ML20128L225

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Dec 1992 for Limerick Generating Station Unit 2
ML20128L225
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/31/1992
From: Meck K
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20128L193 List:
References
NUDOCS 9302190127
Download: ML20128L225 (1)


Text

- _ - - _ _ _ - _ - - - _ - _ - _ - _ _ - _ _ _.

2 OPERATING DATA REPORT DOCKET NO. 50 - Ta3 DATE JANUARV 14, 1992 COMPLETED BV PHILADELPHIA ELECTNIC COMPANY PARL MEC#

"_ C /

h I,)

()

[JN REPORTS SUDERVISOR BUSINESS UNIT LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3320 OPERATING STATUS 1

UNIT NAME: LIMERICK UNIT 2 NOTES: THE REACTOR WAS MANUALLY j

l 2 REPORTING PERIOD:

DECEMBER, 1992 SCRAMMED AFTER BOTH AECIRC.

3.

LICENSED THERMAL POWER (MwT):

3293 PUMPS TRIPPED DURING t

l 4 NAMEPLATE RATING (GROSS MWE):

1138 l

SURVEILLANCE TESTING.

l j

5.

DESIGN ELECTRICAL RATING (NET MWE):

1055 l

t 6,

max! MUM DEPENDABLE CADACITv (GROSS MwE): 1092 l

1 l

l 7 MAXIMUM DEPENDABLE CAPACITY (NET MwE):

1055 l

1 P IF CHANGES OCCUR IN C#PACITv RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:

25 T O -

hh 9.

POWER LEVEL TO wHICH RESTRICTED. IF ANY (NET MwE):

RJ

>=

10. REASONS FOR RESTRICTIONS. IF ANY:

3> 43 -

C30 O-hl(j THIS MONTH VR-TO-DATE CUMULATIVE C)43 1?. HOURS IN. REPORTING PEPIOu 744 8.784 26.136 I

(g g) l/(

.O j

12. NUMBER OF HOURS REACTOR WAS CRITICAL 612.5 8.652.5 23.240.8 7)g,kh
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 RJ 14 HOURS GENERATOR ON-LINE 564.0 8.557.3 22.656.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MwH)

.366.894 26.694.754 71.966.150

17. GROSS ELECTRICAL ENERGV GENERATED'(MWH) 435.710 8.821.470 23,753.106
18. NET ELECTRICAL ENERGY GENERATED (MwH) 415.583

.8.489.182 22.863.047

____.a...____

PAGE 1 05 2 l

l