ML20128K960

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-324/85-14 & 50-325/85-14 on 850520-24.No Violation or Deviation Noted
ML20128K960
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/21/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20128K965 List:
References
NUDOCS 8507110177
Download: ML20128K960 (2)


See also: IR 05000324/1985014

Text

,O o

i )

/ellow

JUN 211985

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NOS. 50-325/85-14 AND 50-324/85-14

On May 20-24, 1985, NRC inspected activities authorized by NRC Operating License

Nos. DPR-71 and DPR-62 for your Brunswick facility. At the conclusion of the

-inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

/d /

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Report Nos. 50-325/85-14 and

50-324/85-14

cc w/ encl:

T. W. Howe, Vice President

Brunswick Nuclear Project

vC'. R. Dietz, Plant General Manager

bec w/ enc 1: (Seepage 2)

8507110177 850G

PDR ADOCK 05000324

p

G

\\

Z20]

.. o

....

Carolina Power and Light Company 2 JUN 211985

bec w/ encl:

W RC-Resident Inspector

Document Control Desk

B. Grimes, IE

H. Thompson,-NRR

State of North Carolina

y RI RI

NMerriweather:lb TEConlon ARHer'dt f715D(h'WO"

6//f/85 $/ /85 6/g/85 g n'