ML20132C795

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Repts 50-348/84-27 & 50-364/84-27 on 841009-10 & Notice of Violation.Actions Taken to Improve Safeguards Administrative Control Sys Requested.Notice of Violation Withheld (Ref 10CFR73.21 & 2.790)
ML20132C795
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/13/1984
From: Creilly J, James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20132C800 List:
References
NUDOCS 8507300520
Download: ML20132C795 (2)


See also: IR 05000348/1984027

Text

{{#Wiki_filter:SAFEGUARDS INFORMATION gg

           ,
   4
                                       DEC 131984
 Alabama Power Company
 ATTN: Mr. R. P. Mcdonald
          Senior Vice President-Nuclear Generation
 P. O. Box 2641
 Birmingham, AL 35291
 Gentlemen:
 SUBJECT:     REPORT NOS. 50-348/84-27 AND 50-364/84-27
 On October 9-11, 1984, a special safeguards inspection was conducted concerning
 activities authorized by NRC License Nos. NPF-2 and NPF-8 for your Farley I and 2
 facility. At the conclusion of the inspection and at an Enforcement Conference
 on October 30, 1984, the findings were discussed with you and members of your
 staff.
 The purpose of this inspection was to evaluate the significance of the licensee's
 failure to maintain adequate administrative controls over the conduct of a
 security drill which resulted in the introduction of unauthorized material into
 the protected area.
 The inspection findings indicate that certain activities violated NRC require-
 ments. The violations, references to pertinent requirements, and elements to be
 included in your response are presented in the enclosed Notice of Violation.
 The NRC strongly supports the use of drills as a valuable method of assessing
 the adequacy of the security force training program. However, we believe the
 lack of administrative controls demonstrated in this case is a serious matter
 and deserves management's attention. Consequently, in your reply, you should
 describe in particular the actions taken to improve the effectiveness of your
 safeguards administrative control system.
 In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
 security measures are exempt from public disclosure; therefore, the enclosures to
 this letter, with the exception of the report cover page which presents a
 nonexempt summary, will not be placed in NRC's Public Document Room.
 The responses directed by this letter and the enclosures are not subject to the
 clearance procedures of the Office of Management and Budget issued under the
 Paperwork Reduction Act of 1980, PL 96-511.
 Should you have any questions concerning this letter, please contact us.
                                             Sincerely,

8507300520 841213 PDR G

     ADOCK 05000348
                    PDR
                                             James P. O'Reilly
                                             Regional Administrator
 Enclosures:     (See Page 2)                                              g; muys
                                                                      y,73;:.2.'i C i'O O TIO
                                                                      e           .
                                                                      v .'. -m z    mj 'IIIL
                       SAFEGUARD 3 INFORMATION
                                                                      5"
                                                                                     mm.j
                                                                                        g
                                                                                  -           a

r

               .
                                  SAFEGUARDS INFORMATION
     -Alabama Power Company                      2                        DEC 131984
      Enclosures:
      1.     Notice of Violation
                (Safeguards Information)
      2.     Inspection Report Nos. 50-348/84-27
               -and 50-364/84-27
                (Safeguards Information)
      cc w/encls:
      W. O. Whitt, Executive Vice President
      J. D. Woodard,; Plant Manager
      W. G. Hairston, III, Manager, Nuclear Engineering
         and Technical Support
      J. W.-McGowan, Manager-Safety Audit
         and Engineering Review
      H. O. Thrash, Manager, Nuclear Operations
         and Administration
     W. G. Ware, Supervisor-Safety Audit
         and Engineering Review
      bec-w/ enc 1s:
      IE File
      NMSS/SGPL
      NRR/DL/SSPB
    'bcc w/o encls:
      NRC Resident Inspector
      E. Reeves, Project Manager, NRR
      Document Control Desk
      State of Alabama
     bec w/encls:
     Jane Axelrad, IE HD
      RII
         v,
                        RI     .       RI
                                           f                  RII
                                                                s

.

      DM6Ere:km              uire      KB rr       RII }. r
                                                   JPS        RButcher
        2/15 /84        12/lt /84      12//2 /84 124 /84      12//A/84

'.

                                                           f

l RII RII RII RI)

                                            7
      FCan rell
                         v
                        DVerrelli      JPu
                                                           N                         %
                                             ett       DLewis                 ce: TAW T  :
      12/     84        12/f y/84                      12/g84       5         3n

l

                                       12/{{/84                                        3
      RIIgggf/fn    I
                                                                       ), *fy 03Th0Y'
'
       J01shinski
       12/p/84               SAFEGUARDS INFORMATION
  l                                                                                        J

}}