ML20127C306

From kanterella
Jump to navigation Jump to search
Forwards SEP Branch Draft SER of return-to-svc Plan.Review for Comments or Concurrence Requested by 841113
ML20127C306
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/09/1984
From: Case E
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20126G811 List:
References
FOIA-84-885 NUDOCS 8411200212
Download: ML20127C306 (2)


Text

,

' o Erc t

o

+

UNITED STATES

[I

)o

,et NUCLEAR REGULATORY COMMISSION L

.j WASHINGTON, D. C. 20555

%, ~ ]

tm e w Docket No.: 50-206 ftEl'ORANDUM FOR: Attached Distribution FROM:

Edson G. Case, Deputy Directer Office of Nuclear Reactor Regulation

SUBJECT:

REVIEW 0F DRAFT SAFETY EVALUATICN REPOPT FOR SAN ONOFRE UNIT 1 RESTART Attached is a draft Safety Evaluation Report prepared by the Systenatic Evaluation Program Branch regarding San Onofre Unit I restert. The Commission has requested the earliert possible review of this report as it relates tc the procedural issues for plant restart.

This c' raft is being hand-carried to you for your imediate review.

I request that yrc review this draft and direct your contents or concurrence to C. Grirer (X27464) by 9:00am, Tuesday, November 13, 1984.

g s

EdsonG. Case,deputyDirector Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

C. Grimes E. McKenra T. Cheng P. Y. Chen M

k d

a e?-

  • y DISTRIBUTION O

/.

D. G. Eisenhut, Director

)

s.

Division of Licer. sing D. M. Crutchfield, Assistant Director for Safety Director, DL j

J. A. Zwolinski, Chief Operating Reactors Branch #5, DL s

R. H. Vollmer, Director Division of Engineering J. P. Knight, Assistant Director for Components and Structures Engineering, DE R. J. Bosnak, Chief Mechanical Engineering Branch, DE G. E. Lear, Chief Structural and Geotechnical Engineering Branch, DE L. Reiter, Acting Chief Geosciences Branch, DE R. M. Bernero, Director Division of Systems Integration R. W. Houston, Assistant Director for Reactor-Safety, DSI B. Sheron, Chief Peactor Systems Branch, DSI 9

I r

~

,,