3/4.7 PLANT SYSTEMS 3/4.7.1 TURBINE CYCLE 5AFETY VALVES LIMITING CONDITION FOR OPERATION 1
3.7.1.1 All main steam line code safety valves shall be OPERABLE.
APPLICABILITY: MODES 1. 2 and 3.
ACTION:
With one or more main steam line code safety valves inoperable, operation in MODES 1. 2 and 3 may proceed provided, that within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, either the inoperable valve is restored to OPERABLE status or the High Flux Trip Setpoint is reduced per Table 3.7-1; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in 66 SHUTDOWN within the following D> hours.
The provisions of Specificatiert '3.0.4'are not applicable.
~
NOT 3.
t SURVEILLANCE REQUIREMENTS l
c 4.7.1.1 No additional Surveillance Requirements other than those required by Specification 4.0.5 are applicable for the main steam line code safety valves of Table 4.7-1.