IR 05000348/1984027

From kanterella
(Redirected from ML20132C801)
Jump to navigation Jump to search
Safeguards Insp Rept 50-348/84-27 & 50-364/84-27 on 841009-11.Violations Noted:Failure to Control Vehicle & Personnel Access Into Protected Area During Security Drill. Details Withheld (Ref 10CFR73.21 & 2.790)
ML20132C801
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/11/1984
From: Hall B, Mcguire D, Moore D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20132C800 List:
References
50-348-84-27, 50-364-84-27, NUDOCS 8507300529
Download: ML20132C801 (1)


Text

u SAFEGUARDS INFOrdAATION UNITED STATES

/gm Rio NUCLEAR REGULATORY COMMISSION

[ o,$ REGION 11 5* $ 101 MARIETTA STREET. * ATLANTA, GEORGIA 30303 (

% ,,,,, # DEC 131984 i

Report Nos. 50-348/84-27 and 50-364/84-27 Licensee: Alabama Power Company P. O. Box 2541 Birmingham, AL 35291

. Docket Nos. 50-348 and 50-364 License Nos, f4PF-2 and NPF-8 Facility Name: Farley Units 1 and 2 Inspection Dat : October 9-11, 1984 Inspectors: i 9 / J2/))h

/ E Noo , Physical Security Inspector D&td Signed D . b 1% 1 Security Inspector B. L. HalI, Phys

)ll h Date ligned Approved b

.

IslJ

/ ~

jFFcGuire, Chief, Physical Security Section 12/II/fs4 Datd Signed q $r Materials Safety and Safeguards Branch il sion of Radiation Safety and Safeguards SUMMARY Scope: This special inspection entailed 38 inspector-hours on site reviewing the circumstances surrounding a security event which led to the discovery of an unauthorized seapon and ammunition within the protected area. Areas inspected included: Access Control - Personnel / Vehicles; Security Organization; Physical- Barriers - Protected Area; Assessment Aids; Detection

,

Aids - Protected Area; and Communication Results: The following violations of regulatory requirements were identified: Failure to control vehicle access into the Protected Area during a security dril Failure to control personnel access into the Protected Area during a security dril Failure to maintain in effect provisions of the approved Physical Security and Training and Qualification Plans concerning the conduct of security drill cm" e IM '

DR ADOCK 05000348 pgC] "g . TIOL

.

PDR sat w ~

ggy 5 n?lT1C...

s+"mig yAGE IS DZCCUIngLLED.