Forwards Response to NRC 931220 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Including Program Plan Process Flow Chart & Technical Approach to Resolving Cable Percent Fill in Cases Not Covered by NUMARC Testing
ML20073R991
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/10/1994
From: Antony D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-08, GL-92-8, TAC-M85592, TAC-M85593, NUDOCS 9402160227
Download: ML20073R991 (39)


Text

_

i Northem States Power Company 414 Nicollet Mall Minneapoks, Minnesota 55401 1927 Telephone (612) 330-5500 l

l l

February 10, 1994 Generic Letter 92-08 ]

1 l

i US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 ]

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 l 1

Response to a Request for Additional Information l Related to Generic Letter 92-08, "Thermo-Lag 330-1 j Fire Barriers", (TAC Nos. M85592 and M85593)

I l

References:

(a) L. J. Callan, Nuclear Regulatory Commission, to R. O.

Anderson, Northern States Power Company, letter dated December 20, 1993 (b) R. O. Anderson, Northern States Power Company, to the Nuclear Regulatory Commission, letter dated June 24, 1993 l

(c) Marsha Gamberoni, Nuclear Regulatory Commission, to R. O.

Anderson, Northern States Power Company, letter dr, tid May 18, 1993 (d) R. O. Anderson, Northern States Power Cor.4pany, to US Nuclear Regulatory Commission 10 CFR 50.54 (f) Response, dated April 16, 1993 (e) Nuclear Regulatory Commission Generic Letter 92-08, dated December 17, 1992

  • 0 0 f ~r -)

ON 9402160227 940210 T

PDR ADOCK 05000282 s\

P PDR  :

'I 4~4 t 1

~ NodNwn States Power Company e USNRC  :

4 February 10, 1994 -l q Page 2 l I

l l

i f In Reference (a), the Nuclear Regulatory Commission (NRC)L requested that {

Northern States Power Company (NSP) provide additional information regarding

. -the Thermo-Lag 330-1 fire barriers installed at Prairie Island. The request for additional information is a follow-up to the information_ requested in Generic Letter 92-08, Reference (e). NSP's response to GL 92-08 was provided

'I in Reference (d). NSP's response to the NRC's earlier request for additional '

information, Reference (c), was supplied via Reference (b).

This letter provides NSP's response to Reference (a). The attached response-  !

provides a summary of the background to the NRC's letter (Section A) a .i description of NSP's Thermo-Lag Qualification Program PlanL(Section B),'and a i quotation (in bold type) of.the specific requests in the NRC's letter along j with NSP's res;onse to each request item (section C)

In addition, please note that NSP had originally planned'to provide a j description of the planned actions and schedular commitments regarding Thermo- j Lag to the NRC within 30 days after completion of the NUMARC program, as i requested in Reference (c). However, Reference (a) required NSP to, provide a i differently structured response roughlyctwo months ahead of NSP's original

.{

response schedule. Therefore, the information provided in this letter may i need to be updated at a future time, following~ completion of'the NUMARC-  ;

program. j I

This correspondence contains the following new NRC commitment:  :!

We will resolve the Thermo-Lag issue at Prairie Island using Section B i of Attachment 1, THERMO-LAG QUALIFICATION PROGRAM PLAN as a guide with  :

completion occurring by December 31, 1996 as shown-in Attachment-4, ,

Prairie Island Station's Thermo-Lag Program schedule. This completion ,

date is based on the potential need for cable rerouting which would take j place during unit refueling outages.

.)

1

% a Northem States Power Company USNRC February 10, 1994 Page 3 l

l

! Please contact Jack Leveille (612-388-1121, Ext. 4662) if you require further information.

/ o . 1# -

( Douglas D Antony (

l Vice President l Nuclear Generation l

cc: Regional Administrator - III, NRC NRR Project Manager, NRC Sr Resident Inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg Attachments: A) Affidavit to the US Nuclear Regulatory Commission

1) NSP Response to Request for Additional Information Regarding Generic Letter 92-08, Pursuant to 10 CFR 50.54(f)

Tables 1: Thermo-Lag Installation Summary 2: Effect of Configuration Parameters on Fire Endurance Performance of Wrapped Raceways

2) Program Plan Process Flow Chart
3) Technical approach to resolving cable percent fill in cases not covered by NUMARC testing
4) Prairie Island Station's Thermo-Lag Program schedule I

l l

l 1

i

i .

ATTACHMENT A UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT DOCKET NOS. 50-282 50-306 THERMO-LAG 330-1 FIRE BARRIERS Northern States Power Company, a Minnesota corporation, with this letter is submitting information requested by Generic Letter 92-08, Thermo-Lag 330-1 Fire Barriers, pursuant to 10 CFR 50.54(f).

This letter contains no restricted or other defense information.

NORTHERN, TATES POWER COMPANY By ' D /I[ N/

Douglas D Antony Vice President

[

Nuclear Generation on this / day of Er A /44 before me a notary public in and ;

for said County, personally adeared'bo6glas D Antony, Vice President, Nuclear '

Generation and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belief the statements made in it are true and that it is not interposed for delay, i

/ //

lU l f* *A\%MAAMA>wvAAw%AAvAr,A e A e

  • a

\

g JUDYL KLAPPER!Cx NOTARY PUBLICN ANESO9&

  • ANOKA COUNTV $

Vy Comnussion Exo:res Sept a 'm$

. .wswwwwvwwwww wwas % .

l , .

s ATTACHMENT 1 Northern States Power Company Response to NRC Request for Additional Information Regarding Generic Letter 92-08 A. BACKGROUND The NRC issued Generic Letter 92-08 in December 1992 to request licensees and CP holders to provide information on Thermo-Lag 330-1 fire barrier materials installed at their plants. Specifically, the Generic Letter requested information on: fire endurance and ampacity derating qualification testing; consistency between installed and tested configurations; corrective actions needed including schedules; and, compensatory measures taken in accordance with technical specifications or administrative controls.

NSP's response to Generic Letter 92-08 was provided on April 16, 1993. In the response letter, NSP stated that "At the present time we are awaiting the results of the efforts in place by the Nuclear Management and Resource Council (NUMARC)." Phase 1 of NUMARC's test program was completed in November 1993. Phase 2 is scheduled for completion in March 1994. NUMARC expects to issue an industry application guide based on the tests in April 1994.

Recently, the NRC Staff has raised concerns relative to the adequacy and progress of the NUMARC test program. The NRC ,

has now issued follow-up letter, pursuant to 10 CFR ,

50.54(F), dated December 20, 1993, to request information on l the applicability of the NUMARC test program to Prairie Island.

The following sections provide NSP's response to the requests contained in the December 20, 1993, letter.

l B. THERMO-LAG OUALIFICATION PROGRAM PLAN 1.0 Introduction I Northern States Power Company (NSP) has been actively reviewing potential options for qualifying Thermo-Lag fire barriers since the inception of the NUMARC test program. As a result, NSP has developed a Thermo-Lag qualification plan that we believe will provide a satisfactory resolution of this issue. The foundation of the proposed plan consists of an integrated engineering evaluation. The goal of this evaluation

Attactment 1 Page 2 of 24 is to determine the most appropriate qualification strategy for each Thermo-Lag configuration at Prairie Island.

An important feature of the qualification plan is that all Thermo-Lag configurations in the plant will be comprehensively evaluated regardless of whether or not they are bound by the NUMARC test program. Therefore, qualification of Thermo-Lag by reference to NUMARC test results is considered one option among several possible resolution options in the NSP's program plan.

In addition, although plant-specific testing is one possible qualification approach to Thermo-Lag configurations that fall outside the NUMARC test program scope, NSP does not believe that plant- [

specific testing should be the central focus of the- -

qualification plan. The primary reason for this is that testing does not necessarily guarantee final f resolution. Another issue is the cost-effectiveness of plant-specific testing. As discussed in Section C of this response, one of the plant-unique Thermo-Lag configuration may be different from the NUMARC test assemblies. NSP does not believe that fire endurance testing of this type of configuration is a cost-beneficial approach, particularly since satisfactory i results are not guaranteed. It is possible, however,  ;

that our detailed engineering evaluations may determine that plant-specific testing is the only available option for qualifying a specific configuration, however NSP believes that, in general, the testing approach should be pursued only-after all other potential solutions have been eliminated from ,

consideration. '

2.0 Summary of NSP Oualification Procram Plan The Thermo-Lag qualification program plan consists of 14 steps, however, the plan can be summarized under five main tasks as follows (see flow chart, Attachment 2):

2.1 Task 1 - Establish Field Confiauration Steps 1 through 3 of the process establish the field l configuration and provides the means for multi-disciplined engineering evaluation. Step 1 is a data collection step which has been completed.

- _ .- - -~ .- .

. . l l

  • I I

Attachment 1  ;

Page 3 of 24 In Step 2, Key Plans, the team will prepare key plan  !

drawings showing the raceways required to be wrapped in accordance with the station's design and licensing basis. The team will select the most appropriate .

project drawings as a background for the key plans.

Walkdowns will be used to reconcile the field ,

i conditions with the design / licensing basis. This step is now in progress and is scheduled to be completed by l February 28, 1994. 1 Step 3, Establish the Field Condition, is a detailed  ;

walkdown effort that is designed to breakdown-the wrapped-raceways shown on the key plan drawings into elements that can be compared against test -

configurations. Configuration parameters that can be i extracted from field inspections will be collected at this step. Configurations that can not be matched with a test basis will also be documented and .

pertinent information collected. This step is  !

scheduled to be completed within 8 weeks from the-release of NUMARC's application guidelines.

2.2 Task 2 - Enaineerina Evaluation / Analysis l

Steps 4 through 7 provide for the engineering- l evaluation of the entire scope and will close the i items / fire areas that can be accepted as is or i resolved by analysis with no field work. To ,

accomplish this, classification of the field  !

configurations are needed. To perform this review, the values of the configuration parameters not -

collected in Step 3 (parameters internal to the i barrier system), will be established through the l following methods:

l

  • Assume limiting conditions, e.g., post-buttered ] '

versus pre-buttered joints, no internal bands versus internal bands.  ;

i

  • Reviews of contractor work practices and procedures through documentation or testimony.  !
  • Destructive examination of barriers on a sample  !

basis to obtain information on construction  !

techniques.

l

l

Attacknent 1 Page 4 of 24 2.2.1 Configuration Classification Review.

A fire protection engineer will perform a detailed review of the field configuration data and compare it against the approved NUMARC test reports. Each configuration will be categorized as follows:

Category 1: Bounded and acceptable as is.

Category 2: Bounded, but requires minor modification, such as adding tie wires.

Category 3: Bounded, but requires moderate modification, such as seam repairs, using stress skins and trowel grade material plus tie wires.

Category 4: Bounded, but requires extensive modification, such as full wrap .

with extra layer of wrap.

Category 5: Not bounded by NUMARC test report.

Configurations in Categories 1 and 2 will be further evaluated for cable functionality, if required,and acceptable ampacity, under Tasks 3 and 4. Configurations in Categories 3, 4 and 5 will be reviewed to identify available alternate options to resolve the problem areas without relying on modifications j (Categories 3 and 4), or relying on station i unique testing (Category 5). l 2.2.2 Combustibility Review This task will be performed in accordance with the NUMARC program. All the Thermo-Lag installations in a given fire area will be addressed including potential upgrades using additional Thermo-Lag materials.

2.3 Task 3 - Fire Wrao Oualification/Unarade Steps 8 and 9 of this process address fire wrap field j installation modifications and station unique testing l l required to bring the installations into compliance with the regulatory requiremants. ,

on I

Attactment 1 Page 5 of 24 2.4 Task 4 - Desian Basis Update Steps 10 through 13 of this process complete the design and licensing basis update to reflect the qualified condition. These will be completed on a fire area basis after field work is completed to reflect as-built conditions. The completion of this group of steps for a particular fire area allows the ending of compensatory fire watch measures by declaring the fire barrier in this fire area as operable.

2.5 Task 5 - Closure Report Step 14 of this process is the final closure report that shall be prepared for the entire scope to document the compliance of Prairie Island to the regulatory requirements.

3.0 Types of Resolutions The following is a list of the various technical solutions that will be considered to resolve station specific Thermo-Lag fire barrier configurations (most favorable listed first):

Accept As Is -

Match the configuration with an acceptable qualifying baseline test t (with no upgrade).

Resolution By Analysis -

Perform analysis to eliminate, or abandon the fire barrier based on any combination of the following aspects:

Safe Shutdown Analysis Review

. Reevaluation of licensing-commitments

. Taking credit for the 20-foot separation criteria Probabilistic Risk Assessment (PRA)

Appendix R Exemption Please note that an ongoing review of the NSP Appendix R program is now nearing completion. This review affects the safe shutdown list for Prairie Island and resulted in reducing the requirement for Thermo-Lag fire wrap.

f Attactment 1 Page 6 of 24 Repair / Upgrade -

Repair existing Thermo-lag fire barrier, or upgrade the assembly based on NUMARC Industry Test Data.

This may require overlay with a second application of Thermo-Lag or the use of another fire barrier.

Modifications -

Reroute cable - This is partially completed as a result of the ,

Station Blackout modification. -

This modification includad cable reroutes for separation of redundant cables. ,

Install fire rated cable Install structural barrier Redesign Existing Configuration r

Replace -

Remove Thermo-Lag and install another qualified fire barrier. l i Station Unique l Testing -

Perform testing for-site specific applications. l C. NRC REOUESTS AND NSP RESPONSES l I. Thermo-Lag Fire Barrier configurations and Amounts I.B.1 Describe the Thermo-Lag 330-1 barriers  !

l installed in the plant to:

a. meet 10 CFR 50.48 or Appendix R to 10 CFR- ,

Part 50, l

b. support an exemption from Appendix R,  ;

I

c. achieve physical independence of electrical  ;

systems, i

d. meet a condition of the plant operating license,
e. satisfy licensing commitments.

The descriptions should include the following l

information: the intended purpose and fire l rating of the barrier (for example, 3-hour fire l

barrier, 1-hour fire barrier, radiant energy heat shield), and the type and dimension of the i barrier (for example, 8-ft by 10-ft wall, 4-ft by 3-ft by 2-ft equipment enclosure, 36-inch-wide cable tray, or 3-inch-diameter conduit).

l l

I Attactment 1 Page 7 of 24

Response

NSP has performed *arious levels of investigative walk . owns to establish preliminary estimates of the quantity of Thermo-Lag and configuration characteristics. A detailed walkdown is planned as part of the full scale evaluation program (see Section B of this Attachment), in accordance with the program plan's schedule. Therefore, the enclosed Table 1, Thermo-Lag Installations Scope, provides the best estimates of Thermo-Lag installation data available at this time.

I.B.2 For the total population of Thermo-Lag fire barriers described under Item I.B.1, submit the following information:

1. For cable tray barriers: state the total linear feet and square feet of 1-hour barriers and the total linear feet and square feet of 3-hour barriers.
2. For conduit barriers: state the total linear feet of 1-hour barriers and the total linear feet of 3-hour barriers.
3. For all other fire barriers: state the total square feet of 1-hour barriers and the total square feet of 3-hour barriers.
4. For all other barriers and radiant heat shields: state the total linear or square feet of 1-hour barriers and the total linear or square feet of 3-hour barriers as appropriate for the barrier configuration or type.

Response

See Table 1 and the response to Item I.B.1 above.

II. Important Barrier Parameters II.B.1 State whether or not you have obtained and verified each of the aforementioned parameters for each Thermo-Lag barrier installed in the plant. If not, discuss the parameters you have not obtained or verified. Retain detailed

- - - . . . . - . . - . ~_

l I

l Attachment 1  !

Page 8 of 24 l information on site for.NRC audit where the aforementioned parameters are known.

Response

The NRC 10 CFR 50.54(f) letter discusses and f lists a number of parameters of importance concerning cable protection by fire barriers, i It is not presently clear that consideration of all of these parameters would be necessary for r most barriers. Therefore, efforts to obtain j the listed parameters, or describe how barriers will be evaluated in the absence of these parameters, are unjustified at this time.

The NUMARC industry application guideline will

! discuss bounding parameters and their I application to installed configurations using ,

combinations of tested configurations. Based on testing performed to date, the draft application guideline would address the parameters listed in the 10 CFR 50.54 (i) letter. The listing provided in Table 2 i represents a clarification and expansic.n of the ,

24 point listing provided in the 10 CFF.

50.54(f) letter, and addresses.installied l configuration types that would be bouni by given test configurations.

As indicated in Section B, Ite;; 2.1 of this [

attachment, Task 1 - Establishing Field Conditions, is now in progress. Table 3 a. hows  ;

some of these parameters that are listcJ fn the  !

10 CFR 50.54 (f) letter. The key plan  ;

preparation, now in progress, - will er.tablish  !

additional items on that list of parnmeters. ,

In addition, preliminary review of tle  ;

documentation used as the basis for ti.e installation yielded some more items. Items  !

22, 23, and 24 may not be of any significance-as the NUMARC tests will not-include these '

provisions which improve the fire-endurance performan'e of the envelop. The remaining parametene which are presently unknown are Items 4, 6, 8, and 12 through 21 of the NRC list.

II.B.2 For any parameter that is not known or has not been verified, describe how you will evaluate the in-plant barrier for acceptability.

l AttacNnent 1

- Page 9 of 24

Response

Following the issue of the NUMARC application guide the remaining important parameters will be determined as part of Task 1 and Task 2 activities (refer to Section B of this attachment, Items 2.1 and 2.2).

Task 2, Item 2.2 of Section B of this letter provides description on how these parameters will be used in the Engineering Evaluation process.

To the extent that fire test results are satisfactory on the basis of temperature, as provided in the NRC draft test and acceptance '

criteria, NUMARC believes the NRC listing of cable performance parameters need to be limited to the percent cable fill in cable trays (subset of item 4 of the NRC listing), which relates to enclosed thermal mass and barrier performance. Please note that Table No. 1 includes raceways with percent cable fill values of less than 15%.

If fire tests demonstrate cases where the temperature criteria have been exceeded, one optional approach to resolution, as provided in the NRC draft test and acceptance criteria, I would be to evaluate cable functionality at the elevated temperatures. In this case, determination of cable performance at elevated temperature (item 8 of the NRC listing) would be necessary, using cable performance test data or information for specific installed cable types (items 1, 2, 3, and 7 of the NRC listing).

However, NRC has yet to finalize requirements for cable functionality evaluation, nor are test results yet available that would clearly indicate the need for or the scope of such ,

evaluations. The degree and conservatism of I cable functionality evaluation requirements implied here, and discussed in proposed Supplement 1 to Generic Letter 86-10, significantly exceeds the original requirements of GL 86-10. 1 Nevertheless, if the proposed Supplement 1 to Generic Letter 86-10 is finalized and is l

l 4

Attachment 1 lage 10 of 24 l basically unchanged, several options are available to NSP to evaluate the effects of -

percent cable fill and test results exceeding the temperature criteria on several of the wrapped raceways in Prairie Island. These options have been discussed in Section B of this attachment, Item 3.0. In cases where a site specific testing is determined to be unavoidable, NSP intends to investigate applying the technical approach discussed in Attachment 3. We understand that NUMARC has received several recommendations on the percent cable fill concerns, and is currently deciding on which course of action to adopt. If NUMARC does not change their current plans on this concern, NSP will investigate teaming with other utilities on implementing the approach of Attachment 3, or any other alternate solution that may evolve in the coming months. As such, NSP will select the approach deemed most appropriate for the conditions encountered during the engineering evaluation phase of implementing our program plan. NSP would welcome NRC's review of the proposed approach of Attachment 3 to help in the decision process on which option to adopt.

Items 4, 5 and 6 of the above NRC listing address issues relative to potential cable / barrier contact for cable trays. This is an unresolved issue at this time, and barrier inspection in this regard would be. difficult or impossible. Barrier contact would be most  !

likely to occur in situations of large cable fills. However, the large cable fills also provide significant thermal mass that would improve barrier system performance and mitigate the effect of cables in contact with the barrier. NUMARC has agreed to provide additional thermocouples in the Phase 2 cable tray tests to provide information on temperatures on raceway surfaces in contact l with the cold side of the fire barriers.

Further, note that a small piece of Sealtemp cloth (NRC item 6) was used only in NUMARC test Number 1-4 (24" steel cable tray with air drop, three hour test), and did not impact performance or useability of the test.

The NRC 10 CFR 50.54(f) letter discusses chemical testing of Thermo-Lag. Chemical i

1

. ~ .

i Attaciment 1 Page 11 of 24 testing performed by NUMARC on a wide variety of aged samples, has not revealed significant variations in chemical composition. These test i results will be shared and discussed with NRC, l and distributed to industry along with the Phase 1 test reports. Further, Phase 2 testing will include barrier materials of various ages, '

as well as additional chemical testing. Unless unexpected results are encountered, NUMARC does not believe plant unique chemical evaluation should be necessary.

II.B.3 To evaluate NUMARC's application guidance, an understanding of the types and extent of the unknown parameters is needed. Describe the-type and extent of the unknown parameters at your plant in this context. ,

Response

The NRC 10 CFR 50.54(f) letter lists a number '

of parameters of importance concerning fire barriers. It should be noted that parameters ,

not listed in Table No. 2, including barrier l panel ribs facing out, raceway gage (mass),

type of cable tray side rails ("C" shape facing in, "C" shape facing out, "I" shape), cable tray ladder rung spacing, and thermal shorts '

penetrating the barrier but not contacting the raceway, have been identified as potentially important. It is not presently clear that consideration of all these. parameters would be necessary for most barriers. Upon' completion of the NUMARC Phase 2 testing (schedule for March 1994), a better understanding of the  ;

important parameters will be known. l l

Presently, NSP has not attempted to identify these unknown parameters. The primary reason  ;

is that the NUMARC parameter list is considered  ;

J preliminary. Based on the results of the NUMARC test program, some of the parameters may prove to be unimportant or additional .

parameters may need to be'added to the list. l l

III. Thermo-Lag Fire Barriers Outside the Scope of The NUMARC Program.

III.B.1 Describe the barriers discussed under Item I.B.1 that you have determined will not be bounded by the NUMARC test program.

.- -- .. - - . . . - ~ - - . _ = _ . . _ -. .. -- =- = --

l l

i Attachment'l Page 12 of 24 .]

i Resoonse:

Preliminary scope-estimates completad to date identified only two areas where it 7fpears that  ;

NUMARC testing program would~not bound.the I i

installations at Prairie Island. These two areas are 1. Tray cable fill less than 15% and

2. non standard cable tray configuration.

Please refer to response II.B.2 and.

Attachment 3 for discussions on the percent '

cable fill.

Although not in the original Phase 2 test l program, upgraded 3-hour 30" X 4" cable trays  :

with Tee section may be tested in the expanded 'I NUMARC testing program. -As such, this NUMARC test No. 2-17 may provide the basis for j resolving a'l-hour 30" X 6" cable tray section l that includes a Tee section, in Prairie  ;

Island's Fire Area No. 74._ One of the options 1 available to NSP in-this case is to  !

conservatively apply a 3-hour upgrade to a 1-hour installation, to avoid a: potential site ,

specific test'. One other option available to

i NSP is to structurally reinforce (by adding I steel angle reinforcement at the corners) non-l standard cable tray junctions in_ addition to applying the same upgrades required to qualify ,

the adjacent standard cable tray' sections l meeting at that junction. This has been proposed to NUMARC. There is_a possibility.

that NUMARC might use. features of this proposal in their expanded test Nos. 2-13 and 2-15.

It is important to note here that the scope of Thermo-Lag installations, as shown on Table 1, is roughly 850 feet long of wrapped raceways. ,

Cut of these, only one configuration appears with potential to be, requiring site specific testing. This configuration is approximately 6 feet long, representing less than 1% of the total population. Therefore, as stated earli" in Section B of this response, NSP does not believe that site specific testing would be a central focus of the qualification plan for Prairie Island.

This assessment is subject-to change pending completion of the NUMARC expanded test program, issuance of the industry application guide,.and

I Attachment 1 Page 13 of 24 completion of Tasks 1 and 2 of the NSP program plan (refer to section B of this Attachment).

III.B.2 Describe the plant-specific corrective action program or plan you expect to use to evaluate the fire barrier configurations particular to '

the plant. This description should include a discussion of the evaluations and tests being considered to resolve the fire barrier issues identified in GL 92-08 and to demonstrate the adequacy of existing in-plant barriers.

i

Response

I Please refer to Section B of this attachment.

The scope of this issue and the specific item-by-item approach to resolution depends on three main variables:

1. The performance of the NUMARC Phase 2 testing including the expanded scope; ,
2. The finalization of the NRC acceptance criteria; and
3. The completion of the engineering evaluation  !

(Task 2) in NSP's qualification program.  ;

NUMARC's letter of December 17, 1993 requested licensees to provide information on determination of installed configurations outside the scope of the current NUMARC program. NUMARC will evaluate this information, and, through the Fire Protection Working Group, provide recommendations to the NUMARC Executive Committee for potential test program expansion. The generic testing program, including potential expansions, will be limited to cable raceway protection applications. Preliminary feedback from the industry meeting indicated potential additional generic benefit might be realized from testing of the following types of configurations:

1. Air drops;
2. Cable trays with small (less than 15%) cable fills;
3. Cable trays with large (greater than 15%)

cable fills;

4. Cable trays with T-sections;

I  !

l  ?

l Attachment 1  !

l Page 14 of 24 l

5. Box installations with panel ribs facing  !

outward; i

6. Further testing of alternate upgrade  ;

materials / techniques for cable raceways; and j

7. Further testing of box enclosures mounted to l

! concrete.  :

i NUMARC expects to provide information-on-test program scope expansion in April 1994. [

.. l With regard to test and acceptance criteria,-  !

generic test and acceptance criteria for cable.  ;

l  :

raceway fire barriers are under development by

! NRC (draft proposed supplement to' Generic Letter 86-10), and have been subject to .

considerable public review, technicalfscrutiny, [

CRGR and ACRS review, and NRC management .

involvement. This criteria, when final, would. j be required for establishing ratings for cable i raceway fire barriers used for protection of [

safe shutdown functions in accordance with 1 Appendix R. NSP' intends to' apply the NRC's.  !

l generic criteria, when finalized.: We'have no l

current plans to develop plant-specific test i and acceptance criteria. l As discussed earlier in this response, NSP .

f i intends to investigate possibilities of. teaming l with other utilities for cases where site l specific testing is determined to be  !

unavoidable. The NSP program plan is discussed

~

further in Section B of this~ Attachment. .

III.B.3 If a plant-specific fire endurance test program [

is anticipated, describe the following: j i

1. Anticipated test specimens, j i
2. Test methodology and acceptance criteria  ;

including cable functionality. [

ResDonse:

Plant-specific fire endurance t3 sting is not i anticipated at this time. NSP's position  ;

regarding plant specific testing is discussed l in the qualification plan description in ,

Section B of this Attachment. Refer to the  !

response to Items II.B.2, II.B.3, III.B.1, and.  !

III.B.2 for further discussion. j t

i

i I

Attachment 1  !

Page 15 of 24 IV. Ampacity Derating ,

IV.B.1 For the barriers described under Item I.B.1, describe those that you have determined will l fall within the scope of the NUMARC program for ampacity dorating, those that will not be l' bounded by the NUMARC program, and those for '

which ampacity dorating does not apply.

Response

t Ampacity derating is an issue that applies only [

to cable raceways containing power cables.

Ampacity derating factors determined for upgraded configurations can be conservatively applied to baseline configurations. The NUMARC -

program for ampacity derating evaluation a contain the following elements:

For upgraded one hour cable trays and conduits, NUMARC will be discussing with NRC the generic [

applicability of ampacity derating factors ,

derived by TUEC using the methodology of IEEE l P848 Draft 11, with some modifications. The i IEEE P848 test methodology has been extensively discussed with NRC by NUMARC and TUEC.

However, NRC acceptance of the methodology is still pending. NRC has informed NUMARC that  !

they will issue a request for further l information to TUEC in January 1994 regarding i l the submitted ampacity test report. The TUEC  !

l testing provided preliminary ampacity derating l l factors of 32% for cable trays and 11% for i i conduits, which are within the range of  ;

l previously reported values.

J NUMARC will conduct ampacity testing of  ;

upgraded three hour barriers to the requirements of IEEE P848, following determicition of appropriate barrier upgrades l for three hour installations, and agreement with NRC on ampacity test methodology. It is expected that this testing would be conducted in the second quarter of 1994, at the earliest.

To the extent that successful upgrades using alternative materials are identified, ampacity-testing of these upgrades would be considered as well.

1

- -. - .~ -. . .- _ - = .

Attac}nent 1 Page 16 of 24 The IEEE P848 approach provides for testing of a single cable tray, and small and large  !

conduits. The limiting conduit derating factor  !

(of the two sizes tested) is applied to the  ;

range of conduit sizes, cable fills, etc. For i cable trays, single cable tray derating factor is applied to all sizes of cable trays, cable fills, etc. Thus, ampacity testing can be performed generically with broad applicability, j unlike fire testing where many performance parameters must.be considered. The NUMARC  ;

program is expected to provide ampacity. j derating factors for one and three' hour .i barriers, for cable trays and conduits. (

Assuming NRC agreement with the IEEE P848 ,

approach, few if any installations are expected l to fall outside the generic scope. l i

Based on preliminary reviews completed to date, l it appears that the Texas Utilities (TU) and ,

the Tennessee Valley Authority (TVA) ampacity test results may not be applicable.to the j Prairies Island Station. Therefore, no  !

comparison to these configurations.have been made at this time. This comparison will be  ;

made, however, during the full scale implementation of the qualification program.

As indicated by the NSP response dated' June 24, ,

1993 (Reference b), the Prairie Island design addressed power cable ampacity derating using an analytical approach rather than- using the originally published TSI ampacity derating i factors. This analytical approach'was used l because it provided conservative, yet practical ,

results. These values were conservative as compared with the values originally published  !

by TSI and are in line with the preliminary  ;

results of the TU testing for a similar l configuration.

The following screening approach will be used in documenting acceptable ampacity values for wrapped raceways after the need for upgrades ,

have been determined (Task 3, Item 2.3 of Section B of this attachment): ,

i

1. Values from the NUMARC Industry Program, as  !

well as applicable TU and/or TVA test results, will be used to confirm that acceptable cable ampacity design is documented. The effect of i

Attachment 1-Page 17 of 24 any reduction to cable ampacity would be assessed to ensure that the cable's actual load-current does not exceed the calculated. )

ampacity.  ;

2. The analytical approach used for the Prairie l Island design can be applied to any upgrades j that may be made to the existing in-plant'  ;

barriers to determine the ampacity derating for i these upgraded configurations. Because the i heat transfer models for the upgraded i configurations may be more complex than the j design configurations, the analytical approach  !

may need to depend on some conservative  !

assumptions. Where these assumptions. result in impractical ampacity derating, the NUMARC l testing (and perhaps the TU and TVA testing, if  :

applicable) will be used as a basis for the i removal of some conservatism.

3. Where the load current. appears to exceed the calculated ampacity, detailed calculations will be performed to address each apparent overload.

These detailed calculations would consider the actual heat (I 2 R) generated by each cable (Stolpe's method assumes that each cable  !

carries its allowable current, while the cables  ;

may actually be carrying less than this value  !

and some may carry no current at all) .

(

f

4. Where these methods do not resolve the apparent overload, a variety of alternatives are j available, including the following:
a. consideration of the actual ambient i temperature in the area of the cable tray I (actual temperature may be lower than  ;

maximum design temperature),  !

b. rerouting of the specific " problem" cable, l
c. perform site specific testing of the configuration or
d. derate the barrier to a one hour barrier and ,

eliminate the need for the. upgrade l IV.B.2 For the barriers you havs determined fall

~

within the scope of the NUMARC program,  ;

describe what additional testing or evaluation i

l l

I'

Attachment 1 Page 18 of 24 you will need to perform to derive valid ampacity derating factors.

Response

Refer to the response to Item IV.B.1.

IV.B.3 For the barrier configurations that you have determined will not be bounded by the NUMARC test program, describe your plan for evaluating whether or not the ampacity derating tests ,

relied upon for the ampacity derating factors  !

used for those electrical components protected by Thermo-Lag 330-I (for protecting the safe- ,

shutdown capability from fire or to achieve physical independence of electrical systems)  ;

are correct and applicable to the plant design.

Describe all corrective actions needed and submit the schedule for completing such actions. t

Response

Refer to the response to Item IV.B.1, With regard to schede.les, refer to the response to  ;

Item VI.B IV.B.4 In the event that the NUMARC fire barrier tests indicate the need to upgrade existing in-plant barriers or to replace existing Thermo-Lag barriers with another fire barrier system, describe the alternative actions you will take (and the schedule for performing those actions) to confirm that the ampacity derating factors were derived by valid tests and are applicable to the modified plant design.

Response

Refer to the response to Item IV.B.1, With regard to schedules, refer to the response to Item VI.B V. Alternatives V.B Describe the specific alternatives available to you for achieving compliance with NRC fire protection requirements in plant areas that contain Thermo-Lag fire barriers. Examples of possible alternatives to Thermo-Lag-based upgrades include the following:

1 Attactment 1 Page 19 of 24

1. Upgrade existing in-plant barriers using ,

other materials,

2. Replace Thermo-Lag barriers with other fire barrier materials or systems,
3. Reroute cables or relocate other protected components.
4. Qualify 3-hour barriers as 1-hour barriers and install detection and suppression systems to satisfy NRC fire protection  :

requirements.

Response

Currently, there are five undefined factors .

that must be considered in determining whether ,

upgrades using additional Thermo-Lag materials are practical, and what alternatives would be most appropriate in case Thermo-Lag upgrades i cannot be developed:  ;

1. Test and acceptance criteria have not been finalized and issued by.NRC. Proposed draft criteria contain new conservatism in fire test methods and acceptance criteria that could affect the scope and complexity of upgrades to installed barriers. The content of the final criteria, and the resulting impact on Prairie Island specific action plans, is uncertain.
2. Complete Phase 2 test results will not be known until the mid-March time frame.

Results of baseline (as installed) and upgraded test configurations from Phase 2 must be considered to determine appropriate Prairie Island action plans to address specific configurations.

l

3. The Application Guideline, to be final by  ;

mid-April, will include a matrix of I important performance parameters and i bounding conditions. Discussion with NRC will be necessary to reach agreement on the j comparison parameters and bounding i conditions. The results of these NRC  !

interactions will define the final document and would directly impact the generic

l .- .  ;

i ,

. .s I ,

4 I

. Attachment 1 i Page 20 of 24

applicability of a given test to an j installed configuration. j i

1 4. The expanded NUMARC test program would expand the coverage of the NUMARC program' and would potentially include alternate  ;

material, refer to Response-to III.B.2, l 4 Item 6. .

5. Finalization of'the ongoing NRC reviews of I test reports of' fire barrier materials other  !

than Thermo-Lag, such as 3M,.Kaowool, etc.

This review is indicated by the statement ,

included in Information Notice IN 93-41 that  ;

"the staff previously requested additional information on Kaowool from Thermal l Ceramics, Inc. ~ in a letter of April 27, 1993, and on 3M fire barrier systems from 3M Company in a letter of May 4,.1993."  :

Therefore, without clear indication of NRC's l position on those materials, NSP can not l replace certain Thermo-Lag installations in-Prairies Island Power Station with another j material,-say 3M, only_to find out that the  :

NRC has identified concerns with the related test report.  ;

The four possible alternatives listed'in the  !

10 CFR 50.54(f) letter will be considered in the NSP evaluation program. In addition, the l following alternatives will be considered: i 1

e Reevaluation of engineering analyses used l for determination of Appendix R safe i shutdown pathways, equipment, and actions.

This could provide a basis for reduction in scope of protected circuits, and their associated fire barriers.

  • Exemption requests could be submitted based upon the use of fire modeling in conjunction with NUMARC's baseline (non-upgraded) test results to demonstrate adequate protection for the postulated hazard. Alternatively or in conjunction, probabilistic safety assessment (PSA) could be used as an exemption basis, by demonstrating.

insignificant core damage' frequency impacts assuming barrier inoperability.

1 I

i J

_ _._-l

Attactment 1 Page 21 of 24

  • Reevaluation of licensing commitments that may exceed the requirements of the pertinent regulations may be undertaken.
  • Use the 20-foot separation criteria with installation of suppression and detection where necessary to meet NRC requirements.

VI. Schedules VI.B Bubmit an integrated schedule that addresses the overall corrective action schedule for the plant. At a minimum, the schedule should address the following aspects for the plant:

1. Implementation and completion of corrective actions and fire barrier upgrades for fire barrier configurations within the scope of the NUMARC program,
2. Implementation and completion of plant-specific analysis, testing, or alternative actions for fire barriers outside the scope of the NUMARC program.

Response

The scheduling of the resolutions of the various items in the station's scope will be established based on the combined worth of the following factors:

1. Importance to safety (PRA/PSA)
2. Contribution to the completion of the scope in a given area / zone or raceway
3. Cost of the fix
4. Economy of grouping of fixes, as opposed to ,

implementing the work for one item as soon l as its fix is finalized

5. Outage schedules, where applicable ,

l

6. Potential for teaming arrangement with other stations / utilities on site specific testing The implementation of modifications in the field, or site specific testing, need careful planning and integration with other station activities (e.g., outages). This requires adequate time to design the most effective, and

Attachment 1 Page 22 of 24 at the same time the most economic, resolutions. Site specific testing and upgrades will not be started until the impact on ampacity (for the safe shutdown cables in the entire raceway), the ability.of the seismic supports to accommodate the additional weight, and the fire loading of the area (combustibility review) are evaluated add determined to be acceptable. Also, engineering ,

evaluation of the design / licensing basis and resolution by analysis reviews will be completed first before field work and/or site specific testing are committed. This is to avoid doing expensive and operation disruptive field work that would not be required after these reviews are completed. For example, the review of the safe shutdown analysis may ,

identify equipment and their associated cables, such as cubicle coolers, that can be deleted from the requirements of fire wrap.

Although timely resolution of the Thermo-Lag problem is desirable, adequate time to ensure '

prudent resolutions are reached is important for the economic performance of the plant, as long as provisions are in place to ensure the plant's safe operation are maintained in the interim period. Accordingly, the attached preliminary schedule for the station (Attachment 4) was developed based on the station's program plan for the resolution and takes into account the above considerations. 1 The schedule in Attachment 4 reflects the time frame required to complete the engineering evaluation and the field work for the entire scope, whether bound or not bound by the NUMARC ,

program. Any modifications requiring plant '

shutdowns shall be completed within the following scheduled outages:

Unit 2 Outage Starts 5/27/95 Unit 1 Outage Starts 1/6/96 Note that the coming Unit 1 outage starts in May 1994 which is too early to take it into consideration.

As explained previously in Section B, item 2.1, the project team at NSP has already begun in preparing the key plan drawings of the Thermo-

^

l

. j Attachment 1 Page 23 of 24  ;

Lag wrap design basis. But the completion of Task 1 and the subsequent full scale implementation of that program is scheduled to i start within one month from the release of the  !

NUMARC application guidance. This ensures a stabilized basis for committing resources to such an extensive program. At the same time, this start date allows for timely receipt of input from the ampacity portion of the NUMARC and the expanded scope of the NUMARC testing.

It is hoped also that the finalized NRC acceptance criteria (Supplement 1 to GL 86-10) will be released within the same time frame.

I Below is the current schedule for the NUMARC program activities. As noted previously, information on the expanded NUMARC test program will be available in April 1994.

Activity Schedule (1994)

Issue Phase 1 test reports January 31 Perform Phase 2 testing January 26 March 24 f Generic test program scope April 1 information  !

Shared testing information April 1 Issue Phase 2 test reports April 15 -

Issue Application Guide April 15 Ampacity program information April 29 Perform ampacity testing July (estimated)

Issue Ampacity test report August (estimated)

  • NUMARC did not release this report as of this date. ,

VII. Sources and Correctness of Information VII.B Describe the sources of the information provided in response to this request for information (for example, from plant drawings, quality assurance documentation, walk downs or inspections) and how the accuracy and validity of the information was verified. ,

l 1

i 1

i l

Attachment 1 I

Page 24 of 24

Response

The following sources were used as the basis for preparing this response:

1. Report No. SL-4894, Revision Draft, dated 2/10/94 -

Program Plan for Cable Raceway Fire Barrier  ;

Qualification at Prairies Island Station.  ;

2. Stone and Webster Ampacity Study Report Number 1291.23-E(D)-1.  ;
3. Thermo-Lag Test Reports, I.T.L 85-1-106, 85-4-377, and i 84-12-181 l
4. Thermo-Lag Installation Procedure, 20684 ,

I l 5. Prairie Island Modification Package 83Y480 t 1 l

Please note that the preparation of this response required 160 person-hours to complete.

l l

l l

1 i

l i

i  ! - i' t  !  ; l[  !^ t

  • j - '

+ " .

T2S ._

Ff L AoJ .

R1 O .

G Ot eR M N - eE I

vh W ReS H ,

A ~ T .

3 2 7 3 .

R 0 0 0 7777777775 8 6 88 8 85 8 8 6 8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 C D 0 0 0 0000000000 000000 00 0 0000 0000 0 00 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 2 2 2 .

- - - - 0 0 4 4 0 -0 0-A . A AA AAA4AA- - - - - -

A A A A A A A A A A A A A A A A A A A A A A A A A A A A A HOHHH HHHNHHH HHH H HH H H H H H H H HH H H H H H H H H H H H H H -

FNFFFFFFFFFFFFIFF5.F FFFFF F FIF FF F F F F F F FF F F 5A324 6 2 9 5 7 7 5.'6 '2 71 2 1.'5 5 1 1 1 6 5 5 -

L L

6 2

/

N1 1 1 1002411~ 1 2

3 31 2 8 12 17 8 4i 2 1 2 1 7 7 631 7 1 1 2 5 5 66 2 0. 0 5 2 2 5 1 1 1 0 2

1 I

F 1 1 2 1 1 1 1 1 1 1 3 3 2 2 2 4 2 m

% ~ .

~

T A LLLLLLLLLLLL LL LL L L L L L L L LL L L L L L L L L L L L L M TTTTTTTTTTTT T T T T T T L T TT T T T T T T T T T T T T T ~

' TTTT_

9 5 5.

6'15 75 107555 355 6 359 H. _)57 2 TT 6 7 1

1 2 1 1

5 75 8

2 1

6 5 5 55 2

5 5 4 5 5 2 7 5 5 5 3 3 5 2 7 1 5 5 5 7 7 6 6 5 .

2 1 1 1 GF( ~

L ~ -

3' ~

~

T P "

Y H"6 P 6 6" 6' 6" "6 '6 6" "

66 6 6" 6" 6" 6 6 6" "6 6 6" *6

  • 6 66 6" 6" 6" 6" 6" 6" 6' 6" 6
  • A

/ A A A

/ / / -

A A N N N N W

E .

C A HA T

I 2' -

Y R D D P " "

R I

R" P"0 0 0 7 0" 0" " '

0" 7 0" 0" 7 0" "-0 0 33 WO9A3333331'B "9 9" 84 233339" "8 5" 8" 0 "0 0 0" 0" 7 0 "

0 8 '

5

  • NA 1 1 1 1 333 3 3333 3 3 1 4 4" 2 4 OM -

TI M O AU ,

N 2 TS .

_ G - 21 -- 1-1 -1i- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SN 1

- 1 1 1 77 2222222222 1 1 1 1 1 1 1 4- 4 4 N00 3 3 3 33 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 9 RO I 1 1 1 1i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 8 8 8

_ 1 1 1 1 1 7 7 W0 1 1 1 1 1 1 1i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 77 EI T 000 0000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0

_ A4 44 0 0 0 0 2 4 2 22 1

WA _ RFFF FFFEFFF 444444- - - 4 F

4 4 4 FF

- - 4 F F F F F F F F F F F

- 4 4 4 4 4- 4 4 4 4 4 4 4 4 4- 4 4 9 9 .

EOL L DNNNNNNUNNNN N5 NNN N N NNN N N NN F F F F F NN N N F F F F F F F N N N N N N N N N F F LP A B YPETBTTTTTTTTT T T TT T T T T T T T T TT T_T T T A DT TNS _

T T T T T O C C C -

AN L

I

~

SG N .

I A _ O EL I

I T ~

RO

. s A

C1 I

AM I 1

1 2341 1 2

^1 28 0 4 5 7 8 .,

RR EI F

A 0 LLLL 4 BBBB8BB 886 BBB 1

BB 9 1 B B B BB 2 3 22 2 2 3 B B B B B B B B B B 8B 4 S 4 S 6 6 7 7S 8 9 6 D D .

PE L TL m

4 L- L- L- 4 L- 4 L- L- L- 4 4 B B B 1 - 1 1- 1 H B N A E G 2 AAAA^AAAAA

- 3 -

GGGG5GG

- - LL -

LLL GGR L L L L L L L M M M M M M M M MM M M MM M M M M M

- - - L- L- L- 5 5 4 -

MR 0 0 0 0 T CID 2T SB 1 1 1 1 1 1 1 1 1 1 AAAA 1 1 1I A A 1A 1A A A A A A A A A A A A M A A A 6 5 5 54 4 4 4 -

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 S ~

E R LD

~ X O -

EI AE ~ B I

RVSS O O OO O S O O S E S O O S S O S S S S S SS T R TM R

EOEE NN NNNN EY N N E E E E E E E S S EE E E O O O O O O S O OO O C YY Y Y N N Y Y N Y Y Y Y E E N AAE Y Y Y Y Y N N N N N N YN N N N U BMR J

= -

~ -

~ B. .

T I

_ - U E A - D RR E 1 3

1 35 8 8 5 88588 8 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 5 9 9 9 O N .

I 55555 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 3 3 3 R

F A ^

5 5 5 5 5 5 5 7 7 7 C .

E ~ T L ,.

U I

R R ~ M G R R R R RRRRR -

~

=

A RR RR R R R R R R R R R R RR R R R R R R R R RR C B N U U U U UUUUU UU U U U U RR R T O O O I

OOOOOOO O O O O O U U U U U U U U UU O O O O O O O O O O U U U U U U U U UU UU U M _

AHHHHHHNHHH H H H H H O O O O O O OO O O OO O Y.

R1 H H H H H H H H H H H H H H H H HH H H HH H A 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 R

1 1 1 1 T

=

T 1 T.

0 1 1 1 1 1 1 1 1 1 I

U _

_ 1 0- 0 0 0 0 0000 1 1 1 1 0 1 1 1 1 00 1 1 0 0 0 0 1 1 1 1 1 2 2 1 1 1 1 1 1 D

0 1 0 000 00 00 00 4 0 0 00 0 0 0 0 00 0 1 2 00 0 1 0 4 0- 000 - -- 8 4 0- 00 0 0 4 5 5 50 0 0 4 4 00 0 1 0 00 N

- - 0 0- 0 0- @ 0- 00 - - -

1 4 1 1 1 1i 1 28 9 6 1 1 1 2 2 2 2 2 23 3 3 4 5

- - O _

A B B B B5BBB B B B B B B B B 8 B 8B B 5 6 6 7 8 99 6 J- DD D C L 3 0 L G 2- G G G G

- 4 L- - LLL L 4 L L L L L L LTGGG G G R M M M M M M M M MM M M M M M M M M M MM-LR

- - - - - - - - L 4 L 4L L L L 4 L L L L L B B 8 B B B B B BB

- - - - - 4L B - -- 1

- 5 55 5 1 1 1

=

C:

O 0 00 0 Y N2T1SBAAAA^AAAAAAAAAA 1 1 1i 1 1 1 1 1 1 1 1 11 1 1 A A A AA A A A A A A A A A AA A 46 4554 54 A _

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 222 W E

C A

R 4

" i ' ' ,'

  • TABLE 1
  • PRAIRIE ISLAND POWER STATION THERMO-LAG INSTALLATION

SUMMARY

R,AC EW AY __ _

_ _ _ _ _ _ _ . BARRIER. ___ _ __ _ , .

BARRIER Y FIRE MATERIAL CABLE P WIDTH LGTH FHA DRAWING NO RATING AREA REMOVED ICENTIFICATION E DRAWING NO OR DIA HT. (FT )_ MAT. % FILL NO 2AM LB1-001 1 HOUR 74 YES 2AM-LB1 T NF-40476 24" 6" 17 TL 14 7 FHA-030 2AM-LB1-001 1 HOUR 74 YES 2AM-LB30 T NF-40476 24" 6" 75 TL 87 FHA 430 2AM-LB2-001 1 HOUR 74 NO 2AM-LB2 T NF-40476 30" 6" 3 TL 85 FHA 430 2AM-LB2401 1 HOUR 74 NO 2AM-LB3 T NF-40476 30" 6" 20 TL 85 FHA 430 2AM-LB3401 1 HOUR 74 YES 2AM-L B3 T NF-40476 37 6" 5 TL 85 FHA 430 2AM-LB3401 1 HOUR 74 YES 2AM-LB4 T NF-40476 30" 6" 5 TL 12 7 FHA 430 2AM-LB3401 1 HOUR 74 YES 2AM-LB5 T NF-40476 3(T 6" 5 TL 82 FHA 430 2AM-LB4-001 1 HOUR 74 YES 2AM-LB4 T NF-40476 30" 6" 15 TL 12 7 FHA 430 2AM-LB5401 1 HOUR 74 YES 2AM-LB5 T NF-40476 30" 6" 75 TL 82 FHA 430 25405-1D403 1 HOUR 74 NO 25403-10 C NF-92178-4 35" N/A 15 TL 20 7 FHA 430 1 HOUR 74 NO 25404-1 C NF-92178-4 2 5" N/A 15 TL 40 5 FHA 430 25405-1D403

~

25405T- DJ)03 iiidUli- 74 NO 54M D_ -C ~ N595ifb ] 4"[_ ]i/{ )) "TL- i5 FifK-030- ~-

TOTAL 839.5 I

Rev . DRAFT  !

RACEWAY: C= CONDUIT. T= TRAY, MC=MULT CONDUIT. B=JUNCT DOXES Sheet 2 of 2 j CATHERMO XLS i

i

TABLE 2 l (Page 1 of 2) 1 1

1 TESTED AND BOUNDED CONMGURATIONS RACEWAY PARAMETERS Tested Confiouration Bounded Installed Confiauration .

I Orientation (horizontal, All orientations vertical, radial bends i

Dimensions (small and large Range bounded by test' specimen '

limits) dimensions-Conduit (No cable) Conduits, bounded by test l specimen dimensions, with-any cable fill Junction Boxes and Lateral Junction Boxes and Lateral Bends Bends = bounded by test specimen dimensions l Ladder Back Cable Tray with Solid back and ladder back

or single layer cable fill cable trays or equal less l 1

dimensions and equal or greater cable fill (in terms of thermal mass) e Boxed Conduits, Boxed  ;

Enclosures (of equal or greater-thermal mass and equal or less  :

dimensions) l Cable Tray with T-Section Cable Tray of equal or less dimension with T-section, and equal or greater cable fill Aluminum Steel (side by side testing of conduits and trays will be conducted to validate bounding condition)

~

Support protection, thermal Thermal Shorts with equivalent shorts (9" protection for one or greater protection hour, 18" protection for three hour)

I Air Drops Air drops of equivalent construction and dimensions Box barrier systems attached Barrier systems of similar to concrete walls, ceilings, construction etc.  !

o .

TABLE 2 (Page 2 of 2)

FIRE BARRIER PARAMETERS I Tested Conficuration Bounded Installed Confiaurations Baseline Panel thickness Equal of greater panel thickness (On Hour 0.50", +0.125", j

-0") (Three Hour 1.00", j

+0.250", -0")  !

! Preformed conduit panels Sprayed on or troweled on installations of equivalent or greater thickness and stress skin j configuration Panel Ribs (parallel to Parallel or perpendicular to l raceway) raceway  !

Unsupported span (typically Equal or less dimensions 48")

Stress Skin (One hour, As tested, plus panels using inside) (Three hour, inside additional stress skin and outside)

No stress skin over joints Stress skin over points No stress skin ties Stress skin ties Dry fit, post buttered Pre-buttered joints joints Joint gap width Equivalent or small gap width l Butt joints Grooved and scored radial bends Cable tray radial bends Grooved and scored radial bends ,

l with separate mitered i l pieces i

l Steel bands Tie wires (will be validated l through testing) l Band / wire spacing Equivalent or closer spacing Band / wire distance to Equivalent or closer distance joints l No internal bands in trays Internal bands in trays l No additional trowel Additional trowel material material over sections, applied joints No edge guards Edge guards l

1 i-Attachment 2 I

l C ,

O l 3 n O a~

e .

5 l

=<e 1

@ { *b-F i52

4) gc5 t i1E '

$ 2.

I '

O i m

J E

O E E

m 3 -~

3s Sill j e ___________,I g g a => >-

c e I b S E dg I F

~ ~

"5-. I

  • N E 3 * ,

i g '

i u 8

u  ; g & g CD (a a~ ,. _ _ _ .l s E s

-j{

@j+il.

+ =1fj 2 a l l

a. t l l 8

a .i .

C "

1 I

{ "

.O . = Es-a, a x~ s "g E bb }I!}j hi IEk --+

  • jf -+ I5 d 4 5m 31 '}Pb*I .

i .d  :-I{k 3 :j o g .

=

0 g 1 l A

a. u.

a ld 4

4) .

A . JJ A  !

C

-2 mi x i i  :-  !

a a W g n

- a

.g w ,

~ .

Attachment 3 l

' January 13, 1994  !

Page 1 of 3 j Analvtical accroach to the Determination of Actual Enveioce/ Cable Temoerature for Station Cases with Other than 15% Cable Fill Inside Thermo-Lao Wracoea Raceways (Trays)

General Discussion:

At the current time, the NUMARC testing program for Thermo-Lag covers a set of standard configurations wnicn are commonly found at the member utilities stations based upon the survey results submitted to NUMARC. These configurations will be tested using a cable mass equivalent to 15% fill for the trays tested. This will result in all cases with greater than 15% fill being bound by the tests and those with less than 15% not bound. Also,.the test results may be conservative for those cases with significantly greater than 15% cable fill .

An analytical methoc neeas to be developed for evaluating the cases which are not bouno by the NUMARC test program in order to avoid station specific testing or unnecessary modifications. Unlike other configuration parameters af fecting the Thermo-Lag performance in fire endurance testing, cables' thermal mass is a mathematically quantifiable parameter. Therefore, a slightly modified NUMARC testing detail can provide adequate data to establish the effects of the cable fill on the temperature performance of the wrap assembly. This evaluation method could also be used to establish the conservatism in the cases where more than 15% fill occurs in order to reduce the scope of the cable functionality reviews which will be required as a i result of some of the testing exceeding the temperature acceptance criteria. '

Sargent & Lundy (S&L) has the capability to adapt one of our existing computer #~ 1 programs for the task as described above. This program has been used successfully to evaluate the temperature of structural steel members with damaged or degraced fire proofing materials at several nuclear power stations.

If the results of the current NUMARC testing program are made available, S&L can use these results to perform benchmark evaluations. The purpose of these evaluations would be to establish the effect of the cable fill on the Thermo-Lag enclosure's temperature performance. This effort would provide a methodology which could be used to predict the actual temperatures within the enclosure for site specific cable fill conditions.

Technical Basis:

S&L employs an advanced computer program that uses the finite element method to perform three-dimensional linear and nonlinear transient heat transfer analyses. The program can solve the field equations representing the radiation, conduction and convection modes of heat transfer between the heat source / sink and the material in question. A wide variety of material models ,

and heat transfer coefficients can be modeled with precision. Using this computer program, the heat input to the cable tray will be modeled as a radiation heat exchange (emission and absorption) between the fire and the Thermo-lag enclosure surface. The Thermo-Lag enclosure will be prescribed

.~. Attachment 3

January 13. 1994 Page 2 of 3 i

'1

)'

with a nonlinear conductivity moael in oraer to simulate the heat transmission from the exterior to the interior. The transfer of heat from the enclosure ,

to the caole tray ano the cable will be modeled using a combination of l conouction and raciation. The test configuration and thermal properties of I the caole tray ano the caoles will be simulated as .close as possible in order i

! to duplicate the temperature history using a nonlinear transient analysis. '

Procosal:

S&L reouests that we be authorized to develop the methodology discussed above.

The steos involved in this process are listed below. A listing of the input -

to the evaluation process is also provided.

Process:

l

i. Review a representative sample test results from the various  ;

configurations testea to cate (e.g.. NUMARC Test-1-5). i l

Z. Deveioo a computer model of the enclosure and the cable fill. This model j l would provide noces at the thermocouple locations which would be compared  !

to the test time history.

1 l 3. Perform a time history analysis of the initial'model subjecting it to.the l l test temperatures outside the enclosure and iterating the insulating  :

behavior of the Thermo-Lag materials to achieve a match with the ,

thermocouple readings taken during the test.

4 Using this initial model. we would then compare the results of subsequent tests to the calibration run discussed in Step 3. This-would be us~ed to -

cevelop a model which would envelope the results of ~the test of the 15%-

( cases.

Note that in oraer to oevelop the process, test results from identical enclosures with at least two different fill levels are needed. We suggest j that an arrangement similar to test assemoly 2-11 be tested at 5% fill and j at 15% fill, preferably within the same test. l l l

5. Use the results of the identical configurations with different' fill level (5%) to determine the effect of the cable fill on'the temperatures within-the enclosure.
6. Based upon the results of the comparison done in Step 5. develop an evaluation methodology to predict the effect of cable fill on the envelop temperatures.

Inout Reouired:

1. Test assembly details and time history results of some recent testing.of Thermo-Lag which are currently available (for example, NUMARC Test:1-5).

l

~ . Attachment 3

, :r January 13, 1994 Page 3 of 3

2. Test assemoly cross-section cetails of the configuration being tested in accoraance with tnis procosal. As suggestea aoove, assembly 2-11 with 5%

and 15% fill would serve as a good basis.

3. NUMARC testing resuits of one identical assemoly using two different fills in the test.

Deliveracles:

The celiverable for this task is a summary report documenting analytical l fincings, comparison to test results and a guideline which can be used to perform analytical investigation to assess cable trays with non-standard cable ills. The basis for inis guiaeline would be justified in calculations which would be available to NUMARC.

200iications:

  • The attacnea figures tilustrate now time temperature curves from NUMARC test (15% caole fill) maaifiea using the proposed methodology can be used to accress site specific actual cases of less than 15% (Case 1) and more than 15%

(Case 2).

t R. Knoebel l (312) 269-6297 M. A. Milaa (312) 269-8606 l MAM: cab c:\mam\casel.3 l

Sample Time Temperature Curve Case 1 : Actual Cable Fill Less Than 15%

Tem p "F I

a --

/w Furnace Temperature Cable Func tionality Review

- - - -Re + quired Case 1 + '

Ambient + _

5 250 " F y _ _ .

11-

[~~ ' ~~ 7 '

f

' (_ Numarc Base Test a (15% cable fill) 0 60 min.'

Time -

e

e f

Sample Time Temperature Curve Case 2 : Actual Cable Fill Greater Than 15%

Temp "F A -

  • ^ Furnace Temperature 1

Numarc Base Test ( 15% fill ) .

Ambient + E y

.s -~~ p"

,,~~'t

.M'

// . _ _ . Case 2 -

0 60 min.

Time >

i

t s

Attachment 4 ,

Prairie Island Thermo-Lag Program

, 1994 1996 1996 1.Name Sl0lNlD JjFlMlAIMlJjJlAlSIOINlD JlFlMlAjMlJlJlAISlOlNlD JlFlMlAlMlJIJlAISlOlNlD J 1 Prepere Program Plan my

?

! 2 Task 1 - Estathsh Field Contguration gg yggMp;j r 3 Prepere GL 92-08 Response To NRC 4 Task 2 - Engmeering Evaluation / Analysis  ! Vfyp/Mggg yMfyp pysfj .

I 5 Task 3 - Fire Wrap Quahreation / Upgrade Vpys/Mypp/MM/pp/A B Ehnsive Modircation & Testing i VM/MMM/MDM//MMM/pMMMEVAs 7 Task 4 Desagn Basis Update l* vp p M p M v p g w y// M E 8 Task 5 - Closure Report j <>

i i

pp: m Cr$ical V/M/MMMM/J Progress Summary N N: l@M Noneritical M Mdestone $ RolledUp Q Sargent & Lundy Engmeers t

i i

- ~ , . , - - , - - - , - - , + - . - . - . - . .