ML20128L189
| ML20128L189 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 02/10/1993 |
| From: | Helwig D PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20128L193 | List: |
| References | |
| NUDOCS 9302190111 | |
| Download: ML20128L189 (1) | |
Text
'
T.S.6.9.1.6 3931012540 PillLADELPillA EIECTRIC COMPANY LIMERICK GENERATING STATION
/
P. O. BOX 2300
/
SANA 10GA, PA 19464-2300 (215) 327-1200. EXT. EU February 10, 1993 DAjj[g,$$G Docket Nos. 50-352 uutnox ocura4 rwa swa 50-353 l
License Nos. NPF-39 NPF-85 U.
S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Limerick Generating Station Monthly Operating Report For Units 1 and 2 i
Enclosed are the monthly operating reports for Limerick Units 1 and 2 for the month of January, 1993 forwarded pursuant to Tv:hnical Specification 6.9.1.6.
Also enclosed is revision 1 to the December, 1992 report for Limerick Unit 2, which corrects the number of hours the reactor was critical (line 12).
This error occurred as a result of an incorrect data entry.
We regret any inconvenience this may have caused.
Very truly yours, W
KWM/dtc Enclosures cc:
T.
T. Martin, Administrator, Region I, USNRC (w/ enclosures)
T.
J.
MhbI ({1, n.4 nn 9302190111 930210
/ Q/
PDR ADOCK 05000352 i
i R
PDR V