Letter Sequence Response to RAI |
---|
|
|
MONTHYEARML20266C2431996-04-11011 April 1996 10 SW 2 Service Water Diesel Generator Bldg Class IV P Piping Project stage: Request ML20116G6381996-08-0505 August 1996 Forwards Response to RAI Re Rev of Third 10-yr Interval Inservice Insp Program.Request for Relief RI-23, Withdrawn Project stage: Response to RAI ML20129E6151996-10-24024 October 1996 Forwards RAI Re Third 10-yr Interval ISI Program for Plant in Order to Complete Review Project stage: RAI ML20133B7191996-12-31031 December 1996 Forwards Response to RAI Re Third ten-yr Interval Inservice Insp Program.Revised ISI Rept Encl Project stage: Response to RAI ML20212E0681997-10-23023 October 1997 Forwards SE Re Evaluation of Third 10-yr Interval Insp Program Plan & Associated Requests for Relief for Plant. Inel Technical Ltr Rept Also Encl Project stage: Approval 1996-04-11
[Table View] |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195F6171999-06-0909 June 1999 Informs That GE Rept, Matl Presented by GE 970709 Meeting at Cooper Nuclear Power Station Re Replacement of ECCS Pump Suction Strainers Between Nppd,Ge & NRC Staff, Will Be Withheld from Public Disclosure as Requested ML20207G3031999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Rev 24,under 10CFR50,App E,Section V Provisions.No Violations Identified ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207G4481999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure,Epip 5.7.1, Emergency Classification,Rev 23 C2,under Provisions of 10CFR50,App E,Section V ML20207G3001999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station Ep,Rev 33,under Provisions of 10CFR50,App E,Section V.No NRC Approval Required Based on Determination That EP Effectiveness Not Affected by Changes ML20207G4531999-06-0707 June 1999 Ack Receipt of Which Transmitted Changes to Cooper Nuclear Station EP Implementing Procedure EPIP 5.7.1, Emergency Classification,Revision 25,under Provisions of 10CFR50,App E,Section V ML20207D3811999-05-27027 May 1999 Informs That During Next 6 to 12 Months,Starting 990530,NRC Plans to Conduct Insps Shown in Attached Insp Plan.Insps Include Both Planned Baseline & Supplemental Insps (Formerly Core & Regional Initiative Insps) ML20207A5191999-05-19019 May 1999 Forwards Insp Rept 50-298/99-04 on 990321-0501.Four Violations Identified & Being Treated as non-cited Violations 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM ML20207A0701999-05-19019 May 1999 Forwards Rev 3 to CNS Strategy for Achieving Engineering Excellence, Which Provides Effective Tool for Overall Engineering Work Mgt.Commitments Made by Util,Encl ML20206R7601999-05-17017 May 1999 Forwards Annual Radiological Environ Rept,Radiological Environ Monitoring Program,Jan-Dec 1998,per TS 5.6.2 ML20206P9681999-05-13013 May 1999 Forwards Monthly Operating Rept for Apr 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Safety/Relief Valves ML20206J0741999-05-0404 May 1999 Forwards Rev 14 to CNS QA Program for Operation, Per 10CFR50.54(p) & 10CFR50.71.None of Changes Represent Reduction of Commitments.Summary of Changes,Encl ML20206J2331999-05-0303 May 1999 Forwards CNS Annual Radioactive Effluent Release Rept for 1998 & Offsite Dose Assessment Manual ML20206F2021999-04-30030 April 1999 Informs That NPPD Now Anticipates LAR Committed in Will Be Submitted by 990615.Operability Evaluations Presently in Effect Ensure That ECCS Pumps Are Operable But Nonconforming & Are Capable of Fulfilling Safety Functions ML20206E5461999-04-29029 April 1999 Forwards Cooper Nuclear Station Occupational Radiation Exposure Rept for 1998. Numbers Reported Reflected Tabulation of All Personnel on Site by Work & Job Function. Repts Will Be Corrected & Resubmitted by 990701 ML20205K1151999-04-0101 April 1999 Submits Extension of Commitment Date for Rev to Plant Strategy for Achieving Engineering Excellence from 990331 to 990519.Licensee Requires Addl Time to Finalize & Approve Rev 3 to Plant Strategy for Achieving Engineering Excellence ML20205E4331999-03-31031 March 1999 Forwards First Biennial Rept of Financial Assurance for Decommissioning for Cns,Per 10CFR50.75(f)(1) ML20205A0561999-03-23023 March 1999 Provides Info Detailing Property Insurance Coverage Maintained by NPPD & Midamerican Energy Co for Cns,In Compliance with 10CFR50.54(w)(3) 05000298/LER-1999-001, Forwards LER 99-001-00,including List of NRC Commitments Made by Util1999-03-22022 March 1999 Forwards LER 99-001-00,including List of NRC Commitments Made by Util ML20204G8811999-03-22022 March 1999 Forwards CNS Inservice Insp Summary Rept,Fall 1998 Refueling Outage (RFO-18), IAW Provisions of 10CFR50.55a. Analytical Evaluation for RPV Shell Weld Indications & Augmented Exam Results of RPV Also Included ML20204J4841999-03-19019 March 1999 Requests NRC Review & Approval of CNS ISI Relief Request (RR) PR-04,rev 1.ISI RR PR-04,rev 0 Required CNS to Perform Visual Insp of RPV Head Flange Seal Leak Detection Line. Approval Is Required Because Test Methodology Was Changed 05000298/LER-1998-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl1999-03-16016 March 1999 Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl ML20204C9641999-03-15015 March 1999 Forwards Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20207J5811999-03-10010 March 1999 Forwards Rev 1 to Calculation Nedc 98-024, APRM - RBM Setpoint Calculation ML20207F9661999-03-0101 March 1999 Responds to NRC Re Violations Noted in Insp Rept 50-298/98-08.Corrective Actions:Circumstances Surrounding Four Examples Have Been Discussed with Individuals Involved & Counseled,Where Appropriate ML20203C6961999-02-0808 February 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 980701-1231,per 10CFR26.71(d) ML20202H6721999-02-0202 February 1999 Informs of Changes in Schedule Affecting Four Commitments in ,By Greater than One Month & Notifies of Plans to Issue Rev 3 to Strategy for Achieving Engineering Excellence ML20202E2231999-01-28028 January 1999 Forwards Response to NRC 980603 RAI Re NRC Ongoing Review of IPEEE for Cooper Nuclear Station,Submitted 961030 ML20199K6721999-01-19019 January 1999 Requests Extension of Present Due Date to 980202,as Addl Time Is Required to Resolve Issues Raised on Corrective Actions During Senior Mgt Review of Insp Rept 50-298/98-15 05000298/LER-1998-011, Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl1999-01-19019 January 1999 Forwards LER 98-011-00,per 10CFR50.73(a)(2)(v).Commitments Made by Util,Encl ML20199E6281999-01-14014 January 1999 Forwards Monthly Operating Rept for Dec 1998 for Cooper Nuclear Station.Rept Also Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20206P4171998-12-31031 December 1998 Informs of Extended Completion Due Date of Third Commitment Re EOP Calculations,Per Licensee 980723 Response to Violations Noted in Insp Rept 50-298/98-02.Date Has Been Extended to 990228 ML20199D2251998-12-30030 December 1998 Forwards 1998 CNS Simulator Certification Rept,As Required by 10CFR55.45.Rept Describes Performance Tests Conducted from 1995-98,discusses Performance Test Discrepancies from 1995-98 & Provides Revised Test Plan for 1999-2002 ML20198K2491998-12-23023 December 1998 Discusses RAI Re Response to NRC GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps ML20205A4411998-12-17017 December 1998 Forwards Initial Exam Outline for RO Written Exam to Be Given Week of 990208.Preliminary Copies of License Applications for Candidates Encl ML20196C4011998-11-20020 November 1998 Forwards Rev 1 to Cooper Nuclear Station COLR Cycle 19. Licensee Discovered That COLR Submitted with Contained Incorrect Max Average Planar Linear Heat Generation Rate Curves Specified in Figures 1 to 4 1999-09-20
[Table view] |
Text
e.a T33 @df al& omi Nebraska Public Power District *=25'Et,""
-W NLS960234 December 31,1996 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection Program (TAC No. M94000)
Cooper Nuclear Station, NRC Docket 50-298, DPR-46
References:
- 1. Letter to NRC Document Control Desk from J. H. Mueller dated October 18,1995, " Submittal of Third 10-year Interval Inservice Inspection Program"
- 2. Letter to NRC Document Control Desk from J. H. Mueller dated April 11, 1996," Submittal of Revision 1 to the Third 10-year Interval Inservice ;
Inspection Program"
- 3. Letter to G. R. Horn (NPPD) from J. R. IIall (USNRC) dated October 24, 1996," Request for Additional Information Regarding Third 10-year Interval Inservice Inspection (ISI) Program" Gentlemen:
The purpose of this letter is to provide the additional information regarding the Third 10-year Interval Inservice Inspection (ISI) Program (submitted per References 1 and 2) for Cooper Nuclear Station, that was requested in your letter of October 24,1996 (Reference 3). The response to your questions is provided as Attachment I to this letter. Revised pages for the ISI Program are provided as Attachment 2.
If you have any questions or require any additional infonnation, please contact me.
Sincerely, pza,, u x Philip D. Graham l
Vice President - Nuclear Ah$7;,
/dnm Attachment 030044 9701060111 961231 PDR ADOCK 05000298 G PDR ~
i, e *.
.- _ m. . -
(. .. ... - - . . . .-. .
... - - ... - . - -. - . . - - . _ ... - - .- . . . . - . ~ . . . ~ . . . .
l NLS960234 December 31,1996
- f. Page 2 of 2 l
cc: Regional Administrator USNRC - Region IV l
l Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector
~USNRC i
Michael T. Anderson l- INEL Research Center 1
- 1 1
- NPG Distribution ;
I I
L i
l l
l I
s I
l .
i 1.
Attachment I to NLS960234 Page 1 of 3 ATTACHMENT 1 REQUEST FOR ADDITIONAL INFORMATION NRC Request A.a.
in Request for Relief RI-14, Nebraska Public Power District has requested to implement the alternative to Code requirements contained in Code Case N-509, Alternative Rulesfor the Selection and Examination ofClass 1, 2, and 3 Integrally Welded Attachments. The NRC staff's position is that this alternative to the Code requirements is acceptable for use with the following condition: that the licensee perform a minimum 10% sample examination of all integrally welded attachments for each Examination Category item in each Code class per interval.
NPPD Response NPPD will comply with the staff's position on Code Case N-509. Request for Relief RI-14 has been revised to reflect this additional condition. ,
i NRC Request A.h.
In Request for Relief PR-05, Nebraska public Power District has requested to implement the alternative to Code requirements contained in Code Case N-522, Pressure Testing of Containment Penetration Piping. The NRC staff's position is that the use of Code Case N-522 is acceptable with the following conditions: the test is conducted at the peak l calculated containment pressure, and the test procedure permits the detection and location of through-wall leakage in containment isolation valves and pipe segments between the '
CIVs.
NPPD Response The leakage test will be conducted at the peak calculated containment pressure. If the i leakage rate exceeds the Appendix J acceptance criteria, NPPD will apply additional measures in order to verify that the test failure is not due to a through-wall leak. These additional measures would be outside the scope of the leak rate test procedure. Request for Relief PR-05 has been revised to reflect these additional conditions.
NRC Request A.c.
In Request for Relief RI-02, Nebraska Public Power District requested authorization to continue using existing calibration blocks. For ti e existing calibration blocks, the licensee has committed to perform a comparison between the attenuation of the calibration block material and the material being examined when the block lacks appropriate documentation. The staff's position is that the proposed alternative must also include the performance of material velocity checks of the calibration blocks in conjunction with the attenuation checks. This will ensure that the ultrasonic scanning angle in the materials is essentially the same.
4 Attachment I to NLS960234 Page 2 of 3 NPPD Response NPPD will comply with the staff's position on performing velocity checks in conjunction with attenuation checks. Request for Relief RI-02 has been revised to reflect this additional condition.
NRC Request B.
a.) In the licensee's response to the staff's questions regarding Request for Relief PR-4 02, the licensee stated the pressure test boundaries are essentially equivalent to the Code required pressure boundaries. Provide a list of the portions of all Class 1 pressure test boundaries excluded from the system leakage and hydrostatic tests.
Describe how the pressure test requirements will be satisfied for those remaining sections of piping beyond the proposed boundaries.
b.) Describe how the proposed alternative will provide the same level of quality and safety for the pressure test boundaries defined by the Code.
c.) Describe how a test pressure associated with 100% reactor pressure will be achieved.
NPPD Response Section XI states that the boundary for the system leakage test shall be the reactor coolant pressure boundary with all valves in the position required during reactor startup. In a PWR the primary loop is a closed system. This is not the case in a BWR. The purpose of Request for Relief PR-02 is to clarify that certain Class 1 boundary valves which are normally open for reactor startup, will be closed for the pressure test.
a.) Three of the four Feedwater Check valves will be closed for the system pressure test following a refueling outage. The inboard check on one Feedwater line is kept open by Reactor Water Cleanup (RWCU) flow. The RWCU system is kept in service during the pressure tests. During the ten-year hydrostatic pressure test, a mechanical jumper will be installed around the other inboard check valve to pressurize the syctem to the outboard check valve. The outboard check valves are the class 1 boundary valves.
The four outboard Main Steam Isolation Valves (MSIV) will be closed for the system pressure test and the ten-year hydrostatic pressure test. The inboard MSIV's are opened to pressurize the system to the outboard valves. The outboard MSIV's are the class 1 boundary valves.
6 Both liigh Pressure Coolant Injection (IIPCI) and both Reactor Core Isolation Cooling (RCIC) steam supply valves will be closed for the system pressure test following a refueling outage. These valves close automatically on low steam
i l
i Attachment 1 to NLS960234 I Page 3 of 3 supply pressure. During the ten-year hydrostatic pressure test, the system will be pressurized to the outboard valves. The outboard valves are the class 1 boundary valves.
b.) The position of the valves for the system leakage test and the hydrostatic pressure j test as described above is consistent with the intent of footnote 1 to Table IWB- 1 2500-1, Category B-P. Abnormal lineups and installation ofjumpers is not required for the system leakage test. For example, both the inboard and outboard class 1 isolation valves in the Core Spray system are in their nomial closed position for the system leakage test. The inboard check valves arejumpered during the ten-year hydrostatic pressure test. Although the inboard check valves are closed for the system leakage test, the VT-2 inspection includes the outboard 4
valves. The valves described in (a) above are normally open during a reactor startup. In order to pressurize the reactor coolant pressure boundary for testing, these valves must be closed. ,
Since the portions of the piping between the valves described in (a) above are operated at or above reactor pressure during normal operation, any through wall i
leakage would be detected by the drywell leakage collection system, or by operations perronnel on normal rounds.
c.) Except as described in (a) above, the Class 1 boundary is pressurized as required by the Code. The VT-2 inspection includes the entire reactor coolant pressure boundary.
4 We regret any confusion this Request for Relief may have caused.
9
.. - . - . . . . . . . . _ , , . - . . . - - . . .. . . _ . . _ . - . . - ~ . ~ . - . - _ - - . _ - . ~ . . . _ - . _ . ~ . _ _ - . . . _ . -
ATTACHMENT 3 LIST OF 24RC COMMITMENTS l
l Correspondence No: NLS960234 i
The following table identifies those actions committed to by the District in this !
document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's informat. ion and are not regulatory commitments. Please notify the Licensing Manager l at Cooper Nuclear Station of any questions regarding this document or any associated ;
regulatorf commitments.
COMMITTED DATE l COMMITMENT OR OUTAGE I None N/A i