Reviews Util 841009 Response to Generic Ltr 84-11, Insps of BWR Stainless Steel Piping. Insps Revealed IGSCC in RHR Stainless Steel Piping.Insps Conducted Per IE Bulletins 82-03,Rev 1 & 83-02.Reinsp Program Acceptable
ML20133C428
Person / Time
Site: Oyster Creek
Issue date: 08/05/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
References
GL-84-11, IEB-82-03, IEB-82-3, IEB-83-02, IEB-83-2, LSO5-85-08-005, LSO5-85-8-5, NUDOCS 8508070046
Download: ML20133C428 (2)


Text

August 5, 1985 Docket No. 50-219 DISTRIBUTION LS05-85-08-005 Docket JPartlow NRC PDR JDonohew Local PDR CJamerson Mr. P. B. Fiedler O!?B #5 Rdg JZwolinski Vice President and Director HThompson ACRS(10)

Oyster Creek Nuclear Generating Station OELD WKoo Post Office Box 388 EJordan WHazelton Forked River, New Jersey 08731 BGrimes BDLiaw WJohnston

Dear Mr. Fiedler:

SUBJECT:

INSPECTION OF BWR STAIt'LESS STEEL PIPING (GENEP,IC LETTER 84-11)

Re: Oyster Creek Nuclear Generating Station On April 19, 1984, the staff issued Generic Letter (GL) 84-11, " Inspections of BWR Stainless Steel Piping", to all licensees of operating boiling water reactors (BWRs) including Oyster Creek. In the GL, the staff stated that inspections conducted at several BWPs revealed intergranular stress corrosion cracking (IGSCC) in large-dineter recirculation and residual heat removal stainless steel piping. These inspections were conducted pursuant to IE Bulletins 82-03, Pevision 1 and 83-02, and the NRC August 26,1983 Or Jer.

It is the position of NRR that the results of these inspections mandate an ongoing progran for sinflar reinspections at all operating BWRs. The staff provided guidance in the GL as to what an acceptable reinspection program should include.

By letter dated October 9, 1984, GPU Nuclear (the licensee) submitted a response to GL 84-11. The response provided a piping reinspection progran for the Cycle 11 refueling outage. This program provided the scope of inspections, examination criteria, repair methods, nitigating actions, leak detection and leakage limits. The Cycle 11 outage is scheduled to begin in April 1986.

The staff has reviewed the licensee's responses against the guidance provided in GL 84-11. The staff concludes that the licensee's reinspection program meets the guidelines in the GL ard, therefore, is acceptable to the staff for the Cycle 11 refueling outage. This letter closes out the staff's action on this item.

Sincerely, nal signed byr John A. Zwolinski, Chief Operating Reactors Branch #5 .

Division of Licensing cc: See next page DL:0RB#5 \ DL: DL:0RBli D D/SA CJamerson: -

S /6 /85 JDo hew g/g/85 JZwolinski

$ / 5/85 DCru . field

/ /8

'N p 8508070046 850805 PDR ADOCK 05000219 O PDR

Mr. P. B. Fiedler Oyster Creek Nuclear Generating Station Oyster Creek Nuclear Generating Station cc G. F. Trowbridge, Esquire Resident Inspector Shaw, Pittman, Potts and Trowbridge c/o U.S. NRC 1800 M Street, N.W. Post Office Box 445 Washington, D.C. 20036 Forked River, New Jersey 08731 J.B. Liberman, Esquire Commissioner Bishop, Liberman, Cook, et al. New Jersey Department of Energy 1155 Avenue of the Americas 101 Commerce Street New York, New York 10036 Newark, New Jersey 07102 Eugene Fisher, Assistant Director Regional Administrator Division of Environmental Quality

,_ . Nuclear Regulatory Commission Department of Environmental Region I Office Protection 631 Park Avenue 380 Scotch Road King of Prussia, Pennsylvania 19406 Trenton, New Jersey 08628 BWR Licensing Manager GPU Nuclear 100 Interpace Parkway Parsippany, New Jersey 07054 Deputy Attorney General State of New Jersey Department of Law and Public Safety 36 West State Street - CN 112 Trenton, New Jersey 08625 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 D. G. Holland Licensing Manager Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731