ML20127A895

From kanterella
Jump to navigation Jump to search
Forwards IE 830629 Memo on Flexible Approach to Be Followed During Period of Inconsistent Dot/Nrc Transport Regulations
ML20127A895
Person / Time
Issue date: 07/13/1983
From: Taylor J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Hind J, Martin T, Olshinski J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20127A006 List:
References
FOIA-85-3 NUDOCS 8309150465
Download: ML20127A895 (2)


Text

M,9< [

s.,2(aMeg,'%

UNITED ST ATES

/

'!.? $;.s.g y i NUCLEAR REGULATORY COMMISSION

~v i

WASHlfJGTON, D. C. 20555 f.a.e b

' u.s July 13,1983 MEMORANDUM FOR:

Thomas T. Martin, Director Division of Engineering and Technical Programs, RI Johnh.01shinski, Director Division of Engineering and Radiological Safety Programs, RII John A. Hind, Director l

Division of Radiological and l

Materials Safety Programs, RIII Richard L. Bangart, Director Division of Vendor and Technical Programs, RIV P,oss A. Scarano, Director Division of Radiological Safety and Safeguards Programs, RV FF.0M:

James M. Taylor, Director Division of Quality Assurance, Safeguards, and Inspection Programs, IE l

l

SUBJECT:

INTERIM POSITION ON INSPECTION / ENFORCEMENT OF l

DIFFERING NRC/ DOT TRANSPORT REGULATIONS I

Encicsed for your guidance is a self-explanatory memo, concurred in by the EDO, which describes the flexible approach you should follow during this current period of incensistent DOT /NRC transport regulations.

I have also enclosed for 3our information a copy of a recent exchange of correspondence between DOT and hF.C in whicn DDT declined an NRC request to extend the effective date of its l

new regulations.

We understand that the NRC may consider the 10 CFR 71 final amendment at ae. affirmation session during the week of July 11-15.

If it is r

affirmed, publication of the final rule could be by late July with an effective date 30 days later, j

(i /

Mv"

/

wg 7

James M. Taylor, Director j

Division of Quality Assurance, Safeguards, and Inspection Programs, IE

Enclosure:

ECO Meno d:c. 6/29/83 cc w/ enclosure:

J. Cag s, N"ss

a

-d:-

w.

1,f Multipleaddresses Distribution n

.IE files

-IE reading-Oasip reading-

~

SM?B reading

. A. Greila, IE L.-Ccto, IE J. M.' Jayl or,. IE -

'J. Axeirad, ES J..Partlow, IE

.bcc:

9. Cur.ninghat,.!! MSS
5. Euchbinder, RES
. Hopkins, EES

.C. MacDenald, f MSS J. Lieberman, ELD-k o

f

  • (see previous concurrence) 3,,,

. 3M:E:IE

  • SV :IE " -

kS~ ;/ -

GRPYIh D:QASIP:IE

/'Kx,elrac

,l A3 relia L

JP5ticw J

b ' JTaylor 4

7/ /E3sc 7/g/EI s 7/.;/83 7/ -J83 7/,7/83 I

l~t s t

o.

..