,O
o
/ellow
i
)
JUN 211985
Carolina Power and Light Company
ATTN: Mr. E. E. Utley
Executive Vice President
Power Supply and Engineering
and Construction
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NOS. 50-325/85-14 AND 50-324/85-14
On May 20-24, 1985, NRC inspected activities authorized by NRC Operating License
Nos. DPR-71 and DPR-62 for your Brunswick facility.
At the conclusion of the
-inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
/d /
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Report Nos. 50-325/85-14 and
50-324/85-14
cc w/ encl:
T. W. Howe, Vice President
Brunswick Nuclear Project
vC'. R. Dietz, Plant General Manager
bec w/ enc 1:
(Seepage 2)
8507110177 850G
ADOCK 05000324
p
G
\\\\
Z20]
..
o
. . . .
Carolina Power and Light Company
2
JUN 211985
bec w/ encl:
W RC-Resident Inspector
Document Control Desk
B. Grimes, IE
H. Thompson,-NRR
State of North Carolina
y
RI
RI
NMerriweather:lb
TEConlon
ARHer'dt
f715D(h'WO"
n'
6//f/85
$/ /85
6/g/85
g