ML20128Q245

From kanterella
Jump to navigation Jump to search

Proposed Tech Specs,Revising Table 4.3.1 to Provide for Testing to Confirm Operability of Shunt & Undervoltage Trip Devices of CRD Trip Breakers
ML20128Q245
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/29/1985
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20128Q229 List:
References
TAC-55352, TAC-59932, NUDOCS 8506040131
Download: ML20128Q245 (2)


Text

.

O}-

O.

Oc

~

n.. -

... j t

t-g

. TABLE 4.J-1 t'.

!=

RFACTOR PROTECTION SYSTEM INSTRUMENTATION SWVEILLANCE REdlIREMENTS Q

s E

CHAMEL MODES IN WICN E

CHAlulEL CHANNEL FUNCTIONAL SURVEILLANCE 4

FUNCTIONAL UNIT CHECK CALIRRATION TEST REQUIRE 0 1.

Manual Reactor Trip N.A.

N.A.

5/U(1)

N.A.

2.

Hfgh Flus 5

9(2),andQ(7)

M

1. 2 3.

RC High Temperature 5

R M

1. 2

~

~

4.

Flum -' AFlus - Flow-5(4)

M(3)andq(7.8)

M

1. 2 5.

RC Low Pressure 5

R***

M

1. 2 6.

RC High Pressure 5

R***

M

1. 2 g

7.

RC Pressure-Temperature 5

R M

1, 2 8.

High Flux / Number of Reactor

[

Coolant Pumps on 5

R M

1. 2 i

1.

Contalruient High Pressure.

5 R

M

1. 2
10. Interisediate' Range. Neutron

)'

Flux and Rate 5

R(7) 5/U(5)(1)

1. 2 and*

A g

g

11. Source Range. Neutron Flux 4

g and Rate 5

R(7)

Mand 5/U(1)(5)

2. 3. 4 and 5 g

I

12. Control Rod Drive Trip Rreakers N.A.

II. A.

M ::f ",/C)

1. 2 and*

M

1. 2 and*

g

13. Reactor Trip Module ~ Logic '

N.A.

N.A.

14 Shutdoun Rypass High Pressure 5

R M

2** 3**.4**.5**

hl M (f) ded S/v (i 9) g[

l-

,k s

0 h?'*AE5?l8 i

i 29

M O f~ $ Y OAA t.

TABLE 4.3-1 (Continued)

CL NOTATION

-l If not performed in previous 7 days.

(1)

Heat balance only, above 15% of RATED THERMAL POWER.

(2)

WhenTHERMALPOWER[TP]isabove30%ofRATEDTHERMAL (3)

POWER [RTP],comparaout-of-coremeasuredAXIALPOWER IMBALANCE [ API ] to incore measured AXIAL POWER IMBALANCE -

[ API]. Reca1Thrateif:

g y [ API,- API ] 3,3.5%

g AX1AL POWER IMBALANCE and loop flow indications only.

(4)

Verify at least one decade overlap if not verified in previous (5) 7 hp.

Each train tested every other month.

(6)

Neutron detectors may be excluded frein CHANNEL CALIBRATION.

1 (7)

Flow rate measurement sensors may be excluded from CHANNEL (8) b CALIBRATION. However each flow measurement sensor shall be calibrated at least once per 18 months.***

With any control rod drive trip breaker closed.

14.an Shutdown Bypass is actuated.

1 Eighteen-monti surveillance test due in Har.ch 1982 ' delayed until March 3'l 1982.

TEsr/A>6

/NP.GPENPcA>rk s-g,on;4% s, ryg (9)

OfdAABluTf' op WK SWuN'r ifND "NMR LO4WW l'Alf PEW cg.$,

r s

g i

DAVIS,-BESSE, UNIT 1 3/4 3-8 Amendment No. 43 g.