ML20128L204
| ML20128L204 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 01/31/1993 |
| From: | Meck K PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20128L193 | List: |
| References | |
| NUDOCS 9302190117 | |
| Download: ML20128L204 (10) | |
Text
i _
p' i
3931012540 Docket No. #50-352 i
Attachment to Monthly j
Operating Report for j
January 1993 I
LIMERICK GENERATING STATION l
UNIT 1 1
JANUARY 1 THROUGH JANUARY 31, 1993 J
I.
NARRATIVE
SUMMARY
OF OPERATING EXPERI,ENCES i
l Limerick Unit 1 began the month of January at a nominal 100%
of rated thermal power. - On Friday, January 1, reactor power 4
was reduced to 90% due to excess generating capacity, power -
4 j
was restored the same day.
On Friday, January 8,
reactor power was reduced to 95% for main turbine control valve i
exercise surveillance testing, reactor power was restored to j
100% the same day.
Unit 1 ended this operating period at a-nominal 100% of rated thermal power.
i Unit 1 occurrences during the operating period included:
On Saturday, January 9, at 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br />, "1A" reactor protection
}
system- (RPS) uninterruptable power supply was lost during l
restoration from 18-month RPS electrical breaker shunt trip operability surveillance testing (ST-8-036-320-1) and 6-month i
RPS overvoltage/undervoltage/underfrequency electrical power monitoring surveillance testing (ST-2-036-621-1). The loss of j
power resulted in various engineered safety feature (ESP) l actuations.
The RPS power monitoring system undervoltage relay was reset and RPS power subsequently was restored.
By 0940
- hours, all primary containment isolation system-
[
isolations were reset.
The event'was reported to the NRC pursuant to 10CFR50.72 (b) (2) (ii).
I i
l II.
CHALLENGES TO MAIN STEAM SAFETY RELIEF VALVES i
l~
There were no challenges to the Main Steam Safety Relief-Valves during the month, I
i P
i u
oprtgcx1 9302190117 930210-PDR ADOCK 05000352 R
_m 4 - _. _.. -.
. ~... _.. _ _ _ _..
__....._..._.....__.._..m._._
m.
..-.m...__
g._
i
. AVERAGE DAILY UNIT DOWER LEVEL l
l t
DOCMET NO. 50 352
[
4 UNIT LINERICM UNIT t DATE FEBRUARY 10 1993 I
t COMPANY PHILADELPHIA ELECTRIC COwpANY E
i KARL WECM f
REPORTS SUPERVISOR I
BUSINESS UNIT I
LIWERICK GENERATING STATION f
I TELEP**ONE (215) 327-1200 ExTE.NSION 3320 I
{
MONTH JANUARY 1993
{
}
DAV AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWE-hET)
(wwE-NET) 1 1039 17 1057 1-
?
2 1057 1e 1061
[
t 3
1053 19 1058 I
i 4
1030' 20 1051 t
{l 5
1035 21 1054 l
6-1045 22 1040 7
1041 23 1066 l'
8 1054 24 1036 9
i 4
9 1050 25 1053 10 1058-26 1059 f
\\
11 1053 27 1087 4
l 12 1059 29 1018
.)
r
}
13
'1055 29 1053
')
t U
i 14 1032 30 1072-g i
i 15 1057 31 1030 W'
I 16 1057 O
{
i 1
N tn A
k O
l i
t S-
,. ~ -
OPERATING DATA REPORT DOC *ET NO. 50 - 352
)
DATE FEBRUARY 10. 1993 3931012540 ELECTRICCOMDAN; COMPLETED BV IA MARL wECA REPORTS SUPERVISOR BUSINES$ UNIT LINERICM GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 OPERATIt.G STATUS 1 UNIT NAME: LIMERICK UNIT 1 l NOTES: THERE WERE NO LOAD DROPS l
g
- 2. REPORTING PERIOD:
JANUARV. 1993 GREATER THAN 20s.
3.
LICENSED THERWAL POWER (wwT):
3293 4 NAMEPLATE RATING (GROSS M*E):
1138 l
S. DESIGN ELECTRICAL RATING (NET wwE):
1055 l
l l
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS wwE): 1092 l
l g
- 7. MAXIMUM DEPENDABLE CAPACITY (NET wwE):
1055 l
l 8.
IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL 70 wHICH RESTRICTED. IF AN" (NET wwE):
- 10. REASONS'FOR RESTRICTIONS. 18 ANY:
THIS WONTH VR-TO-DATE CUwJLATIVE
- 11. POURS IN REPORTING PERIOD 744 744 61.368
- 12. NUMBER OF HOURS REACTOD WAS CRITICAL 744.0 744.0 48.293.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE' 744.0 744.0 47.302.2 15.-UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 C.D
- 16. GROSS THERwAL ENERGV GENERATED (WWH) 2,446,877 2;446,$77 144,78Q,342
- 17. GROSS ELECTRICAL ENERGV GENERATED (wwH) 810.890 8t0.890 46.786.030 18.-NET ELECTRICAL.. ENERGY GENERATED (wwH) 782.265 782.265 44.822.782 PAGE 1 OF 2
! I4 -
.if;
[.f et
, I h {i;,;i'
- fE lI i!i}t
+
6
!kt!l:I!:!i!I6Iii il1 l,A'
^
0 4
5 2
1 0
1 3
9 3
2 5
3 0
5 O
2 1
1 2.__2. _ 2..
N E
V S
T I
7. 7 - 9_9 5
O E
T 7
7 - 6_6 M
A 2
+
~
C L
O U
E D
V D
G U
E 4
. 5 6 _
A C
V 8
8 8.
P E
/
/
/
3 I
2-3 1 -
9 H
2 -
1 0-9 C / -
/
/
1 -
t A
2 4._2-1 -
)
E 0
- 0. -
- 7. -
- 7. -
0
. C M
0 T
1 A
0-0 9-9-
0 A
5 D.
0 0
9 9-E A. 8 6_
Y 1 -
1 T
8.L 8
O 8
S R -
/
A -
T 0
A 9
_I R.
U C
1 -
R T
R R
N E
/ -
P C.
B V
O R
2-A E _
I p
O 1 -
T.
F _
T u
F D
S.
A T
t E
R R
w
)
T U
A D
A H
D T
0.
0.
7 7
- 0. -
E D
T S
U N
D N
O 009 9
O N
F I
W 00 9
9 A
O T
1 - 1
)
N S
E N
O I
.E T
O C
H
.T A
I
(
T A
D T
.D A
T D
R R
E E
O E
T P
P p
A O
E y
M R
T I
L
(
T A
A S
I T
s E C A
n R
N D
)
)
T E
V Y
O T
T N
D M T
T I
G E
E O
O M I
I T
N N
N M
I O
L C
A I
R C
A I
R T
C R
6 E
C R
E A
D E
P O
I T
P R
M D T
T T
C O E
X T
I E
P G G E
R R
R L
L O
N N
N O O C
E A
I I
P I
I R S S R
E R
L L
C O U U E
E R
P A
A R
T
(
(
T V
(
I I
E C
A O
F T
T M
A R
R R
O.S I
I M
R F
O O D
U N
N O O
T T
E E
D T
I I
C T
Y C C G L
N A
C T
A A
A U
E T
A I
F F
T D
S F
L U E T
I Y
V O H A
T E
B T T
C S
C A
I I
D S N
E I
L C C E
W T
V I
A A
C S
O R
A P
P R
N D
N E
V A
A O w T
I S
A C C F
O U
D H S T
T T
T T
T S
T I
I I
I I
U I
N N
N N
N H
F N
U U U U U S I
U 9 0 1
2 3
4 5
6 1
2 2 2
2 2
22 e
l'.1'
- 4 44,h '
,}i I4iI 4ii' l*
il
!1}5II11i4i!i!i
!i 4i 1
=..
..... -~ ~ = -
-+
UNIT SHUTDOWNS ann POWER REDUCTIONS DOCGET NO. 50 - 352
~
UNIT NAWE LINERICM UNIT 1 6
DATE FEBRUARY 10. 1993 i
REPORT MONTH JANUARV. 1993 COMPLETED BV PHILADELPHIA ELECTRIC CONDANY f
MARL MECM
~
3931012540 REPORTS Su,ERv1So" BUSINESS UNIT LINERICM GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 p
t 1
J l'
]
. METHOD OF l LICENSEE lSYSTEWlCOMPONENTj CAUSE AND CORRECTIVE
{
l ITYPElOURATIONlREASON $ HUTTING DOWNI EVENT l CODE 1 CODE I ACTION TO NO.!
DATE i (1)I (HOURS)l (2)
RE4~OR (3) l REPORT
- l (4) l (5) l PREVENT RECURRENCE l
I i
i I
j 1
930101 S
000.0 H l 4
l N/A ZZ l ZZZZZZ l ?_OAD WAS REDUCED 10% DUE TO EXCESS l
l L
l l GENERATING CAPACITY 1
1 1
I I
1 i
I 2
930108 5
000.0 i
B l 4
N/A l HB
{ %ALVEX l REACTOR POWER WAS REDUCED 5% TO PERFORM i
l l
l l WAIN TURSINE CONTROL VALVE EMERCISE l
l l
ll SURVEILLANCE TESTINw l
3 l
g t
I i
1 i
1 I
L r
i f'
i l
(1)
(2)
- 13).
(4) l F - FORCL' REASON METHOD SMHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PRECADATION OF DATA B - WAINTENANCE OR TEST 2 - WANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOWATIC SCRAW.
EVENT REPORT (LER) i D - REGULATORV RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161) f E - OPERATOR TRAINING + LICENSE EXAw1 NATION f
F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
EXHIBIT I - SAME SOURCE f
4 4
I a
f i
i I
i I
i
3931012540 4
Docket No. #50-353 Attachment to Monthly Operating Report for i
January 1993 j
LIMERICK GENERATING STATION l
UNIT 2 JANUARY l THROUGH JANUARY 31, 1993 I.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES Limerick Unit 2 beoan the month of January in end-of-cycle coastdown at a nominal 69% of rated thermal power with core flow maximized.
On
- Sunday, January 3,
the reactor j
automatically scrammed on reactor high pressure due to a main i
turbine electro hydraulic control (EHC) malfunction.
Unit 2 remained in JPCON 3
until Wednesday, January 6,
when criticality was achieved at 2307 hours0.0267 days <br />0.641 hours <br />0.00381 weeks <br />8.778135e-4 months <br />.
On Thursday, January 7,
Unit 2 peak end-of-cycle reactor power was attained at a nominal 69% rated.
On Thursday, January 21, Unit 2 was manually scrammed from 20% power to commence the second refueling outage.
On Wednesday, January 27, Unit 2 entered CPCON 5 to support ongeing second refueling outage activities.
Unit 2 ended this operating period in OPCON 5.
Unit 2 occurrences during the operating period included:
4 On Sunday, January 3, at 1612 hourr, the reactor automatically scrammed due to high reactor pressure.
The high reactor i
pressure was caused by main turbine control valve closure due to an undetermined EHC malfunction.
Trin nrocedure T-101 was entered and executed.
Reactor water level reached
-37.9".
Prcper primary containment iuolation system isolations and reactor core isolation cooling (RCIC) initiation were appropriateli, received.
Reactor level was immediately i
restored.
i_ip procedure T-99 was entered and executed.
Normal shutdo',en per general procedure GP-3 was commenced.
II.
LyALLEKGES.!O MAIN STEAM SAFETY RELIEF VALVES There were no challenges to the 1%in Steam Safety Relief Valves during the month.
oprtgex2
.._._.m.
. ~.. -.
_.._..m._
_...-~.._..m
. AVERAGE DAILY. UNIT POER LEVEL DOCKET NO. 50 - 353
.h
....----~- ---- -...--.....
' ' " " M"'"!c"....'"I'2 393101E340 DATE FEBRUARY 10, 1993 COMPANY PHILADELPHIA ELECTRIC COMPANY KARL MECK REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 MONTH JANUARY 1993-DAY tVERAGE DAILY POWER LEVEL'-
DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(WWE-NET) 1 701 17 655 2
703 la 647
(
3 469 19
' 644 i'
r 4
0
'20 636 5
0'
.21 69 6
0 22 0
'7 0
23 0
0 395 24' O
i 9
699.
25.
0' 10 690-26 0
y 11 680 27 0
12-679 28 0
13 674 29 0
14 661 30.
O L
15 667 31 0
16 663 1
l
- l i
y i--w.3 4
2_.2___,. _ _ _ _ _
_-_____,.__.____.___..2
-.- -- ~... -...- -.
n
.~..--._w.
.-nn.._..
OPERATING DSTA REPORT DOCKET NO. 50 - 353
+
.___..__.______~_ _______-_
1 DATE FEBRUARY 10, 1993 COMPLETED BV PHILADELPHIA ELECTRIC COMPANY REPORTS SUPERVISOR BUSINESS UNIT LIMERICK GENERATING STATION F
TELEPHONE (215) 327-1200 EXTENSION 3320 OPERATING STATUS 1 UNIT NAME: LIMERICK
- UNI T 2.
NOTES: REACTOR AUTO SCRAMMED ON l
l
- 2. REPORTING PERIOD:
JANUARY. 1993 ON HIGH REACTOR PRESSURE I
l 3.
LICENSED' THERMAL POWER (MWT):
3293 1
DuE TO AN UNDETERMINED MAIN 4
NAMEPLATE RATING (GROSS MwE):
1138
.TUR81NE EHC MALFUNCTION 5.
DESIGN ELECTRICAL RATING (NET MWE):
1055 REACTOR WAS MANUALLY SCRAMMED i
- 6. MAXIMUM DEPf %DABLE C APACITV (GROSS WWE): 1092 FROM 20% POWER TO BEGIN THE 7.
MAXIMUM DEPENDABLE CAPACITV (NET kwE):
'1055 SECOND REFUELING OUTAGE.
I 8.
!F. CHANGES OCCUR IN CAPACITV RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
)
9.
POWER LEVEL TO'WHICH RESTRICTED. IF-ANY (NET'WWE):
1
- 10. REASONS FOR RESTRICTIONS. IF ANY:
1 THIS MONTH VR.TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 744 744 26.880" 12.' NUMBER OF HOURS REACTOR WAS CRITICAL 400.1 400.1' 23.640.9
[
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
'14 HOURS GENERATOR ON-LINE 382.0 382.0 23.C38.5 l
15.' UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 J.O 1
- 16. GROSS THERMAL ENERGY GENERATED (WWH) 816.994 816.994 72.783.144
- 17. GROSS ELECTRICAL ENERGV GENERATED (MwH) 260.100 260,100 24.013.206 18.-NET ELECTRICAL ENERGY GENERATED (KwH)
-____'___..__246.765 246.765
.23.109.812 1
L PAGE 1 OF 2 x
y.
.m._
._.m
... ~.
.m....--.....
..~.._. _ _... _._.., _... ~ _ _. _ _.. _.. -
..m..
.m
..m
.o _
OPERATIMG DATA REPORT (CONTINUED)
DOCMET NO. 50 - 353 4
- 1
[
DATE FEBRUARY 10, 1993
{} }, [4 () THIS MONTH YR-TO-DATE CUMULATIVE 7
- 19. UNIT SERVICE FACTOR 51.3 51.3 85.7
- 20. UAIT AVAILABILITY FACTOR 51.3 51.3 85.7 21 UNIT CAPACITY FACTOR (USING MDC NET) 31.4 31.4 81.5 e
- 22. - UNIT CAPACITY FACTOR (USING DER NET) 31.4 31.4 81.5
- 23. UNIT FORCED OUTAGE RATE 25.0 25.0.
5.1 24 SHUTDOWN 5 SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH): SECOND REFUELING: 01/22/93: 68 DAYS-
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: 03/31/93
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATICN):
FORECAST -ACHIEVED ( INITIAL CRITICALITY 08/12/89 08/12/89 INITIAL ELECTRICITY 09/01/89 09/01/89 COMMERCIAL OPERATION 02/01/90 01/08/90 h + ' I s PAGE 2 OF 2 i L i .m..
._.m m .m I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET 40. 50 - 353 1 UNIT NAME LIMERICK UNIT 2 DATE FEBRUARY 13. 1993 REPORT MONTH JANUARV. 1993 COMPLETED BV PHILADELPHIA ELECTRIC COMPANV MAPL MECM ~ [ 7 Q d' jQ1}J pi REPORTS SUPERVISOR I v3 v BUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 __.__.._.____....._....___~_ [ l l METHOD OF LICENSEE ISYSTEM'COMPONENil CAUSE AND CORRECTIVE TVPEIDURATIONIREASON SHUTTING DOWN EVEN- l CODE ' CODE l ACTION TO ' NO.' DATE (1}} (HOURS)l (2) REACTOR (3) REPORT
- l (4)
(5) 1 PREVENT RECURRENCE I i 1 1 1. 930103 i F 1C3.3 l A i 3 l 2-93-001 CC INSTRU REACTOR AUTOMATICALLY SCRAMMED ON l HIGH REACTOR PRESSURE CAUSED BY EAIN i TURBIhE CONTROL VALVE CLOSURE DUE TO Ah l l UNDETERMINED EHC MALFUNCTION. v 2 930121 F 024.0 H 2 N/A ZZ ZZZZZZ REACTOR WAS MANUALLY SCAAMMED FPOM 20% 'i POWER ONE DAV PRIOR TC THE SECOND I REFUEL OUTAGE TO BEGIN DECON ACTIVITIES I i i 3 l 930122 S 234.7 C 4 N/A ZZ j ZZZZZZ UNIT 2 SECOND REFUELING OUTAGE BEGINS l i -l l 362.0 1 I I i (1) (2) (3) (A) i F . FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS i 5 - SCHEDULED A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINfENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE e C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) { D - REGULATORY RESTRICTION' 4 - OTHER (EXPLAIN) FILE (NUREG-0161) i E - OPERATOR TRAINING
- LICENSE EXAM' NATION F'- ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN) j H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE l e i 4 9 4 I 1-l b + -}}