Forwards Insp Rept 50-219/85-13 on 850401-0505 & Discusses Apparent Violations Cited in App A.Receipt of 850418 Response to Violation 219/85-01-01 Re Containment Spray HX & Violation 219/85-01-02 Re Tech Specs Ack
ML20127B493
Person / Time
Site: Oyster Creek
Issue date: 06/07/1985
From: Kister H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20127B497 List:
References
NUDOCS 8506210492
Download: ML20127B493 (2)


See also: IR 05000219/1985013

Text

.

- - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ ._ . _ _ _ _ _ _ _ _ _ _ _ _

.. ..

.

.

sp

'

yo

.

I

JUN 7 S85

Docket No. 50-219

License No. DPR-16

GPU Nuclear Corporation

ATTN: Mr. P. B. Fiedler

Vice President and Director

Oyster Creek Nuclear Generating Station

P. 0. Box 388

Forked River, NJ 08731

Gentlemen:

Subject: Inspection 50-219/85-13

This refers to the region based and routine resident safety inspection by

Messrs. W. H. Bateman, J. Wechselberger, ana R. J. Urban from April 1 - May 5,

1985, at the Oyster Creek Nuclear Generating Station. Forked River, New Jersey.

The inspection consisted of document reviews, interviews, and observation of

activities. The findings were discussed with you and members of your staff at

the conclusion of the inspection.

' Apparent violations of NRC requirements are cited in Appendix A and

categorized under the NRC Enforcement Policy 10 CFR 2 Appendix C (49 FR 8E',3,

March 8, 1984). A reply is required and should be prepared in accordance with

g Appendix A.

We acknowledge receipt of your April 18, 1985 response to Violation

219/85-01-01 concerning a Containment Spray heat excnanger differential

pressure anomaly and Violation 219/85-01-02 involving failur'e to comply with

Technical Specification requirements when performing required safety-related

surveillance procedures. Your corrective actions will be examined in a future

inspection.

This letter also acknowledge: a change in your commitment date to complete

corrective action to address a concern raised in Inspection Report 84-09

involving failure to specify angular tolerance criteria for pipe support

installations. In your June 15, 1984 response letter, you stated design

standards to address this and other situations would be developed by March 1, .

1985. In your supplemental follow-up letter dated August 9, 1984, you stated

development of these standards could take up to two years to complete. The

commitment date is now clarified to be December 31, 1985.

On 3/27/85, Region I received eleven allegations in an anonymous letter. Six

of these allegations were found to have adequate specificity and have been in-

spected onsite as discussed in Section 15. The remaining five allegations

0FFICIAL RECORD COPY IR OYC 85-13 - 0001.0.0

06/04/85 a\

8506210492 850607

PDR

G

ADOCK 05000219 (fU

/

\t

PDR \

~. . ..

.

. .

. - _ _ _ _ _ _ _ _ _ - _ - _ _ .D

.

.

'

9

GPU Nuclear Corporation 2

lacked specificity and therefore, were not inspected. In regard to the allega -

tion addressed in Section 15.6 concerning plant drawings of record, you are

requested to provide a commitment date as to when all safety-related drawings

will reflect the as-built plant. This information should be included with the

response to the apparent violations.

The responses directed by this letter and the accompanying Notice are not sub-

ject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Action of 1980, PL 96-511.

Your cooperation with us in this matter is appreciated.

Sincerely,

gisimed Signed 3Yf

Harry B. Kister, Chief

Projects Branch No. 1

Division of Reactor Projects

Enclosure:

NRC Region I Report 50-219/85-13

cc w/ encl:

BWR Licensing Manager

Licensing Manager, Oyster Creek

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Jersey

bcc w/ encl:

Region I Docket Room (w/ concurrences)

Senior Operations Officer (w/o enc 1)

Director, DRS

Director, DRSS

DRP Section Chief

PT:0RP

an/jt/sm o'ne

[ I RP

ster

tr e

f

b/s/ t

0FFICIAL RECORD COPY IR OYC 85-13 - 0002.0.0

06/04/85

_J