so that radiant energy from a fire involving the cables of one division would not degrade or ignite cables of the other divisions.
These shields also directed the convective energy from the fire away from the surviving division.
These shields were usually constructed of 1/2-inch marinite board in a metal frame.
Appendix R,Section III.G.f refers to these shields as "a noncombustible radiant energy shield." The guidelines in BTP CMEB 9.5-1, Section C.7.a(1)b. indicate that these shields should have a fire rating of 1/2 hour.
In our opinion any material with a 1/2 hour fire rating should be capable of performing the required function.
The guidelines of BTP CMEB 9.5-1 relating to a firerated radiant energy shield are being considered in our current reviews of NTOL plants.
However, to the extent that an applicant can justify that a proposed radiant energy shield can I
achieve an equivalent level of safety, we have been accepting shields that have l
not been tested against the acceptance criteria of ASTM E-119.
In our Appendix R reviews, we havt accepted non-fire-rated radiant energy shia Ms that have been deFonstrated by fire hazards analysis to crovide an j
acceptable level of protection against the anticipated hazard of a localized fire within the containment.
We have also accepted fire-rated metal-sheathed airewal insulated cables, as a radiant energy shield in specific configurations.
1 3.8 Desian Bases 3.8.1 Fire Protection Features NFPA Conformance QUESTION Sheuld the fire protection features required by Section III.G conform to the NFPA Codes?
RESPONSE
Yes.
For example,Section III G.2 requires an automatic suppression system.
Our guidelines would recommend that the system be in accordance with an NFPA Code.
If deviations are made from the Code, they should be identified in the j
l APPEN0!X R QUESTIONS & ANSWERS 16 L
3.8.2 Design Basis Fire QUESTION Why isn't the industry allowed to design to protect against a design basis i
fire?
RESPONSE
Neither the industry nor the Staff has been able to develop criteria for esta-blishing design basis fire conditions for a single " design basis fire" because the in-situ and potential transient combustibles vary widely in different areas of the plant.
However, the establishment of a " design basis fire" for specific fire areas or zones is a prerequisite to performance of a valid fire hazards analysis (See Appendix R Section II.B(1) and BTP CMEB 9.5-1 Sections C.b(1)
,~
and (2)).
3.8.3 Redundant Trains / Alternate Shutdown QUESTION Confusion exists as to what will be classified as an alternate shutdown system and thus what systems might be required to be protected by suppression and detection under Section III.G.3.b.
For example, while we are relying upon the turbine-building condensate system for a reactor building fire and the RHR sys-tem for a turbine building fire, would one system be considered the alternative to the other.
If so, would suppression and detection be required for either or 1
both systems under III.G.3.b? An explanation of alternative shutdown needs to be advanced for all licensees, i
RESPONSE
If the system is being used to provide its design function, it generally is considered redundant.
If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not treet 4
i tne separation criteria of Section III.G.2, the system is considered an alter-native shutdown capability.
Thus, for the example above, it appears that the condensate system is providing alternative shutdown capability in lieu of sepa-l rating redundant components of the RHR System.
Fire detection and a fixed fire i
suppression system would be required in the area where separation of redundant components of the RHR system is not provided.
However, in the event of a tur-bine building fire, the RHR system would be used for safe shutdown and is not considered an alternative capability.
However, one train of the RHR system must be separated from the turbine building.
3.8.4 Control Room Fire Considerations i
QUESTION What considerations should be taken into account in a control room fire? What is the damage that is considered? What actions can the operators take before evacuating the CR? When can the control room be considered safe after a fire for the operator to return?
APPENDIX R QUESTIONS & ANSWERS 17 J-.-
RESPONSE
The control room fire area contains the controls and instrumental redundant shutdown systems in close proximity (i.e. usually separation is a few inches).
Because it is possible to provide shutdown capability that is physically and electrically independent of the fire area, it is our opinion that alternative or dedicated shutdown capability and its associated circuits for the control room be' independent of the cables system and components in the control room fire area.
The damage to the system in the control room for a fire that causes evacuation of the control room cannot be precicted.
A bounding analysis should be made to assure that safe conditions can be maintained from outside the control room.
This analysis is dependent to the specific design.
The usual assumptions are:
1.
The reactor is tripped in the control room.
2.
Offsite power is lost as well as automatic starting of the onsite a.c.
generators and the automatic function of valves and pumps whose control circuits could be affected by a control room fire.
The analysis should demonstrate that capability exists to manually achieve safe shutdown conditions from outside the control room by restoring a.c. power to designated pumps, assuring that valve lineups are correct, and assuming that any malfunctions of valves that permit the loss of reactor coolant can be corrected before unrestorable conditions occur.
Note that the only manual action in the control room prior to evacuation usually given credit for is the reactor trip.
For any additional control room actions deemed necessary prior to evacuation, a demonstration of the capability of per-forming such actions would have to be provided.
Additionally, assurance would have to be provided that such actions could not be negated by subsequent spur-ious actuation signals resulting from the postulated fire.
After the fire, the operators could return to the control room when the follow-ing conditions have been met:
1.
The fire has been extinguished and so verified by appropriate fire protec-tion personnel.
2.
The control room has been deemed habitable by appropriate fire protection personnel and the shift supervisor.
3.
Damage has been as,sessed and, if necessary, corrective action has been taken to assure necessary safety, control and information systems are functional (some operators may assist with these tasks) and the shift supervisor has authorized return of plant control to the control room.
4.
Turnover procedures which assure an orderly transfer of control from the alternate shutdown panel to the control room has been completed.
After returning to the control room, the operators can take any actions compa-tible with the condition of the control room.
Controls in any area (cabinet) where the fire occurred would not be available.
Smoke and fire suppressant APPENDIX R QUESTIONS & ANSWERS 18
damage in other areas (cabinets) must also be assessed and corrective action taken before controls in such cabinets are deemed functional.
Controls in undamaged area (cabinets) could be operated as required.
Minor modifications inside the cont.'ol room may be performed to reach cold shutdown.
4.
EMERGENCY LIGHTING 4.1 Illumination Levels QUESTION What is the requisite intensity level for emergency lighting for egress routes and areas where shutdown functions must be performed? What are the bases for determining these levels of lighting?
RESPONSE
The level of illumination provided by emergency lighting in access routes to and in areas where shutdown functions must be performed is a level that is sufficient to enable an operator to reach that area and perform the shutdown functions.
At the remote shutdown panels the illumination levels should be sufficient for control panel operators.
The bases for estimating these levels of lighting are the guidelines contained in Section 9.5.3 of the Standard Review Plan, which are based on industry standards (i.e., Illuminating Engineering Society Handbook).
Where a licensee has provided emergency lighting per Section III.J Appendix R, we would expect that the licensee verify by field testing that this lighting is adequate to perform the intended tasks.
5.
ALTERNATIVE AND DEDICATED SHUTDOWN CAPABILITY 5.1 Safe and Alternative Shutdown 5.1.1 Previously Accepted Alternative Shutdown Capability QUESTION As part of the Appendix A review process, some plants had committed to an alter-native shutdown system in the form of a remote shutdown panel or remote shutdown system.
Footnote 2 to Appendix R describes alternative shutdown capability as being associated with " Rerouting, relocating, or modifying of existing systems."
To the extent that an existing remote shutdown system previously reviewed and approved under Appendix A to BTP 9.5-1 does not require modifications, rerouting, or relocating of existing systems, are the requirements of Section III.L of Appendix R backfit?-
RESPONSE
Yes.
Existing remote shutdown capabilities previously reviewed and approved under Appendix A to BTP APCSB 9.5-1 do not categorically comply with Section III.G.3 of Appendix R.
Licensees were requested to re-analyze their plants to determine compliance with Section III.G.
If the licensee chooses to use the APPENDIX R QbESTIONS & ANSWERS 19
.y
. - ~,. _ _, _.
option of II'I.G:3 for provision of safe shutdown capability for cartain areas, the criteria of Section III.L are applicable to that capability for that area.
See also the response to 5.1.3.
5.1. 2 Pre-Existing Alternative Shutdown Capability QUESTIONS Some licensees defined safe shutdown capability for purposes of analysis to Section III.G criteria as being composed of both the normal safe shutdown capability and the pre existing redundant or remote safe shutdown capability which was previously installed as part of the Appendix A process.
This defini-tion often took the form of two " safe shutdown trains" comprising (1) one of the two normal safe shutdown trains, and (2) a second safe shutdown train capa-bility which was being provided by the pre-existing remote shutdown capability.
This definitional process, which was undertaken by a number of licensees, makes a significant difference in the implementation of Appendix R.
Under such a definition, doesSection III.L criteria apply when the Commission did not call out Section III.L as a backfit?
RESPONSE
The definitional process mentioned considers an alternative shutdown capability provided under the Appendix A review as a redundant shutdowa capability under.
the Appendix R review.
This definitional process is incorrect.
For the pur-pose of analysis to Section III.G.2 criteria, the safe shutdown capability is defined as one of the two normal safe shutdown trains.
If the criteria of Section III.G.2 are not met, an alternative shutdown capability is required.
The alternative shutdown capability may utilize existing remote shutdown capa-bilities and must meet the criteria of Sections III.G.3 and III.L of Appendix R.
See also the response to 5.1.3.
5.1. 3 III.L Backfit OUEST!0N Why do the Staff interpretive mer:oranda regarding the criteria for satisfaction of Section III.L form the auditable basis for determining compliance to Appen-dix R when the Commission failed to backfit this section to all plants?
RESPONSE
Although 10 CFR 50.48(b) does not specifically include Section III.L with Sections III.G, J, and 0 of Appendix R as a requirement ap'plicable to all power reactors licensed prior to January 1,1979, the Appendix, read as a whole, and the Court of Appeals decision on the Appendix, Connecticut Light and Power, et al. v. NRC, 673 F2d. 525 (D.C. Cir., 1982), demonstrate that Section III.L applies to the alternative safe shutdown option under Section III.G if and where that option is chosen by'the licensee.
This does not preclude licensees from proposing and justifying other methods, e.g., see Section #1, Process Moni-toring Instrumentation, of the " Interpretations of Appendix R."
APPENDIX R QUESTIONS & ANSWERS 20
5.2 Procedures 5.2.1 Shutdown and Repair Basis QUESTION With regard to the term " post-fire procedures" the Commiss' ion states that it is impossible to predict the course and extent of a fire.
Given this, how does one write post-fire shutdown and repair procedures that are both symptonatic and usable to an operator?
P.ESPONSE Safe shutdown capabilities including alternative shutdown capabilities are all designed for some maximum level of fire-damage (system unavailabilities, spur-ious actuations).
Since the extent of the fire cannot be predicted, it seems prudent to have the post-fire shutdown procedures guide the operator from full system availability to the minimum shutdown capability.
As for repair procedure, similar conditions exist.
A repair procedure can be written based on the maxi-mum level of damage that is expected.
This procedure would then provide shut-down capability without accurately predicting likely fire damage.
5.2.2 Post Fire Operating Procedures QUESTION Does the NRC have any requirements regarding whether post-fire operating proce-i dures should be based upon fire areas, systems, or be symptom-based?
RESPONSE
The NRC does not have requirements, nor do we propose any requirements regard-ing whether post-fire operating procedures should be based upon fire areas, sys-tems or be symptom-based.
We suggest that the post-fire shutdown capabilities designs be reviewed with the olant operation staff and procedures vritten with their input.
See also responses to 5.2.1 and 5.2.3.
5.2.3 Alternative Shutdown Capability QUESTION Is it acceptable to develop post-fire operating procedures only for those areas where alternative shutdown is required?
(For other areas standard, emergency l
operating procedures would be utilized in the presence of potential fire damage to a single train.)
RESPONSE
i t
Yes.
The only requirement for post-fire operating procedures is for those areas where alternative shutdown is required.
For other areas of the plant, shutdown would be achieved utilizing one of the two normal trains of shutdown system.
Shutdown in degraded modes (one train unavailable) should be covered by present operator training and abnormal and emergency operating procedures.
If the degraded modes of operation are not presently covered, we would suggest t
APPENDIX R QUESTIONS & ANSWERS 21
-~,.n,-.--ena,~------.w.
,~,-e~.n.n,
- n n -w m
,,.,e-a,_
+,,,n,-m-.,+,~--.-,----
-m--r-.--n-,
\\
that th'e ope' ration staff of the plant determine whether additional training or procedures are needed.
5.2.4 Post Fire Procedures Guidance Documents QUESTION Do any NRC Staff guidance documents exist relative to the extent, form, nature, etc. of Appendix R post-fire operating procedures?
. RESPONSE No.
Other than the criteria of Section III.L no specific post-fire shutdown procedure guidance has been developed.
See also responses to 5.2.1, 5.2.2 and 5.2.3.
The inspection process will be flexible in this regard as long as the licensee can show compliance with the criteria of Section III.L.
5.3 Safe Shutdown and Fire Damage 5.3.1 Circuit Failure Modes QUESTION What circuit failure modes must be considered in identifying circuits associated by spurious actuation?
RESPONSE
Sections III.G.2 and III.L.7 of Appendix R define the circuit failure modes as hot shorts, open circuits, and shorts to ground.
For consideration of spurious actuations, all possible functional failure states must be evaluated, that is, the component could be energized or de energized by one # more of the above failure modes.
Therefore, valves could fail open or closed; pumps could fail running or not running; electrical distribution breakers could fail open or closed.
For three phase AC circuits, the probability of getting a hot short on all three phases in the proper sequence to cause spurious operation of a motor is considered sufficiently low as to not require evaluation except for any cases involving Hi/Lo pressure interfaces.
For ungrounded OC circuits, if it can be shown that only two hot shorts of the proper polarity without grounding could I
cause spurious operation, no further evaluation is necessary except for any l
cases involving Hi/Lo pressure interfaces.
l 5.3.2 " Hot Short" Duration QUESTION l
If one mode of fire damage involves a " hot short" how long does that condition t
exist as a result of fire damage prior to terminating in a ground or open circuit and stopping the spurious actuation?
i j
RESPONSE
i i
We would postulate that a " hot short" condition exists until action has been taken to isolate the given circuit from the fire area, or other actions as l
l APPENDIX R QUESTIONS & ANSWERS 22 r
l I
t'.., _. _, _, - ~ _
appropriate have been taken to negate the effects of the spurious actuation.
We do not postulate that the fire would eventually clear the " hot short."
5.3.3 Hot Shutdown Duration QUESTION i
Since hot shutdown cannot be maintained indefinitely, hot shutdown equipment needs to be protected for only a limited period of time.
How long must a plant remain in that condition in order to meet the requirement for achieving hot shutdown with a single train of equipment?
RESPONSE
Section III.G.1 requires that the one train of systems needed to achieve and maintain hot shutdown be free of fire damage.
Thus, the systems needed are to be completely protected from the fire regardless of time.
If the intent of the question concerns how long these systems must operate, these systems must be capable of operating until the systems needed to achieve and maintain cold shutdown are available.
5.3.4 Cooldown Equipment QUESTION Certain equipment is necessary only in the cooldown phase when the plant is neither in hot nor cold shutdown condition as defineo by technical specifica-tions.
Is this equipment considered hot or cold shutdown in nature?
RESPONSE
As stated in Section III.G.1, one train of systems needed to achieve and main-tain hot shutdown conditions must be free of fire damage.
Systems necessary to achieve and maintain cold shutdown can ba repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- Thus, if this certain equipment necessary only in the cocidewn phase is used to achieve cold shutdown, it can be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If the certain equipment is maintaining hot shutdown while repairs are being made, one train must be free of fire damage.
See also Section #2 of the " Interpretations of Appendix R."
5.3.5 Pressurizer Heaters QUESTION Most PWRs do not require pressurizer heaters to maintain stable conditions.
In fact, the Commission does not consider heaters to be important to safety and they are not required to meet Class IE requirements.
Are they required for hot shutdown under Appendix R?
If yes, then how does a plant meet the separation requirements of Section III.G.2.d.e. or f without major structural alterations to the pressurizer?
APPENDIX R QUESTIONS & ANSWERS 23 A
-._-,7 m
RESPONSE
~
o One train of systems necessary to achieve and maintain hot shutdown conditions must be free of fire damage.
PWR licensees have demonstrated the capability to achieve and maintain stable hot shutdown conditions without the use of prec-surizer heaters by utilizing the charging pump and a water solid pressurizer for reactor coolant pressure control.
5.3.6 On-Site Power QUESTION Appendix R,Section III.L.4 states in part, "If such equipment and systems will not be capable of being powered by both on-site and off-site electrical power systems because of fire damage, an independent on-site power system shall be provided." Again, in Appendix R,Section III.L.5, the statement is made "If such equipment and systems used prior to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the fire will not be capabic of being powered by both onsite and offsite electrical pcwar systems because of fire damage, an independent onsite power system shall be provided."
An interpretation is neeued of the meaning and the applicability of these two quotes relative to alternative shutdown capabilities.
RESPONSE
These statements are meant to indicate that the alternative shutdown capability should be powered from an onsite power system independent (both electrically and physically) from the area under consideration.
Further, if the normal emergency onsite power supplies (diesel generators) are not available because of fire damage, then a separate and independent onsite power system shall be provided.
As an example, some plants are utilizing a dedicated onsite diesel generator or gas turbine to power instrumentation and control panels which are a part of the alternative shutdown capability.
5.3.7 Torus Level Indication QUESTION For BWRs, I&E Information Notice 84-09 suggests that licensees need to have torus level indication post-fire.
If an analysis shows that a level does not change significantly during any operational modes or worse case conditions, is level indication still required?
Is an analysis in file adequate or is an exemption request required?
RESPONSE
It continues to be our position that torus (suppression pool) level indication is the preferred post-fire monitoring instrumentation in order to confirm the availability of the torus (suppression pool) as a heat sink.
We recognize that existing analyses' indicate that suppressicn pool level is not significantly changed during emergency shutdown conditions.
However, we believe the operator should be able to confirm that spurious operations or other unanticipated occur-rences have not affected the torus function.
An analysis of torus level change by itself is not considered an acceptable basis.
APPENDIX R QUESTIONS & ANSWERS 24
5.3.8 Short Circuit Coordination Studies 00ESTION Should circuit coordination studies consider high impedance faults?
RESPONSE
~
Yes, in those coordination studies performed to assess the vulnerability of safe shutdown capability due to fires involving associated circuits.
To meet the separation criteria of Section III.G.2 and III.G.3 of Appendix R, high impedance faults should be considered for all associated circuits located in the fire area of concern.
Thus, simultaneous high impedance faults (below the trip point for the breaker on each individual circuit) for all associated cir-cuits located in the fire area should be considered in the evaluation of the safe shutdown capability.
Clearing such faults on associated circuits which may effect safe shutdown may be accomplished by manual breaker trips governed by written procedures.
Circuit coordination studies need not be performed if it is assumed that shutdown capability will be disabled by such hign impedance faults and appropriate written procedures for clearing them are provided.
5.3.9 Diagnostic Instrumentation QUESTION What is diagnostic instrumentation?
RESPONSE
Diagnostic instrumentation is instrumentation, beyond that previously identified in Attachment 1 to I&E Information Notice 84-09, needed to assure proper actua-tion and functioning of safe shutdown equipment and support equipment (e.g.,
flow rate, pump discharge pressure).
The diagnostic instrumentation needed depends on the design of the alternative shutdown capability.
Diagno tic in-strumentation, if needed, will be evaluated during the staff's review of tne licensee's proposal for the alternative shutdown capability.
5.3.10 Design Basis Plant Transients QUESTION What plant transients should be considered in the design of the alternative or dedicated shutdown systems?
i
RESPONSE
Per the criteria of Section III.L of Appendix R a loss of offsite power shall be assumed for a fire in any fire area concurrent with the following assumptions:
The safe shutdown capability should not be adversely affected by any one a.
spurious actuation or signal resulting from a fire in any plant area; and APPENDIX R QUESTIONS & ANSWERS 25 6
b.
The safe shutdown capability should not be adversely affected by a fire in any plant area which results in the loss of all automatic function (signals, logic) from the circuits located in the area in conjunction with one worst case spurious actuation or signal resulting from tr.e fire; and The safe shutdown capability should not be adversely affected by a fire c.
in any plant area which results in simultaneous spurious actuation of all valves in high-low pressure interface lines.
5.3.11 Alternative / Dedicated Shutdown v. Remote Shutdown Systems QUESTION 4
What is the difference between the alternate / dedicated shutdown systems required for fire protection and the remote shutdown systems recommended under Chapter 7 of the SRP?
RESPONSE
The remote shutdown systems recommended under Chapter 7 of the SRP are needed to meet GDC 19.
These remote shutdown systems need to be redundant and physi-cally independent of the control room in order to meet GDC 19.
For GDC 19, damage to the control room is not considered.
Alternate shutdown systems for Appendix R need not be redundant but must be both physically and electrically independent of the control room.
6.
OIL COLLECTION SYSTEMS FOR REACTOR COOLANT PUMP 6.1 Lube Oil System Seismic Design QUESTION If the reactor coolant pumo lube oil system and associated appurtenances are se'cmiccll; designed, does the lube oil collection system also require seisr.ic design?
Is an exemption required?
P.ESPONSE Where the RCP lube oil system is capable of withstanding the safe shutdown earthquake (SSE), the analysis should assume that only random oil leaks from the joints could occur during the lifetime of the plant.
The oil collection system, therefore, should be designed to safely channel the quantity of oil from one pump to a ven,ted closed container.
Under this set of circumstances, the oil collection system would not have to be seismically designed.
An exemption is required for a non-seismically designed oil collection system.
The basis for this exemption would be that random leaks are not assumed to occur simultaneously with the seismic event, since the lube oil system is designed to withstand the seismic event.
However, the Rule, as written, does not make this allowance.
APPENDIX R QUESTIONS & ANSWERS 26
6.2 Container QUESTION It would appear that a literal reading of Section III.0 regarding the oil col-lection system for the reactor coolant pump could be met by a combination of seismically designed splash shields and a sump with sufficient capacity to con-tain the entire lube oil system inventory.
If the reactor coolant pump is seismically designed and the nearby piping hot surfaces are protected by seis-mically designed splash shields such that any spilled lube oil would contact only cold surfaces, does this design concept conform to the requirements of the rule?
RESPONSE
!f the reactor coolant pump, including the oil system, is seismically designed and the nearby hot surfaces of piping are protected by seismically designed splash shields such that any spilled lube oil would contact only cold surfaces, and it could be demonstrated by engineering analysis that sump and splash shields would be capable of preventing a fire during normal and design basis accident conditions, the safety objective of Section III.0 would be achieved.
Such a design concept would have to be evaluated under the exemption process.
The justification for the exemption should provide reasonable assurance that oil from all potential pressurized and unpressurized leakage points would be safely collected and drained to the sump.
The sump should be shown capable of safely containing all of the anticipated oil leakage.
The analysis should verify that there are no electric sources of ignition.
7 BRANCH TECHNICAL POSITION CMEB 9.5-1 7.1 Fire Protection and Seismic Events QUESTION For which situations other than the reactor coolant cumo lute n
ey t t.e ? era seismic events assumeo to be initiators of a fire?
R~SPONSE l
The guidelines for the seismic design of fire protection systems which cover other general situations is delineated in BTP CMEB 9.5-1 C.1.C(3) and (4):
"(3) As a minimum, the fire suppression system should be capable of delivering water to manual hose stations located within hose reach of areas contain-ing equipment required for safe plant shutdown following the safe shutdown earthquake (SSE).
In areas of high seismic activity, the staff will con-sider on a case-by-case basis the need to design the fire detection and suppression systems to be functional following the SSE.
(4) The fire protection systems should retain their original design capability for (a) natural phenomena of less severity and greater frequency than the most severe natural phenomena (approximately once in 10 years) such as tornadoes, hurricaties, floods, ice storms, or small-intensity earthquakes APPENDIX R QUESTIONS & ANSWERS 27
i that are characteristic of the geographic region, and (b) potential man-nade site-related events such as oil barge collisions or aircraft crashes that have a reasonable probability of occurring at a specific plant site.
The effects of lightning strikes should be included in the overall plant fire protection program."
We have considered California as being a high seismic activity area.
For those plants reviewed under Appendix A, our position is (A.4):
" Postulated fires or fire protection system failures need not be considered concurrent with other plant accidents or the most severe natural phenomena."
i Our guidelines on the seismic design of fire protection systems installed in safety related areas are delineated in Regulatory Guide 1.29 " Seismic Design Classification," paragraph C.2.
The failure of any system should not affect a system from performing its safety function.
1 Our guidelines on the seismic design of hydrogen lines is delineated in BTP CMEB 9.5-1 Section C.S.d(5):
(5) Hydrogen lines in safety-related areas should be either designed to seismic Class I requirements, or seleved such that the outer pipe is directly vented to the outside, or should be equipped with excess flow valves so that in case of a line break, the hydrogen concentration in the affected areas will not exceed 2%.
All PWR's have a hydrogen line going to the Volume Control Tank (Make up Tank) that needs to be protected.
To identify plant specific situations in which seismic events could initiate a fire in a specific plant area, the fire protection engineer and systems engineer performing the fire hazards analysis should be concerned with in-situ combusti-ble materials which can be released in a manner such that they could contact
' - ; ' t.: ';n'ticn : u r:la y 3 seismic event.
An eastple of L.f: ald Le tne rupture of the RCP lube oil line directly above the hot reactor coolant piping.
The fire protection engineer should also be concerned with seismic induced i pition sources, electrical or mechanical, wnich could contact nearby in-situ combustible materials.
It should be noted that the guidelines cited above from BTP CMEB 9.5-1 are not applicable to plants reviewed and approved under BTP APCSB 9.5-1.
i
- 7. 2 Random Fire and Seismic Events 00ESTION Is a random fire to be postulated concurrent with a seismic event?
j
RESPONSE
Our position, as stated in Section C.1.6 of BTP CMEB 9.5-1, is " Worst case fire need not be postulated to be simultaneous with nonfire related failures in safety systens, plant accidents, or the most severe natural phenomena."
APPENDIX R QUESTIONS & ANSWERS 28 i
,rv- -
-e+--
,,m,.,_.-~
.,n,._.,
.w,,,-.-_-n,,,,,.ge+me._,n,g,-n~_.,,
n.,,-.,,,,,,
Where plant systems are designea to prevent the release of combustible materials caused by a seismic event, sLch as a dike around a fuel oil tank transformer, or
-seismic supports for hydrogen lines, then no fire need to be arbitrarily assumed i
to take place in the fire hazards analysis.
t Because it is impossible to ccmpletely preclude the occurrence of a seismically induced fire, Section C.6.c(4) of CMEB 9.5-1 states:
" Provisions should be made to supply water at least to standpipes and hose connections _for manual firefighting in areas containing equipment required for safe plant shutdown in the event of a safe shutdown earth-quake.
The piping system serving such hose stations should be analyzed for SSE loading and should be provided with supports to ensure system pressure integrity.
The piping and valves for the portion of hose stand-pipe system affected by this functional requirement should, as a minimum, satisfy ANSI B31.1, ' Power Piping.'
The water supply for this condition may be obtained by manual operator actuation of valves in a connection to the hose standpipe header from a normal seismic Category I water sys-tem such as the essential service water system.
The cross connection should be (a) capable of providing flow to at least two hose stations (approximately 75 gpm per hose station), and (b) designed to the same standards as the seismic Category I water system; it should not degrade the performance of the seismic Category I water system."
i The post-seismic procedures should include a damage survey, and a determination of whether any fires were initiated as a result of the seismic event.
See also the response to Question 7.1.
It should be noted that the guidelines cited above from BTP CMEB 9.5-1 are not j
applicable to plants reviewed and approved under BTP APCSB 9.5-1.
8.
LICENSING POLICY i
't 8.1 Fire Hazard Analysis / Fire Protection Plan Updating j
ane cv!y!
What constitutes the fire protection plan required by 50.48(a)?
Should licens-tes have programs to maintain the fire hazards analysis and the fire protection
]
plan current or updated periodically? How often should the plan be updated?
^
Must-revisions be provided to the NRC?
RESPONSE
)
The basic elements required in the fire protection plan are oescribed in i
The fire protection program that implements that plan should include the details of the fire hazards analysis.
The plan and program may be i
separate or combined documents and must be kept current with the fire hazards i
analysis updated prior to making modifications.
We would expect that for most plants licensed after January 1,1979, the fire protaction plan and program would be part of the FSAR and therefore, would be updated and sumitted to the i
NRC in conformance with the requirements of 10 CFR 50.71(e).
For plants whose fire protection plans and programs are not part of the FSAR, we would expect that they would be updated pri.or to making modifications and kept at the site in an auditable form for NRC inspection.
APPENDIX R QUESTIONS & ANSWERS 29 1
i
-,n-,
m--,,
,...-,,,n.---,.w..
,----.~.n,-r.
,-.g
.,.m,
,----.,_,_m
,,y.-,,
,.e.-.
,,,,,--.,..,,,e
.-n,m,
8.2 Fire Protection License Condition QUESTION What is the significance of the fire protection license condition?
RESPONSE
For those plants licensed prior to January 1,1979 (Appendix R plants), the license condition is the legally enforceable requirement for the fire protection features other than those required by III.G, III.J and III.0 that were accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position BTP APCSB 9.5-1.
For those plants licensed after January 1, 1979, the license condition is the legally enforceable requirement for all fire protection features at the facility.
Appendix R is cnly enforceable on Post 1979 plants through the license condition.
10 CFR 50.48 makes Appendix R applicable only to plants licensed prior to January 1,1979.
Refer to 10 CFR 50.48(e).
The NRC has drafted new language for this license condition which delineates the circumstances unde" which the fire protection plan may be revised.
We are now including this language in all new licenses and are considering amending present licenses.
The revised language is as follows.
"9.5 Fire Protection Program (Section 9.5, SER)
The licensee shall implement and maintain in effect all provisions of the a.
approved fire protection program as described in the Final Safety Analysis Report for the facility (or as described in submittals dated
)
and as approved dated in the SER (and supplements dated
)
subject to provisions b & c below, b.
The licensee ma rake no change to the approved fire protection occaram wnicn would cecrease the level of fire protection in the plant without prior approval of the Commission.
To make such a change the licensee must submit an application for license amendment pursuant to 10 CFR 50.90.
The licensee may make changer to features of the approved fire protection c.
program which do not significantly decrease the level of fire protection without prior Commission approval provided (a) such changes do not other-wise involve a change in a license condition or technical specification or result in an unreviewed safety question (see 10 CFR 50.59), and (b) such changes do not result in failure to complete the fire protection program approved by the Commission prior to license issuance.
The licensee shall maintain, in an auditable form, a current record of all such changes in-cluding an analysis of the effects of the change on the fire protection program, and shall make such records available to NRC inspectors upon All changes to the approved program shall be reported annually request.
to the Director of the Office of Nucle 1r Reactor Regulation, along with the FSAR revisions required by 10 CFR $0.71(e).
APPENDIX R QUESTIONS & ANSWERS 30
8.3 III G, J and 0 Exemptions for Future Modifications QUESTION Is an exemption required from Appendix R Sections other than III.G, III.J and III.0 for future modifications that do not comply with such sections?
RESPONSE
Yes, for those modifications which deviate from the previously accepted fire protection configurations.
The exclusion of the applicability of Sections of Appendix R other than III.G, III.J, and III.0 is limited to those features
" accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position BTP APCSB 9.5-1 reflected in staff fire protection safety evaluation reports issued prior to the effective date of the rule." No re-analysis is required except for proposed modifications which would alter pre-viously approved features.
This position is based directly on CFR 50.48(b).
Also see response to Question 8.2.
8.4 Future Changes QUESTION Will future changes (no matter how minor) to approved configurations be required to be reviewed by the Staff in an exemption request? At what point may the process of 10 CFR 50.59 be invoked?
RESPONSE
If a future modification involves a change to a license condition or technical specification, a license amendment request must be submitted.
When a modifica-tion not involving a technical specification or license condition is planned, the evaluation made in conformance with 10 CFR 50.59 to determine whether an unreviewed safety question is involved must include an assessment of the modi-fication's impact on the existing fire hazards analysis for the area.
This
,r
- the evaluation rust be perferr.ed by the perser, responsible for the fire safety program for the plant.
The assessment must include the effect on com-bustible loading and distribution and the consideration of whether circuits or c;r.;onents, including asociated circuits, for a train of equipment needed for safe shutdown are being affected or a new element introduced in the area.
If this evaluation concludes that there is no significant impact, this conclusion and its basis must be documented as part of the 50.59 evaluation and be avail-able for future inspection and reference.
If the evaluation finds that there is an impact that could result in the area either not being in conformance with Appendix R, or some other aspect of the approved fire protection program, or being outside the basis for an exemption that was granted for the area involved, the licensee must either make modifications to achieve conformance or justify and request exemption (or, for the post 1979 plants, approval) from the NRC.
See also responses to Questions 8.1 and 8.2.
APPENDIX R QUESTIONS & ANSWERS 31
i 8.5 Schedurar and Blanket Exemptions QUESTION If an exemption is warranted and at the same time the provisions of the rule indicate that the appropriate schedular deadlines have passed, should a schtd-uler exemption be filed at the same time as the tect.nical exemption request?
If as part of the exemption request the utility is proposing to make modifica-i tions to achieve a reasonable level of conformance with Appendix R, and if the associated " clock" has run out for that type of modification, should the tech-nical exemption request and the description of the modification be filed with a sch..dular exemption?
When filing a schedular exemption under $50.12, it is not always clear from what specific paragraphs of $50.48 an exemption should be sought.
Is it ac-ceptable to request a blanket exemption from the schedular paovisions of 10 CFR 550.48 without a specification by paragraph?
If an exemption request is submitted to meet newly published interpretations of Appendix R, when does the licensee need to be in compliance?
Is the sched-j ule presented in Appendix R still the guideline or must a new schedule be
~
developed under a different criteria?
RESPONSE
We do ndt intend to issue any further extensions of the 50.48(c) schedules.
When a licensee determines that a 50.48(c) schedule cannot be. met, the appro-priate NRC Region must be notified.
This policy is further explained in the generic letter transmitting this package.
4 8.6 Trivial Deviations QUESTION 4
{
anat guidance can tne NRC Staff give the industry regarding when a deviation from the literal interpretation of Appendix R is sufficiently trivial as to not require a specific exemption?
RESPONSE
i The significance of a deviation must be judged as part of a fire hazards anal-4 ysis.
The conclusion of this analysis is always subject to review by the NRC inspector.
8.7 Revised Modifications QUESTION i
What is the process for altering configurations not yet implemented for plants i
with Appendix R SERs?
I i
i APPENDIX R QUESTIONS & ANSWERS 32 i
RESPONSE
If licensees propose changes to their NRC approved modifications, they must sub-mit their new proposal and revised schedule for implementation for NRC approval.
This change must be justified as to (1) the reason for the change, (2) the basis for the revised schedule, and (3) the interim measures that will be pro-vided to assure post fire shutdown capability until the final modifications are implemented.
Whether or not enforcement action will be taken based upon con-tinued noncompliance with Appendix R will be decided by the NRC Regional Administrator in consultation with NRC Headquarters.
8.8 Smallest Opening in a Fire Barrier QUESTION What is the smallest opening allowed in a fire area barrier for which an exemption request is not needed?
RESPONSE
Unsealed openings in the cor. figuration for which approval was obtained by an approved laboratory or the NRC staff would be acceptable.
Our position on openings is given in Section 5.a(3) of BTP CMEB 9.5-1:
"(3) Openings through fire barriers for pipe, conduit, and cable trays which separate fire areas should be sealed or closed to provide a fire resistance rating at least equal to that required of the barrier itself.
Openings inside conduit larger than 4 inches in diameter should be scaled at the fire barrier penetration.
Openings inside conduit 4 inches or less in diameter should be sealed on each side of the fire barrier and sealed either at both ends or at the fire barrier with non-combustible material is pra'cer.t t*1e ;,sssar,e cf smoke and het gases.
Fire barrier penetration; that must maintain environmental isolation or pressure differentials should be qualified by test to maintain the barrier integrity under such conditions."
The unsealed opening (s) allowed in a fire area boundary or a barrier which separates redundant shutdown divisions should not permit flame, radiant energy, smoke and hot gases to pass through the barrier and cause damage to redundant shutdown divisions on the other side.
The licensee should assess the adequacy of existing protection and should determine the minimum size based on a fire hazards analysis and conservative fire protection engineering judgment.
If the significance of openings in fire barriers is marginal, a formal exemption request could be submitted or the staff consulted.
The basis for the lack of signifi-cance should be available for review by NRC Inspectors.
Our acceptance of unprotected openings in fire barriers would depend upon the quantity and nature of combustible materials on either side of the barrier; the location of the opening (s) in relation to the ceiling (for openings in walls);
the location, vulnerability and importance of shutdown systems on either side of the barrier; and compensating fire protection.
APPENDIX R QUESTIONS & ANSWERS 33 O
See also Sec' tion #4 of the " Interpretations of Appendix R."
8.9 NFPA Code Deviation QUESTION Is an exemption / deviation required for deviations from NFPA Codes?
RESPONSE
Deviations from the codes should be identified and justified in the FSAR or FHA.
An exemption is not required for NFPA codes.
NRC guidelines reference certain NFPA codes as guidelines to the systems acceptable to the staff, and therefore such codes may be accorded the same status as Regulatory Guides.
When the applicant / licensee states that its design " meets the NFPA codes" or,
" meets the Intent of the NFPA Codes" and does not identify any deviations from such codes, NRR and the Regions expect that the design conforms to the code and the design is subject to inspection against the NFPA codes.
8.10 " ASTM E-119" Design Basis QUESTION Is an exemption / deviation required, if components are designed to withstand an
" ASTM E-119" fire?
RESPONSE
Some cables are being developed for high temperature (e.g., 1700'F) applications.
An exemption would be required if such cable is used in lieu of the alternatives of III.G.2 or III.G.3 in a pre-1979 plant.
A deviation from the guidelines would be racuired for s'nflar apolications in a post 1979 p' art.
8.11 Plants Licensed After January 1, 1979 QUESTION What fire protection guidelines and requirements apply to the plants licensed after January 1, 19797
RESPONSE
Post-1979 plants are subject to:
GOC 3 10 CFR 50.48(a) and (e)
+
The guidelines identified in the footnotes to 50.48(a)
Guidelines documents issued after January 1,1979.
APPENDIX R QUESTIONS & ANSWERS 34
Commitments made to meet the requirements of Appendix R1 or specific sec-tions such as III.G, III.J, III.0; or Appendix A to BTP APSCB 9.5-1; or BTP CMEB 9.5-1, which includes the requirements of Appendix R* and the previous guidance documents incorporated into the Branch Technical Position.
The license for each plant licensed after January 1, 1979.contains a license condition which identifies by reference the approved fire protection program for that plant.
- A deficiency in the BTP CMEB 9.5-1 has been noted in that a requirement in Appendix R Section II!.G.3.b to provide alternative or dedicated shutdown cap-ability in an area where both redundant safe shutdown trains could be damaged by suppression activities or inadvertent operation or rupture of fire suppres-sion systems is not included.
This requirement will be added in the next revi-sion of the BTP.
8.12 Cold Shutdown Equipment Availability QUESTION A.
Can a licensee achieve compliance with III.G.1(b) by demonstrating that one train of cold shutdown equipment will remain free of fire damage?
B.
In demonstrating that one train of cold shutdown equipment will remain free of fire damage, is a licensee limited to the three alternatives in III.G.2?
RESPONSE
A.
Yes.
8.
No.
8.13 Guidance Documents OUESTION Flease list all NRR guidance documents and position papers issued since Appendix R was promulgated.
RESPONSE
Fire Protection Guidance Issued Since January 1, 1975:
IE Information Notices No. 83-41:
Actuation of fire suppression systems causing inoperability of safety related equipment.
No. 83-69:
Improperly installed fire dampers at nuclear power plants.
No. 83-83:
Use of portable radio transmitters inside nuclear power plants.
APPENDIX R QUESTIONS & ANSWERS 35
- No. 84' 09: ' Lessons Learned From NRC Inspections of Fire Protection Safe Shutdown Systems (10 CFR 50, Appendix R)
Standard Review Plan 9.5.1, Rev. 1 Fire Protection System, dated 5/1/76 9.5.1, Rev. 2 Fire Protection Program, dated 03/78 9.5.1, Rev. 3 Fire Protection Program, July 1981.
Regulations 10 CFR Part 50:
Proposed fire protection program for nuclear power plants operating prior to January 1,1979, dated May 29, 1980.
Federal Register Vol. 45, No. 105, 36082.
10 CFR Part 50:
Fire protection program for operating nuclear power plants, dated November 19, 1980.
Federal Register Vol. 45, No. 225, 76602.
10 CFR Part 50:
Fire protection rule corrections, dated September 8, 1981.
Federal Register Vol. 46, No. 173, 44734.
Generic Letters NOTE:
The following documents were obtained from the Palisades file Docket No. 50-255.
Similar documents should be in the file for other operating facil-ities.
The dates may vary slightly.
1.
Letter dated 9/28/76 - Enclosing App. A to 8TP APCSB 9.5-1 and supplementary guidance on information needed for fire protection program evaluation.
2.
Letter dated 12/1/76 - Enclosing sample Technical Specifications and an errata sheet.
3.
Letter dated 8/19/77 - Enclosing " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance."
4.
Letter dated 6/8/78 - Re:
Manpower requirements for operating reactors.
5.
Letter dated 9/7/79 - Re:
Minimum fire brigade shift size.
6.
Letter dated 9/14/79 - Enclosing staff positions - safe shutdown capability.
7.
Letter dated 10/31/80 - Enclosing new 10 CFR 50.48 regarding fire protection schedules for operating nuclear power plants.
8.
Letter dated 11/24/80 - Enclosing a copy of revised 10 CFR 50.48 and new App. R to 10 CFR 50, and a summary of open items from the SER for the 8TP APCSB 9.5-1 review.
9.
Letter dated 2/20/81 - Generic Letter 81-12 identifying information needed for NRC review of modifications for alternative shutdown capability.
APPENDIX R QUESTIONS & ANSWERS 36
10.
Letter dated 4/7/82 - Provided clarification to Generic Letter 81-12 and guidance on information needed for NRC review of exemption requests.
11.
Letter dated 10/6/82 - Generic Letter 82-21; provided criteria for annual, biennial, ano triennial audits required by Technical Specifications.
- 12. Letter dated 10/19/83 - Generic Letter 83-33; NRC Positions on Certain Requirements of Appendix R to 10 CFR 50.
Staff Generic Positions 1.
Letter, Denton to Bernsen, dated 4/20/82 - Control room fires.
- 2.
SECY 83-269, dated July 5, 1983 - Attachments B and C.
3.
Memo Eisenhut to 01shinski, dated 12/30/83 - Physical independence of electrical systems.
4.
Memo, Eisenhut to Jordan, dated 10/24/83 - Bullet resistant fire doors.
- Staff positions regarding the need for certain exemptions delineated in this guioance document have been revised per the " Interpretations of Appendix R".
8.14 Deviation From Guidance Documents OUESTiON If a utility determines that a deviation from a guidance document exists, does an exemption request need to be filed?
If so, what is the legal basis for this requirement?
RESPONSE
No.
5.'5 5taff Interreetation of Appendia R CUESTICN How does the Staff initiate interpretations of Appendix R in a manner which ensures their technical adequacy and consistency with the rule's objectives (e.g., presentation to ACRS, issue for comment as in draft regulatory guides, etc.)?
RESFONSE Staff positions are initiated when our experience shows that generic issues are identified that require clarification.
These positions are reviewed for accuracy and consistency by the cognizant Division Directors.
Usually, they l
are not issued for comment.
However, Generic Letter 83-33 was commented on by the NUFPG since it was initiated, in part, at their request.
l l
l APPENDIX R QUESTIONS & ANSWERS 37 1
e
8.16 Disseminatio of New Staff Positions QUESTION Will licensees be automatically sent a copy of new Staff position papers as they are developed?
RESPONSE
The Staff positions on generic subjects are considered for issuance in Generic Letters from ONRR and Information Notices or Bulletins from OI&E.
Staff positions issued for specific questions on specific plants are not given generic promulgation because they normally involve plant specific design considerations.
8.17 Equivalent Alternatives QUESTION How does a licensee demonstrate that alternative measures are equivalent to the measures of Section III.G.2 in order to obtain an exemption lacking a formal definition of the term " free of fire damage"?
RESPONSE
See Item #3 of " Interpretations of Appendix R."
8.18 Coordination Study Update QUESTION Circuit modifications are an ongoing process.
How recent must a coordination study be in order to be valid in protecting circuits associated by common power source?
RESPONSE
,le ould expect that as circuit modifications are made, the design package would address the electrical protection required and the effects of this protection on the coordination of the protection for the power distribution system.
This type of consideration should be included in the evaluation required by 10 CFR 50.59 Changes, Tests and Experiments.
The design package and modification evaluation could not be complete without. consideration of the coordination study.
Therefore, we would expect that the coordination studies would be current with the last circuit modfication made.
8.19 Exemption Request Threshold QUESTION (a) What is the threshold for exemption requests?
(b) Is it necessary to file a request for each and every possible deviation from Appendix R7 APPENDIX R QUESTIONS & ANSWERS 38
1
RESPONSE
Typical examples are discussed in the response to Questions 8.19.1 through 8.19.4.
(a) The licensee must develop its criteria for an exemption request threshold.
(b) No.
8.19.1 Penetration Designs Not Laboratory Approved QUESTION Where penetration designs have been reviewed and approved by NRC but have not been classified by an approval laboratory, will it be necessary to submit an exemption request?
RESPONSE
No.
8.19.2 Individual vs. Package Exemptions QUESTION How do we submit future modification exemption requests, etc.? Would NRC prefer them individually, or developed and submitted in packages for review and approval?
RESPONSE
Future exemptions should be submitted individually, if they are independent of each other.
3.10.2 Exemption Req.6st Supporting Detail QUESTION When an exemption request is filed, what criteria are used to determine the level of detail needed to support the request?
RESPONSE
See Enclosure 2 of NRC's letter to all licensees dated April-May 1982.
8.19.4 50.12 vs. 50.48 Exemption Requests QUESTION With regard to exemption requests for future modifications, will they be submitted under 50.12 or 50.48?
APPEN0!X R QUESTIONS & ANSWERS 39
RESPONSE
8.20 Post January 1, 1979 Plants and Exemption Requests QUESTION Do plants licensed after January 1, 1979 which have committed to meet the requirements of Section III.G, III.J and III.0 and are required to do so as a license condition, need to request exemptions for alternative configurations?
RESPONSE
No; however, deviations from the requirements of Section III.G, III.J and III.0 should be identified and justified in the FSAR or FHA and the deviation would probably require a license amendment to change the license condition.
See responses 8.1 and 8.2.
8.21 NRC Approval for BTP CMEB 9.5-1 Deviations QUESTION Do future deviations from BTP CME 8 9.5-1 guidelines require approval by the NRC?
Do such deviations constitute a violation of license conditions?
RESPONSE
Compliance with guidelines in the BTP is only required to the extent that they were incorporated in the approved Fire Protection Program as identified in the license condition.
When the new license condition is in place (See Response 8.2), future deviations may be made in accordance with the procedure stated therein.
With present non-
. - - licerse :Orditier.s, such deviati:n:..ay cr ir.s3 not requirc a lice.ce amendment.
In the absence of a license amendment, a violation may exist.
9.
I"SPECTION POLICY 9.1 Safety Implications QUESTION Since the Commission states that fire damage cannot be defined and fire spread cannot be predicted,'how does the Commission determine which Appendix R viola-tions have "important safety implications?"
RESPONSE
III.G.2 provides alternatives to ensure that one of the redundant trains is free of fire damage.
Fire spread within one area cannot be predicted, but damage is limited to one fire area.
APPENDIX R QUESTIONS & ANSWERS 40
1 i
the same fire area that are needed for safe shutdown or can adversely affect safe shutoown, and are not protected by the features of III.G.2, III.G.3 or an approved alternative.
- 9. 2 Uniform Enforcement QUESTION How does the' Commission ensure that violations of the rule are uniformly treated between regions?
RESPONSE
Each Region evaluates violations in accordance with the NRC Enforcement Policy, 10 CFR 2, Appendix C.
The Policy provides guidance for the determination of appropriate enforcement sanctions for violations.
The Office of Inspection and Enforcement provides guidance for and monitors Regional implementation of the Policy to ensure a uniform application.
In addition, the policy requires that all escalated enforcement actions be approved by the Director of the Office of Inspection and Enforcement.
9.3 NTOL Inspections QUESTION Will NTOLs be subject to an Appendix R audit now being performed on plants licensed to operate prior to January 1, 1979? Or, will the current review and analysis being performed by the Staff be satisfactory?
RESPONSE
Yes, NTOLs will be subject to the Appendix R audit; the TI 2515/62 is being revised to reflect the appropriate requirements for NTOLs' aNG it is our intent to conduct such inspections prior to issuing the operating license.
10 CFR 50.48 requires each such plas,t to have a fire protection plan.
Their operating license will contain a specific license condition to implement their approved fire protection program which must identify deviations from Appendix R.
The fire protection inspections will be against the particular license conditions.
- 9. 4 Future TI 2515/62 Revisions QUESTION Does the NRC plan to ' issue a new or revised version of Temporary Instruc-tion 2515/62 for future Appendix R audits?
RESPONSE
Yes.
APPENDIX R QUESTIONS & ANSWERS 41
O
- 9. 5 Documen'tation Supplied by Licensee QUESTION i
Temporary Instruction 2515/62 provided a list of documentation that the NRC needs to review as part of the audit process.
In past audits, the NRC has requested additional information other than that contained on the list.
Will a new list of documentation be developed?
RESPONSE
The documentation listing Provided in TI-2515/62 does not restrict the inspection team from enhancing inspection efficiency by requesting a licensee to provide additional relevant documentation.
1 is not being developed.
A new listing of documentation for TI-2515/62 9.6 Subsequent Inspections QUESTION To what extent will Appendix R issues be raised at future Regional I&E Fire Protection Audits after a successful Appendix R audit? For example, if an area has already been reviewed and no noncompliance found, will it be subject to later review and reinterpretation by the Staff?
RESPONSE
The Appendix R inspections are conducted on a sample basis.
These inspections do not certify that all possible items of noncompliance with Appendix R have been identified.
The inspection results do provide a basis for a determina-tion of the adequacy of a licensee's Appendix R reanalysis,, modification and preparation.
When a noncompliance with Appendix R requirements is identified, a notice of vim =M on will be issued to ensure adequete cc ~ective actier.
In t.W 4 :sses in which the licensee believes that the staff has invoked a reinterpretation of adequacy in areas which had previously been reviewed, NRC's procedures for appeal would be applicable.
- 9. 7 NRC List of Conforming Items CUESTION At the end of the audit, will the NRC provide a list of it' ems that had been reviewed and found in conformance with Appendix R? To date, only areas of i
nonconformance have been specifically identified in exit interviews.
RESPONSE '
I Subsequent to an Appendix R inspection, the NRC will not provide a list of items reviewed and found to be in conformance with Appendix R.
We do list the areas inspected and where non-compliances were not found.
APPENDIX R QUESTIONS & ANSWERS 42
- ~ - -
l 1
9.8 Inspection Re-review QUESTION Where assumptions are made and clearly stated within the analysis submitted to NRR for review, will such assumptions be subject to a second review by OI&E during the inspection process?
Where assumptions are made in conjunction with the analysis, should exemption requests be filed just to provide protection for the licensee?
{
If NRR accepts a licensee's selection of equipment and shutdown paths as being sufficient to meet the Appendix R shutdown criteria, will OI&E review and have the right to challenge the approved shutdown paths and approved equipment selec-
{
tion?
Or will they only check the shutdown paths and equipment in question to see that they meet the Appendix R requirements, i.e., separation?
RESPONSE
To the extent that a licensee's submittal to NRR is comprehensive and sufft-ciently detailed, the basis for the OI&E Appendix R inspection will be the assumptions, shutdown paths and equipment selections approved by NRR.
If the inspection results in new information that casts doubt upon the approved con-figuration, the Regional inspectors have the responsibility to resolve such doubts.
9.9 List of Shutdown Equipment QUESTION What lists of shutdown equipment will be used by the Regional inspectors, if the shutdown analysis has not been reviewed and approved by NRR7
RESPONSE
Regional Inspectors will use the lists of shutdown equipment the Itcensee has identified in his fire protection plan.
l Generic Letter 81-12 and its clarification documents expect licensees to show
'i how they will shutdown if a fire area is not provided with redundant train separation.
Inherent within this expectation is the assumption that the licen-i see will identify the equipment to be used.
It is because the licensees have l
not had fire hazard analyses at all for non-alternative shutdown fire areas that I
the inspectors to date have resorted to using the only lists available (the alternative shutdown equipment list used by NRR in their reviews).
l It is unlikely there would not be a list of at least those systems to be used for alternate shutdown, since 10 CFR 50.48 requires NRR review and approval of the means of alternate shutdown.
l l
I r
i l
APPEN0!X R QUESTIONS & ANSWERS 43 I
m
i E!! CLOSURE 7 With Attichrisats.1, 2: 4 3);
4/12/85
!!: Sir,UMENTATION FIRE DETECTION INSTRUMENTATION LIl'.ITING CONDITION.FOR OPERATION 3.3:3.8. As a minimum, the fire detection instrumentation for each fire detection zone shown in Table 3.3-11 shall be OPERABLE.
l APPLICABILITY:
Whenever equipment protected by the fire detection instrument is required to be OPERABLE.
ACTION:
With any, but not more than one-half the total in any fire zone, a.
Function A fire detection instruments shown in Table 3.3-11 inoperable,.
restore the inoperable instrument (s) to OPERA 8LE status within 14 days or within the next I hour establish a fire watch patrol to inspect the l
zone (s) with the inoferable instrument (s) at leas't once per hour, unit the instrument (s) is located inside the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (or monitor the containment air temperature at leart once per hour at the locations listed in Speci fication 4. 6.1. 6'.-
With more than one-half of the Function A fire detection instruments b.
in any fire zone shown in Table 3.311 inoperable, or with any Function B fire detection instruments shown in Table 3.3-11 inoperable,
- 7 Jtr
- n t : : n; ;
- j;;;r; 't r;
- i;7, ir,;;7 i;7,;; ;7,; _7,
- 7, j
Iaels 3.011 i.;per;;1;.
ithi ; 15;.7 restore the inoperable instrument (s) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> no that noro i
than one-half of the Function A and all of the Function B instru-i monts are 0FERA3tE, or within the next i hour 4
establish a fire watch patrol to inspect the Zone (s) with the inoperable instrument (s) at least once per hour, unless the instrument (s) is located inside the contain-meat, then inspect that containment zone.at least once per 8 heurs (or monitor the containment air temperature at least once per hour at the locations listed in Specification 4.6.1.6).
The provisions of Specifications 3.0.3 and 3.0.4 are not appli:able.
c.
t i
NOTE: Changes trade by the Working Group are designated by a double bar in the right margin.
1
SURVEILLANCE REQUIREMENTS 4.3.3.8.1 Each of the above required fire detection instruments which are accessible curing plant operation shall be demonstrated OPERABLE at least once per 6 months by performance of a TRIP ACTUATING DEVICE OPERATIONAL TEST.
Fire detectors which are not accessible during plant operation shall be demonstrated OPERA 3LE by the performance of a TRIP ACTUATING DEVICE OPERATIONAL TEST during each COLD SHUTDOWN exceeding Of B:. ; unless performed in the previous 6 months.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> The supervisory system for the NFPA Standard 720 4.3.3.2.2 T he "' F A ' te r. ; r 700 supervised circuits ;_:;r.i;i; associated g
with the detector alarms of each of the above required fire detection instrurents i
snail be demonstrated OPERABLE at least once per 6 mont.hs.
l l
a.3.3.8.3 The r.onsupervised circuits, associated with detector alare.s between the instrument and the centrol room shall be demonstrated OPERAELE at least once per 31 days.
v-STS 3/4 3 68 l
j e
TABLE 3.3-11 FIRE DECTECTION INSTRUMENTATION TOTAL NUMBER INSTRUMENT LOCATICN OF INSTRUMENTS *
(Ilivstrative)
HEAT F LAME SMOKE (x/y)
(x/y)
(x/y) 1.
Containment #
a.
Zone 1 Elevation b.
Zone 2 Elevation 2.
Control Room 3.
Cable Spreading a.
Zonu 1 Elevation b.
Zone 2 Elevation 4.
Computer Room 5.
Switchgear Room 6.
Remote Shutdown Panels 7.
Station Battery Rooms 8;
Turbine a.
Zone 1 Elevation b.
Zone 2 Elevation 9.
Diesel' Generator a.
Zone 1 Elevation b.
Zone 2 Elevation 10.
Safety Related Pumps a.
Zone 1 Elevation b.
Zone 2 Elevation 11.
Fuel Storage a.
Zone 1 Elevation b.
Zone 2 Elevation (List all detectors in areas required to ensure the OPERABILITY of safety-related equipment).
- (x/y):
x is number of Function A (early warning fire detection and notification only) instruments.
y is number of Function 8 (actuation of Fire Suppression Systems and early warning and notification) instruments.
eine fire cetection instruments located within the containment are not required to be OPERABLE during the performance of Type A containment leakage rate tests, y=$TS 3/4 3-69
i e
l PLAfiT SYSTEMS 3/4.7.11 FIRE SUPPRESSION SYSTEMS
'FRRE SUPPRESSION WATER SYSTEM t
LIMITING CONDITION FOR OPERATION 3.7.11.1 The Fire Suppression Water System shall be OPERABLE with:
a.
At least (two) fire suppression pumos, each with a capacity of (2500) gpm, at(125)psig and(rated)rpmfordiesel-drivenpumps with their discharge aligned tr the fire suppression b.
Separate water supplies, each'with a minimum contained volume of gallons, and c.
An OPERABLE flow path capable of taking suction from the tank and the tank and transferring the water through distrioution piping witn OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device on each s--inkler or hose standpipe, and the last valve ahead of the deluge v6 ve on each Deluge or Spray System required to be OPERABLE per Specifications 3. 7.11. 2, 3. 7.11. 5, and 3. 7.11. 6.
APPLICABILITY:
At all times.
ACTION:
a.
With one pump and/or one water supply inoperable, restore -the inoper-able equipment to OPERABLE status within 7 days.or p'revide an alter-nate backup pump or supply.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
b.
With the Fire Suppression Water System otherwise inoperabJe establish a backup Fire Suppression Water System within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
h* SIS 3/4 7 30
PLANT SYSTEMS SURVEILLANCE REOUIREMENTS 4.7.11.1.1 The Fire Suppression Watar System shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying the contained water supply
- volume, b.
At least once per 31 days on a STAGGERED TEST BASIS by starting each electric motor-driven pump and operating it for at least 15 minutes on recirculation fiow, c.
.At lets'. once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path is in its correct position, d.
. (At it;;t ;nce p;r 5 :: nth; by perfora.an;a of & ;;; a. fima6) l e-At least once 'per 12 months by cycling each testable valve in the flow path through at least one complete cy:le of full travel,
-f.
At least once per 18 months by performing a system functional test which includes simulated autorratic actuar. ion of the system throughout its operating sequence, and:
1)
Verifying that each automatic valve in the flow path actuates to its correct position, 2)
'!erifying th;t :::h p mp d;vci;;; et 1;;;t (2500) gpa at a syst;; h;;.d of (2:0) feet, Verifying that each fire pump starts (sequentially) through autcmatic operation and delivers 150 percent of rated capacity at not less than 65 percent of the total rated head and that the shutoff head does not exceed 120 percent of rated head for the split-case pumps or 140 percent for end-section pumps at rated speed (rpm).
~
3)
Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel -eed-
?)
'/arifying th;t ;;;h fira appra;ien p;;p start; (;aj antia11j; t: ::i-t:i-th: " e.-Sepprn:i:r '!:t;r Sy:tc pic;n, ;7aater-th;n er ;; ;
t:
p;ig.
.g.
At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11 of the Fire Protection Handbook, 15th Mt+r Edition, published by the National Fire Protection Association.
and at least once per (6 months - 3 years) by performing a system flush.
The interval for the system flush should be selected on a plant-specific basis, based en the quality of the water source (e.g.,
tank, pond, river, etc.).
1;!-STS 3/4 7-31
c PLAT lT SYSTIJjs SURvellLANCE REOUIREMENTS (Continued) 4.7.11.1.2 The fire pump diesel engine shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying:
1)
The fuel storage tank contains at least gallons of fuel, and continuously 2)
The diesel starts from ambient conditions and operates for at least 30 minutes on recirculation flow.
b.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-1975 is within the acceptable limits specified in Table 1 of ASTM 0975-1S77 when checked for viscosity, water, and sediment; and c.
At least once per 18 months, during shutdown, by subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the, class of service.
.4.7.11.1.3 The fire pump diese starting 24-volt battery bank and charger shall be demonstrated OPERABLE:
a.
At least once per 7 days by verifying that:
1)
The electrolyte level of each battery is above the plates, and 2)
The overall battery voltage is greater than or equal to 24 volts, b.
At least once per 92 days by verifying that the specific gravity is appropriate for continued. service of the battery, and c.
At least once per 18 months by verifying that:
1)
The batteries, cell pistes, and battery racks show no^ visual indication of physical damage or abnormai deterioratien, and 2)
The battery-to-battery and terminal connections are 61ean, tight, free of corrosion, and coated with anti-currosion material..
I W-STS 3/4 7-32
.p-
---e c
,,c
DLANT SYSTEMS SPRAY AND/OR SPRINKLER SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.'11.2 Th'e following Spray and/or Sprinkler Systems shall b.e OPERABLE:
(P1 ant depen' dent - to be liste'd by name and location.)
a.
b.
c.
APPLICABILITY:
Whenever equipment protected by the Spray / Sprinkler System is required to be OPERABLE.
ACTION:
equivalent manual a.
With one o more of the above required Spray and/or Sprinkler Systems inopera
, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch with b::ku; ire suppression equipment for those areas in which redundant
.h systems or components could be damaged; for other areas, establish a hourly fire watch patrol, b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS 4.7.11.2' Each of the,above required Spray and/or Sprinkler Systems shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path is in its correct position,
{
b.
At least once per 12 months by cycling each testable valve in the l
flow path through at least one complete cycle of full travel, i
c.
At least once per 18 months:
1 1)
By performing a system functional test which includes simulated automatic actuation of the system, and:
i a)
Verifying that the automatic valves in the flow path actuate to their correct positions on a test signal, and b)
Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle i
of full travel.
l W-STS 3/4 7-33
_.-.,_1-,_-
~.
P' V:~ SYSTEl'S SURVEIL'_ANCE REQUIREMENTS (Continued) c) Opening a drain v_1ve sufficient to verify that water is available to the systen.
2)
By a visual inspection of the dr3 pip: :;r a rd
- r"'0.07 h;;d;r
systen piping, han6ers and appurtenances to verify their integrity; and 3)
By a visual inspection of each nozzle's spray a'rea to verify the spray pattern is not obstructed.
I d.
' At least once per 3 yeaYs by performing an air flow' test through each open head spray / sprinkler header and verifying each open head spray / sprinkler noIIIe is unobstructed.
h'-ST5 3/4 7-34
i-Pt. ANT SYSTE!*.5 C_0 SYSTEl45
~
2 LIMITING CONDITION FOR OPERATION 3 7.'11.3-The following High Pressure and Low Pressure CO OPERABLE:
2 -Systems shall-be (Plant dependent - to be listed by name and location.)
a.
b.
c.
APPLICABILITY:
Whenever equipment protected by the CO Systems is required to l
be OPERABLE.
2 ACTION:
j a.
With one or more of the above required CO Systems inoperable, 2
within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> estab.lish a continuous fire watch with backup fire suppression equipment for those areas in which redundant systems or components could be damaged; for other areas, establish an hourly fire watch patrol.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIR MENTS 4.7.11.3.1 Each of the above required C0 Systems shall be demonstrated 7
OPERABLE at least once per 31 days by verTfying that each valve (manual, power Operated, or automatic) in the flow path'is in its correct position.
4.7.11.3.2 Each of. the above required '_:1 "r:::r: CO Systems shall be demonstrated OPERABLE:
2 For low-pressure systems, gat least once per 7 days by verifying the C0 storage tank level to a.
g be. greater than and pressure to be greaser than psig, and for high-pressure systems, at least once per 6 months by verifying that the CO stora6e tank weight is at least 90f5 of full-charge weight, 2
and W-STS' 3/4 7-35
i PLANT SYSTEMS SURVEILLANCE REOUIREMENTS (Continued)
At least once per 18 months by verifying: time delays and alarm interlocks b.
1)
The system including valves, associated
-tilation System fire dampers, and fire door release mechanis,
actuate manually and automatically, upon receipt of a simulated L:tuation signal, and 2)
Flow frc.. each nozzle during a " Puff Test."
- 3) The integrity of the system piping, hangers and appurtenances by visual inspection.
___.:__; o:_m, _ _ _... _.,.,
e....___
_m_,,
m_
2 " -'"' '"-
_m_...
.<..,. m.
..m 4:::.:t-:te d C FE* *.E'.E:
.6,.
r,._,.-.,--
.,u
.g g
---,g.
...u...
,,. : <, 4 -,. -- -
a_ 4 w.,
..........--e
-.6, g.
.j r- -,e o o..,,-
.j..
a........
- e....-
.u.... ~:.
u.
u.
..,.._....,...,e....u..
u,....
it...:, +:..
F.,....
- ..,.. A. :..,
.,...:...J t.t._ _:. s.,. :,. u..
.7.....
.,.., +..
=%
...u..
.............ij
..a
<:-. a..
- =_____.
r4 -.
.w.....
,a
.,...a
....s.......
r.
-+ad.
e,
.w-..w x..,s-.-
-.s e
g.
sj
.. - w,,. o..,....
h'-STS 3/4 7-36
.- ~.
~
PLANT SYSTEMS HALON SYSTEMS LIMITING CONDITION FOR OPERATION f
3.7.11.4 The following Halon Systems shall be OPERABLE:
a.
(Plant dependent - to be listed by name and location'.)
b.
c.
APPLICASILITY:
Whenever equipment protected by the Halon System is required to be OPERABLE.
ACTION:
i i
a.
With one or more of the above required Halon Systems inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a continuous fire watch with backup fire suppression equipment for those areas in which redundant systems or coaponents could be da:naged; for other areas, establish an hourly fire watch patrol.
b.
The provisions.of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS 4.7.11.4 Each of the above required Halen Systems shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying that each valve (manual, power operated, or automatic) in the flow path is in its correct-
- position, (or level) b.
At least once per 6 months by verifying Halon storage tank weights to be at least 95% of full charge weight (or level) and pressure to be at least 90% of full charge pressure, and verifying At'aastonceper18monthsby{
1:.
T 1)'
";rif ing Ehe system, including associated Ventilation System 3
fire dampers and fire door release mechanisms, actuates manually and automatically, upon receipt of a simulated actuation signal, and F
during a test 2)
T. fer.T,;n;; cf ; flow teet through headers and nozzles to assure no blockage.
3)
The integrity of the cystem piping, hangers and appurtenances by visual inspection W-STS 3/4 7-37
3 PLANT SYSTEMS FXRE HOSE STATIONS LIMITING CONDITION FOR OPERATION The fire hose stations shown in Table 3.7-5 shall be OPERABLE.
3.7.11.5 APPLICABILITY:. Whentver equipment in the areas protected ~ by the fire he'se
~ stations is required to be OPERABLE.
ACTION:
With one or more of the fire hose stations shown in Tabis 3.7-5 i nop e rabl e,
y_ _._. t..a.. =._;.._,_s, a.
.me oem...
w r u.sn
- c. ov>=
-ges, ch:l' b
- rn;:t;; t; th
- t:tirn(:).
On Outitt Of th: >j:
- t;nd;rd 1:n;th Of h::: pr;;id;d f;r th '.;;^ ;t;;ien.
The ;s;;nd 1:ngth ;f b;;; ;uff!;ient
- .ti;t ;f th; ci;
- h:11 b; ;;nn;;t;d t:
t; pr:;ff: :: :r:;; ?:r th: ;r:: 1:ft unpr;t::t:d by th; in;;;r:bi; h;;; :t;ti:r
' : r: it :;r b: d:::n:tr:t;d th;t the phy;i;;F c;uting ;f th: 'i r; '.::: a;;1d r ; ult in ; r;;;;ri;;b1; h;;;rd tr
- r th; '.::; it:;1f, th; fir;
- r; tin; tech-i
- i
- , p':nt :s. ipr:nt, L
m.....,,_
.L_
u.._,.._
6, 3., _. _ - -. _ _ :-.__,,.._.u.
m_
m...
w.
__s
.m.
- t
- ti:r Sign: :h:i' i: ::;nt;d ;b;v: th; g;t;d u,;(;) t; iden-ity
___.f_____.
..._.....o,
.n.
.....o.
.ue
-e
_L_.
-L_
t___
_t I.L_J faLf_
9 I. X.
f.o_.___._-_L E. f.. _
L.,.
_ ~,
9
....r..,,.
e n AL_
prim;ry ::n: :f ##r: :;ppr;;;i;n, ;th;rwi:; r;ut; th; ;dditi;n;l
_.....r.,....
h;;; _ith'- 21-h:urt.
restore the inoperable station (s) to an OPERA 3LE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or within the next i hour provide equivalent suppression capability in the affected area (s); after 7 days, establish a centinuous fire watch in the affected area (s),
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
b.
. SURVEILLANCE REOUIREMENTS Each of the fire hose stations shown in Table 3.7-5 shall be 4.7.11.5 demonstrated OPERABLE:
At least once per 31 days, by a visual inspection of the fire hose stations accessible during plant operations to assure all required a.
I equipment is at the station.
At least once per 18 months, by:
b.
Visual inspection. of the stations not accessible during plant l
1) operations to assure all required equipment is at the station, Removing the hose for inspection and re-racking, and 2)
Inspecting all gaskets and replacing any degraded gaskets in l
3) the couplings.
l At least once per 3 years, by:
c.
(
Partially opening each hose station valve to verify valve l
1)
OPERABILITY and no flow blockage, and Conducting a hose hydrostatic test at a pressure of 150 psig or I
j 2) at least 50 psig above maximum fire main ooerating. pressure, whichever is greater.
w-STS 3/4 7-38 1
TABLE 3.7-5 FIRE HOSE STATIONS LOCATION
- ELEVATION HOSE RACK #
" List all fire Hose Stations required to ensure the OPERABILITY of safety-related equi;;r.ent.
W-STS 3/4 7-39
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE' HOUSES LIMITING CORDITION FOR OPERATION 3.7.11.6 The yard fire hydrants and associated hydrant hose houses shown in Table 3.7-6 shall be OPERABLE.
APPLICABILITY:
Whenever equipment in the areas protected by the yard fire hydrants is required to be OPERABLE.
ACTION:
a.'
With one or more of the yard fire hydrants or associated hydrant hose houses shown in Table 3.7-6 inoperable, ritbi-1 5:ur 5:ve fficient-dditi=:1 ingth: Of : 1/2 i c h di =:t:r 5 :; i nce.cd in
- n. cdj d =t CP
. ELE hydrn t h::: 5:r:: 1 p :.id: : c re i c e-t-e-ebe-
- r.; rete
- ted : ::( ) ## the 'nep:r:51: fit: hydr: n Or :: n ci t d j
hydrnt5:n 5n; i; th; pr' : ;. ::w: Of
'# r. : pprc::i=;
i
- th;r i n, pret'd t'e 2dd't :n:7 50::
ith'- 29 ' ;r:.
I restore the inoperable hydrant (s) and/or hose house (s) to an OPERE.E status within 224 hours0.00259 days <br />0.0622 hours <br />3.703704e-4 weeks <br />8.5232e-5 months <br />, or within the next i hour provide equitalent euppressien capability in the affected area (s); after 7 days, enablish a centinucus fire watch in the affected area (s).
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable. l SURVEILLANCE REOUIREMENTS 4.7.11.6 Each of the yard fire hydrants and associated ~ hydrant hose houses shown in Table 3.7-6 shall be demonstrated OPERABLE:
At least once per 31 days, by visual inspection of the hydrant host a.
house to assure ell required equipment is at the hose house, b.
At least ence per 6 months (once curing March, April, or May and once during September, Cctober, or November), by visually ir.specting each yard fire hydrant and veri.fying that the hydrant barrel is dry and that the hycrant is net damaged, and c.
At least once per 12 months by:
1)
Conducting a hose hydrostatic test at a pressure of 1E0 psig or at least 50 psig above maximum fire main eperating pressure, whichever is greater, 2)
Inspecting all the gaskets and replacing any degraced gaskets in the couplings, and 3)
Performing a flow check of each hydrant to verify its OPERABILITY.
3/4 7-c0 w-STS
TABLE 3.7-6 YARD FIRE HYi..A' tis AND ASSOCIATED HYDRANT HOSE. HOUSES 7
HYDRANT NUMBER LOCATION
- 4 l
i List all Yard Fire Hydrants and Hydrant Hose Houses required to ensure the
^
OPERA 5ILITY of safety-rela.ed equipment or facilities housing safety-related equipment.
3/4 7-41 W-STS D
' ' ' ' - ~
,.a...,.
J r
PLANT SYSTEMS 3/4.7.12 FIRE RATED ASSEMBLIES LIMITING CONDITION FOR OPERATION 3.7.12 All fire rated assemblies (walls, floor / ceilings, cable tray enclosures and other fire barriers) separating safety related fire areas or separating portions of redundant systems important to safe shutdown within a fire area and all sealing device windows; fire. dampers;ginfireratedassemblypenetrations(firedoors; fire cable, piping, and ventilation duct penetration seals) shall be OPERABLE.
and APPLICABILITY:
- . C' ti ::. '4herever the equipment protected by the fire-rated assembly (ies) must be OPERABLE.
ACTION:
I With one or more of the above required fire rated assemblies and/or d.
sealing devices inoperable, within one hour either establish a continuous fire watch on at least one side of the affected assembly, or verify the OPERABILITY of fire detectors on at least one side of the inoperable assembly and establish an hourly fire watch patrol.
b.
The provisions of Spec fications 3.0 3 and 3.0.4 are not applicable.
SURVEILLANCE REOUIREMENTS 4.7.12.1
^t 1;;.;t en:: p;- 1* = nth; the above required fire rated assemblies and penetration sealing devices shall.be verified OPERABLE *b,7 p;-f;rab;; c
.i; d ing::ticr c':
At least once per 18 months by performin6 visual inspections of:
a.
1.
A The exposed surfaces of ev.h fire rated assembly, 2.
K.
Each fire window / fire damper and associated hardware, 'and 3
A At least 10% percent of each type of sealed penetration.
If apparent changes in appearance or abnormal degradations are found, a visual inspection of an additional 10% of each type of sealed penetration shall be made.
This inspection process shall continue until a 1C%
sample with'no apparent changes in appearance or abnormal degradation is found.
Samples shall be selected such that eacn penetration will be inspected every 15 years, b.
At least once per 16 months by perfoming a functional test of at least 10% of the accessible fire dampers.
If any non-confomins dampers are found, an additional 105 will be functicnally tested.
This process will continue until an acceptable scmple is found.
Samples shall be selected such that all accessible dampers are tested every 15 years.
1(-STS 3/4 7-a2
)
PLANT SYSTEMS SURVEILLANCE REOUIREMENTS (Continued)
~
4.7.12.2 Each of the above required fire docrs shall be ver'_ified OPERABLE by:
.u.
u..
,a__.__
.u.._:.
__s
....r.,.
s.
m.
.m
.r...,
..are...
w
- e. _.,..+.u...,,
.-.a.
r..
. u, -
^.r..aet.,T-v
,e
+ u.. < 4..- s..,
..~.y.._.
u.
m.
s--
.u-u, y...
,-.s m,.. o.,.. m
- 4.,. m a.
.., m m..
gn
- - -..-.m r-m_
bl 6 7 4 h e.
.( ean44W&in6 4 ei. W 6 E.
4 E E'. J e.
W 6 4.E pi G &
e.i & W EJ J g s.
-u..
2___
u.
..,.s..,. c..
- a.,,.,...s
.....,, s,
m_
., w my,
- u...
2....,
._.+u.
..+-
,.4.. u..,..,___..
.s...,.
....u__
.m.........
m.
.~.........
s.
...+,......
.e o, u,,.,...,
. a.
<.....:.,..,...t-
_u_.
a y.
..m..,,...
_,-___s...,.,..... -. -.
, e. _ _.,. u..,. j
- 2...
7,
~u...,.+...,.u...,,,n.u.,
c :.,., s..
. s. u.... s., - - s.. :..,.,.,.__..:.,r...
2 rs.
..... - ___ e,- u.....,
1,
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, by verifying that doors with automatic a.
hold-open and release mechanisms are free of obstructions and that unlocked fire doors without electrical supervision are closed; b.
At '. east once per 7 days, by verifying that each locked-closed fire door is locked and closed:
At least once per 31 days, by performing a TRIP ACTUATI'iG DEVICE c.
OFERATIONAL TEST for each electrically-supervised fire door; d.
At least once per 6 months, by visually inspectin6 the aut.matic hold-open, release and closing mechanisms and latches: and At least once per 18 months, by performing a functional test of all e.
hold-open and release mechanisms.
W-STS 3/4 7-43
PLANT SYSTEMS 3/4.7.13 ALTERNATIVE /EEDICATED SHUTDOWN SYSTEM LIMITING CONDITION FOR OPERATION 3 7.13 The Alternative / Dedicated Shutdown System (ASS / DSS) equipment, shown on Table 3 3-X, shall be OPERA 3LE.
APPLICA3ILITY: MODES 1, 2, and 3 ACTION:
1 With less than the mininum ASS / DSS equipment in Table 3 3-X OPERA 3LE, a.
restore the inoperable equipment to OPERABLE within 7 days, or provide equivalent shutdown capability and restore the inoperable equipment to 0FERA3LE within 60 days, or be in H0r STANDBY within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and HOT SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, b.
The provisions of Specification: 3 0.3 and 3 0.4 are not applicable.
SURVEILLANCE RECUIREMENTS 4.7.13 1 Each monitoring instrumentation cht.nnel shall be demonstrated OPERABLE by perform:.ng the CHANNEL CHECK and CHANNEL CALIBRATION operations at the f:equencies shown en Table 4.3-X.
4.7.13 2 Each transfer switch, power supply and control circuit shall be demonstrated OPERABLE at least once per 18 months by operating each actuated component from the ASS / DSS stations.
4.7.13 3 TheASS/ESSdieselgeneratorshallbedemonstrated0FERA3LE:
1+. least once per 31 days by verifying:
a.
- 1) The fuel level in the fuel storage tank is greater than or equal to (
) inches,and i
- 2) The diesel starts from ambient conditions and operates for at least 30 minutes at greater than or equal to (
) kW.
b.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with i
l ASTM-D270-1975, is within the acceptance limits specified in Table i of ASTM-D975-1977 when checked for viscosity, water and sediments. and At least once per 18 months, during shutdown, by subjecting the c.
diesel to an inspection in accordance with procedures prepared in conjunction with the manufacturer's recommendations for the applicable class of service.
i i
SURVEILLANCE REQUIREMENTS (continued)
The ASS / DSS battery bar.k and charger shall be demonstrated 0FERA3LE:
4.7.13.4
'l l At least once per g days by verifying that:
a.
- 1) The electrolyte level of each battery is above the plates, and The overall battery voltage is greater than or equal to ( ) velts, 2)
At least once per 92 days by verifying that the specific gravity b.
is appropriate for continued service of the battery; and At least once per 18 months by verifying that:
c.
The batteries, cell plates, and battery racks show no visual 1) indication of physical danage or abnormal deterioration, and
- 2) The battery-to-battery and terminal connections are clean, ti6ht, and free of corrosion.
ADD OFERASILITY, ACTION P3QUIREMENTS AND SURVEILLANCE PSQUIP_".._:TS NOTE:
FOR ANY OTHER ASS / DSS PLANT-SFECIFIC EQUIWINT, AS AFFROPRIATE l
(
0 O
S IENNA HC M
U M
I N
I M
OT DER I
T U
N Q
E ER M
N P
O N
N T
I I
O O
N E U
T I
I E T Q
A T
T N A E
C A
A I
I O
C C
I H
M L
D D
U P U
I I
Q O M
P E R I
f i
i M P N
0 Cl l
t P
C I
D T
T U A M
A I
I M
E W
W I S S
R S
S N A S
I D
/
M S
S S
R S A
E D/
i iT S O S A YF E I T T A N R E E D P I,
O E
TO
)Y N
L N
O SE I
S L
I IT A
C N
T U
O I
C I
W R
T T
S I
A N
C R
E R
T M
E L
S U
F O
U R
S R
L T
N T
L S
A N
I N
R O
(
I T
C 1jl
!i
-PLANT SYSTEMS 3/4.7.14 PORTABLE FIRE EXTI'!OUISHERS LIMITING CONDITION FOR OFERATION 3.7.14' All portable fire extinguishers protecting areas containing safety-related equipnent, as described in the Fire Hazards Analysis, shall be 0FERA3LE.
APPLICABILITY: At all tines.
ACTION:
a.
With one or nore of the required portable fire extinguishers inoperable, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> replace the inoperable extinguisher with an OPERA 3LE extinguisher having the sane classification and at least equal rating.
b.
The provisions of Specifications 3.0 3 and 3 0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.7.14 Each required portable fire extinguisher shall be verified to N OPERABLE by perfor.ning surveillance and naintence in,accordance with procedures prepared in conjunction with the nanufacturer's reconnendations and verifying that each extinguisher is located as designated in the Fire Hazards Analysis.
9
&*_4.X.4-._
e.Mcn JS&4c..J
=-
-ksa._.iA*_.L3a LE_6_-a.A_._w__
___o4_4._.2 4
.Aa-- 4A6 t
r a.-.
- ic k 52 53 C
l a
2w A
h.
d 55 i
x A
t!
5
-4 E
m b
=
e ks
.5E I
E s
k I
c
?
m U
5 a<
E Y
ex
=
w I
e l
PLANT SYSTD'.S 3/4.7.15 D'IRGENCY LIG'4TI'!G UNITS LIMITI'iG CONDITION FOR OPERATION 3.7.15 All required self-contained, battery-powered emergency lighting units, as described in the Fire Hazards Analysis, shall be OPE?a3LE.
APPLICABILITY: At all times.
ACTION:
With one or more of the required emergency lighting units inoperable, a.
within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> replace the inoperable lighting unit with an OPERABLE lighting unit.
'b.
The provisions of Specifications 3 0 3 and 3 0.4 are not applicable.
SURVEILLANCE PEQUIREMENTS 4.7.15 Each of the required emergency lighting units shall be verified to be OPERA 3LE by perfoming surveillance and maintence in accordance with procedures prepared in conjunction with the manufacturer's recommendations.
ee-t i
INSTRUMENTATION BASES 3/4.3.3.2 MOVABLE INCORE DETECTORS The OPERABILITY of the movable incere detectors with the specified minim -
complement of equipment ensures that the measurements obtained from use of this system accurately represent the spatial neutron flux distribution of.he The OPERABILITY of this system is demonstrated by irradiating e core.
detector used'and determining the acceptability of its voltage curve For the purpose of measuring'F (Z) or FfH q
a full incere fl map is used.
Quarter-core-flux maps, as defined in WCAP-8648, June 1976, y be used in recalibration of the Excore Neutron Flux Detection System and full incore flux maps or symaetric incere thimbles may be used for nitoring the QUADRANT POWER TILT RATIO when one Power Range channel is inop able.
3/4.3.3.3 SEISMIC INSTRUMENTATION The OPERABILITY of the seismic instr entation ensures that sufficient 5E capability is available to promptly det mine the magnitude of a seismic event S
and evaluate the response of those fe.ures important to safety.
This capa-g'.
bility ir required to permit compar' on of the measured response to that uset E
in the design basis for the faci '.y to determine if plant shutdown is required pursuant to Appendix A of 10 C' Part 100.
The instrumentation is consistent EE with the recommendations of gulatory Guide 1.12, " Instrumentation for Earth-quakes," April 1974.
=
y S
l 3/4.3.3.4 METEOROL ICAL INSTRUMENTATION x
i i
The OPERA ITY of the meteorological instrumentation ensures that i
sufficient m eorological data are available for estimating potential radiation i
doses to public as a result of routine or accidental release of radioactive materia to the atmosphere.
This capability is required to evaluate the need for i tiating protective measures to protect the health and safety of the e and is consigent with the recommendations of Regulatory Guide 1.23, pu
" nsite Meteorologi51 Programs," February 1972.
3/4.3-3:5 REMOTF1 SHUT 00WC5YSTEM The OPERABILITY of the Remote Shutdown System ensures that sufficient capability is available to permit safe shutdown of the facility from locations outside of the control room.
This capability is required in the event control room habitability is lost and is consistent with G*neral Design Criterion 1S of 10 CFR Part 50.-
The OPERABILITY of the Remote Shutdown System ensures that a fire will not precludo achieving safe shutdown.
The Remote Shutdown System instrumentation, W-STS B 3/4 3-4
INSTRU".ENTATION BASES
.RBDlF3HUTDUWNT57EM (Conti nue~d) control and' power ci cuits and transfer. switches necessary to eliminate ef fects of the fire and allow operation of instrumentation,' control and power circuits required to achieve and maintain a safe shutdown condition are independent of areas where a fire could damage systems normally used to shutdown the reactor.
This capability is consistent with General Design Criterion 3 and Appendix R to 10 CFR 50.
1 3/4.3.3.6 ACCIDENT MONITORING INSTRUMENTATION The -OPERABILITY of the accident monitoring instrumentation ensures t" sufficient information is available on selected plant parameters to r
. or and assess these variables following an accident.
This capabili+
tent with the recommendations of Regulatory Guide 1.97, "Ine-
. is consis-a
. mentation for g
Light-Water-Cooled Nuclear Power clants to Assess Plant " nditions During and Ej Following an Accident," Decembef*_975 and NUREG 075', ' Clarification of TMI 3
Action Plan Requirements," November 1980.
S:
Es 3/4.3.3.7 CHLORINE DETECTION SYC'..5
=
The OPERABILITY of '. e Chlorine Detection System ensures that sufficient 3
0 capcbility is avail e to promptly detect and initiate protective action in d
the event of ar
-cidental chlorine release.
This capability'is required to protect co
.ol room personnel and is consistent with the recommendations of Regul
- y Guide 1.95, " Pro.tection of Nuclear Po-er Plant Control Room Oper-
. s Against an Accidental Chlorine Release," February 1975.
+
3 /4. 3. 3. 7 *TI RE ' DETECTION INSTRUMENTATI ON OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of fires and that Fire Su;pression Systems, that are actuatec by fire oetectors, will discharge extinguishing agent in a timely manner.
Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment end is an integral element in the overall facility Fire Protection Program.
When instrumentation is increrable, frequent fire patrols are required in the affected area until 0FEPABILITY can be restored.
Fire detectors that are used to actuate Fire Suppression Systems represent a more critically ' ;;-t;mt compo..ent of a plant's Fire Protection Program than detectors that are installed solely for early fire warning and r.otifica-tion.
Consequently, t.n;
= '.: n.1 e.
- f
- I::;: ; d:'.;;'.;~;
~; ;;
- ;;;;r.
; 'c:: c' d:t;;;';- ;;;;bi' ty '; -' ; : ;; : ;';r :;;.; ;, _;. a ::
b3 ; d;ti;;;re, r;?:.;;.;; a ; :; ' ',;..; ;c;. 3;e;. v.-
- f
- ..n....,...
m U_- ST S B 3/4 3-5 9
~
0 INSTRUMENTATION BASES FIRETDETECTION -INSTRUMENTATION (Continued) i:
- ult, th: ::t:bli 5n:nt of a fire watch patrol must be
- ny :r :.
initiated at an earlier stage than would be warranted for the loss of detectors that provide only early fire warning.
Th: ::t:bli:b::nt of ' :qu:nt '#re p;tc 1; ir. th; cf f;:t:d cc::: i;
- quir:d t; pr;;id; d;t::ti:n ::p;tility until th: #m:p;r: bit #m:tra nt:ticr i: 7::: r:d t;.CIE3'i: LIT".
3/4.3.3.9 LOOSE-PART DETECTION INSTRUMENTATION The OPERABAILITY of the loose part detection instrumentation ensures th sufficient capability is available to detect loose metallic parts in the The Reactor System and avoid or mitigate damage to Reactor System components allowable out-of-service times and surveillance requirements are consi
.ent with the recommendations of Regy)atory Guide 1.133, " Loose-Part Det
. ion 1981.
Program for the Primary System of Light-Water-Cooled Reactors," M,
3/4.3.3.10 RADI0 ACTIVE LIOUID EFFLUENT MONITORING INSTRUME',ATION The radioactive liquid ef fluent instrumentatien i provided to moniter and control,,as applicable, the releases of radioact' e. materials in 1.iquid -
effluents during actual or potential releases of l' uid effluents.
The Alarm / Trip Setpoints for these instruments shali e calculatec and adjusted in w
accordance with the methodology and parameters n the ODCM to ' ensure that the g
alarm / trip will occur prior to exceeding th imits of 10 CFR Part 20.
The 5
OPERABILITY and use of this'instrumentati is consistent with the requirements 3
of General Design Criteria 60, 63 and 6 of Appendix A to 10 CFR Fart 50.
The i
purpose of tank level indicating devi s is to assure the cetection.and control
[
of leaks that if not controlled cou potentially result in the transport of e
2 radioactive materials to UNRESTRI" ED AREAS.
S C
3/4.3.3:11 RADI0 ACTIVE GAC.0US EFFLUENT MONITORING INSTRUMENTATICN M
The radioactive.c ecus effluent instrumentation is proviced te monitor and control, as app 1' cable, the releases of radioactive materials in gaseous The tual or potential releases of gaseous effluents.
effluents during nts for these instruments shall be calculated and adjusted in Alarm / Trip Setp accordance wi*
the methodology and parameters in the 00CM to ensure that the This 11 occur prior to exceeding the limits of 10 CFR Part 20.
alarm / trip instre en otion also includes provisions for monitoring (and controlling) the ations of potentially explosive gas e.ixtures in the WASTE GAS HT. CUP concen*
The OPERABILITY and use of this instrumentation is consistent with SYST~..
requ'rements of General Design Criteria 60, 63 and 64 of Appendix A to l
th CFR Part 50.
B 3/4 3-6 U-STS
- P.LANT SYSTEMS 1
BASES SNUBBERS (Continued)
The service life of a snubber is established via manufacturer input information through consideration of the snubber service conditions an associated installation and maintenance records (newly installed sn eer, seal replaced, spring replaced, in high radiation area, in high temper.ure area, etc...).
The requirement to monitor the snubber service li#
is included to ensure that the snubbers periodically undergo a performanc valuation in view of, their age and operating conditions.
These records wi provide statistical b
ba'ses for future consideration of snubber service li'.
The requirements for the maintenance of records and the snubber se ice life review are not M
intended to affect plant operation.
y
=c 3/4.7.10 ' SEALED SOURCE CONTAMINATION S
The limitations on removable ntamination for sources requiring leak 8
testing, including alpha emitt is based on 10 CFR 70.39(c) limits for p:
This limitation 1 -nsure that leakage from Byproduct, Source, S
. and Special Nuclear Mater'o1 sour:es will not exceed allesable intake values.
Sealed source are classified into three groups according to their use, with Surveillan Requirements commensurate with the probability of damage to a source in th-group.
Those sources wnich are frequently handled are required to be tes*
more often than those which are not.
Sealed sources which are contin usly enclosed within a shielded mechanism (i.e., sealed sources within ra '. ion monitoring or boron measurin'g devices) are considere.d to be stored d need not De tested unless they are removed from the shielded mechanism.
3/4.7.11 FIRE SUPPRESSION SYSTEMS ihe OPERAEILITY'of the Fire Suppressien Systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the f acility where safety-related equipment is located.
The Fire Suppression System consists of tne water system, spray, and/or sprinklers, CC., Halon, fire hose stations, and yard fire hydrants.
The collective cacabitity of the Fire Suppression Systems is a: equate to minimize potential d,amage to safety-related equipment and is a major element in the facility Fire Protection Program, capability In the event that portions of the e'
Suppression Systems are incperable,
- lt:r.;t: backup fire-fighting
- r r-nt is required i
- b;
. i';;ic in the af fected areas until the incperable equipment is restored to service.
the
- . ;; ; 'i
- ;' ' ; ;;c ---_
.:: :. : ':: a t-
...m.
- c'
- _ ; c:: :, ; ': ;:
- -
- - d c ' t ' :
- ;- :: ic pre ':: :-
- 't 1:::
' : ; t c - ' ' t ';
- ~;t'
- :;_, :-;
pr'm:a
- : c' " rc :.;; :::ier.
E-STS s 3/4 7-6
PLANT SYSTEMS BASES FIRE
- SUPPRESSION SYSTEMS (Continued)
Backup fire fighting equipnent, provided when the prinary suppression systens are inoperable, must be able to provide an equivalent capability, in tria centext, equivalent capability means a reasonably similar fire suppression function, consistent with the primary systen's design objective in the Fire Hazards Analysis.
Backup equipment should not compromise plant safety when used.
Th; Cur.;i'1:nt; ' qui ::;nt: pr;;id; ;;;urance that th; c'nimua T ET.CIL!TY -;;uir;m;nt; ;f 15; ~' re S ;pr;;;i;n :y;t: ; Er;, m;t.
An all:-;nce-is I;d: f:r en;;r#ng : N"icient ;;1=: Of tl:r the H;'cr :ter;;; tc.na--
by scr'fy#ng eith r th: ::ight or th: 10:01 Of th: t:rb.
Level m;;;ur;.m:nt; er; J,ed; by Cither U. L. cr
- 9. Oppr:V;d I;th;d.
In the event the Fire Suppression Water System becomes inoperable, FrCnPt
' m; dict; corrective measures must be taken since this system provides the major fire suppression capability of the plant.
2/4 7f12 FIRE RATED ASSEMBLI 'S The f unctional integrity of the fire rated assemblies and barrier penetra-tions ensures that fires will be confined or adequately retarded from spreading to adjacent portions of the facility.
These design features minimize the possibility of a single fire rapidly involving several areas of the facility prio'r to detection and extinguishing of the fire.
The fire barrier penetrations are a passive ele. Tent in the facility fire protection program and are subject to periodic inspections.
Fire barrier penetrations, including cable penetration barriers, fire doors and dampers are considered functional when the visually observed condition is the same as the as-designed condition.
- c th;;e fi.e be. c ;ec g.sc e;i..is
~
that : ; n:t '- th: ::-d::ign:d ::-diti:n, er c.;lutti;r ;b; t; ;;M; t;-
sh;; th;t th; T;dific;ticr 5;;.:t degr:d d th; fir; r; tin; cf th; fi ; b;r-i;r p;n;tratter.
The acti'.e sssemblies (e.g., doors and danpers) are periodically tested to denenstrate their operability.
During periods of time when a barrief is not functional, either:
(1) a continuous fire watcr) is required to be maintained in the vicinity.cf the affected barrier, or (2) the fire detectors on at least one side of the affected barrier must be verified OPERABLE and an hourly fire watch patrol established, until the barrier is restored tc functional status, 3/4.7.13 AREA TEMPERATURE MONITORING w
a e6 The area temperature limitations ensure that safetv-* '-
quipment 3
will not be subjected to temperatures in e -
.. et r envi ronmental quali-8-
fication temperatures.
Excae"-
xcessive temperatures may degrade equipment e
and can causa v.
1ts CPERAEILITY.
The temperature limits include an E
. m...e for instrument error of 2 (
)*F.
=
0C y-STS B 3/4 7-7 uw A
PLANT SYSTEMS BASES 3/4.7.13 ALTERNATIVE / DEDICATED SHUTDOWN SYSTEM The OPERABILITY of the ASS / DSS ensures that a fire will not preclude achieving safe shutdown. The ASS / DSS equipment are independent of areas where a # ire could damage systems normally used to shutdown the reactor. This capability is consistent with GDC 3 and 10CFR50, Appendix R.
The equivalent shutdown capability provided when the ASS / DSS is inoperable depends on the specific equipment involved and, therefore, should be sufficient to assure that the intended shutdown actions can be accceplished, or that fires can be reasonably precluded during that time for which ASS / DSS equipment would otherwise be required, consistent with the ASS / DSS design basis. Any temporary procedures or special fire watch patrols established to provide this equivalent capability should be reviewed by the (PORC) and approved by the (station superintendent) prior to implementation.
3/4.7.14 PORTABLE FIRE EXTINGUISHERS The portable fire extinguishers are the first line of fire defense and are most effective when fires are in their early stages of development. Portable extinguishers provide the capability to protect safety-related ecuiprent from fires in their incipient stages, but must be properly distributed throughcut the plant and maintained in good ope *ating condition to be effective. When an extinguisher is inoperable, it should be promptly repaired or replaced.
3/4.7.15 EMERGENCY LIGHTING UNITS The 8-hour emergency lighting units are provided in arpas needed #cr operation of safe shutdown equipment and in access and egress routes thereto.
This equipment provides illumination for operators to manipulate requirad equiprent concurrent during plant emergency shutdcwn operations with the lost of the normal i.llumination within the area.
This equipment should be properly maintained and if inoperative should be oromptly repaired or replaced consistent with the defense-in-depth philosophy.
_. -.. ~
ADMINISTRATIVE CONTROLS The performance of activities required by the Operational Quality d.
Assurance Program to meet the criteria of Appendix "B",10 CFR 50, at least once per 24 months.
The Emt.;ency Plan and implementing procedures at least once per e.
12 months.
f.
The Security Plan and implementing procedures at least once per 12 months.
Any other area of unit operation considered appropriate by the g.
(CNRAG) or the (Vice President Operations).
h.
The Fire Protection programmatic controls including the implementing orocedures at least once per 24 months by qualified licensee QA
'ersonnel) p T' he fire protecti#n equipment and program implementation at least 1.
once per 12 months utilizing either qualified offsite ifcensee fire protection engineer or an outside independent fire protection consultant.
An outside independent fire protection consultant shall be used at least every third year; AUTHORITY 6.5.2.9 on those areas of responsibility specified in Sections 6.5.2 RECORDS 6.5.2.10 Records of (CNRAG) activities shall be prepared, approved and dis-tributed as -indicated below; Minutes of each (CNRAG) meeting shall be prepared, approved and a.
forwarded to the (Vice President-Operations) within 14 days following each meeting.
b.
Reports of reviews. encompassed by Section 6.5.2.7 above, shall be within 14 days, following completion of the review. prepared Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded c.
to the (Vice President-Operations) and to the management positions responsible for the areas audited within 30 days after completion of the audit by the auditing organization.
P ALL STS 6-13
PROPOSED ACTION STATEMENTS FOR SECTIONS 3.7.11.2-4 AUTOMATIC FIRE SUPPRESSION SYSTEMS With the [ system] inoperable such that one train of a safety system is a.
not protected by automatic fire suppression, verify the functional capability of the redundant safety system train (s) which would accomplish the intended function and its associated fire suppression system, and restore the [ system] to OPERABLE within 7 days or establish hourly fire watch patrols in the affected area (s).
b.
With the [ system] inoperable such that a safety function (i.e., both or all trains of the safety system) is not protected by automatic fire 3
suppression or a fire area is not protected such that a fire could not be contained within the fire barriers which establish the area, within me hour establish a continuous fire watch with eouivalent manual fire suppression equipment in the affected area (s),
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
c.
BASES The OPERABILITY of the fire suppression systems does not include the actuating instrumentation (detectors) because they are covered under 3/4.3.3.8.
When a fire suppression sy' stem is found to be inoperable, the action statement recognizes the importance of the safety functions being protected, consistent i
with the design approach for fire damage limits. When one train of a safety system becomes vulnerable to fires, the functional capability of the redundant train must be verified.
This requirement is intended to provide assurance that a fire in the affected area will not result in a complete loss of the i
a..."
2-safety function of the systems involved.
The term verify the functional capability, as used in this context, means to administrative 1y check by examining logs or other information to determine if necessary components are out-of-service for maintenance or other reasons; it does not mean to perform the survefilance required to demonstrate OPERABILITY of the system because such testing could reduce the system's reliability.
When an entire safety function (both or all trains) becomes vulnerable to fires, prompt action must be taken to ensure adequate manual fire fighting capability, until the automatic fire suppression systems are restored.
Similarly, when a fire area is unprotected such that a fire in that area would not be automatically contained and, therefore, could spread beyond its boundaries, prompt action must be taken to monitor the area with preparations for any manual fire fighting necessary to ensure such fires will be contained.
i 2
t t
?
,,-e,
--,,-m_,-,
--,vym.r~,---
r www_-p,av r -, - -
gwwg---
-,~-m.-
w-n,n s 9 w-m--p eer-
_ Attachment 2 SIGNIFICANT FIRE PROTECTION TECHNICAL SPECIFICATION ISSUES 1.
Detection Instrumentation The Working Group (WG) initially tried to remove the Function B (actuation) instrumentation.from Technical ~ Specification (TS) 3.3.3.8.
Our objective was to simplify the complex action statement associated with Function A, Function B and detectors inside containment.
However, in doing so, the resulting action statement associated with the suppression system, as it would apply to the Function 8 detectors, would be overly restrictive. Moreover, there is an STS ob,iective to keep such instrumentation separate and a precedent in the Reactor Protection System for distinguishing the LC0 for actuating instrumentation (sensors) from the actuated system LCO.
Ideally, there should be a actior matrix which is a function o# the nurber of inoperable detectors in any zone and the number of unprotected fire areas served by those detectors. However, ruch a requirement would be overly complex and confusing.
Conversely, we believe that 3'ction within one hour whenever any detector is inoperab!e is wholly unwarranted.
Therefore, we have left the original construction o# the action statement and modified the restoration periods to be appropriately comparable with those which would be required with one or both trains of a safety system inoperable.
In our judgment these changes are still conservative.
2-2.
Definition of Terms There were several comments that relate to the definitfor or explanation of terms; e.g., fire watch patrol, backup equipment, TRIP ACTUATING DEVICE OPERATIONAL TEST, and puff test.
Terms which are used consistently throughout the STS and have a precise meaning are defined in the introduction and are capitalized in the text (e.g., OPERABLE).
In some ca'ses, there soens to be a wide range of views regarding terms commonly understood by fire protection engineers. Many of the clarificatiens proposed are so detailed that they more appropriately belong in the plant's procedures implementing the -techiiical specifications.
In such. cases, the inspector must be able to judge whether the procedures achieve the objective of the TS and, if they do not, then we would expect that the licensee has a broader problem which requires appropriate enforcement action.
Where reasonably simple and constructive clarifications can be made, we have augmented the associated " bases" section in accordanca with STS practice.
3.
Reporting Requirements There were existing and recommended reporting requirements in action statements which would otherwise allow an indeterminant period of equivalent manual fire detection (fire watch patrol) or suppression.
. These reporting requirements appear to principally serve as a punitive measure to prevent licensees from operating under such conditions for extended periods of time.
We believe that such reporting requirements are unnecessary and only serve to shift the responsibility for action from the licensee to the NRC.
The personnel time (i.e., fire watch patrols) required to provide the equivalent protection should be sufficient incentive for the licensee to repair inoperable equipment.
The Regicos may not completely agree with this judgment.
4 Surveillance Requirements In several cases, recommended changes to the surveillance requirements were so detailed that they constituted implementing procedures or they appeared to verify design capability.
We believe such changes go beyond the objective of surveillance requirements, which is to simply describe the inspections and tests necessary to assure that the LC0 is satisfied.
In those cases where specf fic procedures or testing requirements are necessary to accomplish the surveillance, then soecific references should be cited; e.g., ASTM-D975-1977 for diesel fuel chemistr,f.
Otherwise, procedures for conducting su'rveillance should be prepared in 3ccordance with TS 6.8.1 and, where appropriate, reference is made to procedures
" prepared ir conjunction with manufacturer's reccmmendations."
,m
. 5.
Fire Suppression Systems - Action Requirement Based on comments received, the WG attempted to prepare a new set of action statements which would be applied consistently to all fire suppression systems.
These action statements would recognize that the fire suppression systems serve to protect safety systems and, therefore, if a redundant safety system train is still protected, a longer restoration time could be allowed than if an entire safety function is unprotected.
Even then, manual fire suppression could serve for some reasonable time until the fire suppression system is again operable.
These action statements would also recognize that fire suppression systems prevent fires from spreading from one fire area to another or from growing to an unmanagable size.
/i r#
A draft of these action statements is presented in E*e4esure g'.
While we believe that the approach is correct, we have not had time to assure that the proposed actions are appropriate for all possible system
- ailures. We suggest that the Steering Committee consider this approach and, if agreeable, re will continue to refine this proposal.
6.
Alternate / Dedicated Shutdown Systems Based on a variety of existing and recommended LCOs and surveillance requirements for Alternate and Dedicated Shutdown Systems (ASS / DSS),
the WG has endeavored to construct a composite STS. We received comments regarding ASS / DSS inoperability for 60 days and the completeness of the TS.
n-,----we
-~,,v
<-,v we
-m
,-y
~e
-- y
-~
~
' The WG selected a 60-day restoration period because (1) we included a provision for " equivalent shutdown capability" in the event for inoperable equipment cannot be restored in 7 days, and (2) we considered the time that would be required to evaluate and process a TS change, should a situation arise requiring a temporary modification to the ASS / DSS. We believe that, in most cases, any necessary repairs could be made in 60 days and the system inoperability could be reasonably compensated during that time.
With regard to completeness, we attempted to identify LCOs and surveillance requirements for all of the major system components. A clarifying note is included whi:h explains that additional (plant-specific) components should be similarly added.
7.
Equivalent Cepability There are several actions which require the licensee to establish
" equivalent" fire protection capability when a system is inoperable. We used the term " equivalent" to be consistent with its use throughout the STS. However, we believe this term will be misconstrued in many cases; it does not mean identical, it is intended to be more like " comparable."
In order to ensure this understanding, we have added clarifications to the appropriate bases sections.
y
,.--n.
4
-S-As a generic matter, we recommend that the Technical Specificatico Review Group (TSRG) consider an alternate term for use throughout the STS which will not be construed to mean " identical" where it is not so intended; e.g, ccmparable, compensatory, or appropriate.
8.
Refueling Outage Surveillance The STS specify "at least once per 18 months" for surveillance that are intended during refuelirg outages.
The WG noted that such a period can create schedular problems for plants with long power runs and, therefore, reconnended changer to "at each refueling outage."
This is a policy issue beyond. fire protection.
The -STS practice is to specify time periods.
In either case, there are potential problems (e.g., replacing one fuel element is a refueling outage).
Therefore,
we have withdrawn our recommendation in favor of consistency. However, as a generic matter, we suggest the TSRG consider extending the 18-month period or specify "at least at each scheduled refueling outage but not less often than once each 24 months."
9.
Emergency / Security Plans A question was raised regarding a change in the schedules from 24 months to 12 months for Emergency and Security Plans (6.5.2.8).
These changes were made by the TSRG, not the WG, to make these schedules consistent with the requirement for annual updates required in the regulations.
WORKING GROUP COMMENTS ON PROPOSED FIRE PROTECTION TECHNICAL SPECIFICATIONS The Working Group reviewed the Standard Technical Specifications (STS) taking into account comments from Regions I, II ar.d III. The CRGR package version of the Westinghouse STS was used as the basis document. The Working Group attempted to simplify and clarify the STS and added specifications for alterna-tive and dedicated shutdown systems, port;ble fire extinguishers and emergency
' lighting. The rationale for these additions is that these features are explicitly included in Appendix R.
Obviously, the Working Group has had to exercise a collective judgment to develop these recommended changes to the technical specifications. We did not always include recommended changes to the technical specifications; because of the wide' range of opinions, we perceive that there may never be universal agreement on the details of these requirements.
Neverthaless, there were comments which raised issues broader than fire protection or involved
' conflicting objectives; e.g., simplicity of action statements, definition of terms, reporting requirements, procedural details, action objectives and t
9
, consistency, use of " equivalent" capabilities, and surveillance during refueling outages.
To ensure that the bases for our recommended changes are clearly understood, we have responded to the more significant comments and explained some of our judgments in Attachment 2.
We have also recommended
. generic improvements to the STS which should be considered when a final action is taken to upgrade the fire protection technical specifications.
The Working Group is not entirely satisfied with its revisions to the STS.
Although we believe the surveillance and LCOs concerning fire protection enhance safety, we are concerned that the way they are presented elevates fire protection almost to the stature of ECCS. However, given the safety signifi-cance of fire prctection 3rd the present format of the STS, the Working Group could not come up with an acceptable alternative.
We believe that the technical specification format included in the proposed rulemaking offers a more appropriate way of regulating fire protection sur-vefilance and compensatory measures for inoperative equipment.
The rule-making (47FR13369, 3/30/82) calls for only the most important features to be a
included in the body of the technical specifications.
The LCOs, compensatory measures, surveillance requirements, and admir.istrative requirements of lesser importance but still important to safety removed from the technical specifica-tions are to be p* aced in a companion document (supplemental specifications).
The supplemental specification may t,e revisec by the licensee upon approval l
s I
4 }
of its safety committee. The supplemental specifications and the documentation of surveillance and tests conducted in accordance with the supplemental speci-fications are subject to NRC inspection.
1 We recommend that the "new" Technical Specifications include an administrative l
requirement for the licensee to maintain a procedure for surveillance and compensatory measures for inoperative equipment. This procedure would not be a part of the Technical Specifications but would be included in and therefore could be revised by the licensee on approval of the licensee's safety committee without NRC approval.
However, the procedure and the records of surveillances and compensatory measures could be inspected by the region.
i l
l i
I i
i
'1 9
- \\
1 k
.i.
ENCLOSURE 6 4
j 5/.5/b'J^
~
o O 7D o 4 *t^b. V Y L l,
- /
0 q /p ern vacv l
p,,k,g fxo fy cx #sst a /te an b.y I
&e rro oued
/
r
%> > *) e.
m bu, a,_e / / C Y
/r APPENDIX R QUESTIONS AND ANSWERS i.
i 1
e i
{
i i
- h j
l
?
O
APPENDIX R QUESTIONS AND ANSWERS 1.
INTRODUCTION
?.
OVERVIEW 3.
III G, FIRE PROTECTION OF SAFE SHUTDOWN CAPABILITY 3.1 Fire Area Boundaries 3.1.1 Fire Area Definition 3.1.2 Previously Accepted Fire Area Boundaries 3.1.3 Exterior Walls 3.1.4 Exterior Yards 3.1.5 Fire Zones 3.1.6 Documentation 3.2 Fire Barrier Qualifications 3.2.1 Acceptance Criteria 3.2.2 Deviations from Tested Configurations 3.2.3 Fire Door Modifications
- 3. 3 Structural Steel 3.3.1 NFPA Approaches 3.3.2 Previously Accepted Structural Steel 3.3.3 Seismic Supports 3.3.4 rabit Tray Support Protection 3.4 Automatic Suppression System 3.4.1 Water Density 3.4.2 NRC Consultation 3.4.3 Sprinkler Location 3.4.4 Fixed Suppression System In Fire Area 3.4.5 Sprinkler Head Location 3.4.6 Previously Approved Suppression Systems
- 3. 5 Separation of Redundant Circuits 3.5.1 Twenty-Foot Separation Criteria 3.5.2 Floor-to-Floor Separation 3.6 Intervening Combustibles 3.6.1 Negligible Quantities of Intervening Combustibles 3.6.2 In Situ Exposed Combustibles 3.6.3 Unexposed Combustibles APPENDIX R QUESTIONS & ANSWERS 1
c
3.7 Radiant Energy Shields 3.7.1 Fire Rating 3.8 Design Bases 3.8.1 FireProtectionFeaturesNFPAConformbnce 3.8.2 Design Basis Fire 3.8.3 Redundant Trains / Alternate Shutdown 3.8.4 Control Room Fire Considerations 4.
III J, EMERGENCY LIGHTING 4.1 Illumination Levels 5.
III L, ALTERNATIVE AND DEDICATFD SHUTDOWN CAPABILITY 5.1 Safe and Alternative Shutdown 5.1.1 Previously Accepted Alternativa Shutdown Capability 5.1.2 Pre-Existing Alternative Shutdown Capability 5.1.3 III L Buckfit 5.2 ?rocedures 5.2.1 Shutdown and Repair Basis 5.2.2 Post Fire Operating Procedures 5.2.3 Alternative Shutdown Capability 5.2.4 Post Fire Procedures Guidance Documents 5.3 Safe Shutdown and Fire Damage 5.3.1 Circuit Failure Modes 5.3.2
" Hot Short" Duration 5.3.3 Het Shutdewn Caration 5.3.4 Couldown Equipment 5.3.5 Pressurizer Heaters 5.3.6 On-Site Power 5.3.7 Torus Level Indication 5.3.8 Short Circuit Coordination Studies 5.3.9 Diagnostic Instrumentation 5.3.10 Design Basis Plant Transients 5.3.11 Alternate / Dedicated Shutdown vs. Remote Shutdown Systems 6.
III 0, OIL COLLECTION SYSTEMS FOR REACTOR COOLANT PUMP 6.1 Lube Oil System Seismic Design 6.2 Container 7.
BRANCH TECHNICAL POSITION CMEB 9.5-1 7.1 Fire Protection and Seismic Events 7.2 Random Fire and Seismic Events APPENDIX R QUESTIONS & ANSWERS 2
t
8.
LICENSING POLICY 8.1 Fire Hazards Analysis / Fire Protection Plan Updating 8.2 Fire Protection License Condition 8.3 III G. J and 0 Exemptions for Future Modifications 8.4 Future Changes 8.5 Schedular and Blanket Exemptions 8.6 Trivial Deviations
- 8. 7 Revised Modifications 8.8 Smallest Opening in a Fire Barrier 8.9 NFPA Code Deviations 8.10 " ASTM E-119" Design Basis Fire 8.11 Plants Licensed After January 1,1979 8.12 Cold Shutdown Equipment Availability 8.13 Guidance Documents 8.14 Deviations from Guidance Documents 8.15 Staff Interpretations of Appendix R 8.16 Dissemination of New Staff Positions 8.17 Equivalent Alternatives 8.18 Coordination Study Updates 8.19 Exemption Request Threshold 8.19.1 Penetrction Designs Not Laboratory Approved 8.19.2 Individual vs. Package Exemptions 8.19.3 Exemption Request Supporting Detail 8.19.4 50.12 vs. 50.48 Exemption Requests 3.20 Post January 1, IS79 Plants and Exemption Requests 8.21 NRC Approval for BTP CMEB 9.5-1 Deviations 9.
INSPECTION POLICY 9.1 Safety Implications 9.2 Uniform Enforcement 5.2 NT0L Ir.5;;tc:icas
- 9. 4 Future TI 2515/62 Revisions
- 9. 5 Documentation Supplied by Licensee 5.6 Subsequent Inspections 9.7 NRC List of Conforming Items
- 9. 8 Inspection Re-review 9.9 List of Shutdown Equipment i
APPENDIX R QUESTIONS & ANSWERS 3
1.
INTRODUCTION A major fire damaging safe shutdown equipment occurred at' the Browns Ferry Nuclear Station in March 1975.
The fire damaged over 1600 electrical cables and caused the temporary unavailability of some core cooling systems.
Because this fire did substantial damage, the NRC established a Special Review Group which initiated an evaluation of the need for improving the fire protection pro-grams at all nuclear power plants.
The group found serious design inadequacies regarding fire protection at Browns Ferry, and its report, " Recommendations Related to Browns Ferry Fire" (NUREG-0050, February 1976), contained over fifty recommendations regarding improvements in fire prevention and control in exist-ing facilities.
The report also called for the development of specific guidance for implementing fire protection regulations, and for a comparison of that guid-ance with the fire protection program at each operating plant.
NRC developed technical guidance from the technical recommendations in the Special Group's report, and issued those guidelines as Branch Technical Position Auxiliary Power Conversion Systems Branch 9.5-1 (BTP APCSB 9.5-1),l/ " Guidelines for Fire Protection for Nuclear Power Plants." This guidance did not apply to plants operating at that time.
Guidance to operating plants was provided later inAppendixA3/toBTPAPCSB9.5-1which,totheextentpracticable,relieson BTP APCSB 9.5-1.
The guidance in these documents was also published for public comment as Regulatory Guide 1.120, " Fire Protection for Nuclear Power Plants" (June 1976).
In response to public comment, the NRC issued an extensively revised version of Regulatory Guide 1.120 for further public comment.
In May 1976, the NRC asked licensees to compare operating reactors with BTP APCSB 9.5-1, and in September 1976, those licensees were informed that the guidelines in Appendix A would be used to analyze the consequences of a fire in each plant area.
In September 1976 the licensees, were also requested to provide a fire hazards analycis that divided the plant into distinct fire 3-nac and snow that redundant systems required to achieve and maintain cold shutdown are adequately protected against damage by a fire.
Early in 1977 each licensee responded with a Fire Protection Program E aluation which ir.cluded a Fire Ha: ara Analysis.
These evaluations and analyses identified aspects of licensees' fire protection programs that did not conform to the NRC guidelines.
!/Rather than serving as inflexible, legal requirements that must be followed by licensees, issuances such as regulatory guides and branch technical posi-tions are meant to give guidance to licensees concerning those methods the staff finds acceptable for implementing the general criteria embodied in the NRC's rules.
See, e.g., Petition for Emergency & Remedial Action, CLI-78-6, 7 NRC 400, 406 (1978);
Gulf States Utilities Company (River Bend Station, Units 1 and 2) ALAB-444, 6 NRC 760, 772 (1977).
3/ Guidelines for Fire Protection for Nuclear Power Plants Docketed Prior to July 1, 1976.
APPENDIX R QUESTIONS & ANSWERS 1
O Thereafter,'the' staff initiated discussions with all licensees aimed at achieving implementation of fire protection guidelines by October 1980.
The staff held many meetings with licensees, conducted extensive correspondence with them, and visited every operating reactor.
As a result, many fire protection items were resolved, and agreements were included in Fire Protection Safety Evaluation Reports issued by the NRC.
Several fire protection issues remained enresolved with a number of licensees.
By early 1980, most operating plants had implemented most of the guidelines in Appendix A.
However, as the Commission noted in its Order of May 23, 1980, the fire protection program has had some significant problems with implementa-tion.
Despite the staff's efforts, several licensees had expressed continuing disagreement with, and refused to adopt recommendations relating to several generic issues, including the requirements for fire brigade size and training, water supplies for fire suppression systems, alternate and dedicated shutdown capability, emergency lighting, qualifications of seals used to enclose places where cables penetrated fire barriers, and the prevention of reactcr coolant pump lubrication system fires.
To establish a definitive resolution of these contested subjects in a manner consistent with the general guidelines in Appen-dix A to the BTP and to assure timely compliance by licensees, the Commission issued a proposed fire protection rule and its Appendix R, which was described as setting out minimum fire protection requirements for the unresolved issues (45 Fed. Reg. 36082 May 29, 1980).3/ The fire protection features addressed included protection of safe shutdown capability, emergency lighting, fire bar-riers, associated circuits, reactor coolant pump lubrication system, and alter-nate shutdown systems.
The Commission stated that it expected all modifications (except for alternate and dedicated shutdown capability) to be implemented by November 1,19802/
As originally proposed (Federal Register Vol. 45 No. 1&5, May 22, 1980),
Appendix R would have applied to all plants including those for which the staff had previously accepted other fire protection modifications.
After analyzing comments on the rule, the Commission determined that only three of the fifteen items in Appendix R were of such safety significance that they should apply to all nients inc1Mino those for which alternative fire pitecticr. atticos h;d been approved previously by the staff.
These items are protection of safe shutdown capability (including alternate shutdown systems), emergency lighting, M tec reactor coolant pump lubrication system.
Accordingly, the final rule required all reactors licensed to operate before January 1, 1979, to comply with these three items even if the NRC had previously approved alternative fire protection features in these areas (45 Fed. Reg. 76602 Nov. 19, 1980).
- However, the final rule is more flexible than the proposed rule because Item III.G now provides three alternative fire protection features which do not require anal-ysis to demonstrate the protection of redundant safe shutd'own equipment, and reduces the acceptable distance in the physical separation alternative from fifty feet to twenty feet.
In addition, the rule now also provides an exemp-tion procedure which can be initiated by a licensee's assertion that any required fire protection feature will not enhance fire protection safety in the facility or that such modifications may be detrimental to overall safety (10 CFR 50.48(c)(6)).
If the Director, Nuclear Reactor Regulation determines 3/11NRC707,718(1980) f/Id. at 719 APPENDIX R QUESTIONS & ANSWERS 2
o that a licensee has made a prima facie showing of a sound technical basis for such an assertion, then the implementation dates of the rule are tolled until final Commission action on the exemption request.
Most licensees requested and were granted additional time to perform the'r reanalysis, propose modifications to improve post fire sh to identify exemptions for certain fire protection configu,utoown capability &nd rations.
In reviewing some exemption requests, the staff noted that some licensees had made signifi-cantly different interpretations of certain requirements.
Thesa differences were identified in the staff's draft SER's.
These differences were also dis-cussed on several occasions with the cognizant licensee as well as the Nuclear Utility Fire Protection Group.
These discussions culminated in the issuance of generic letter 83-33, 2.
OVERVIEW Section 50.48 Fire Protection of 10 CFR Part 50 requires that each operating nuclear power plant have a fire protection plan that satisfies General Design Criterion 3 of Appendix A to 10 CFR 50.
It specifies what should be contained in such a plan and lists the basic fire protection guidelines for this plan.
It requires that the Fire Protection Safety Evaluation Report which has ;2een issued for each operating plant state how these guidelines were applied to each facility.
Section 50.48 also requires that all plants with operating licenses prior to January 1,1979 satisfy the requirements of Section III.G, III.J and III.0, and other Sections of Appendix R where approval of similar features had not been obtained prior to the effective date of Appendix R.
By a separate action, the Commission approved the staff's requirement that all plants to receive their operating license after January 1,1979 also satisfy the requirements of Sections III.G, III.J and III.0 and that a fire protecticn license condition be established.
Deviations from Appendix R requirements for pre-1979 plants are processed under the exemption process.
Deviation from other guicelines are identified and evaluated in the Safety Evaluation Report.
A standard fire protection license condition has been developed and will be included in each riew operating license.
Present operating licenses will be amended to include the standard license condition.
The Regions initiated inspections of operating plants and identified several significant items of non-compliance.
The Nuc, ear Utility Fire Protection Group requested interpretations of certain Appendix R requirements and provided a list of questions that they thought should be discussed with the industry.
The NRC held workshops in each Region to assist the industry in understanding the NRC's requirements and to improve the Staff's understanding of the industry's CortCerns.
This document presents the NRC's response to the questions posed by the industry and supplemented with additional questions identified at the workshops as being of interest to the industry or the staff.
These responses may be used as guid-ance for design, review and inspection activities.
The questions have been reformatted according to their applicability to Sections of Appendix R, BTP CMEB 9.5-1, licensing policy or inspection policy.
APPENDIX R QUESTIONS & ANSWERS 3
o 3.
SECTION III.G, F1RE PROTECTION OF SAFE SHUTDOWN CAPABILITY 3.1 Fire Area Boundaries 3.1.1 Fire Area Definition I
QUESTION Section III.G states the fire protection features required for cables and
-equipment or redundant trains of systems required to achieve and maintain hot shutdown that are located within the same fire area.
Is the fire area of Section III.G, the same fire area referred to in BTP APCSB 9.5-1, Appendix A; i
and the supplementary guidance of September 1976?
RESPONSE
The definition of a fire area given in the BTP is somewhat more restrictive than that given in Section #4 of the " Interpretations of Appendix R."
- Clearly, where a licensee has reviewed its facility using the BTP criteria, this would meet Appendix R requirements.
The BTP criteria may continue to be used as guidance, but the minimum requirements for fire area boundaries are set out in Section #4 of the " Interpretations."
3.1.2 Previously Accepted Fire Area Boundaries QUESTION If a fire area boundary was described as a rated barrier in t.he 1977 fire hazards analysis, no open items existed in this area in the Appendix A SER, and the barriers have not been altered, then need those barriers be reviewed by licensees or the Staff under Appendix R?
RESPONSE
If a fire area boundary was describad as a rated barrier in the 1977 fire hazards u..ai,a!., and was evaluated and accepted in a published SER, tne fire area boun-dary need not be reviewed as part of the re analysis for compliance with Sec-tion III.G of Appendix R.
Openings in the fire barriers, if any, should have been specifically identified and justified in the fire hazards analysis per-formed in the Appendix A process.
If openings in the fire area boundaries were not previously evaluated, such an evaluation should be performed as a basis for assessing compliance with Appendix R.
See Items #4 and #6 of the "Interpreta-cions of Appendix R," and the response to question 3.1.1.
In BTP APCSB 9.5-1, Fire Barrier is defined as:
" Fire Barrier - those components of construction (walls, floors, and roofs) that are rated by approving laboratories in hours for resistance to fire to prevent the spread of fire.
The term " fire area" as used in Appendix R means an area sufficiently bounded to withstand the hazards associated with the fire area and, as necessary, to protect important equipment within the fire area from a fire outside the area.
In order to meet the regulation, fire area boundaries need not be completely APPENDIX R QUESTIONS & ANSWERS 4
7
e sealed with floor to ceiling and/or wall-to-wall boundaries.
Where fire area boundaries were not approved under the Appendix A process, or where such bounc-
)
aries are not wall-to-wall or floor-to-ceiling boundaries with all penetrations l
sealed to the fire rating required of the boundaries, licensees must perform an i
evaluation to assess the adequacy of fire area boundaries in their plants to determine if the boundaries will withstand the hazards associated with the area and protect important equipment within the area from a fire outside the area.
l s
This analysis must be performed by at least a fire protection engineer and, if required, a systems engineer.
Although not required, licensees may submit their i
evaluations for Staff review and concurrence.
In any event, these analyses must be retained by the licensees for subsequent NRC audits.
3.1. 3 Exterior Walls QUESTION Must exterior walls to buildings and their penetrations be qualified as rated barriers?
RESPONSE
Exterior walls and their penetrations should be qualified as rated barriers when (1) they are required to separate a shutdown related division (s) inside the plant from its redundant (alternate) counterpart outside the plant in the immediate vicinity of the exterior wall, (2) they separate safety related areas from non-safety related areas that present a significant fire threat to the safety related areas, or (3) they are designated as a fire barrier in the FSAR or FHA.
Usually exterior walls are designated as a fire area boundary; therefore, they are evaluated by the guidelines of Appendix A.
A FHA should be performed to determine the rating of exterior walls, if required by the above criteria.
3.1.4 Exterior Yards QUESTION
% should a utility define the boundaries of fire areas comprising exterior yards?
_ RESPONSE An exterior yard area without fire barriers should be considered as one fire area.
The area may consist of several fire zones.
The boundaries of the fire zones should be determined by a FHA.
The protection for redundant / alternate shutdown systems within a yard area would be determined on the bases of the largest " design basis fire" (see response to j
question 3.8.2) that is likely to occur and the resulting damage.
The boundaries of such damage would have to be justified with a fire hazards analysis.
The i
analysis should consider the degree of spatial separation between divisions; the l
presence of in-situ and transient combustibles, including vehicular traffic; grading; available fire protection; sources of ignition; and the vulnerability and criticality of the shutdown related systems.
See Sections #3, #4 and #6 of the " Interpretations of Appendix R."
APPENDIX R QUESTIONS & ANSWERS 5
1 l
3.1.5 Fire'2ones QUESTION Appendix R,Section III.G.3 states " alternative or dedicated shutdown capability and its associated circuits, independent of cables, systems or components in the area room or zcne under consideration...." What is the implied utilization of a room or zone concept under Section III.G of Appendix R? The use of the phraseology " area, room or zone under consideration" is used again at the end of the Section III.G.3.
Does the requirement for detection and fixed suppres-sion indicate that the requirement can be limited to a fire zone rather than throughout a fire area?
Under what conditions and with what caveats can the fire zone concept be utilized in demonstrating conformance to Appendix R?
RESPONSE
Section III.G was written after NRC's multi-discipline review teams had visited all operating power plants.
From these audits, the NRC recognized that it is not practical and may be impossible to subdivide some portions of an operating plant into fire areas.
In addition, the NRC recognized that in some cases where fire areas are designated, it may not be possible to provide alternate shutdown capability independent of the fire area and, therefore, would have to be evaluated on the basis of fire zones within the fire area.
The NRC also recognized that because some licensees had not yet performed a safe shutdown analysis, these analy:es may identify new unique configurations.
To cover the large variation of possible configurations, the requirements of Section III.G were presented in three parts:
Section III.G.1 requires one train of hot shutdown systems be free of fire damage and damage to cold shutdown systems be limited.
Section III.G.2 provides certain separation, suppression and detection requirements within fire areas; where such requirements are met, analysis is not necessary.
Section III.G.3 requires alternative dedicated shutdown capability for configurations that do not satisfy the requirements of !!!.G.2 or where fire suppressants released as a result of fire fighting, rupture of the system or inadvertent operation of the system may damage redundant equip-ment.
If alternate shutdown is provided on the basis of rooms or zones, the provision of fire detection and fixed suppression is only required in the room or zone under consideration.
6 Section III.G recognizes that the need for alternate or dedicated shutdown capability may have to be considered on the basis of a fire area, a room or a fire zone.
The alternative or dedicated capability should be independent of the fire area where it is possible to do so (See Supplementary Information for the final rule Sec' tion III.G).
When fire areas are not designated or where it is not possible to have the alternative or dedicated capability independent of the fire area, careful consideration must be given to the selection and location of the alternative or dedicated shutdown capability to assure that the performance requirement set forth in Section III.G.1 is met.
Where alternate or dedicated shutdown is provided for a room or zone, the capability must be physically and APPENDIX R QUESTIONS & ANSWERS 6
0 0
electrically independent of that room or zone.
The vulnerability of the equip-ment and personnel required at the location of the alternative or dedicated shutdown capability to the environments produced at that location as a result of the fire or fire suppressant's must be evaluated.
These environments may be due to the hot layer, smoke, drifting suppressants, common ventilation systems, common drain systems or flooding.
In addition, other interactions between the locations may be possible in unique configurations.
If alternate shutdown is provided on the basis of rooms or zones, the provision of fire detection and fixed suppression is only required in the room or zone under consideration.
Compliance with Section III.G.2 cannot be based on rooms or Zones.
See also Sections #5 and #6 of the "Interpretat*ons of Appendix R."
3.1.6 Documentation QUESTION In Generic Letter 83-33 at pg. 2, the NRC Staff referred to the guidance in Appendix A to BTP 9.5-1 to establish the rating of the barrier.
What level of documentation must be provided to verify that the fire area meets the require-ments of Appendix R?
RESPONSE
The documentation required to verify the rating of a fire barrier should in-clude the design description of the barrier and the test reports that verify its fire rating.
Reference can be made to UL listed designs.
3.2 Fire Barrier Qualification 3.2.1 Acceptance Criteria OUESTION Recently the Staff has applied a 325'F cold side temperature criterion to its evaluation of the acceptability of one-hour and three-hour fire barrier cable tray wraps.
This criterion is not in Branch Technical Position (BTP) APCSB 9.5-1, Appendix A as an acceptance criterion for fire barrier cable tray wraps and is not contained in Appendix R.
It appears to represent post-Appendix R guidance.
What is the origin of this criterion and why is it applicable to electrical l
cables where insulation degradation does not begin until jacket temperatures reach 450'F to 650'F?
j
RESPONSE
I Fire barriers relied upon to protect shutdown related systems to meet the re-l quirements of III.G.2 need to have a fire rating of either one or three hours.
S 50.48 references BTP APCSB 9.5-1, where the fire protection definitions are found.
Fire rating is defined:
i
" Fire Rating - the endurance period of a fire barrier or structure; it defines the period of resistance to a standard fire exposure before the first critical point in behaviur is observe,d (see NFPA 251)."
l APPENDIX R QUESTIONS & ANSWERS 7
The acceptance criteria contained in Chapter 7 of NFPA 251, " Standard Methods of Fire Tests of Building Construction and Materials," pertains to non-bearing fire barriers.
These criteria stipulate that transmission of heat through the barrier "shall not have been such as to raise the temperature on its unexposed surface more than 250 F above its initial temperature." The ambient air tem-perature at the beginning of a fire test usually is between 50 F and 90 F.
It is generally recognized that 75 F represents an acceptable norm.
The resulting 325 F cold side temperature criterion is used for cable ttay wraps because they perform the fire barrier function to preserve the cables free of fira damage.
It is clear that cable that begins to degrade at 450 F is free of fire damage at 325 F.
During the Appendix A review, licensees began to propose fire barriers to enclose cable trays, conduit, fuel lines, coolant lines, etc.
Industry did not have standard rating tests for such components or for electrical, piping or bus duct penetrations.
The NRC issued a staff position giving acceptance criteria for electrical penetration tests.
These criteria require an analysis of any temperature on the unexposed side of the barrier in excess of 325 F.
In the past, manufacturers designed their own qualification tests.
Nuclear Insurers, and the Institute of Electrical and Electronic Engineers have issued tests for some of these components.
These tests usually exposed the component to the ASTM E-119 time temperature curve, but all had different acceptance criteria.
Conduit and cable tray enclosure materials accepted by the NRC as 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> barrier prior to Appendix R (e.g. some Kaowool and 3M materials) and already installed by the licensee need not be replaced even though they may not have met the 325'F criteria.
However, for newly identified conduit and cable trays requiring such wrapping new material which meets the 325 F crite-rion should be used, or justification should be provided for use of material which does not meet the 325 F criterion. This may be based on an analysis demonstrating that the maximum recorded temperature is sufficiently below the cable insulation ignition temperature.
3.2.2 Deviations from Tested Configurations m.e e v,3 Cue to obstructions and supports, it is often impossible to achieve exact dupli-c W ;n af the specific tested configuration of the one-hour fire barriers which are to be placed around either conduits or cable trays.
For each specific in-stance where exact replication of a previously tested configuration is not and cannot be achieved, is an exemption necessary in order to avoid a citation for a violation?
RESPONSE
No.
Where exact replication of a tested configuration cannot be achieved, the field installation should meet all of the following criteria:
1.
The continuity of the fire barrier material is maintained.
2.
The thickness of the barrier is maintained.
3.
The nature of the support assembly is unchanged from the tested configuration.
APPENDIX R QUESTIONS & ANSWERS 8
4.
The application or "end use" of the fire barrier is unchanged from the tested configuration.
For examole, the use of a cable tray barrier to protect a cable tray which differs in configuration from those that were
~
tested would be acceptable.
However, the use of struttural steel fire proofing to protect a cable tray assembly may not be acceptable.
5.
The configuration has been reviewed by a qualified f' ire protection engineer and found to provide an equivalent level of protection.
3.2.3 Fire Door Modifications QUESTION Where labeled and rated fire doors have been modified to incorporate security hardware or for flooding protection, is an exemption from Appendix R required?
RESPONSE
Where a dcor is part of a fire area boundary, and the modification does not effect the fire rating (for example, installation of security " contacts"), no further analysis necd be performed.
If the modifications could reduce the fire rating (for example, installation a vision panel), the fire rating of the door should be reassessed to ensura that it continues to provide adequate mar-gin considering the fire loading on both sides.
Since this reassessment per-tains to the establishment of a valid fire area boundary, an exemption is not required.
See Section #4 of the " Interpretations of Appendix R."
3.,3 Structural Steel 3.3.1 NFPA Approaches QUESTION Does the NRC's definition of structural steel supporting fire barriers com-pletely accommodate artroaches described in NFPA guidance d:cu cats and st;ndarc:?
RESPONSE
The NRC does not define the structural steel supporting fire barriers.
This steel is identified by the licensee.
Our position regarding the need to protect the structural steel, which forms a part of or supports fire barriers, is con-sistent with sound fire protection engineering principles as delineated in both NFPA codes and standards, and The Fire Protection Handbook.
3.3.2 Previously Accepted Structural Steel QUESTION Is it necessary to protect structural steel in exisitng fire barriers where those barriers were approved in an Appendix A SEP?
RESPONSE
No.
APPENDIX R QUESTIONS & ANSWERS 9
i e
t 3.3.3 Seismic Supports QUESTION Does structural steel whose sole purpose is to carry dynamic loads from a seismic event require protection in accordance with Section III.G.2a of Appendix R7 s
RESPONSE
No, unless the failure of any structural steel member due to a fire could result in significant degradation of the fire barrier.
Then it must be protected.
4
)
3.3.4 Cable Tray Support Protection QUESTION Should cable tray supports be protected if there is a sprinkler system in the fire area? Under what conditions may cable tray supports be unprotected? Do unprotected supports require an exemption?
RESPONSE
In general, cable tray supports should be protected, regardless of whether there j
is a sprinkler system.
However, they need not be protected if (1) the qualifi-cation tests were performed on wrapped cable trays with unprotected supports, and the supports are shown to be adequate, or (2) an analysis is performed, wnich takes into account the fire loading and automatic suppression available I
in the area, and which demon-strates that the unprotected support (s) will not fail and cause a loss of the cable tray fire barrier required for the postulated j
fire.
1 An exemption is not required; however, the qualification tests and applicability or the structural evaluatiun should be documented and available for audit.
?. 4
& +--stic w m u ten Svst m l
3.4.1 Water Density QUESTION f
Staff guidance provided in Generic Letter 83-33 concerning automatic suppression coverage of fire areas interprets the phrase "in the fire area" in Section III.G as meaning "throughout the fire area." What delivered water density or occupancy standard as specified in NFPA-STD-13 must be achieved to meet this guidance?
RESPONSE
1
}
Individual plant areas are diverse in nature.
The designer should determine the particular water density or occupancy classification.
Those areas which contain a limited quantity of in-situ and anticipated transient cornbustibles and which feature contents such as tanks and piping, may be considered as
" Ordinary Hazard (Group 1)," as defined by NFPA Standard No. 13.
For those areas containing large amounts of cables or flammable liquids, an occupancy classification of " Extra Hazard" may be warranted.
The decision as to which APPEN0!X R QUESTIONS & ANSWERS 10 l
i
i classification should be applied should be made by a qualified fire protection i
engineer.
Once the occupancy classification is determined, the minimum water density i
should be based on the Density Curves in table 2.2.1(B) of NFPA 13.
Any den-sity equal to or in excess of the curves would be in conformance with our guidelines as delineated in Section C.6.c of BTP CMEB 9.5-1.
3.4.2 NRC Consultation QUESTION Section 4.1.2 of NFPA-STD-13 allows for " partial installations" or partial coverage.
The standard states that "the authority having jurisdiction shall be consulted in each case." With the NRC as authority in this instance, must consultation occur only through the exemption process?
j I
i
RESPONSE
i l
No.
The staff is always available to consult with utility representatives and
[
provide guidance as to the acceptability of a particular fire protection con-I figuration in individual plant areas.
See also Section #5 of the "Interpreta-tions of Appendix R."
i 3.4.3 Sprinkler Location t
l QUESTION How does a suppression system designer know whether the term "throughout the area" means that sprinkler heads must be above or below cable trays when, in I
his judgment, the hazard of concern is a floor based fire?
l 1
i
RESPONSE
i i
h: tion C.G.c(3) of BTP C"EB 9.5-1 states:
i
"(3) Fixed water extinguishing systems should conform to requirements of i
appropriate standards such as NFPA-13. " Standard for the Installation of Sprinkler Systems," and NFPA-15, " Standard for Water Spray Fixed Systems"."
i
)
This question pertains to those spriakler systems covered by NFPA-13.
Chapter 4 of NFPA-13 provides guidance as to the location of sprinkler heads in relation to common obstructions.
In general, to achieve complete area-wide coverage, l
sprinklers should be located at the ceiling, with additional sprinklers provided below significant obstructions such as wide HVAC ducts and " shielded" or solid i
bottom' stacked cable trays.
To the extent that an existing or proposed sprin-klar system design deviates from this concept, the design would have to be justified by a fire hazards analysis.
See also Section #5 of the "Interpreta-1 tions of Appendix R."
l i
APPENDIX R QUESTIONS & ANSWERS 11
)
l i
i
(
3.4.4 FixedSuppr[ssionSystemInFireArea QUESTION l
Are fixed suppression systems required by Section III G.3 to be throughout the
[
fire area, room or zone under consideration?
l
RESPONSE
No, but partial coverage must be properly justified and documented.
See Item #5 of the " Interpretations of Appendix R."
"... suppression less than full area coverage may be adequate to comply with l
the regulation. Where full area suppression and detection is not installed, licensees must perform an evaluation to assess the adequacy and necessity of j
partial suppression and detection in an area.
The evaluation must be performed by a fire protection engineer and, if required, a systems engineer.
Although I
l not required, licensees may submit their evaluations to the staff for review and' concurrence.
In any event, the evaluations must be retained for subsequent i
NRC audits..."
3.4.5 Sprinkler Head Location t
QUESTION I
If stacks of horizontal or vertical cable trays extend from ceiling to floor, i
i are sprinkler heads required (1) under the lowest horizontal trays, near the l
floor for vertical trays; (2) at some intermediate level between the floor and ceiling, and (3) at the ceiling?
RESPONSE
Sprinkler heads should be located at the ceiling.
Sprinkler heads at other E
locations may be necessary depending upon the hazard and the cumulative effect l
of the obstructions to the discharge of water from the sprinkler head.
The j
sprinkler system design should meet NFPA 13.
i i
3.4.6 Previously Approved Suppression Systems i
QUESTION
)
Must suppression systems approved and installed under BTP APCSB 9.5-1, Appen-dix A be extended or altered to meet the total area'requir'ements of Section III.G l
(as interpreted by the Staff) or does this " requirement" only apply to new installations?
RESPONSE
Suppression systems installed in connection with Appendix A may or may not have h
to be extended as a result of III.G.
The licensee must analyze each area where suppression is required by III.G, and where only partial suppression has been provided, determine if the coverage is adequate for the fire hazard in the crea.
l The licensee may consult with the staff during this review.
In any event, the APPEN0!X R QUESTIONS & ANSWERS 12
Appendix R analysis showing that the suppression provided is adequate must be retained and available for NRC audit.
See also Section #5 of the "Interpreta-tions of Appendix (t."
3.5 Separation of Redundant Circuits 3.5.1 Twenty-Foot Separation Criteria QUESTION Assuming that a licensee is utilizing the 20-foot separation for circuit protec-i tion, could an exemption request be granted for a portion of the circuit that did not maintain the 20-foot minimum separation if that portion was protected by one-hour barrier until 20-foot was achieved? This barrier would not be firewall-to-firewall, and the circuit protection would not be claimed under the one-hour barrier rule.
i
RESPONSE
With the erection of a partial qualified one-hour rated barrier for portions of the circuits with less than 20 ft. separation, if 20 feet of horizontal separation existed between the redundant unprotected portions of the circuits without intervening combustibles or fire hazards, and if the fire area was pro-tected by automatic fire detection and suppression, compliance with Section III.G.2.b would be achieved.
i These types of configuration have to be evaluated cn a case-by-case basis by the NRC.
3.5.2 Floor-to-Floor Separation QUESTION Where redundant circuits are separated by floor elevation but are within the same fire area due to open hatchways, stairs, etc., wnat is the flDC's position with regard to separation criteria?
If train A is located twenty feet from an open hatchway on the lower elevation and train B is located ten feet from the i
same opening on the next elevation, would this be considered adequate separation?
{
RESPONSE
If 1 wall or floor / ceiling assembly contains major unprotected openings such as hatchways and stairways, then plant locations on either side of such a bar-rier must be considered as part of a single fire area.
Refer to Section #4 of the " Interpretations of Appendix R."
i As to the example provided, if train A was separated by a cumulative horizontal distance of 20 feet from train B, with no intervening combustible materials or fire hazards, and both elevations were provided with fire detection and suppres-sion, the area would be in compliance with Section III.G.2.b.
e APPENDIX R QUESTIONS & ANSWERS 13 P
w..-
3.6 Interve'ning C bustibles 3.6.1 Negligible Quantities of Intervening Combustibles QUESTION Twenty feet of separation with absolutely no intervening combustibles is a rare case in most nuclear plants.
What is the most acceptable method of addressing intervening combustibles? How are various utilities addressing this subject, and what would be sufficient justification to support an exemption request?
RESPONSE
If more than negligible quantities of combustible materials (such as isolated cable runs) exist between redundant shutdown divisions, an exemption request should be filed.
[ Negligible quantity" is an admittedly judgmental criterion, and this judgment should be made by a qualified fire protection engineer and documented for later NRC audit.] Justifications for such exemptions have been based on the following factors:
1.
A relatively large horizontal spatial separation between redundant divi-sions; all cables qualified to IEEE-383.
2.
The presence of an automatic fire suppression system over the intervening combustible (such as a cable tray fire suppression system);
3.
The presence of fire stops to inhibit fire propagation in intervening cable trays; 4.
The likely fire propagation direction of burning intervening combustibles in relation to the location of the vulnerable shutdown division; 5.
The availability of compensating active and passive fire protection.
Any ' e re changes in the catic configuration due to modifications could be handled under 50.59.
See the provisions of the license condition in the response to question 8.2.
3.6.2 In-Situ Exposed Combustibles QUESTIONS Within Appendix R,Section III.G.2.b, the phrase " twenty f.eet with no interven-ing combustible or fire hazards" is utilized.
What is the definition of "no intervening combustible?"
Is the regulation focused predominantly on the absence of fixed combustibles?
RESPONSE
There is no specific definition of "no intervening combustible." The regulation is focused on the absence of in-situ exposed combustibles.
Non combustible materials would not be considered as intervening combustibles.
In BTP CMEB 9.5-1, noncombustible material is defined as:
APPENDIX R QUESTIONS & ANSWERS 14
" Noncombustible Material A material which in the form in which it is used and under the conditions a.
anticipated, will not ignite, burn, support combustion, or release flamma-ble vapors when subjected to fire or heat.
b.
Material having a structural base of noncombustible material, as defined in a., above, with a surfacing not over 1/8-inch thick that has a flame spread 'ating not higher than 50 when measured using ASTM E-84 Test r
" Surface Burning Characteristics of Building Materials."
In Generic Letter 83-33, we state:
" Staff Position:
Section III.G.2.b requires the " separation...with no inter-vening combustibles..." To meet this requirement, plastic jackets and insula-tion of grouped electrical cables, including those which are coated, should be considered as intervening combustibles."
For fire protection, "no intervening combustibles" means that there is no sig-nificant quantities of in-situ materials which will ignite and burn located between redundant shutdown systems.
The amount of such combustibles that has significance is a judgmental decision.
As with other issues, if the licensees fire protection engineer is concerned that the quantity of combustibles between shutdown divisions may not be considered insignificant by an independent reviewer, an exemption could be requested, or the staff consulted.
Transient materials are not considered as an intervening combustible; however, they must be considered as part of the overall fire hazard within an area.
Cables that are in cable trays which do not have solid sheet metal bottom, sides and top should also be considered as intervening combustibles.
Coated cables with a fire retardant material are also considered as intervening combustibles.
3.6.3 Unexposed Combustibles CUESTION Are unexposed combustibles, such as oil in sumps, closed cans, or sealed drums, or electrical cable in conduits, considered as " intervening combustibles?"
RESPONSE
Only oil in closed containers which are in accordance with NFPA 30 or electrical cables in metal conduits (or in cable trays or raceways having solid sheet metal bottom, sides and top) are not considered as intervening combustibles.
In situ oil in open sumps is considered to be an intervening combustible; in-situ oil in closed sumps equivalent to NFPA Standard-30 containers is not considered to be an intervening combustible.
6 APPENDIX R QUESTIONS & ANSWERS 15
3.7 Radiant' Energy Shield 3.7.1 fire Rating QUESTION Recently, the NRC Staff indicated that non-combustible radiant energy shields should be tested against ASTM-TD-E-119 based, apparently, on the requirements of BTP CMEB 9.5-1, Rev. 3, a document issued after Appendix R was promulgated.
This new requirement would not appear to be required by Appendix 4 or BTP
{
APCSB 9.5-1 Appendix A.
Could the Staff clarify the requirements in this stea?
j
RESPONSE
I During the Appendix A reviews, we observed that inside some containments, there were larga concentrations of cables converging at electrical penetration areas.
I,n some cases, where the penetrations were grouped by division, shields were placed between the divisions so that radiant energy from a fire involving the cables of one division would not degrade or ignite cables of the other divisions.
These shields also directed the convective energy from the fire away from the surviving division.
These shields were usually constructed of 1/2-inch marinite board in a metal frame.
Appendix R,Section III.G.f refers to these shields as "a noncombustible radiant energy shield." The guidelines in BTP CMEB 9.5-1, Section C 7.a(1)b. indicate that these shields should have a fire rating of 1/2 hour.
In our opinion any material with a 1/2 hour fire rating should be capable of performing the required functior.
The guidelines of BTP CMEB 9.5-1 relating to a firerated radiant energy shield are being considered in our current reviews of NTOL plants.
However, to the extent that an applicant can justify that a proposed radiant energy shield can achieve an equivalent level of safety, we have been accepting shields that have not been tested against the acceptance criteria of ASTM E-119.
In our Appendix R reviews, we have accepted non-fire-rated radiant energy shields that have been denonstrated by fire hazards analysis to provide an acceptable level cf protection against the anticipated hazard of a localized fire within the containment.
We have also accepted fire-rated metal-sheathed mineral insulated cables, as a radiant energy shield in specific configurations.
3.8 Design Bases l
3.8.1 Fire Protection Features NFPA Conformance QUESTION Should the fire protection features required by Section III.G conform to the NFPA Codes?
RESPONSE
Yes.
For example,Section III G.2 requires an automatic suppression system.
Our guidelines would recommend that the system be in accordance with an NFPA Code.
If deviations are made from the Code, they should be identified in the FSAR or FHA.
APPENDIX R QUESTIONS & ANSWERS 16
3.8.2 Design Basis Fire QUESTION Why isn't the industry allowed to design to protect against a design basis fire?
RESPONSE
Neither the industry nor the Staff has been able to develop criteria for esta-blishing design basis fire conditions for a single " design basis fire" because the in-situ and potential transient combustibles vary widely in different areas of the plant.
However, the establishment of a " design basis fire" for specific fire areas or zones is a prerequisite to performance of a valid fire hazards analysis (See Appendix R Section II.B(1) and BTP CMEB 9.5-1 Sections C.b(1) and (2)).
3.8.3 Redundant Trains / Alternate Shutdown QUESTION Confusion exists as to what will be classified as an alternate shutdown system and thus what systems might be required to be protected by suppression and detection under Section III.G.3.b.
For example, while we are relying upon the turbine-building condensate system for a reactor building fire and the RHR sys-tem for a turbine building fire, would one system be considered the alternative to the other.
If so, would suppression and detection be required for either or both systems under III.G.3.b? An explanation of alternative shutdown needs to be advanced for all licensees.
RESPONSE
If the system is being used to provide its desig.1 function, it generally is considered redundant.
If the system is being used in lieu of the preferred system because the redundant components of the preferred system does not meet the separation criteria of Section III.G.2, the system is considered an alter-native shutdown capability.
Thus, for the example above, it appears that the condensate system is providing alternative shutdown capability in lieu of sepa-rating redundant components of the RHR System.
Fire detection and a fixed fire suppression system would be required in the area where separation of redundant components of the RHR system is not provided.
However, in the event of a tur-bine building fire, the RHR system would be used for safe shutdown and is not considered an alternative capability.
However, one train of the RHR system must be separated from the turbine building.
3.8.4 Control Room Fire Considerations QUESTION What considerations should be taken into account in a control room fire? What is the damage that is considered? P?at actions can the operators take before evacuating the CR? When can the ceottol room be considered safe after a fire for the operator to return?
APPENDIX R QUESTIONS & ANSWERS 17
RESPONSE
The control room fire area contains the controls and instrumental redundant shutdown systems in close proximity (i.e. usually separation is a few inches).
Because it is possible to provide shutdown capability that is physically and electrically independent of the fire area, it is our opinion that alternative or dedicated shutdown capability and its associated circuits for the control
~
room be independent of the cabics system and components in the control room fire area.
The damage to the system in the contrcl room for a fire that causes evacuation of thu control room cannot be predicted.
A bounding analysis should be made to assure that safe conditions can be maintained from outside the control room.
This analysis is dependent to the specific design.
The usual assumptiens are:
1.
The reactor is tripped in the control room.
2.
Offsite power is lost as well as automatic starting of the onsite a.c.
generators and the automatic function of valves and pumps whose control circuits could be affected by a control room fire.
The analysis should demonstrate that capability exists to manually achieve safe shutdown conditions from outside the control room by restoring a.c. power to designated pumps, assuring that valve lineups are correct, and assuming that any malfunctions of valves that permit the loss of reactor coolant can be corrected before unrestorable conditions occur.
Note that the only manual action in the control room-prior to evacuation usually given credit for is the reactor trip.
For any additional control room actions deemed necessary prior to evacuation, a demonstration of the capability of per-forming such actions would have to be provided.
Additionally, assurance would have to be provided that such actions could not be negated by subsequent spur-ious actuation signals resulting from the postulated fire.
After the fire, the operators could return to the control room when the follow-ing conditions have been met:
1.
The fire has been extinguished and so verified by appropriate fire protec-tion personnel.
2.
The control room has been deemed habitable by appropriate fire protection personnel and the shift supervisor.
3.
Damage has been assessed and, if necessary, correctiv'e action has been taken to assure necessary safety, control and information systems are functional (some opcrators may assist with these tasks) and the shift supervisor has authorized return of plant control to the control room.
4.
Turnover procedures which'cssure an orderly transfer of control from the alternate shutdown panel to the control room has been completed.
After returning to the control room, the operators can take any actions compa-tible with the condition of the control room.
Controls in any area (cabinet) where the fire occurred would not be available.
Smoke and fire suppressant APPENDIX R QUESTIONS & ANSWERS 18
F damage in other areas (cabinets) must also be assessed and corrective action taken before controls in such cabinets are deemed functional.
Controls in undamaged area (cabinets) could be operated as required.
Minar modifications inside the control rcom may be performed to reach cold shutdown.
4.
EMERGENCY LIGHTING 4.1 Illumination Levels QUESTION What is the requisite intensity level for emergency lighting for egress routes and areas where shutdown functions must be performed? What are the bases for determining these levels of lighting?
RESPONSE
The level of illumination provided by emergency lighting in access routes to and in areas where shutdown functions must be performed is a level that is sufficient to enable an operator to reach that area and perform the shutdown functions.
At the remote shutdown panels the illumination levels should be su'ficient for control panel operators.
The bases for estimating these levels of lighting are the guidelines contained in Section 9.5.3 of the Standard Review Plan, which are based on industry standards (i.e., Illuminating Engineering Society Handbook).
Where a licensee has provided emergency lighting per Section III.J Appendix R, we would expect that the licensee verify by field testing that this lighting is adequate to perform the intended tasks.
5.
ALTERNATIVE AND DEDICATED SHUTDOWN CAPABILITY 5.1 Safe and Alternative Shutdown 5.1.1 Previously Accepted Alternative Shutdown Capability CUESTION As part of the Appendix A review process, some plants had committed to an alter-native shutdown system in the form of a remote shutdown panel or remote shutdown system.
Footnote 2 to Appendix R describes alternative shutdown capability as being associated with " Rerouting, relocating, or modifying of existing systems."
To the extent that an existing remote shutdown system previously reviewed and approved under Appendix A to BTP 9.5-1 does not require modifications, rerouting, or relocating of existing systems, are the recuirements of Section III.L of Appendix R backfit?
RESPONSE
Yes.
Existing remote shutdown capabilities previously reviewed and approved under Appendix A to BTP APCSB 9.5-1 do not categorically comply with Section III.G.3 of Appendix R.
Licensees were requested to re-analyze their plants to determine compliance with Section III.G.
If the licensee chooses to use the 9
APPENDIX R QUESTIONS & ANSWERS 19
option of.II'I.G.3 for provision of safe shutdown capability for certain areas, the criteria of Section III.L are applicable to that capability for that area.
See also the response to 5.1.3.
5.1. 2 Pre-Existing Alternative Shutdown Capability QUESTIONS Some ifcensees defined safe shutdown capability for purposes of analysis to Section III.G criteria as being composed of both the normal safe shutdown capability and the pre-existing redundant or remote safe shutdown capability which was previously installed as part of the Appendix A process.
This defini-tion often took the form of two " safe shutdown trains" comprising (1) one of the two normal safe shutdown trains, and (2) a second safe shutdown train capa-bility which was being provided by t5e pre-existing remote shutdown capability.
This definitional process, which was undertaken by a number of licensees, makes a significant difference in the implemen~tation of Appendix R.
Under such a definition, doesSection III.L criteria apply when the Commission did not call out Section III.L as a backfit?
RESPONSE
The definitiorai process mentioned considers an alternative shutdown cepability proviced under the Appendix A review as a redundant shutdown capability under the Appendix R review.
This definitional process is incorrect.
For the pur-pose of analysis to Section III.G.2 criteria, the saf'e shutdown capability is defined as one of the two normal safe shutdown trains.
If the criteria of Section III.G.2 are not met, an alternative shutdown capability is required.
The alternative shutdown capability may utilize existing remote shutdown capa-bilities and must meet the criteria of Sections III.G.3 and III.L of Appendix R.
See also the response to 5.1.3.
5.1.3 III.L Backfit OUFSTION Why oc the Staff interpretive memoranda regarding the criteria for satisfaction of Section III.L form the auditable basis for determining ccmpliance to Appen-dix R when the Commission failed to backfit this section to all plants?
RESPONSE
Although 10 CFR 50.48(b) does not specifically include Section III.L with Sections III.G, J, and 0 of Appendix R as a requirement ap'plicable to all power reactors licensed prior to January 1, 1979, the Appendix, read as a whole, and the Court of Appeals decision on the Appendix, Connecticut Light and Power, et al. v. NRC, 673 F2d. 525 (D.C. Cir., 1982), demonstrate that Section III.L applies to the alternative safe shutdown option under Section III.G if and where that optian is chosen by'the licensee.
This does not preclude licensees from proposing and justifying other methods, e.g., see Section #1, Process Moni-toring Instrumentation, of the " Interpretations of Appendix R."
APPENDIX R QUESTIONS & ANSWERS 20
4 5.2 Procedures 5.2.1 Shutdown and' Repair Basis QUE5 TION With regard to the term " post-fire procedures" the Commishion states that it is impossible to predict the course and extent of a fire.
Given this, how does one write post-fire shutdown and repair procedures that are both symptomatic and usable to an operator?
RESPONSE
Safe shutdown capabilities including alternative shutdown capabilities are all designed for some maximum level of fire-damage (system unavailabilities, spur-ious actuations).
Since the extent of the fire cannot be predicted, it seems prudent to have the post-fire shutdown procedures guide the operator from full system availability to the minimum shutdown capability.
As for repair procedure, similar conditions exist.
A repair procedure can be written based on the maxi-mum level of damage that is expected.
This procedure would then provide shut-down capability without accurately predicting likely fire damage.
5.2.2 Post Fire Operating Procedures QUESTION Does the NRC have any requirements regarding whether post-fire operating proce-dures should be based upon fire areas, systems, or be symptom-based?
RESPONSE
The NRC does not have requirements, nor do we propose any requirements regard-ing whether post-fire operating procedures should be based upon fire areas, sys-tems or be symptom-based.
We suggest that the post-fire shutdown capabilities designs be reviewed with the plant operation staff and procedures written with their input.
See also responses to 5.2.1 and 5.2.3.
5.2.3 Alternative Shutdown Capability QUESTION Is it acceptable to develop post-fire operating procedures only for those areas where alternative shutdown is required?
(For other areas standard, emergency operating procedures would be utilized in the presence of potential fire damage to a single train.)
RESPONSE
Yes.
The only requirement for post-fire operating procedures is for those areas where alternative shutdown is required.
For other areas of the plant, shutdown would be achieved utilizing one of the two normal trains of shutdown system.
Shutdown in degraded modes (one train unavailable) should be covered by present operator training and abnormal and emergency operating procedures.
If the degraded modes of operation are not presently covered, we would suggest APPENDIX R QUESTIONS & ANSWERS 21
E 1
that th'e ope' ration staff of the plant determine whether additional training or
~
procedures are needed.
5.2.4 Post Fire Procedures Guidance Documents O
QUESTION Do any NF.C Staff guidance documents exist relative to the extent, form, nature, etc. of Appendix R post-fire operating procedures?
RESPONSE
No.
Other than the criteria of Section III.L, no specific post-fire shutdown precedure guidance has been developed.
See also responses to 5.2.1, 5.2.2 and 5.2.3.
The inspection process will be flexible in this regard as long as the licensee can show compliance with the criteria of Section III.L.
- 5. 3 Safe Shutdown and Fire Damage 5.3.1 Circuit Failure Modes QUESTION What circuit failure modes must be considered in identifying circuits associated by spurious actuation?
RESPONSE
Sections III.G.2 and III.L.7 of Appendix R define the circuit failure modes as hot shorts, open circuits, and shorts to ground.
For consideration of spurious actuations, all possible functional failure states must be e' valuated, that is, the component could be energized or de-energized by one or more of the above failure modes.
Therefore, valves could fail open or closed; pumps could fail running or not running; electrical distribution breakers could fail open or closed.
For three phase AC circuits, the probability of getting a hot short on all three phases in the proper sequence to cause spurious operation of a motor is considered sufficiently low as to not require evaluation except for any cases involving Hi/Lo pressure interfaces.
For ungrounded DC circuits, if it can be shown that only two hot shorts of the proper polarity without grounding could cause spurious operation, no further evaluation is nEcessary except for any cases involving Hi/Lo pressure interfaces.
5.3.2 " Hot Shortd Duration QUESTION If one mode of fire damage involves a " hot short" how lor.g does that condition exist as a result of fire damage prior to terminating in a ground or open circuit and stopping the spurious actuation?
RESPONSE
We would postulate that a " hot short" condition exists until action has been taken to isolate the given circuit from the fire area, or other actions as APPENDIX R QUESTIONS & AN5WERS 22
appropriate have been taken to negate the effects of tha spurious actuation.
We do not postulate that the fire would eventually clear the " hot short."
5.3.3 Hot Shutdown Duration QUESTION 1
Since hot shutdown cannot be maintained indefinitely, hot shutdown equipment needs to be protected for only a limited period of time.
How long must a plant remain in that condition in order to meet the requirement for achieving hot shutdown with a single train of equipment?
RESPONSE
Section III.G.1 requires that the one train of systems needed to achieve and maintain hot shutdown be free of fire damage.
Thus, the systems needed are to be ccmpletely protected from the fire regardless of time.
If the intent of the question concerns how long these systems must operate, these systems must be capable of operating until the systems needed to achieve and maintain cold shutdown are available.
5.3.4 Cooldown Equipment QUEETION Certain equipment is necessar.y only in the cooldown phase when the plant is neither in hot nor cold shutdcwn condition as defined by technical specifica-tions.
Is this equipment considered hot or cold shutdown in nature?
RESPONSF As stated in Section III.G.1, one train of systems needed to achieve and main-tain hot shutdown conditions must be free of fire damage.
Systems necessary to achieve and maintain cold shutdown can be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- Thus, if this certain equipment necessary only in the cooldown phase, is used to achieve cold shutdown, it can be repaired within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
If the certain equipment is maintairing hot shutdown while repairs are being made, one train must be free of fire damage.
See also Section #2 of the " Interpretations of Appendix R."
5.3.5 Pressurizer Heaters QUESTION Most PWRs do not require pressurizer heaters to maintain stable conditiens.
In fact, the Commission does not consider heaters to be important to safety and they are not required to meet Class IE requirements.
Are they required for hot shutdown under Appendix R?
If yes, then how does a plant meet the separation requirements of Section III.G.2.d,e. or f without major structural alterations to the pressurizer?
APPENDIX R QUESTIONS & ANSWERS 23 O
i
RESPONSE
One train of systems necessary to achieve and maintain hot shutdown conditions must be free of fire damage.
PWR licenscas have demonstrated the capability to achieve and maintain stable hot shutdown conditions without the use of pres-surizer heaters by utilizing the charging pump and a water solid pressurizer for reactor coolant pressure control.
5.3.6 On-Site Power QUESTION Appendix R,Section III.L.4 states in part, "If such equipment and systems will not be capable of being powered by both on-site and off-site elec.trical power systems because of fire damage, an independent on-site power system shall be provided." Again, in Appendix R,Section III.L.5, the statement is made "If such equipment and systems used prior to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after the fira will not be capable of being powered by both onsite and offsite electrical power systems because of fire damage, an independent onsite power system shall be provided."
An interpretation is needed of the meaning and the applicability of these two quotes relative to alternative shutdowa capabilities.
RESPONSE
These statements are meant to indicate that the alternative shutdown capability should be powered from an onsite power system independent (both electrically and physically) from the area under consideration.
Further, if the r.armal emergency onsite power supplies (diesel generators) are not available because of fire damage, then a separate and independent onsite power system shall be provided.
As an excmple, some plants are utilizing a dedicated onsite diesel generator or gas turbine to power instrumentation and control panels which are a part of the alternative shutdown capability.
5.3.7 Torus Level Indication OUESTION For BWRs, I&E Information Notice 84-09 suggests that licensees need to have torus level indication post-fire.
If an analysis shows that a level does not change significantly during any operational modes or worse case conditions, is level indication still required? Is an analysis in file adequate or is an exemption request required?
RESPONSE
It continues to be our position that torus (suppression pool) level indication is the preferred post-fire monitoring instrumentation in order to confirm the availability of the torus (suppression pool) as a heat sink.
We recognize that existing analyses' indicate that suppression pool level is not significantly changed during emergency shutdown conditions.
However, we believe the operator should be able to confirm that spurious operations or other unanticipated occur-rences have not affected the torus function.
An analysis of torus level change by itself is not considered an acceptable basis.
APPENDIX R QUESTIONS & ANSWERS 24
o 5.3.8 Short Circuit Coordination Studies QUESTION Should circuit coordination studies consider high impedance faults?
RESPONSE
Yes, in those coordination studies performed to assess the vulnerability of safe shutdown capability due to fires involving associated circuits.
To meet the separation criteria of Section III.G.2 and III.G.3 of Appendix R, high impedance faults should be considered for all associated circuits located in the fire area of concern.
Thus, simultaneous high impedance faults (below the trip point for the breaker on each individual circuit) for 611 associated cir-cuits located in the fire area should be considered in the evaluation of the safe shutdown capability.
Clearing such faults on associated circuits which may effect safe shutdown may be accomplished by manual breaker trips governed by written procedures.
Circuit coordination studies need not be performed if it is assumed that shutdown capability will be disabled by such high impedance faults and appropriate written procedures for clearing them are provided.
5.3.9 Diagnostic Instrumentation QUESTION What is diagnostic instrumentation?
RESPCNSE Oiagnostic itistrumentation is instrumentation, beyond that previously identified in Attachment 1 to I&E Information Notice 84-09, needed to assure proper actua-tion and functioning of safe shutdown equipment and support equipment (e.g.,
flow rate, pump discharge pressure).
The diagnostic instrumentation needed depends on the design of the alternative shutdown capability.
Diagnoctic in-strumentation, if needed, will be evaluated during the staff's review of the licensee's proposal for the alternative shutdown capability.
5.3.10 Design Basis Plant Transients QUESTION What plant transients should be considered in the design of the alternative or dedicated shutdown systems?
RESPONSE
Per the criteria of Section III.L of Appendix R a loss of offsite power shall be assumed for a fire in any fire area concurrent with the following assumptions:
The safe shutdown capability should not be adversely affected by any one a.
spurious actuation or signal resulting from a fire in any plant area; and APPENDIX R QUESTIONS & ANSWERS 25
b.
The safe shutdown capability should not be adversely affected by a fire in any plant area which results in the loss of all automatic function (signals, logic) from the circuits located in the area in conjunction with one worst case spurious actuation or signal resulting from the fire; and The safe shutdown capability should not be adversely affected by a fire c.
in any plant area which results in simultaneous spurious actuation of all valves in high-low pressure interface lines.
5.3.11 Alternative / Dedicated Shutdown v. Remote Shutdown Systems QUESTION What is the difference between the alternate / dedicated shutdown systems required for fire protection and the remote shutdown systems recommended under Chapter 7 of the SRP?
RESPONSE
The remote shutdown systems recommen5ed under Chapter 7 of the SRP are needed to meet GDC 19.
These remote shatdown systems need to be redundant and physi-cally independent of the control room in order to meet GDC 19.
For GDC 19, damage to the control room is not considered.
Alternate shutdown systems for Appendix R need not be redundant but must be bs'd physically and electrically independent of the control room.
6.
OIL COLLECTION SYSTEMS FOR REACTOR COOLANT PUMP 6.1 Lube Oil System Seismic Desian QUESTION If the reactor coolant pump lube oil system and associated appurtenances are seitmically designed, does the lube oil collection system also require seismic design?
Is an exemption required?
RESPONSE
Where the RCP lube oil system is capable of withstanding the safe shutdown earthquake (SSE), the analysis should assume that only random oil leaks from the joints could occur during the lifetime of the plant.
The oil collection system, therefore, should be designed to scfely channel the quantity of oil from one pump to a vented closed container.
Under this set of circumstances, the oil collection system would not have to be seismically designed.
An exemption is required for a non-seismically designed oil collection system.
The basis for this exemption would be that random leaks are not assumed to occur simultaneously with the seismic event, since the lube oil system is designed to withstand the seismic event.
However, the Rule, as written, does not make this allowance.
APPENDIX R QUESTIONS & ANSWERS 25
6.2, Container QUESTION It would appear that a literal reading of Section III.0 regtrding the oil col-lection system for the reactcr coolant pump could be met by a combination of seismically designed splash shields and a sump with sufficient capacity to con-tain the entire luhe cil system inventory.
If the reactor coolant pump is seismically designed and the nearby piping hot surfaces are protected by seis-mically designed splash shielos such that any spilled lube c4! wouid contact only cold surfacts, does this aesign concept conform to the requirements of the rule?
RESPONSE
If the reactor coolant pump, including the oil system, is seismically designed and the nearby hot surf &ces of piping are protected by seismically designed splash shields such that any spi Med lube oil would contact only cold surfaces, and it could be demonstrated by engineering analysis that sump and splash shields would be capable of preventing a fire during normal and design basic accident conditions, the safety objective of Section III.0 would be achieved.
Such a design concept Would have to be evaluated under the exemption process.
The justification for the exemption should provide reasonable asseyance that oil from all potential pressuriz3d and unpressurized leatage points would be safely collected and drained to the sump.
The sump should be shown capable of safely containing all of the anticipated oil leakage.
The analysis should verify that there are no electric sources of ignition.
7 BRANCH TECHNICAL POSITION CMEB 9.5-1 7.1 Fire Protection and Seiscic Events QUESTION For which situations other than the reactor coolant cump lobe oil system are seismic events assumed to be initiators of a fire?
RESPONSE
The guidelines for the seismic design of fire protection systems which cover other general situations is delineated in BTP CMEB 9.5-1 C.1.C(3) and (4):
"(3) As a minimum, the fire suppression system should be capable of delivering water to manual hose stations located within hose reach of areas contain-ing equipment required for safe plant shutdown following the safe shutdown earthquake (SSE).
In areas of high seismic activity, the staff will con-sider on a case-by-case basis the need to design the fire detection and suppression systems to be functional following the SSE.
(4) The fire protection systems should retain their original design capability for (a) natural phenomena of less severity and greater frequency than the most severe natural phenomena (approximately once in 10 years) such as tornadoes, hurricanes, floods, ice storus, or smal?-intensity earthquakes APPENDIX R QUESTIONS & ANSWERS 27
that are characteristic of the geographic region, and (b) potential man-made site related events such as oi1 barge collisions or aircraft crashes that have a reasonable prcbability of occurring at a specific plant site.
The effects of lightning strikes should be included in the overall plant fire protection program."
We have. considered California as being a nigh seismic activity area.
For those plants reviewed under Appendix A, our position is (A.4):
" Postulated fires or fire protection system failures need not be considered concurrent with other plant accidents or the most severe natural phenomena."
Our guidelines on the seismic design of fire protection systems installed in safety related areas are delineated in Regulatory Guide 1.29 " Seismic Design Classification," paragraph C.2.
The failure of any system should not affect a system from performing its safety function.
Our guidelines on the seismic design of hydrogen lines is delineated in BTP CMEB 9.5-1 Section C.S.d(5):
(b) Hydrogen lines in safety-related areas should be either designed to seismic Class I requirements, or seleved such that the outer pipe is directly vented to the outside, c7 should be equipped with excess flow valves so that in case of a line break, the hydrogen concentration in the affected areas will not exceed 2%.
All PWR's have a hydrogen line going to the Volume Control Tank (Make-up Tank) that needs to be protected.
To identify plant specific situations in which seismic events could initiate a fire in a specific plant area, the fire protection engineer and systems engineer performing the fire hazards analysis should be concerned with in-situ combusti-ble materials which can be released in a manner such that they could contact
' -situ i;nition ::urces by a seismic event.
An example of this would be the rupture of the RCP lube oil line directly above the hot reactor coolant piping.
The fire protection engineer should also be concerned with seismic induced ignition sources, electrical or mechanical, which could contact nearby in situ combustible materials.
It should be noted that the guidelines cited above from BTP CMEB 9.5-1 are not applicable to plants reviewed and approved under BTP APCSB 9.5-1.
- 17. 2 Random Fire and Seismic Events QUESTION Is a random fire to be postulated concurrent with a seismic event?
RESPONSE
Our position, as stated in Section C.1.6 of BTP CMEB 9.5-1, is " Worst case fire need not be postulated to be simultanecus with nonfire-related failures in safety systems, plant accidents, or the most severe natural phenomena."
APPENDIX R QUESTIONS & ANSWERS 28
O O
Where plant systems are designed to prevent the release of combustible materials caused by a seismic event, such as a dike around a fuel oil tank transformer, or seismic supports for hydrogen lines, then no fire need to be arbitrarily assumed to take place in the fire hazards analysis.
Because it is impossible to completely preclude the occurrence of a seismically induced fire, Section C.6.c(4) of CMEB 9.5-1 states:
" Provisions should be made to supply water at least to standpipes and hose connections for manual firefighting in areas containing equipment required for safe p; ant shutdown in the event of a safe shutdown earth-quake.
The piping system serving such hose stations should be analyzed for SSE loading and should be provided with supports to ensure system pressure integrity.
The pining and valves for the portion of hose stand-pipe system affected by thi. 'unctional requirement should, as a minimum, satisfy ANSI B31.1, ' Power Piping.'
The water supply for this condition may be obtained by manual operator actuation of valves in a connection to the hose standpipe header from a normal seismic Category I water sys-tem such as the essential service water system.
The cross connection should be (a) capable of providing flow to at least two hose stations (approximately 75 gpm per hose station), and (b) designed to the same standards as the seismic Category I water system; it should not degrade the performance of the seismic Category I water system."
The post-seismic procedures should include a damage survey, anc a determination of whether any fires were initiated as a result of the seismic event.
See also the response to Question 7.1.
It should be noted that the guidelines cited above from BTP CMEB 9.5-1 are not applicable to plants reviewed and approved under BTP APCSB 9.5-1.
8.
LICENSING POLICY 8.1 Fire Hazard Analysis / Fire Protection Plan Updating 0"ECTIT1 What constitutes the fire protection plan required by 50.48(a)? Should licens-ees have prcgrams to maintain the fire hazards analysis and the fire protection plan current or updated periodically? How often should the plan be updated?
Must revisions be provided to the NRC?
RESPONSE
The basic elements required in the fire protection plan are described in 10 CFR 50.48(a).
The fire protection program that implements that plan should include the details of the fire hazards analysis.
The plan and program may be separate or combined dccuments and must be kept current with the fire hazards analysis updated prior to making modifications.
We would expect that for most plants licensed after January 1, 1979, the fire protection plan and program would be part of the FSAR and therefore, would be updated and sumitted to the NRC in conformance with the requirements of 10 CFR 50.71(e).
For plants whose fire protection plans and programs are not part of the FSAR, we would expect that they would be updated pri,or to making modifications and kept at the site in an auditable form for NRC inspection.
APPENDIX R QUESTIONS & ANSWERS 29
8.2 Fire Protection License Condition QUESTION What is the significance of the fire protection license condition?
RESPONSE
For those plants licensed prior to January 1,1979 (Appendix R plants), the license conc! tion is the legally enforceable requirement for the fire protection features other than those required by III.G, III.J and III.0 that were accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position BTP APCSB 9.5-1.
For those plants licensed after January 1,1979, the license condition is the legally enforceable requirement for all fire protection features at the facility.
Appendix R is only enforceable on Post 1979 plants through the license condition.
10 CFR 50.48 makes Appendix R applicable only to plants licensed prior to January 1,1979.
Refer to 10 CFR 50.48(e).
The NRC has drafted new language for this license condition which delineates the circumstances under which the fire protection plan may be revised.
We are now including this language in all new licenses and are considering amending present licenses.
The revised language is as follows.
"9.5 Fire Protection Program (Section 9.5, SER)
The licensee shall implement and maintain in effect all provisions of the a.
approved fire protection program as described in the Final Safety Analysis Report for the facility (or as described in submittals dated
)
and as approved dated in the SER (and supplements dated
)
subject to provisions b & c below.
b.
The licensee ma rake no change to the aporoved fire protection orogram wnicn would oecrease the level of fire protection in the plant without prior approval of the Commission.
To make such a change the licensee must submit an application for license amendment pursuant to 10 CFR 50.90, The licensee may make changes to features of the approved fire protection c.
program which do not significantly decrease the level of fire protection without prior Commission approval provided (a) such changes do not other-wise involve a change in a license condition or technical specification or result in an unreviewed safety question (see 10 CFR 50.59), and (b) such changes do not result in failure to complete the fire protection program approved by the Commission prior to license issuance.
The licensee shall maintain, in an auditable form, a current record of all such changes in-cluding an analysis of the effects of the change on the fire protection program, and'shall make such records available to NRC inspectors upon request.
All changes to the approved program shall be reported annually to the Director of the Office of Nuclear Reactor Regulation, along with the FSAR revisions required by 10 CFR 50.71(e).
APPENDIX R QUESTIONS & ANSWERS 30
O 8.3 III,G, J and 0 Exemptions for Future Modifications QUESTION Is an exemption required from Appendix R Sections other than III.G, III.J and III.0 for future modifications that do not comply with such sections?
RESPONSE
Yes, for those modifications which deviate from the previously accepted fire protection configurations.
Tre exclusion of the applicability of Sections of Appendix R other than III.G, III.J, and III.0 is limited to those features
" accepted by the NRC staff a3 satisfying the provisions of Appendix A to Branch Technical Position BTP APCSB 9.5-1 reflected in staff fire protection safety evaluation reports issued prior to the effective date of the rule." No re-analysis is required except for proposed modifigations which would alter pre-viously approved features.
This position is based directly on CFR 50.48(b).
Also see response to Question 8.2.
8.4 Future Changes QUESTION Will future changes (no matter how minor) to approved configurations be required to be reviewed by the Staff in'an exemption request? At what point may the process of 10 CFR 50.59 be invoked?
RESPONSE
If a future modification involves a change to a license condition or technical specification, a license amendment request must be submitted.
When a modifica-tion not involving a technical specification or license condition is planned, the evaluation made in conformance with 10 CFR 50.59 to determine whether an unreviewed safety question is involved must include an assessment of the modi-fication's impact on the existing fire hazards analysis for the area.
This p "t of the evaluation cust be perferned by the person responsible for the fire safety program for the plant.
The assessment must include the effect on com-bustible loading and distribution and the consideration of whether circuits or cc.Aonents, including asociated circuits, for a train of equipment needed for safe shutdown are being affected or a new element introduced in the area.
If this evaluation concludes that there is no significant impact, this conclusion and its basis must be documented as part of the 50.59 evaluation and be avail-able for future inspection and reference.
If the evaluation finds that there is an impact that could result in the area either not being in conformance with Appendix R, or some other aspect of the approved fire protection program, or being outside the basis for an exemption that was granted for the area involved, the licensee must either make modifications to achieve conformance or justify and request exemption (or, for the post 1979 plants, approval) from the NRC.
See also responses to Questions 8.1 and 8.2.
APPENDIX R QUESTIONS & ANSWERS 31
8.5 Schedurar and Blanket Exemptions QUESTION If an exemption is warranted and at the same time the provisions of the rule indicate that the appropriate schedular deadlines have passed, should a sched-uler exemption be filed at the same time as the technical exemption request?
If as part of the exemption request the utility is proposing to make modifica-tions to achieve a reasonable level of conformance with Appendix R, and if the associated " clock" has run out for that type of modification, should the tech-nical exemption request and the description of the modification be filed with a schedular exemption?
When filing a schedular exemption under $50.12, it is not always clear from what specific paragraphs of S50.48 an exemption should be sought.
Is it ac-ceptable to request a blanket exemption from the schedular provisions of 10 CFR 550.48 without a specification by paragraph?
If an exemption request is submitted to meet newly published interpretations of Appendix R, when does the licensee need to be in compliance?
Is the sched-ule presented in Appendix R still the guideline or must a new scheoule be developed under a different criteria?
RESPONSE
We do not intend to issue any further extensions of the 50.48(c) schedules.
When a licensee determines that a 50.48(c) schedule cannot be. met, the appro-priate NRC Region must be notified.
This policy is further explained in the generic letter transmitting this package.
8.6 Trivial Deviations QUESTION wnat guidance can tne NRC Staff give the industry regarding when a deviation from the literal interpretation of Appendix R is sufficiently trivial as to not require a specific exenption?
/
RESPONSE
The significance of a deviation must be judged as part of a fire hazards anal-ysis.
The conclusion of this analysis is always subject to review by the NRC inspector.
8.7 Revised Modifications QUESTION What is the process for altering configurations not yet implemented for plants with Appendix R SERs?
APPENDIX R QUESTIONS & ANSWERS 32
RESPONSE
If licensees propose changes to their NRC approved modifications, they must sub-mit their new proposal and revisec schedule for implementation for NRC approval.
This change must be justified as to (1) the reason for the change, (2) the basis for the revised' schedule, and (3) the interim measures that will be pro-vided to assure post fire shutdown capability until the final modifications are implemented.
Whether or not enforcement action will be taken based upon con-tinued noncompliance with Appendix R will be decided by the NRC Regional Administrator in consultation with NRC Headquarters.
8.8 Smallest Openino in a Fire Barrier QUESTION What is the smallest opening allowed in a fire area barrier for which an exemption request is not needed?
RESPONSE
Unsealed openings in the configuration for which approval was obtained by an approved laboratory or the NRC staff would be acceptable.
Our position on openings is given in Section 5.a(3) of BTP CMEB 9.5-1:
"(3) Openings through fire barriers for pipe, conduit, and cable trays which separate fire areas should be sealed or closed to provide a fire resistance rating at least equal to that required of the barrier itself.
Openings inside conduit larger than 4 inches in diameter should be sealed at the fire barrier penetration.
Openings inside conduit 4 inches or less in diameter should be sealed on each side of the fire barrier and sealed either at both ends or at the fire barrier with non-combustible material to prevent the passage of smoke and hot gases.
Fire barrier penetrations that must maintain environmental isolation or pressure differentials should be qualified by test to maintain the barrier integrity under such i
conditions."
i The unsealed opening (s) allowed in a fire area boundary or a barrier which separates redundant shutdown divisions should not permit flame, radiant energy, smoke and hot gases to pass through the barrier and cause damage to redundant t
l shutdown divisions on the other side.
The licensee should assess the adequacy i
of existing protection and should determine the minimum size based on a fire hazards analysis and conservative fire protection engineering judgment.
If the significance of openings in fire barriers is marginal, a formal exemption request could be submitted or the staff consulted.
The basis for the lack of signifi-cance should be available for review by NRC Inspectors.
Our acceptance of unprotected openings in fire barriers would depend upon the quantity and nature of combustible materials on either side of the barrier; the location of the opening (s) in relation to the ceiling (for openings in walls);
the location, vulnerability and importance of shutdown systems on either side of the barrier; and compensating fire protection.
APPENDIX R QUESTIONS & ANSWERS 33
~
See also Sec' tion #4 of the " Interpretations of Appendix R."
8.9 NFPA Code Deviation QUESTION Is an exemption / deviation required for deviations from NFPA Codes?
RESPONSE
Deviations from the codes should be identified and justified in the FSAR or FHA.
An exemption is not required for NFPA codes.
NRC guidelines reference certain NFPA codes as guidelines to the systems acceptable to the staff, and therefore such codes may be accorded the same status as Regulatory Guides.
When the applicant / licensee states that its design " meets the NFPA codes" or,
" meets the Intent of the NFPA Codes" and does not identify any deviations from such codes, NRR and the Regions expect that the design conforms to the code and the design is subject to inspection against the NFPA codes.
8.10 " ASTM E-119" Design Basis QUESTION Is an exemption / deviation required, if components are designed to withstand an
" ASTM E-119" fire?
RESPONSE
Some cables are being developed for high temperature (e.g., 1700 F) applications.
An exemption would be required if such cable is used in lieu of the alternatives of III.G.2 or III.G.3 in a pre-1979 plant.
A deviation from the guidelines would be recuired for similar applications in a post 1979 plant.
8.11 Plants Licensed After January 1, 1979 QUESTION What fire protection guidelines and requirements apply to the plants licensed after January 1, 1979?
RESPONSE
Post-1979 plants are subject to:
G0C 3 10 CFR 50.48(a) and (e)
The guidelines identified in the footnotes to 50.48(a)
Guidelines documents issued after January 1,1979.
APPENDIX R QUESTIONS & ANSWERS 34
Commitments made to meet the requirements of Appendix R1 or specific sec-tions such as III.G, III.J, III.0; or Appendix A to BTP APSCB 9.5-1; or BTP CMEB 9.5-1, which includes the requirements of Appendix R* and the previous guidance documents incorporated into the Branch Technical Position.
The license for each plant licensed after January 1, 1979,contains a license condition which identifies by reference the approved fire protection program for that plant.
'A deficiency in the BTP CMEB 9.5-1 has been noted in that a requirement in Appendix R Section III.G.3.b to provide alternative or dedicated shutdown cap-ability in an area where both redundant safe shutdown trains could be damaged by suppression activities or inadvertent operation or rupture of fire suppres-sion systems is not included.
This requirement will be added in the next revi-sion of the BTP.
8.12 Cold Shutdown Equipment Availability QUESTION A.
Can a licensee achieve compliance with III.G.1(b) by demonstrating that one train of cold shutdown equipment will remain free of fire damage?
B.
In demonstrating that one train of cold shutdown equipment will remain free of fire damage, is a licensee limited to the three alternatives in III.G.2?
RESPONSE
A.
Yes.
B.
No.
8.13 Guidance Documents QUESTION Please list all NRR guidance documents and position papers issued since Appendix R was promulgated.
RESPONSE
Fire Protection Guidance Issued Since January 1, 1975:
IE Information Notices No. 83-41:
Actuation of fire suppression systems causing inoperability of safety related equipment.
No. 83-69:
Improperly installed fire dampers at nuclear power plants.
No. 83-83:
Use of portable radio transmitters inside nuclear power plants.
APPENDIX R QUESTIONS & ANSWERS 35
- No. 84~09:' Lesso s Learned From NRC Inspections of Fire Protection Safe Shutdown Systems (10 CFR 50, Appendix R)
Standard Review Plan 9.5.1, Rev. 1 Fire Protection System, dated 5/1/76 9.5.1, Rev. 2 Fire Protection Program, dated 03/78 9.5.1, Rev. 3 Fire Protection Program, July 1981.
Regulations 10 CFR Part 50:
Proposed fire protection program for nuclear power plants operating prior to January 1,1979, dated May 29, 1980.
Federal Register Vol. 45, No. 105, 36082.
10 CFR Part 50:
Fire protection program for operating nuclear power plants, dated November 19, 1980.
Federal Register Vol. 45, No. 225, 76602.
10 CFR Part 50:
Fire protection rule corrections, dated September 8, 1981.
Federal Register Vol. 46, No. 173, 44734.
Generic Letters NOTE:
The following documents were obtained from the Palisades file Docket No. 50-255.
Similar documents should be in the file for other operating facil-ities.
The dates may vary slightly.
1.
Letter dated 9/28/76 - Enclosing App. A to BTP APCSB 9.5-1 and supplementary guidance on information needed for fire protection program evaluation.
2.
Letter dated 12/1/76 - Enclosing sample Technical Specifications and an errata sheet.
3.
Letter dated 8/19/77 - Enclosing " Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance."
4.
Letter dated 6/8/78 - Re:
Manpower requirements for operating reactors.
5.
Letter dated 9/7/79 - Re: Minimum fire brigade shift size.
6.
Letter dated 9/14/79 - Enclosing staff positions safe shutdown capability.
7.
Letter dated 10/31/80 - Enclosing new 10 CFR 50.48 regarding fire protection schedules for operating nuclear power plants.
8.
Letter dated 11/24/80 - Enclosing a copy of revised 10 CFR 50.48 and new App. R to 10 'CFR 50, and a summary of open items from the SER for the BTP APCSB 9.5-1 review.
9.
Letter dated 2/20/81 - Generic Letter 81-12 identifying information needed for NRC review of modifications for alternative shutdown capability.
APPENDIX R QUESTIONS & ANSWERS 36
10.
Letter dated 4/7/62 - Provided clarification to Generic Letter 81-12 and guidance on information needed for NRC review of exemption requests.
11.
Letter dated 10/6/82 - Generic Letter 82-21; provided criteria for annual, biennial, and triennial audits required by Technical Specifications.
- 12. Letter dated 10/19/83 - Generic Letter 83-33; NRC Positions on Certain Requirements of Appendix R to 10 CFR 50.
Staff Generic Positions 1.
Letter, Denton to Bernsen, dated 4/20/82 - Control room fires.
- 2.
SECY 83-269, dated July 5, 1983 - Attachments B and C.
3.
Memo, Eisenhut to Olshinski, dated 12/30/83 - Physical independence of electrical systems.
4.
Memo, Eisenhut to Jordan, dated 10/24/83 - Bullet resistant fire doors.
- Staff positions regarding the need for certain exemptions delineated in this guidance document have been revised per the " Interpretations of Appendix R".
8.14 Deviation From Guidance Documents 00ESTION If a utility determines that a deviation from a guidance document exists, does an exemption request need to be filed?
If so, what is the legal basis for this requirement?
RESPONSE
No.
3.15 Staf f Interpretation of Appendix R OUESTION How does the Staff initiate interpretations of Appendix R in a manner which ensures their technical adequacy and consistency with the rule's objectives (e.g., presentation to ACRS, issue for comment as in draft regulatory guides, etc.)?
RESPONSE
Staff positions are initiated when our experience shows that generic issues are identified that require clarification.
These positions are reviewed for accuracy and consistency by the cognizant Division Directors.
Usually, they are not issued for comment.
However, Generic Letter 83-33 was commented on by the NUFPG since it was initiated, in part, at their request.
APPENDIX R QUESTIONS & ANSWERS 37
8.16 Disseminatio of New Staff Positions QUESTION Will licensees be automatically sent a copy of new Staff position papers as they are developed?
RESPONSE
The Staff positions on generic subjects are considered for issuance in Generic Letters from ONRR and Information Notices or Bulletins from OI&E.
Staff positions issued for specific questions on specific plants are not given generic promulgation because they normally involve plant specific design considerations.
8.17 Equivalent Alternatives QUESTION How does a licensee demonstrate that alternative measures are equivalent to the measures of Section III.G.2 in order to obtain an exemption lacking a formal definition of the term " free of fire damage"?
RESPONSE
See Item #3 of " Interpretations of Appendix R."
8.18 Coordination Study Update QUESTION Circuit modifications are an ongoing process.
How recent must a coordination study be in order to be valid in protecting circuits associated by common power source?
RESPONSE
'le would expect that as circuit modifications are made, the design package would address the electrical protection required and the effects of this protection on the coordination of the protection for the power distribution system.
This type of consideration should be included in the evaluation required by 10 CFR 50.59 Changes, Tests and Experiments.
The design package and modification evaluation could not be complete without consideration of the coordination study.
Therefore, we would expect that the coordination studies would be current with the last circuit modification made.
8.19 Exemption Request Threshold QUESTION (a) What is the threshold for exemption requests?
(b) Is it necessary to file a request for each and every possible deviation from Appendix R?
APPENDIX R QUESTIONS & ANSWERS 38
o
RESPONSE
Typical examples are discussed in the response to Questions 8.19.1 through 8.19.4.
t (a) The licensee must develop its criteria for an exemption request threshold.
(b) No.
8.19.1 Penetration Designs Not Laboratory Approved QUESTION Where penetration designs have been reviewed and approved by NRC but have not been classified by an approval laboratory, will it be necessary to submit an exemption request?
RESPONSE
No.
8.19.2 Individual vs. Package Exemptions QUESTION How do we submit future modification exemption requests, etc.? Would NRC prefer them individually, or developed and submitted in packages for review and approval?
RESPONSE
Future exemptions should be submitted individually, if they are independent of each other.
3.19.3 Exemption Regaest Supporting Detail QUESTION When an exemption request is filed, what criteria are used to determine the level of detail needed to support the request?
RESPONSE
See Enclosure 2 of NRC's letter to all licensees dated April-May 1982.
8.19.4 50.12 vs. 50.48 Exemption Requests QUESTION With regard to exemption requests for future modifications, will they be submitted under 50.12 or 50.48?
APPENDIX R QUESTIONS & ANSWERS 39
r L.
RESPONSE
8.20 Post January 1, 1979 Plants and Exemption Reauests QUESTION Do plants licensed af ter January 1,1979 which have committed to meet the requirements of Section III.G, III.J and III.0 and are required to do so as a license condition, need to request exemptions for alternative configurations?
RESPONSE
No; however, deviations from the requirements of Section III.G, III.J and III.0 should be identified and justified in the FSAR or FHA and the deviation would probably require a license amendment to change the license condition.
See responses 8.1 and 8.2.
8.21 NRC Approval for BTP CMEB 9.5-1 Deviations QUESTION Do future deviations from BTP CMEB 9.5-1 guidelines require approval by the NRC? Do such deviations constitute a violation of license conditions?
RESPONSE
Compliance with guidelines in the BTP is only required to the extent that they were incorporated in the approved Fire Protection Program as identified in the license condition.
When the new license condition is in place (See Response 8.2), future deviations may be made in accordance with the procedure stated therein.
With present non-c ;#:r-license ccnditions, such deviat'cn: may cr may not requirc a licease amendment.
In the absence of a license amendment, a violation may exist.
9.
INSPECTION POLICY 9.1 Safety Implications QUESTION Since the Commission states that fire damage cannot be defined and fire spread cannot be predicted, how does the Commission determine which Appendix R viola-tions have "important safety implications?"
RESPONSE
III.G.2 provides alternatives to ensure that one of the redundant trains is free of fire damage.
Fire spread within one area cannot be predicted, but damage is limited to one fire area.
APPENDIX R QUESTIONS & ANSWERS 40
the same fire area that are needed for safe shutdown or can adversely affect safe shutdown, and are not protected by the features of III.G.2, III.G.3 or an approved alternative.
9.2 Uniform Enfcrcement QUESTION How does the' Commission ensure that violations of the rule are uniformly treated between regions?
RESPONSE
Each Region evaluates violations in accordance with the NRC Enforcement Policy, 10 CFR 2, Appendix C.
The Policy provides guidance for the determination of appropriate enforcement sanctions for violations.
The Office of Inspection and 4
Enforcement provides guidance for and monitors Regional implementation of the Policy to ensure a uniform application.
In addition, the policy requires that all escalated enforcement actions be approved by the Director of the Office of Inspection and Enforcement.
9.3 NTOL Inspections 1
QUESTION 1
Will NT0Ls be subject to an Appendix R audit now being performed on plants licensed to operate prior to January 1,1979? Or, will the current review and analysis being performed by the Staff be satisfactory?
RESPONSE
Yes, NT0Ls will be subject to the Appendix R audit; the TI 2515/62 is being revised to reflect the appropriate requirements for NT0Ls' and it is our intent to conduct such inspections prior to issuing the operating license.
10 CFR 50.48 requires each such plant to have a fire protection plan.
Their operating license will contain a specific license condition to implement their approved fire protection program which must identify deviations from Appendix R.
The fire protection inspections will be against the particular license conditions.
9.4 Future TI 2515/62 Revisions QUESTION Does the NRC plan to issue a new or revised version of Temporary Instruc-tion 2515/62 for future Appendix R audits?
RESPONSE
Yes.
APPENDIX R QUESTIONS & ANSWERS 41
,_1
~
9.5 Documen'tation Suoplied by Licensy QUESTION Temporary Instruction 2515/62 provided a list of documentation that the NRC needs to review as part of the audit process.
In past audits, the NRC has requested additional information other than that contained on the list.
Will a new list of documentation be developed?
RESPONSE
The documentation listing Provided in TI-2515/62 does not restrict the inspection team from enhancing inspection efficiency by requesting a licensee to provide additional relevant documentation.
A new listing of documentation for TI-2515/62 is not being developed.
9.6 Subsequent Inspections QUESTION To what extent will Appendix R issues be raised at future Regional I&E Fire Protection Audits after a successful Appendix R audit? For example, if an area has~ already been reviewed and no noncompliance found, will it be subject to later review and reinterpretation by the Staff?
RESPONSE
The Appendix R inspections are conducted on a sample basis.
These inspections do not certify that all possible items of noncompliance with Appendix R have been identified.
The inspection results do provide a basis for a determina-tion of the adequacy of a licensee's Appendix R reanalysis, modification and preparation.
When a noncompliance with Appendix R requirements is identified, a notice of v!M eion will be issued to ensure adequate ccrrective actic4.
In those cases in which the licensee believes that the staff has invoked a reinterpretation of adequacy in areas which had previously been reviewed, NRC's procedures for appeal would be applicable.
9.7 NRC List of Conforming Items QUESTION At the end of the audit, will the NRC provide a list of it' ems that had been reviewed and found in conformance with Appendix R? To date, only areas of nonconformance have been specifically identified in exit interviews.
RESPONSE
Subsequent to an Appendix R inspection, the NRC will not provide a list of items reviewed and found to be in conformance with Appendix R.
We do list the areas inspected and where non-compliances were not found.
APPENDIX R QUESTIONS & ANSWERS 42
n
- 9. 8 Inspection Re-review QUESTION Where assumptions are made and clearly stated within the analysis submitted to NRR for review, will such assumptions be subject to a second review by OI&E during the inspection process?
Where assumptions are made in conjunction with the analysis, should exemption requests be filed just to provide protection for the licensee?
If NRR accepts a licensee's selection of equipment and shutdown paths as being sufficient to meet the Appendix R shutdown criteria, will OI&E review and have the right to challenge the approved shutdown paths and approved equipment selec-tion? Or will they only check the shutdown paths and equipment in question to see that they meet the Appendix R requirements, i.e., separation?
RESPONSE
To the extent that a licensee's submittal to NRR is comprehensive and suffi-ciently detailed, the basis for the OI&E Appendix R inspection will be the assumptions, shutdown paths and equipment selections approved by NRR.
If the inspection results in new information that casts doubt upon the approved con-figuration, the Regional inspectors have the responsibility to resolve such doubts.
- 9. 9 List of Shutdown Equipment QUESTION What lists of shutdown equipment will be used by the Regional inspectors, if the shutdown analysis has not been reviewed and approved by NRR?
RESPONSE
Regional Inspectors will use the lists of shutdown equipment the licensee has identified in his fire protection plan.
Generic Letter 81-12 and its clarification documents expect licensees to show how they will shutdown if a fire area is not provided with redundant train separation.
Inherent within this expectation is the assumation that the licen-see will identify the equipment to be used.
It is because the licensees have not had fire hazard analyses at all for non alternative stutdown fire areas that the inspectors to date have resorted to using the only lists available (the alternative shutdown equipment list used by NRR in their reviews).
It is unlikely there would not be a list of at least those systems to be used for alternate shutdown, since 10 CFR 50.48 requires NRR review and approval of the means of alternate shutdown.
APPENDIX R QUESTIONS & ANSWERS 43
-