ML20126G807
| ML20126G807 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/26/1985 |
| From: | Felton J NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Bell N NUCLEAR INFORMATION & RESOURCE SERVICE |
| Shared Package | |
| ML20126G811 | List: |
| References | |
| FOIA-84-885 NUDOCS 8506180155 | |
| Download: ML20126G807 (9) | |
Text
_ _ _ _ _. _ _. _ __
b f#
umitasTATas 3
NUCLEAR REGULATORY COMMISSION
(
l 3,
usm=oton. o. c. aom t
t,*****
E4R36 g i
l I
Ms. Nina Bell, Assistant Director Nuclear Infomation and Resource Service i
1346 Connecticut Avenue, NW, 4th Floor IN RESPONSE REFER i
Washington, DC 20036 TO F0!A-84-885
Dear Ms. Bell:
This is in further response to your letter dated November 28, 1984, in which you requested, pursuant to the Freedom of Infomation Act (FOIA), documents related to the restart of the San Onofre Nuclear Generating Station Unit 1.
The documents identified on enclosed Appendix B are already publicly available in the NRC Public Document Room (PDR),1717 H Street, NW, Washington, DC 20555.
The PDR accession number is listed beside each document description. The documents identified on enclosed Appendix C are being placed in the PDR and will be filed in folder F01A-84-885 under your name, The dccuments identified on enclosed Appendix D are being withheld. Documents 2, 4, 5 and 8 contain the predecisional legal analyses, opinions and recommendations of the Office of the General Counsel (OGC) for the Comissioners' consideration of the request for restart of San Onofre 1.
Documents 1, 3, 6, 7, 9 and 10 on Appendix 0 contain the predecisional opinions and recomendations of the Connissioners and their staffs on the restart of San Onofre 1.
Because the documents reflect the predecisional process between OGC and the Comissioners and between the Comissioners and their staffs, the documents are exempt from mandatory disclosure pursuant to Exemption 5 of the FOIA, 5 U.S.C.1552(b)(5), and the Comission's regulations,10CFR69.5(a)(5). Release of the documents would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. The documents do not contain any reasonably segregabie factual portions. The documents are being withheld in their entirety.
Pursuant to 10 CFR 9.15 of the Comission's regulations, it has been detemined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public i
interest. The person responsible for the denial of Documents 2, 4, 5 and 8 on Appendix 0 is James A. Fitzgerald, Assistant General Counsel. The person responsible for the denial of documents 1, 3, 6, 7, 9 and 10 on Appendix D is John C. Hoyle, Assistant Secretary of the Comission, i
05061g1558509 NL84-5 PDR l
1 This denial may be appealed to the Comission within 30 days from receipt of this letter. Any such appeal must be in writing, addressed to the Secretary 2
of the Comission, U. S. Nuclear Regulatory Comission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an
" Appeal from an Initial FOIA Decision."
The search for and review of additional documents subject to your request are continuing. We will notify you as soon as the search and review are completed.
i S
'erely,
. M. Felton, Director Division of Rules and Records Office of Administration
)
Enclosures:
As stated l
?
i I
i I
I 1
t 1
i L
j I
s t
Re: F0!A 84-885 APPENDIX B Documents Already Available in the PDR 1.
11/13/84 Letter from J. A. Zwolinski (NRC) to K. Baskin (SCE),
transmitting Sea Wall Evaluation. (16 pages)
Accession No. 8411190472 2.
11/06/84 Memorandum from G. Lear to J. Knight " Trip Report -
San Onofre Unit 1. Masonary Wall Meeting and Site Visit." (4 pages) Accession No. 8412060191 3.
11/03/84 LetterfromM.O.Medford(SCE)toJ.Zwolinski(NRC).
(1page) Accession No. 8411070104 4.
11/03/84 Letter from K. Baskin (SCE) to D. M. Crutchfield (NRC),
Responses to October 19, 1984 letter. (3 pages)
Accession No. 8411070001 5.
10/27/84 LetterfromM.Medford(SCE)toJ.Zwolinski(NRC),
transmitting Masonary Wall Responses. (5 pages)
Accession No. 8410300310 6.
10/27/84 LetterfromM.O.Medford(SCE)toJ.A.Zwolinski(NRC).
(7pages) Accession No. 8410300286 7,
10/22/84 LetterfromM.O.Medford(SCE) tow.Paulson(NRC).
(18pages) Accession No. 8410250019 8.
10/18/84 LetterfromM.O.Medford($CE) tow.A.Paulson(NRC),
Intake Structure Degradation and Repair. (2 pages)
Accession No. 8410230285 with the conditions of 10 CFR 55.31(e). (3 pages) pliance Letter from M. O. Medford to W. A. Paulson Re: Com 9.
10/18/84 Accession No. 8410230330 10.
10/17/84 LetterfromK.Baskin(SCE)toH.R.Denton(NRC).
(38pages) Accession No. 8410220011 11.
10/02/84 Letter from M. O. Medford (SCE) to W. Paulson (NRC).
(1page) Accession No. 8410050239 12, 10/01/84 Inspection Report No. 50-206/84-14.
(2pages)
Accession No. 8410260244
- 13. 09/07/84 Inspection Report No. 50-206/84-16.(7pages)
Accession No. 841002015
- 14. 08/29/84 LetterfromM.O.Medford(SCE) tow.A.Paulson(NRC).
(375pages) Accession No. 8409040121 l
- 15. 08/22/84 Inspection Report No. 50-206/84-13.(2pages)
Accession No. 8409180069 I
m
Re:
F0!A-84-885 APPENDIX B (Continued)
- 16. 08/16/84 Letter from D. Crutchfield (NRC) to K. Baskin (SCE).
l (9 pages) Accession No. 8408200114 i
- 17. 08/07/84 Letter from D. Crutchfield (NRC) to K. Baskin (SCE).
(4 pages) Accession No. 8408140188
- 18. 07/06/84 Inspection Report No. 50-206/84-10(2pages).
Accession No. 8407260119
- 19. 06/08/84 LetterfromM.O.Medford(SCE)toD.M.Crutchfield(NRC),
Small Bore Piping Walkdown Criteria. (1 page)
Accession No. 840140189 1
l
- 20. 05/17/84 Letter from M. O. Medford (SCE) to D. M. Crutchfield (NRC).
l (30pages) Accession No. 8405210185 i
- 21. 02/27/84 LetterfromT.Cheng(NRC) toc. Grimes (NRC).TripReportfor February 8-9, 1984 Site Visit.
(7pages)
Accession No. 8403160098
- 22. 02/08/84 Letter from H. Denton (NRC) to K. Baskin (SCE)
(4 pages)
Accession No. 8402100200 23.
12/23/83 Letter from M. O. Medford (SCE) to D. Crutchfield (NRC).
(1page) Accession No. 8312290390 1
- 24. 09/30/82 LetterfromK.Baskin(SCE)toD.Crutchfield(NRC).
(1page) Accession No. 8210040177
- 25. 09/20/82 Letter from W.Paulson(NRC) tor.Dietch(SCE).
(15pages) Accession No. 8209270289
- 26. 09/16/82 LetterfromW.Paulson(NRC) tor.Dietch(SCE),
Sutdect: Free Field Ground Motion.
Accession No. 8209220253
- 27. 08/11/82 LetterfromD.Crutchfield(NRC) tor.Dietch(SCE) transmitting " Order Confirming Licensen Commitments i
on Seismic Upgrading." (2 pages) Accession No. 8208170143
- 28. 07/26/82 LetterfromW.Paulson(NRC) tor.Dietch(SCE).
(11pages) Accession No. 8207300299 i
- 29. 06/28/82 LetterfromK.Baskin(SCE)toD.Crutchfield(NRC).
j (1page) Accession No. 8206300139
- 30. 06/24/82 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
(1page) Accession No. 8306280505
Re: F0!A-84-885 APPENDIX B (Continued)
- 31. 06/23/82 LetterfromW.Paulson(NRC) tor.Dietch(SCE).
(2 pages) Accession No. 8206300165
- 32. 06/15/82 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
(2pages) Accession No. 8206170129
- 33. 04/30/82 Letter from K. Baskin (SCE) to D. Crutchfield (NRC) transmitting Balance of Plant and Mechanical Equipment Report.
(1page) Accession No. 8205040438
- 34. 04/30/82 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
(2pages) Accession No. 8205040565 l
- 35. 04/12/82 Letter from M. O. Medford (SCE) to D. Crutchfield (NRC).
j (4 pages) Accession No. 8204160315
- 36. 02/09/82 LetterfromR.Krieger(SCE)toD.Crutchfield(NRC).
(4pages) Accession No. 8202110210 37, 12/08/81 LetterfromK.Baskin(SCE)toD.Crutchfield(NRC).
l (56pages) Accession No. 8112100248 38.
11/16/81 LetterfromD.Crutchfield(NRC) tor.Dietch(SCE) transmitting Directors Decision on 2.206 Petitions.
(1page) Accession No. 8111190377 j
1 39.
10/19/81 LetterfromW. Moody (SCE)toD.Crutchfield(NRC).
(50pages) Accession No. 8110220437 40.
10/06/81 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
i (3pages) Accession No. 8110190952
- 41. 09/28/81 LetterfromW. Moody (SCE)toD.Crutchfield(NRC).
(10pages) Accession No. 8110010348 42.
08/11/81 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
(62pages)AccessionNo. 8108280253 l
- 43. 07/07/81 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
(12pages) Accession No. 8107100034 44.
04/24/81 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
(4pages) Accession No. 8105010264
- 45. 04/24/81 Letter from D. Crutchfield (NRC) to R. Dietch (SCE).
(5pages) Accession No. 8104290472 j
l I
I Re: F0!A-84-885 APPEN0!X B (Continued) 1
- 46. 02/23/81 LetterfromK.Baskin(SCE)toD.Crutchfield(NRC).
(1page) Accession No. 8102250204 1
47.
12/80 "SEP Guidelines for Soil-Structure Interaction Review,"
SeniorSeismicReviewTeam(SSRT),NUREG/CR1981.
i (Docket 50-219)
(158 pages) Accession No. 8105260532 l
- 48. 09/24/80 Letter from K. Baskin (SCE) to D. Crutchfield (NRC).
j (3pages) Accession No. 8008250103
- 49. 08/04/80 Letter from D. Eisenhut (NRC) to R. Dietch (SCE).
(3 pages) Accession No. 8008250103 l
- 50. 07/28/80 Letter from D. Crutchfield (NRC) to R. Dietch (SCE).
(5pages) Accession No. 8008140445 1
51 04/28/80 Letter from K. Baskin (SCE) to D. L. Ziemann (NRC).
]
(89pages) Accession No. 8005150283 1
- 52. 01/01/80 LetterfromD.Eisenhut(NRC)toJ. Drake (SCE).
(5pages) Accession No. 8001210301
- 53. 05/78 NUREG/CR-0098. " Development of Criteria for Seismic Review of Selected Nuclear Power Plants."
l (78pages) Accession No. 7911130375 i
1 1
a 6
l l
i I
r
Re: F0!A-84-885 APPENDIX C Documents Being Placed in the POR 1.
11/28/84 Menorandum to Samuel J. Chilk from John H. Austin
Subject:
SECY-84-434 - Options for San Onofre 1.
(1page) 2.
11/21/84 Handwritten notes of Comissioner Asselstine from the 11/21/84 open Comission Meeting on San Onofre 1.
(3pages) 3.
11/14/84 Systematic Evaluation Program Branch, Docket No. 50-206 Record of Phone Conversation.
(1page) 4.
11/09/84 Memorandum from Edson G. Case, Deputy Director, Office of Nuclear Reactor Regulation
Subject:
Review of Draft Safety Evaluation Peport for San Onofre Unit 1 Restart.
(41pages) 5.
11/07/84 Memorandum tn Chaiman Palladino from James K. Asselstine
Subject:
COMNP-84-45-SanOnofre1 Restart.(1page) 6.
10/29/84 StatusonSanOnofreUnit1.(14pages) 7, 10/22/84 MemorandumtoLynnScattolinifromJohnAustin.(2pages) 8.
10/12/84 SanOnofre1.SeismicPeevaluationforRestart.(10pages) 9.
10/12/84 Memorandum to Ly(nn Scattolini from Pat Davis,
Subject:
San Onofre 1.
5pages) 10.
10/11/84 Memorandum to Herzel Plaine General Counsel from James K. Asselstine,
Subject:
SanOnofre1.(1page) 11.
10/04/84 SanOnofra1TechnicalStatus.(3pages) 12.
10/03/84 Memorandum and sumary from Miller & Chevalier onSanOnofre1.(18pages)
- 13. 08/16/84 Status of Completion of June 24, 1982 Comitments -
SanOnofre1.(3pages)
- 14. 08/28/84 Memorandum to William Dircks Executive Director for Operations
Subject:
Procedural Requirements for San Onofre Unit 1 Restart.(1page) t
(
i
- 15. 07/05/84 Transmittal Slip to Larry Chandler, OELO. from Chris Grimes I
Re: SONGS 1RestartRequirements.(2pages) l
- 16. 06/19/84 Memorandum to Chris Grimes from Jack Rainsberry
Subject:
Pipe Support Status Infomation. San Onofre Unit 1.
(9 pages)
- 17. 03/05/84 Memorandum to Frank J. Miraglia. Director for Safety Assessment. OL from Dennis Crutchfield.
Subject:
Telephone Conversation with California Public Utilities Commission - San Onofre Unit 1. (2 pages)
P r
Re: F0!A-84-885 4
APPENDIX D Documents Being Withheld 1.
11/15/84 Comissioner Thomas Roberts' vote sheet for SECY-84-434, i
" Options for San Onofre 1."
(3pages) 2.
11/09/84 Memorandum (SECY-84-434) from M. Malsch Deputy General Counsel, and G. Cunningham, Executive Legal Director, to the Connissioners,
Subject:
Options for San Onofre 1.
(4 pages) l 3.
11/08/84 Memorandum from Comissinner Thomas Roberts to the I
Connissioners,
Subject:
Proposal for Restart of San Onofre 1.
(2pages) 1 4.
11/05/84 Memorandum from H. Plaine, kneral Counsel, to the Comissioners
Subject:
Proposal for Restart of San Onofre 1.
(33pages) 5.
10/22/84 Draft of Memorandum from M. Malsch and Crane, OGC, to H. Plaine, General Counsel,
Subject:
Request for 4
Restart of San Onofre 1 (5 pages) i 6.
09/21/84 Handwritten notes of Pat David. Legal Assistant,
Subject:
t San Onofre, from meeting with ED0 staff.
(2pages) l 7.
02/13/84 Draft Separate views of Comissioner James K. Asselstine on t
J San Onofre 1 restart.
(7pages) l l
8.
Undated Draft of November 5, 1984 Memorandum from H. Plaine, General Counsel to the Comissioners,
Subject:
Proposal forRestartofSanOnofre1(31pages) 9.
Undated Handwritten notes of Pat Davis Legal Assistant,
Subject:
San Onofre, from Meeting with ED0 staff (3 pages)
- 10. Undated Handwritten notes of Comissioner Asselstine from the 4
November 21, 1984 closed Comission briefing on l
investigations (4pages) i
- - - - -