_ l
- "'*4),,
}
UNITED STATES g_
g NUCLEAR REGULATORY COMMISSION
.., C Q g
.j WASHINGTON, D. C. 20555 y
[,
June 8,1984 M-MEMORANDUM FOR:
Learned W. Barry, Director Office of Resource Management FROM:
Harold R. Denton, Director
~
Office of Nuclear Reactor Regulation
SUBJECT:
ADDITIONALTECHNICALASSISTANCEFUNDSNEEDEDYIREGIONIV TO SUPPORT COMPLETION OF OUTSTANDING REGULATORY ACTIONS ON CDMANCHE PEAK AND WATERFORD 3
Reference:
1.
Memorandum dated May 17, 1984, from R. P. Denise, Director, Division of Reactor Safety, Region IV, to D. M. Crutchfield, Overall Management Coordination for Waterford 3 " Technical Assistance Funds Needed By Region IV..."
2.
Memorandum dated March 17, 1984, W. J. Dircks, EDO,
~
" Completion of Outstanding Regulatory Actions on Comanche Peak and Waterford 3" 3.
Memorandum dated May 29, 1984, from H. Denton, NRR, to L. Barry, Director, ORM, " Revised Mid-Year Resource Estimate" The overall management coordination by NRR to complete outstanding regulatory actions on Comanche Peak and Waterford 3 was set up on March 12, 1984, in the referenced memorandum from W. J. Dircks. Since then significant technical assistance funds have been expended by Region IV on these plants to support this effort.
~
My staff has identified $180K needed by Region IV to continue their technical assistance efforts. This is $120K for BNL to evaluate allegations on coatinos at Comanche Peak and $60K (see enclosed referenced memo to D. H. Crutchfield) to make up for higher level of effort expended at Waterford 3 than originally planned by Region IV. This $180K requested for Region IV is in addition to the $2,500K requested for NRR, in my memorandum to you dated May 29, 1984, referenced above.
We request that you provide $180K immediately to Region IV. This will allow BNL to provide assistance for Comanche Peak during June 1984
/
~
w Harold R. Denton, Director Office of Nuclear Reactor Regulation ec:
J. Funches, PPAS J. Collins, R-IV
!p W. Foster, R-IV gg5Ed n
w
N N
muur
_p
=5gir DISTRIBUTION: w/o Gncl Centrat Flies
~
May 29,1984 PPAS R/F ECase HDenton osaana LSolander DEisenhut MEMORANDUM FOR:
- 1. earned W. Barry, Director and Controller
~
L. BARRY' -- F~~C Office of Resource Management FRON:
Harold R. Denton, Director Office of Nuclear Reactor Regulation
SUBJECT:
REVISED MID-YEAR RESOURCE ESTIMATE As a result of the NRC management meeting on May 18, 19,84, we have ieanalyzed.
the NRC funding requirements for Near-Tem Operating License (NTOL) and certain operating plant reviews for the remainder of FY 1984 Based on our most recent analysis, the NRR mid-year resource request that was submitted by Jesse Funches to Dr.THner on ADH1 28, 1984 should be increased by 52,500K.
A markup of Exhibit 1 of the ApH1 23, 1984 is enclosed, ~which reflects this increase and other changes sinc April 23, 1984. Note that the resources identified included our best estimate of the effort needed for licensing reviews and inspeu. ions.
If ii. M&necessary to reallonte Lo uGer-NRC' offices anc regions, 7 sid submit the appropriate reallocation requests to yOU*
l The additional resources are based on the following:
Waterford - $250K to assist in the review of issues, including necessary inspections that need to be closed pH or to full power licensing. decision.
Comanche Peak - $1,250 to assist in the review of scfety issues, inspections, review of allegations, etc. for timely licensing decision as identified in the draft plan developed by the assessment SES (T. Ippolito).
Other NTDLs (Ferini 2. Wolf Creek, Diablo Canyon 2. Bymn 1, Limerick 1, etc.) and operating reactors (San Onofre 1 restart). Althot.gh it i
is uncertain what needs to be accomplished on these plants. I believe that based on preliminary infomation, it is prudent to plan ci about
$1,000K of effort for the remainder of FY 1984 to assist in the review of potential licensing and inspection issues.
t w a,f - ~ 71 ly
.r J r. f m
-i l '" F............................................................
er >
l l c:= 30..o.ci.c. on.o OFFICIAL RECORD COPY
4 N
T 897
""MF N
Learned W. Barry I would also like to reiterate the need for additional NRR travel funds, since these funds are necessary to support the onsite work at these NTOL plants.
If you have questions, pleasicontact Jesse Funches or Lars Solander.
anonna signed by a.R.asens Harold R. Denton, Director Office.of Nuclear Reactor Regulation Enclosum:
As stated cc w/o Encl.:
J. Roe V. Stallo E. Triner R. DeYoung Regional Administrators t
f, f
i
.....P.P..A. S......
.... N.. R.......... D..*t.N.o.
, l 5.0...'i./. 84 5b /.84
.5
.---,----.-._e
N N
~ #
N DISTRIBUTION:
w/o encl Centrat Files May 29,1984 PPAS R/F ECase HDenton voiana LSolander DEisenhut
^
MEMORANDUM FOR: ' Learned W. Barry, Director and Controller
~~
Office of Resource Management a
FROM:
Harold R. Denton, Directar Office of Nuclear Reactor Regulation
SUBJECT:
REVISED MID-YEAR RESOURCE ESTIMATE
~
As a result of the NRC management meeting on May 18, 1984, we have reanalyzed the NRC funding requirements for Near-Tem Operating License (NTOL) and certain operating plant reviews for the remainder of FY 1984.
Based on our most recent analysis, the NRR mid-year resource, request that was submitted by Jesse Funches to Dr.TH ner on ADM1 28, 1984 should be increased by $2,500K.
A markup of Exhibit 1 of the ADM123,1984 is enclosed, which reflects this increase and other changes sinc April 23, 1984 Note that the resources identified included our best estimate of the effort needed for licensing reviews and inspections.
If it becomes necessary to reallocate to other NRC offices and regions, we would submit the appropMate reallocation requests to you.
l The additional resources are based on the following:
Waterford - $250K to assist in the review of issues, including necessary inspections that need to be closed prior to full power licensing. decision.
Comanche Peak - $1,250 to assist in the review of safety issues, inspections, review of allegations, etc. for timely licensing decision as identified in the draft plan developed by the assessment SES (T. Ippolito).
l Other NTOLs (Fermi 2. Wolf Creek, Diablo Canyon 2, Byron 1 Limerick I, l
etc.) and operating reactors (San Onofre 1 restart). Although it l
1s uncertain what needs to be accomplished on these plants, I believe that based on preliminary infomation, it is prudent to plan on about
$1,000K of effort for the remainder of FY 1984 to assist in the review of pctential licensing and inspection issues.
O rr & & l ?
~ j).
v.i e i
M h.......................................
C O *8 3te 890 GCs e.#Cm 0240 O EClf*lA8 Mf*"^""
Attatn=ent 2_
g['gg j UNITaDsTATas-e,
-NUCLEAR REGULATORY COMMISSION y
,,mssmc en.o.c.:osss ggfj y MAN 1.21934
/
5 MEMORANDUM FOR:
John T. Collins, Regional Administrator j
. Region IV Harold R. Denton, Director Office of Hu~ clear Reactor Regulation Richard C. DeYoung, Director-0ffice of Inspection & Enforcement FROM:
William J. Dircks
=-
Execut'ive Director for Operations COMPLETIONOFOUTSTANDINGRE5DLATORYACTIONSON~'
SUEJECT:
COMANCHE PEAK AND WATERFORD
~
C:nstruction of the Cer.anche Peak arid Waterford fac.i.11 ties is nearing
.~.we ecmoletion.
There remain a number of issues thatTeR to be resolved before the staff can make its licensing decisions. The issues remaining for these plants are quite complex and span more than one Office.
In order to assure the overall coordination / integration of these issues and to assure issues c-~
are. resolved on a schedule to satisfy _ hearing and licensing decision needs. ~
I am. directing NRR to manage all necessary NRC acticns leading to pro =pt licensing decisions.
Darrell Eisenhut, Director, Division of Licensing, NRR...
is being assigned the lead responsibility for this activity.
He will ec rdinate the efforts cf NRR, IE, and Region IV, and will coordinate this actiyity,with OI and OELD.
Prior to any of the affected Offices undertaking hajoY ac,tivities (e.c., inspections) or naking decisions on these plants.
- htt activity should be concurred in by NRR.
We are presently in the process of assigning a dedicated senior manager to assist Mr. Eisenhut in the management of these activities.
The first phase of this program will be the identification of issues seeded,
to be resolved for each plant prior to hearing and licensing decisions.
l Once the issues-have been identified a Program Plan for resolution of each item shculd be develeped and im;ilemented. The Program Plan should ad'dres's '
the secpe of the werk needed, the identification of the responsible line crganization, and ' he schedule for completion.
In principle his effort l
will therefore be similar to the effort undertaken regarding the allegatien l
eview en Diable Cany:n except that this effert should encompass til' l
l iicensing, inspecticn, hearing, and allegation issues.
i sain-n,,in s
g a
o l
-2, Each affected Office will assign a full time senior menaceti to werk with NRR
- o define, schedule and complete the issues.
I expect these managers to be identified by each of ycu wi, thin a few days.
All affected offices shcuid.
- revide dedicated resources and give their full support to this effort, to assure that all existing issues are expediticusly handled and all new issues are promptly provided to NRR so as.not to delay the licensing decisions.
In additien, copies of all information, documents, depositions,.en. should be. -
promptly provided to NRR to ensure a coordinated approach.
i' anticipate that the approach utilized here will be necessary for a number of upccming OL projects, and am directing NRR to take the lead for ctrrying cut this activity.
(EiEnt:D ES..l.Di.:ks m
William A Dircks Executive Director. for Operations cc:
.G. Cunningham, ELD B. Hayes, 01
- q_. _. -
' ?..~.: -
Distribution:
Dircks Rot Rehm Stello 2 0 r/f.
.3 c_ ' -hF h W p_k) Q 1
U esp s
p DCrd:d@
Id:cc J
dut HDe n
ircks
.p/ /"/84
/
/84 9/Ci/84 g/r/84 J
3
e 4
./.
OVE?).!.L twiAGEMENT r
C00RDINATION (liRR)
?
9.rd.c l
6M
. 0L Contact dvuh.
S w.Eo ELD Contac S.Ts '
j l
Overall Review cf Review cf Desien Review of Constraction Issues and Operation Issues QA Adecuacy (CAT) ~
(:'RR)
IRegIV)
(IE-),
S
'Ngepk C1p{sdo
. m_... e,
p o
. r
,... L% w.* l.
j
. -QIrrt 3 if f 9
O n.
o ce O
e9 0
eg s'
e 8
g 9
0 0
_. _. _ _ _ _ _ _ _