Informs of Change to Projected Completion Date for Activities Re GL 92-08, Thermo-lag 330-1 Fire Barriers
ML20133C534
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/31/1996
From: Wadley M
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-08, GL-92-8, TAC-M85592, TAC-M85593, NUDOCS 9701070212
Download: ML20133C534 (3)


Text

_ _

b

~

j .

Northern States Power Company Prairie Island Nuclear Generating P! ant 1717 Wakonade Dr. East Welch, Minnesota 55089 December 31,1996 Generic Letter 92-08 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Change to Projected Completion Date for All Activities Related to Generic Letter 92-08 on Thermo-Lag issues (TAC Nos. M85592 and M85593)

We have previously committed that, by December 31,1996, we would complete the activities necessary to resolve the concerns discussed in Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers". This commitment date was based on the scope of the project as we could foresee it at the time. All locations requiring removal of Thermo-Lag and replacement with Darmatt will be completed by the end of January 1997.

During the engineering phase of the project, we have re-done the 10CFR50 Appendix R Safe Shutdown Analysis for Prairie Island. As a result of the re-analysis, which was performed with the intent of minimizing the total amount of fire protective wrap necessary, we have identified several small projects which also need to be completed prior to complete close-out of the issues addressed by Generic Letter 92-08. }/ .

None of these projects involve removal of Thermo-Lag from required safe-shutdown

//

raceways. These projects will be completed by the end of June 1997. Fire watches /

established in response to the Thermo-Lag issue will be maintained until completion of these projects. The remaining work represents less than 15% of the total effort at rq }

Prairie Island to resolve the fire wrap issues.

In this letter we have modified one Nuclear Regulatory Commission commitment, changing the completion date from December 31,1996 to June 30,1997.

9701070212 961231 PDR ADOCK 05000282 P PDR

s USNRC NORTHERN STATES POWER COMPANY December 31,1996  :

Page 2 Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions related to this letter.

/Yl< Y $lO N .

I Michael D Wadley Plant Manager ,

Prairie Island Nuclear Generating Plant  !

c: Regional Administrator- Region Ill, NRC Senior Resident inspector, NRC NRR Project Manager, NRC f J E Silberg Attachmert: Affidavit i

I I

i e

9208-11. DOC

s.

. - l l

l UNITED STATES NUCLEAR REGULATORY COMMISSION i

NORTHERN STATES POWER COMPANY j 1

PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NO. 50-282  !

50-306  !

1 GENERIC LETTER 92-08, THERMO-LAG 330-1 FIRE BARRIERS i

l 1

Northern States Power Company, a Minnesota corporation, with this letter is submitting information requested by NRC Generic Letter 92-08, pursuant to 10 CFR 50.54(f).

This letter contains no restricted or other defense information.

NORTHERN STATES POWER COMPANY BY /Yltr nYb(Oe',h0LM Michael D Wadley Plant Manager

[

Prairie Island Nuclear Generating Plant d'

/ JQ On this day of  ? - // before me a notary public in and for said County, personally appeared Michael D Wadley, Plant Manager, Prairie Island Nuclear Generating Plant; and being first duty swom acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that knows the tents thereof, and that to the best of his k1owledge,information, nd elief st ts made i it are true and that it is not interposed for delay.

9 m i /

)b vLtd -

v, m:= v:::=.v::::::::,N s:::.v::.v. a excu aca 9 l% comumm0ua HD0fEPWCOUNTY l L*y CCO":ssion Dprea kn. 31,2000 w:v v::.v.vv::::.v:v :::::m, Gl I

u