Forwards Safeguards Insp Repts 50-348/84-27 & 50-364/84-27 on 841009-10 & Notice of Violation.Actions Taken to Improve Safeguards Administrative Control Sys Requested.Notice of Violation Withheld (Ref 10CFR73.21 & 2.790)
ML20132C795
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/13/1984
From: Creilly J, James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20132C800 List:
References
NUDOCS 8507300520
Download: ML20132C795 (2)


See also: IR 05000348/1984027

Text

{{#Wiki_filter:SAFEGUARDS INFORMATION gg , 4 DEC 131984 Alabama Power Company ATTN: Mr. R. P. Mcdonald Senior Vice President-Nuclear Generation P. O. Box 2641 Birmingham, AL 35291 Gentlemen: SUBJECT: REPORT NOS. 50-348/84-27 AND 50-364/84-27 On October 9-11, 1984, a special safeguards inspection was conducted concerning activities authorized by NRC License Nos. NPF-2 and NPF-8 for your Farley I and 2 facility. At the conclusion of the inspection and at an Enforcement Conference on October 30, 1984, the findings were discussed with you and members of your staff. The purpose of this inspection was to evaluate the significance of the licensee's failure to maintain adequate administrative controls over the conduct of a security drill which resulted in the introduction of unauthorized material into the protected area. The inspection findings indicate that certain activities violated NRC require- ments. The violations, references to pertinent requirements, and elements to be included in your response are presented in the enclosed Notice of Violation. The NRC strongly supports the use of drills as a valuable method of assessing the adequacy of the security force training program. However, we believe the lack of administrative controls demonstrated in this case is a serious matter and deserves management's attention. Consequently, in your reply, you should describe in particular the actions taken to improve the effectiveness of your safeguards administrative control system. In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosures to this letter, with the exception of the report cover page which presents a nonexempt summary, will not be placed in NRC's Public Document Room. The responses directed by this letter and the enclosures are not subject to the clearance procedures of the Office of Management and Budget issued under the Paperwork Reduction Act of 1980, PL 96-511. Should you have any questions concerning this letter, please contact us. Sincerely, 8507300520 841213 PDR ADOCK 05000348 G PDR James P. O'Reilly Regional Administrator Enclosures: (See Page 2) g; muys y,73;:.2.'i C i'O O TIO v.'. -m z 'IIIL e . mj mm.j SAFEGUARD 3 INFORMATION 5" g - a

r SAFEGUARDS INFORMATION . -Alabama Power Company 2 DEC 131984 Enclosures: 1. Notice of Violation (Safeguards Information) 2. Inspection Report Nos. 50-348/84-27 -and 50-364/84-27 (Safeguards Information) cc w/encls: W. O. Whitt, Executive Vice President J. D. Woodard,; Plant Manager W. G. Hairston, III, Manager, Nuclear Engineering and Technical Support J. W.-McGowan, Manager-Safety Audit and Engineering Review H. O. Thrash, Manager, Nuclear Operations and Administration W. G. Ware, Supervisor-Safety Audit and Engineering Review bec-w/ enc 1s: IE File NMSS/SGPL NRR/DL/SSPB 'bcc w/o encls: NRC Resident Inspector E. Reeves, Project Manager, NRR Document Control Desk State of Alabama bec w/encls: Jane Axelrad, IE HD f RII }. r RII RI RI RIIs . v, . DM6Ere:km uire KB rr JPS RButcher 2/15 /84 12/lt /84 12//2 /84 124 /84 12//A/84 ' . f l RII RII RII RI) 7 N v % FCan rell DVerrelli JPu ett DLewis ce: TAW

T 12/ 84 12/ y/84 12/{{/84 12/g84 5 3n f l 3 RIIgggf/fn ) *fy 03Th0Y' I , J01shinski ' 12/p/84 SAFEGUARDS INFORMATION l J }}