ML20127K533

From kanterella
Jump to navigation Jump to search
Documents Status of Review of NSP Reactor Vessel Field Fabrication as Reported by Lofy of Parameters,Inc on 661223
ML20127K533
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/29/1966
From: James Shea
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20127K496 List:
References
NUDOCS 9211200427
Download: ML20127K533 (1)


Text

_ __________ _ _ _

7..gg; .. .......,

. . . . . . , , x l!NITED STATES GOVERNMENT Memorandum

  • l THE FILES DA1E: Decerber 29, 1966 f ,) TilRU: Roger S. Boyd, Chief Research & Power Reactor Safety Branch, JRL ,

NW J. J. Shea, Research 6 Power Reactor Snfety Branch /q y Division of Reactor Licensing st nJLcT: SSP FIELD FABRICATED VESSEL CONSULTANT'S REPORT 50 -Q Mr. Lofy, Parameters Inc., called on December 23, 1966 to report on the status of his review of NSP Reactor Vessel Field Fabrication.

Mr. Kota, Parameter's non-destructive testing consultant will have his portion of the review completed by December 30, 1966. Mr. Kyle, welding consultant, will have his contribution for the consultant report by January 3, 1966. Mr. Lofy estimated that the entire report should be complete by January 6,1966.

Distribution:

DRL Reading R&PRSB Reading cc: P. A. Morris E. G. Case R. S. Boyd B. Grimes W. Jensen J. Shea C

a',

G 1M" Buy U.S. Saiings Bonds Regidarly on ilu Payroll Savings Plan 9211200427 670123 PDR ADOCK 05000263 A PDR I